CN107732740A - Preassembled transformer station - Google Patents

Preassembled transformer station Download PDF

Info

Publication number
CN107732740A
CN107732740A CN201711056491.1A CN201711056491A CN107732740A CN 107732740 A CN107732740 A CN 107732740A CN 201711056491 A CN201711056491 A CN 201711056491A CN 107732740 A CN107732740 A CN 107732740A
Authority
CN
China
Prior art keywords
hyperbaric chamber
cut
framework
transformer station
load switch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711056491.1A
Other languages
Chinese (zh)
Inventor
王升升
陈静雅
徐青亚
葛淑娜
张英杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Senyuan Electric Co Ltd
Original Assignee
Henan Senyuan Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Senyuan Electric Co Ltd filed Critical Henan Senyuan Electric Co Ltd
Priority to CN201711056491.1A priority Critical patent/CN107732740A/en
Publication of CN107732740A publication Critical patent/CN107732740A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B7/00Enclosed substations, e.g. compact substations
    • H02B7/06Distribution substations, e.g. for urban network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/01Frameworks
    • H02B1/013Profiles for cabinet frames

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Patch Boards (AREA)
  • Housings And Mounting Of Transformers (AREA)

Abstract

The present invention relates to a kind of preassembled transformer station.Preassembled transformer station includes housing and the low-pressure chamber, hyperbaric chamber and the transformer room that are arranged in housing, on-load switch is provided with the hyperbaric chamber, it is provided with the hyperbaric chamber and is connected with housing and hyperbaric chamber is isolated into the cut-off portion of cable vault and the individual compartment of on-load switch room two, the cut-off portion includes cut-off framework and shrouding, and the on-load switch is arranged on cut-off framework.Hyperbaric chamber is divided into cable vault and on-load switch room by separating part, and the switchgear that script is arranged on high-tension switch cabinet is arranged on the cut-off framework in cut-off portion.Solve the problems, such as that hyperbaric chamber floor space present in prior art is big and manufacturing cost is high.

