CN107730158A - Power network project intelligent evaluation method and system - Google Patents

Power network project intelligent evaluation method and system Download PDF

Info

Publication number
CN107730158A
CN107730158A CN201711224844.4A CN201711224844A CN107730158A CN 107730158 A CN107730158 A CN 107730158A CN 201711224844 A CN201711224844 A CN 201711224844A CN 107730158 A CN107730158 A CN 107730158A
Authority
CN
China
Prior art keywords
evaluation
user
business element
evaluation model
score
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711224844.4A
Other languages
Chinese (zh)
Inventor
龚贺
池少宁
陈俊山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Information and Telecommunication Co Ltd
Fujian Yirong Information Technology Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Information and Telecommunication Co Ltd
Fujian Yirong Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Information and Telecommunication Co Ltd, Fujian Yirong Information Technology Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201711224844.4A priority Critical patent/CN107730158A/en
Publication of CN107730158A publication Critical patent/CN107730158A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • General Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

Power network project budget intelligent evaluation method and system, wherein method comprises the following steps, business element is received, the business element includes scale of input, fund configuration, budget completion rate, investment plan completion rate, planned budget adjustment number, power transformation capacity, line length, cable length, economic benefit, safe mass or satisfaction;User's evaluation model information is received, user's evaluation model includes Rationality Assessment result, the target property reached result, and Automatic Evaluation Model is obtained as output training deep learning algorithm using business element as input, user's evaluation model;Project score is calculated according to business element and user's evaluation model, project appraisal result is obtained, improves the operating efficiency and mass content of evaluation, improve automation and the intelligent Application of evaluation.