Description

Preassembled transformer station
Technical field
The present invention relates to a kind of preassembled transformer station.
Background technology
In power system, transformer station plays a part of cut-out, connects, changes or debug voltage, is the weight of power system Want part.With the rapid development of China's power equipment, the application of preassembled transformer station is more and more extensive, its floor space It is the necessary factor that designer considers all the time with cost.Transformer station is typically by hyperbaric chamber, low-pressure chamber, transformer room's three parts group Into at present, switchgear and related component in hyperbaric chamber are generally arranged in high-tension switch cabinet, then by high-tension switch cabinet It is placed in hyperbaric chamber.Using the hyperbaric chamber of such a design method, hyperbaric chamber floor space is generally large to think high-tension switch cabinet The reserved certain installation surplus of installation.In addition, the manufacturing cost of high-tension switch cabinet is higher, high-tension switch cabinet should hyperbaric chamber With the holistic cost that can undoubtedly increase hyperbaric chamber.
The content of the invention
It is an object of the invention to provide a kind of preassembled transformer station, is taken up an area with solving hyperbaric chamber present in prior art The problem of area is greatly and manufacturing cost is high.
To achieve the above object, the technical scheme of preassembled transformer station of the invention is:
Technical scheme 1:Preassembled transformer station, including housing and the low-pressure chamber, hyperbaric chamber and the transformer room that are arranged in housing, institute State and on-load switch is provided with hyperbaric chamber, be provided with the hyperbaric chamber and be connected with housing and hyperbaric chamber is isolated into cable vault and load The cut-off portion of two, switch gear room individual compartment, the cut-off portion include cut-off framework and shrouding, the on-load switch be arranged on every On disconnected framework.
Beneficial effect:Hyperbaric chamber is divided into cable vault and on-load switch room by separating part, and script is pressed off installed in height The switchgear closed on cabinet is arranged on the cut-off framework in cut-off portion, on the one hand, high-voltage switch gear need not be reserved in hyperbaric chamber The erection space of cabinet, reduce the floor space in hyperbaric chamber;On the other hand, hyperbaric chamber need not use the expensive height of manufacturing expense Compress switch cabinet, saves the overall manufacturing cost in hyperbaric chamber.Solve hyperbaric chamber floor space present in prior art greatly and The problem of manufacturing cost is high.
Technical scheme 2:On the basis of technical scheme 1, the cut-off framework is fixed at the top of hyperbaric chamber including one end, separately One end is fixed on the column of hyperbaric chamber bottom, and the switchgear is arranged on the column.Switchgear is arranged on column, Increase the mounting stability of switchgear.
Technical scheme 3:On the basis of technical scheme 2, the cut-off framework is that π fonts separate framework, and the column is set There are two, two root posts upper end is fixedly connected with crossbeam, and the crossbeam is fixed on the top plate of hyperbaric chamber, the on-load switch installation Between two root posts, the two root posts and crossbeam form described π fonts cut-off framework.Separate framework for π fonts to separate Framework, it is good to separate the structural strength of framework, adds the overall construction intensity in hyperbaric chamber.
Technical scheme 4:On the basis of technical scheme 3, the on-load switch is arranged in the middle part of the two root posts, shrouding Closure is in on-load switch circumference side.On-load switch is arranged in the middle part of column, and shrouding closure is convenient in combination switch circumference side The installation of combination switch and the closure of shrouding.
Technical scheme 5:On the basis of technical scheme 4, the shrouding includes upper sealing plate, lower shrouding and two side seal boards, Between the column and crossbeam, the lower shrouding is blocked between the column and hyperbaric chamber bottom plate for the upper sealing plate closure, Described two side seal board closure are between column and hyperbaric chamber side plate.Cut-off framework is blocked using multiple shroudings, ensured The buffer action in cut-off portion.
Technical scheme 6:On the basis of technical scheme 1-5 any one, it is additionally provided with the hyperbaric chamber auxiliary for installing Help the inside door of component.Inside door is used for installing auxiliary element, be ensure that while without using high-tension switch cabinet in hyperbaric chamber The function of high-tension switch cabinet.
Technical scheme 7:The interior doorframe being fixedly connected with the casing is provided with the basis of technical scheme 6, in the hyperbaric chamber Frame, the inside door are arranged on interior door frame.Inside door is arranged on the mounting stability that inside door is ensure that on interior door frame.
Technical scheme 8:On the basis of technical scheme 7, the interior door frame includes mounting rail and two inside doors on inside door Column, the inside door are arranged on two interior door pillars.Inside door is arranged on two interior door pillars, facilitates the installation of inside door.
Technical scheme 9:On the basis of technical scheme 8, it is described cut-off framework be π fonts separate framework, the π fonts every Disconnected framework includes two root posts and is fixedly connected on the crossbeam of two root posts upper end, the on-load switch be arranged on two root posts it Between, the crossbeam is fixedly connected with mounting rail on inside door.Crossbeam is fixedly connected with mounting rail on inside door, makes interior door frame, cut-off Framework and housing link together, and ensure that the overall construction intensity of high-voltage board.
Technical scheme 10:On the basis of technical scheme 7 or 8 or 9, the interior door frame also include with cut-off portion, visit The middle standing pillar that mounting rail is fixed, the middle standing pillar are provided with on-load switch guidance panel.On-load switch guidance panel is set The convenient operation to on-load switch on middle standing pillar.
Brief description of the drawings
Fig. 1 is the front view of the preassembled transformer station specific embodiment one of the present invention;
Fig. 2 is the top view of internal structure in Fig. 1;
Fig. 3 is the right view of Fig. 2 mesohighs room;
Fig. 4 is the left view of Fig. 2 mesohighs room;
Fig. 5 is Fig. 1 cut-away view;
Fig. 6 is the cut-away view of the specific embodiment two of the preassembled transformer station of the present invention;
Fig. 7 is Fig. 6 top view;
In figure:1- low-pressure chambers, 2- hyperbaric chambers, 3- transformer rooms, the right shroudings of 4-, 5- crossbeams, 6- upper sealing plates, 7- high voltage loads are opened Pass-fuse combined electric apparatus, the left shroudings of 8-, 9- front columns, 10- rear columns, shrouding under 11-, 12- inside door right columns, 13- instrument Case installation door, mounting rail on 14- inside doors, 15- instrument doors, 16- inside door left columns, 17- maintenance doors, 18- user's door, among 19- Column, 20- on-load switch guidance panels, 21- cable vaults, 22- on-load switches room, 23- cut-offs portion, 25- instrument boxs, 100- low pressure Room, 200- hyperbaric chambers, 300- transformer rooms.