Description

Power network project intelligent evaluation method and system
Technical field
The present invention relates to the office automatic field of power network project appraisal, more particularly to a kind of new power network project intelligence Change reviewing method and system.
Background technology
Project budget performance review substantially uses manual examination and verification mode at present, extracts the key index of feasibility study content, people Work carries out economic feasibility study, the examination & verification of financial compliance, lacks automation examination & verification processing, and examination amount is very big, the cycle is longer, It is inefficient.Some projects use the method for fixed model+manual intervention under line to carry out, and evaluation model is relatively fixed, not clever enough Living, autgmentability is not strong, and history evaluation data are failed to make full use of, the work such as lack of wisdomization application.
This invention mainly solve examination amount is big, inefficient, evaluation model is single, evaluation lack automation and intelligence The problems such as changing.Electronic document is converted to by text-only file by OCR technique, using natural language and machine learning techniques, Text feature information is extracted from various dimensions, natural text is converted to the data that can be analyzed, easily analyze.Combining assessment knowledge base, Automatic Evaluation, output result and classification storage are carried out according to project performance evaluation model, using association study, cluster calculation, god Depth self study is carried out through network scheduling algorithm, constantly corrects evaluating, improves evaluation knowledge base.Introduce regulation engine simultaneously And artificial intelligence technology, the operating efficiency and mass content of evaluation are substantially increased, improves the automation and intellectuality of evaluation Using.
The content of the invention
For this reason, it may be necessary to provide a kind of new power network project intelligent evaluation method, solves existing power network project scoring examination & verification There is no the problem of Automated check function.
To achieve the above object, a kind of power network project budget intelligent evaluation method, including following step are inventor provided Suddenly, receive business element, the business element include scale of input, fund configuration, budget completion rate, investment plan completion rate, Planned budget adjustment number, power transformation capacity, line length, cable length, economic benefit, safe mass or satisfaction;
User's evaluation model information is received, user's evaluation model includes Rationality Assessment result, the target property reached knot Fruit, Automatic Evaluation Model is obtained as output training deep learning algorithm using business element as input, user's evaluation model;
Project score is calculated according to business element and user's evaluation model, obtains project appraisal result.
Specifically, the Rationality Assessment result includes input score, process score, output score and effect score;Institute Stating the target property reached result includes target weight, deviation ratio, target grading.
Further, in addition to step, Integrity Assessment is carried out according to the index of business element, and evaluation result is classified Collect.
A kind of power network project budget intelligent evaluation system, including following module, business element module, user evaluate mould Block, training module, computing module;
The business element module is used to receive business element, and the business element includes scale of input, fund configures, pre- Calculate completion rate, investment plan completion rate, planned budget adjustment number, power transformation capacity, line length, cable length, economic benefit, Safe mass or satisfaction;
User's evaluation module is used to receive user's evaluation model information, and user's evaluation model is commented including reasonability Valency result, the target property reached result,
The training module trains deep learning model using business element as input, user's evaluation model as output, Obtain Automatic Evaluation Model;
The computing module is used to calculate project score according to business element and user's evaluation model, obtains project appraisal knot Fruit.
Specifically, the Rationality Assessment result includes input score, process score, output score and effect score;Institute Stating the target property reached result includes target weight, deviation ratio, target grading.
Further, in addition to integrity module, the integrity module are used to carried out according to the index of business element The evaluation of whole property, and by evaluation result Classifying Sum.
By above-mentioned design, this programme can be on the premise of incoming traffic element be limited, and business element is converted to can Calculate, the parameter easily analyzed, improve project appraisal intelligence degree.
Brief description of the drawings
Fig. 1 is the power network project intelligent evaluation method flow diagram described in the specific embodiment of the invention;
Fig. 2 is the power network project intelligent evaluation system module figure described in the specific embodiment of the invention.
Description of reference numerals
200th, business element module
202nd, user's evaluation module
204th, training module
206th, computing module;
208th, integrity module.
Embodiment
To describe the technology contents of technical scheme, construction feature, the objects and the effects in detail, below in conjunction with specific reality Apply example and coordinate accompanying drawing to be explained in detail.
Referring to Fig. 1, a kind of power network project budget intelligent evaluation method, comprises the following steps, S100 receives business member Element, the business element include scale of input, fund configuration, the adjustment time of budget completion rate, investment plan completion rate, planned budget Number, power transformation capacity, line length, cable length, economic benefit, safe mass or satisfaction;Above-mentioned parameter is generally numeral, Receive one kind in above-mentioned business element or it is several after store, wait subsequent treatment.
S102 receives user's evaluation model information, and user's evaluation model includes Rationality Assessment result, target is reached Property result, specifically, the Rationality Assessment result includes input score, process score, output score and effect score;It is described The target property reached result includes target weight, deviation ratio, target grading.Also carry out step S104 using business element as input, User's evaluation model obtains Automatic Evaluation Model as output training deep learning algorithm;Automatic Evaluation Model after training exists When inputting new business element item collection, evaluation model, newly-generated automatic Evaluation can be generated automatically according to business element Model can automatically generate Rationality Assessment result, the target property reached result by the input of business element, reach automatically to industry Business element input carries out the effect of preliminary treatment.
Also carry out step S106 and project score is calculated according to business element and user's evaluation model or Automatic Evaluation Model, obtain To project appraisal result.The calculating of review result can be according to business element item input value, input score, process score, output Score, effect score, target weight, deviation ratio and the numerical computations of target grading draw, by the above method, solve power network It can not be inputted in project intellectuality according to business element and automatically generate evaluation model, evaluation knot is automatically generated further according to evaluation model The problem of fruit.
In some further embodiments, in addition to step, Integrity Assessment is carried out according to the index of business element, and By evaluation result Classifying Sum.In the particular embodiment, score can also be calculated automatically according to according to indices coefficient, and Evaluation result is conversed automatically according to metrics evaluation collection (V1 is complete, V2 is substantially complete, V3 is imperfect, V4 is very imperfect), and Classifying Sum.The intelligentized effect of raising power network project is preferably reached by such scheme.
In the embodiment shown in Figure 2, a kind of power network project intelligent evaluation system, including following module, business are introduced Element module 200, user's evaluation module 202, training module 204, computing module 206;
The business element module is used to receive business element, and the business element includes scale of input, fund configures, pre- Calculate completion rate, investment plan completion rate, planned budget adjustment number, power transformation capacity, line length, cable length, economic benefit, Safe mass or satisfaction;
User's evaluation module is used to receive user's evaluation model information, and user's evaluation model is commented including reasonability Valency result, the target property reached result,
The training module trains deep learning model using business element as input, user's evaluation model as output, Obtain Automatic Evaluation Model;
The computing module is used to calculate project score according to business element and user's evaluation model, obtains project appraisal knot Fruit.
In specific embodiment, the Rationality Assessment result includes input score, process score, output score and effect Score;The target property the reached result includes target weight, deviation ratio, target grading.Set by said system, solve electricity It can not be inputted in net project intellectuality according to business element and automatically generate evaluation model, evaluation is automatically generated further according to evaluation model As a result the problem of.
In the further embodiment shown in Fig. 2, in addition to integrity module 208, the integrity module are used for root Integrity Assessment is carried out according to the index of business element, and by evaluation result Classifying Sum.Set by above-mentioned module, preferably reached The intelligentized effect of raising power network project is arrived.
The intellectualizing system of the present invention program also includes following functions:
(1) material electronicsizationes processing is evaluated, according to<Input, process, output, effect>Etc. the electricity that dimension carries out evaluation material Sonization file process, electronic disposal is carried out to evaluation material using high photographing instrument, scanner etc., according to business rule template definition It is automatic to extract business element.
(2) evaluation model management function, the principle evaluated according to target Rationality Assessment and the target property reached are evaluated The Template Manager of model.Target reasonability is carried out according to SMART principles, and target examining content is using standard x ML configurations, using commenting Point system is examined.The target property reached is set according to weight and single target is reached marking mode and carried out, and weight and reaches scoring Standard is configured using standard x ML, is examined using graduation.
(3) automatic Evaluation is handled, according to evaluation element (scale of input, fund configuration, the budget completion of standard x ML configurations Rate, investment plan completion rate, planned budget adjustment number, power transformation capacity, line length, cable length, economic benefit, safe matter Amount, satisfaction etc.), according to target Rationality Assessment (input, process, output and effect) and the target property reached (target weight, partially Rate, score grading) dimension evaluated.Using multithreading and rule engine technique, evaluation element is automatically processed, from Whether dynamic generation project objective examination result (finds to include other list-items, whether finds partition project verification, whether finds project Capital expenditures and cost-effectivenes pay that division is inaccurate, whether finds to tear open that past heritage money quantity and processing scheme are unreasonable, whether send out Existing engineering other fees expenditure is unreasonable), score is calculated automatically according to indices coefficient, and (V1 is complete according to metrics evaluation collection Whole, V2 is substantially complete, V3 is imperfect, V4 is very imperfect) evaluation result, and Classifying Sum are conversed automatically.
(4) knowledge base management is evaluated, classification storage is carried out to evaluation result, classification pipe is carried out according to 16 class special project types Reason, it is managed according to dimensions such as item types, item attribute, evaluation element, evaluation index, evaluation coefficient, evaluation results.Comment Valency knowledge base is that the power network project budget evaluates a kind of new method, by constantly learning, accumulates project appraisal empirical value.Using Deeplearning4j frameworks, the evaluation attributes of same project type are compared using clustering algorithm, constantly excavated New evaluation element and index.Learnt by correlation rule, the associated data of assay element and index, improve evaluation rule Then.Decision tree is generated using neural network algorithm, deep learning, constantly improve evaluation element and evaluation are carried out to evaluation knowledge base Index, complete evaluation knowledge base self-teaching process.
It should be noted that although the various embodiments described above have been described herein, but not thereby limit The scope of patent protection of the present invention.Therefore, based on the present invention innovative idea, to embodiment described herein carry out change and repair Change, or the equivalent structure or equivalent flow conversion made using description of the invention and accompanying drawing content, directly or indirectly will be with Upper technical scheme is used in other related technical areas, is included within the scope of patent protection of the present invention.

Claims (6)

  1. A kind of 1. power network project intelligent evaluation method, it is characterised in that comprise the following steps, receive business element, the industry Business element includes scale of input, fund configuration, budget completion rate, investment plan completion rate, planned budget adjustment number, change electric capacity Amount, line length, cable length, economic benefit, safe mass or satisfaction;
    User's evaluation model information is received, user's evaluation model includes Rationality Assessment result, the target property reached result, will Business element obtains Automatic Evaluation Model as input, user's evaluation model as output training deep learning algorithm;
    Project score is calculated according to business element and user's evaluation model, obtains project appraisal result.
  2. 2. power network project according to claim 1 can change reviewing method, it is characterised in that the Rationality Assessment result bag Include input score, process score, output score and effect score;The target property the reached result include target weight, deviation ratio, Target is graded.
  3. 3. power network project intelligent evaluation method according to claim 1, it is characterised in that also including step, according to industry The index of element of being engaged in carries out Integrity Assessment, and by evaluation result Classifying Sum.
  4. 4. a kind of power network project intelligent evaluation system, it is characterised in that including following module, business element module, Yong Huping Valency module, training module, computing module;
    The business element module is used to receive business element, and the business element includes scale of input, fund configures, budget is complete Into rate, investment plan completion rate, planned budget adjustment number, power transformation capacity, line length, cable length, economic benefit, safety Quality or satisfaction;
    User's evaluation module is used to receive user's evaluation model information, and user's evaluation model includes Rationality Assessment knot Fruit, the target property reached result,
    The training module obtains business element as input, user's evaluation model as output training deep learning model Automatic Evaluation Model;
    The computing module is used to calculate project score according to business element and user's evaluation model, obtains project appraisal result.
  5. 5. power network project intelligent evaluation system according to claim 4, it is characterised in that the Rationality Assessment result Including input score, process score, output score and effect score;The target property the reached result includes target weight, deviation Rate, target grading.
  6. 6. power network project intelligent evaluation system according to claim 4, it is characterised in that also including integrity module, The integrity module is used to carry out Integrity Assessment according to the index of business element, and by evaluation result Classifying Sum.
CN201711224844.4A 2017-11-29 2017-11-29 Power network project intelligent evaluation method and system Pending CN107730158A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711224844.4A CN107730158A (en) 2017-11-29 2017-11-29 Power network project intelligent evaluation method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711224844.4A CN107730158A (en) 2017-11-29 2017-11-29 Power network project intelligent evaluation method and system