Embodiment
Embodiments of the present invention are described further below in conjunction with the accompanying drawings.
The specific embodiment one of the preassembled transformer station of the present invention, as shown in Figures 1 to 5, preassembled transformer station includes shell Body and low-pressure chamber 1, hyperbaric chamber 2 and the transformer room 3 being arranged in housing, to make the more compact structure of transformer station, the present embodiment In transformer station in low-pressure chamber 1, hyperbaric chamber 2 and transformer room 3 use isosceles triangle arrangement as shown in Figure 2.Hyperbaric chamber 2 Interior to be provided with on-load switch, the on-load switch in the present embodiment is high voltage load switch-fuse combined electric apparatus 7.Set in hyperbaric chamber 2 Have a cut-off portion 23 being connected with housing, cut-off portion 23 by hyperbaric chamber be isolated into cable vault 21 and the independence of on-load switch room 22 two every Room.For convenience of the installation of switchgear, ensure mounting stability of the switchgear in hyperbaric chamber 2, cut-off portion 23 includes being used for The cut-off framework of installation switchgear and the shrouding for closure on cut-off framework, high voltage load switch-fuse combination electricity Device 7 is arranged on cut-off framework.The design in hyperbaric chamber 2 need not reserve the erection space of high-tension switch cabinet in hyperbaric chamber, subtract The small floor space in hyperbaric chamber.In addition, hyperbaric chamber need not use the expensive high-tension switch cabinet of manufacturing expense, high pressure is saved The overall manufacturing cost of room.Solve the problems, such as that hyperbaric chamber floor space present in prior art is big and manufacturing cost is high.
To ensure that cut-off framework has a preferable structural strength, the cut-off framework in the present embodiment is by front column 9, rear vertical The π fonts cut-off framework that post 10 and crossbeam 5 form.High voltage load switch-fuse combined electric apparatus 7 is arranged on front column 9 with after Between the column 10 and middle part in two root posts, it ensure that the installation of high voltage load switch-fuse combined electric apparatus 7 is stable Property.In other embodiments, separate framework can be by the H-shaped that two root posts and the crossbeam being connected between two root posts form every Disconnected framework, now, on-load switch are arranged on two between the two root posts of H-shaped cut-off framework or installed in H-shaped cut-off framework Root post can also be that other facilitate on-load switch to install and ensure cut-off framework overall construction intensity with crossbeam, separating framework The cut-off framework of other structures.It should be noted that to ensure the overall construction intensity in hyperbaric chamber 2, crossbeam 5 is connected to hyperbaric chamber On 2 top plate, front column 9, one end of rear column 10 are fixed on crossbeam 5, and the other end is fixed on the bottom of hyperbaric chamber 2.To ensure The isolation effect in cut-off portion 23, there is shrouding in the circumferential side closure of high voltage load switch-fuse combined electric apparatus 7.Such as Fig. 3 institutes Show, shrouding includes upper sealing plate 6, lower shrouding 11, left shrouding 8 and right shrouding 4.Upper sealing plate 6 is blocked in crossbeam 5, front column 9, stood afterwards Between post 10 and high voltage load switch-fuse combined electric apparatus 7;Lower shrouding 11 blocks to be born in front column 9, rear column 10, high pressure Between lotus switch-fuse combined electric apparatus 7 and the bottom plate in hyperbaric chamber 2;Left shrouding 8 is blocked in front column 9, crossbeam 5, hyperbaric chamber 2 Bottom plate and side plate between;Right shrouding 4 block rear column 10, crossbeam 5, hyperbaric chamber 2 bottom plate and side plate between.Using cut-off Framework and closing plate structure replace former high-tension switch cabinet, make the compact-sized, firm of hyperbaric chamber 2, significantly reduce hyperbaric chamber 2 Manufacturing cost and the floor space of transformer station.In addition, different high-voltage switch gears can be installed to possess different height on cut-off framework Pressure chamber switch solution, this arrangement in hyperbaric chamber can be widely used for the individual compartments such as European-type box change, magnificent formula case change, switchyard Controlling switch controls class formation, and versatility is good and easily promotes.
To ensure that hyperbaric chamber 2 has the function of high-tension switch cabinet, it is provided with hyperbaric chamber 2 and is used to auxiliary element be installed Inside door.Inside door in the present embodiment includes being used for the user's door 18 entered for user, for the maintenance door 17 of operation maintenance, for auxiliary The instrument door 15 of component installation and 13 4 inside doors of instrument box installation door installed for instrument box 25, in other embodiments may be used As needed with the easy to operate inside door for setting one, two, three or more than four, each function of inside door also can be as needed Set.Multiple functional, proper, the connection and reasonable arrangement of function division of inside door, achievable operation high efficiency, facilitation.For convenience of inside door Installation, ensure the stability of inside door installation, the interior door frame being fixedly connected with the casing be provided with the hyperbaric chamber 2.This implementation Interior door frame in example includes mounting rail 14, inside door left column 16, inside door right column 12 and middle standing pillar 19 on inside door, and centre is vertical Post 19 and cut-off portion 23 and on-site install beam 14 and be fixedly connected.To ensure the overall construction intensity in hyperbaric chamber 2, mounting rail on inside door 14 are fixedly connected with the crossbeam 5 of π fonts cut-off framework.As shown in figure 1, maintenance door 17 and instrument box installation door in the present embodiment 13 are arranged on inside door right column 12, and user's door 18 and instrument door 15 are arranged on inside door left column 16, to save high-voltage board 2 Volume, instrument box 25 are arranged on the inner side of instrument box installation door 13.As shown in figure 5, for convenience of to high voltage load switch-fuse The control operation of combined electrical apparatus 7, on-load switch guidance panel 20 is being provided with middle standing pillar 19 in the present embodiment.Hyperbaric chamber 2 The division of four inside door functions it is strict, complete, easy to operation, interior door frame structure is stable in addition, functional, coordinates load to open The institute that the electrical equipment such as pass can substitute original high-tension switch cabinet completely is functional.
The specific embodiment two of the preassembled transformer station of the present invention, the specific embodiment with the preassembled transformer station of the present invention One compares, and differs only in:As shown in Figure 6 to 7, the low-pressure chamber 100 in the present embodiment, hyperbaric chamber 200 and transformer room 300 Arrangement be mesh font.

Claims (10)

1. preassembled transformer station, including housing and the low-pressure chamber, hyperbaric chamber and the transformer room that are arranged in housing, the hyperbaric chamber It is interior to be provided with on-load switch, it is characterized in that, it is provided with the hyperbaric chamber and is connected with housing and hyperbaric chamber is isolated into cable vault and born The cut-off portion of two, lotus switch gear room individual compartment, the cut-off portion includes cut-off framework and shrouding, the on-load switch are arranged on Separate on framework.
2. preassembled transformer station according to claim 1, it is characterized in that, the cut-off framework is fixed on high pressure including one end Ceiling portion, the other end are fixed on the column of hyperbaric chamber bottom, and the switchgear is arranged on the column.
3. preassembled transformer station according to claim 2, it is characterized in that, the cut-off framework is that π fonts separate framework, institute Column is stated provided with two, two root posts upper end is fixedly connected with crossbeam, and the crossbeam is fixed on the top plate of hyperbaric chamber, the load Switch is arranged between two root posts, and the two root posts and crossbeam form described π fonts cut-off framework.
4. preassembled transformer station according to claim 3, it is characterized in that, the on-load switch is arranged on the two root posts Middle part, shrouding are blocked in on-load switch circumference side.
5. preassembled transformer station according to claim 4, it is characterized in that, the shrouding includes upper sealing plate, lower shrouding and two Individual side seal board, the upper sealing plate closure is between the column and crossbeam, and the lower shrouding closure is in the column and hyperbaric chamber Between bottom plate, described two side seal board closure are between column and hyperbaric chamber side plate.
6. according to the preassembled transformer station described in claim 1-5 any one, it is characterized in that, it is additionally provided with use in the hyperbaric chamber In the inside door of installation auxiliary element.
7. preassembled transformer station according to claim 6, it is characterized in that, it is provided with and is fixedly connected with the casing in the hyperbaric chamber Interior door frame, the inside door is arranged on interior door frame.
8. preassembled transformer station according to claim 7, it is characterized in that, the interior door frame include on inside door mounting rail and Two interior door pillars, the inside door are arranged on two interior door pillars.
9. preassembled transformer station according to claim 8, it is characterized in that, the cut-off framework is that π fonts separate framework, institute Stating π fonts cut-off framework includes two root posts and is fixedly connected on the crossbeam of two root posts upper end, and the on-load switch is arranged on Between two root posts, the crossbeam is fixedly connected with mounting rail on inside door.
10. according to the preassembled transformer station described in claim 7 or 8 or 9, it is characterized in that, the interior door frame also include with every Disconnected portion, the middle standing pillar for on-siteing install beam fixation, the middle standing pillar are provided with on-load switch guidance panel.
CN201711056491.1A 2017-11-01 2017-11-01 Preassembled transformer station Pending CN107732740A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711056491.1A CN107732740A (en) 2017-11-01 2017-11-01 Preassembled transformer station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711056491.1A CN107732740A (en) 2017-11-01 2017-11-01 Preassembled transformer station