Publications (1)

Publication Number Publication Date
CN107730158A true CN107730158A (en) 2018-02-23

Family

ID=61218792

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711224844.4A Pending CN107730158A (en) 2017-11-29 2017-11-29 Power network project intelligent evaluation method and system

Country Status (1)

Country Link
CN (1) CN107730158A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108171487A (en) * 2018-03-27 2018-06-15 国家电网公司 A kind of project of transmitting and converting electricity design review system
CN109345133A (en) * 2018-10-17 2019-02-15 大国创新智能科技(东莞)有限公司 Reviewing method and robot system based on big data and deep learning
CN109800420A (en) * 2018-12-19 2019-05-24 福建亿榕信息技术有限公司 A kind of feasibility study review report automatic generation method and storage medium
CN110427675A (en) * 2019-07-23 2019-11-08 江西博微新技术有限公司 A kind of data detection method for three dimensional design evaluation
CN114926012A (en) * 2022-05-16 2022-08-19 广东省技术经济研究发展中心 Intelligent acceptance and review method and system for research and development project and readable storage medium

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108171487A (en) * 2018-03-27 2018-06-15 国家电网公司 A kind of project of transmitting and converting electricity design review system
CN109345133A (en) * 2018-10-17 2019-02-15 大国创新智能科技(东莞)有限公司 Reviewing method and robot system based on big data and deep learning
CN109800420A (en) * 2018-12-19 2019-05-24 福建亿榕信息技术有限公司 A kind of feasibility study review report automatic generation method and storage medium
CN110427675A (en) * 2019-07-23 2019-11-08 江西博微新技术有限公司 A kind of data detection method for three dimensional design evaluation
CN110427675B (en) * 2019-07-23 2023-01-03 江西博微新技术有限公司 Data detection method for three-dimensional design review
CN114926012A (en) * 2022-05-16 2022-08-19 广东省技术经济研究发展中心 Intelligent acceptance and review method and system for research and development project and readable storage medium

Similar Documents

Publication Publication Date Title
CN107730158A (en) Power network project intelligent evaluation method and system
CN113642088B (en) Method for feeding back construction progress information and displaying deviation of BIM (building information modeling) model in real time
CN112383052B (en) Power grid fault repairing method and device based on power internet of things
CN109033497B (en) High-concurrency-oriented multi-stage data mining algorithm intelligent selection method
CN107861942A (en) A kind of electric power based on deep learning is doubtful to complain work order recognition methods
CN108154430A (en) A kind of credit scoring construction method based on machine learning and big data technology
CN106483947A (en) Distribution Running State assessment based on big data and method for early warning
CN108229828A (en) A kind of analysis system based on industrial data
CN107368918A (en) Data processing method and device
CN105931116A (en) Automated credit scoring system and method based on depth learning mechanism
CN101826090A (en) WEB public opinion trend forecasting method based on optimal model
CN103092975A (en) Detection and filter method of network community garbage information based on topic consensus coverage rate
CN108985542A (en) A kind of evaluation on S&amp;T projects method and system
CN105574544A (en) Data processing method and device
CN110147389A (en) Account number treating method and apparatus, storage medium and electronic device
CN108446885A (en) A kind of automatic collecting method of review comment
CN112785427B (en) Enterprise credit analysis system based on power data
CN108228788A (en) Guide of action automatically extracts and associated method and electronic equipment
CN114202243A (en) Engineering project management risk early warning method and system based on random forest
CN109299753A (en) A kind of integrated learning approach and system for Law Text information excavating
CN112347254A (en) News text classification method and device, computer equipment and storage medium
CN116775879A (en) Fine tuning training method of large language model, contract risk review method and system
CN115794803A (en) Engineering audit problem monitoring method and system based on big data AI technology
CN107798137B (en) A kind of multi-source heterogeneous data fusion architecture system based on additive models
CN115438190B (en) Power distribution network fault auxiliary decision knowledge extraction method and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180223