Publications (1)

Publication Number Publication Date
CN107732740A true CN107732740A (en) 2018-02-23

Family

ID=61221165

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711056491.1A Pending CN107732740A (en) 2017-11-01 2017-11-01 Preassembled transformer station

Country Status (1)

Country Link
CN (1) CN107732740A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101640386A (en) * 2009-05-26 2010-02-03 苏州爱知电机有限公司 Box-type transformer substation
CN201860046U (en) * 2010-07-23 2011-06-08 江苏银佳企业集团有限公司 Transforming plant box body
CN202633798U (en) * 2012-05-31 2012-12-26 宁波奥克斯高科技有限公司 Pre-installation type converting station
CN103208754A (en) * 2013-03-17 2013-07-17 安徽皖翔电力设备有限公司 New type combined transformer
CN203796294U (en) * 2014-02-26 2014-08-27 山东科技大学 Mining Pi-shaped reinforcing steel bar ladder
CN105489357A (en) * 2016-01-21 2016-04-13 南通市海王电气有限公司 Combined transformer
CN206076774U (en) * 2016-08-24 2017-04-05 江苏大全箱变科技有限公司 A kind of compact 35kV photovoltaic generations are become with boosting case
CN207611997U (en) * 2017-11-01 2018-07-13 河南森源电气股份有限公司 A kind of preassembled transformer station

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101640386A (en) * 2009-05-26 2010-02-03 苏州爱知电机有限公司 Box-type transformer substation
CN201860046U (en) * 2010-07-23 2011-06-08 江苏银佳企业集团有限公司 Transforming plant box body
CN202633798U (en) * 2012-05-31 2012-12-26 宁波奥克斯高科技有限公司 Pre-installation type converting station
CN103208754A (en) * 2013-03-17 2013-07-17 安徽皖翔电力设备有限公司 New type combined transformer
CN203796294U (en) * 2014-02-26 2014-08-27 山东科技大学 Mining Pi-shaped reinforcing steel bar ladder
CN105489357A (en) * 2016-01-21 2016-04-13 南通市海王电气有限公司 Combined transformer
CN206076774U (en) * 2016-08-24 2017-04-05 江苏大全箱变科技有限公司 A kind of compact 35kV photovoltaic generations are become with boosting case
CN207611997U (en) * 2017-11-01 2018-07-13 河南森源电气股份有限公司 A kind of preassembled transformer station

Similar Documents

Publication Publication Date Title
CN101662132B (en) 110kV/220kV voltage level composite apparatus and application thereof
CN206313344U (en) A kind of cities and towns miniaturization preassembled transformer station
CN105375376B (en) Prefabricated substation switch cabinet
CN202026018U (en) Handcart interlocking centrally-installed switch cabinet
CN106532534A (en) Miniaturized preassembled substation for towns
WO2021135260A1 (en) High-voltage device box
CN207611997U (en) A kind of preassembled transformer station
CN107732740A (en) Preassembled transformer station
KR101266963B1 (en) Distributing board
CN203415822U (en) Secondary equipment screen cabinet and secondary equipment prefabricated cabin employing same
CN101662129B (en) High voltage switch cabinet
CN104979773B (en) A kind of landing pot type fully closed combined electric unit of 252kV
CN202094513U (en) Overhead transformer substation
CN205724612U (en) A kind of high-pressure aerated switch cubicle of all insulation modularity
CN202586129U (en) 110kV combination electric appliance GIS applied to integrated, prefabricated and box type substation
CN203301038U (en) Box type fixed ring network high-voltage switchgear
CN207124385U (en) A kind of new compact assembling structure type low-voltage cabinet
CN206225804U (en) box-type substation
CN204905745U (en) 252kV falls to ground totally closed combined electrical apparatus of pot -type
CN201518389U (en) High-voltage switch cabinet
CN201504036U (en) High-voltage power supplying and metering box type transformer substation
CN203415889U (en) Double-handcart cabinet with voltage transformer handcart and arrester handcart
CN204290140U (en) With thus sentence the armored withdraw type metal enclosed switch cabinet of device
CN217158950U (en) High tension switchgear with convenient ground structure
KR20040028892A (en) A package panel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination