CN107729550A - Underground building object depth degree sectional drawing method for visualizing - Google Patents
Underground building object depth degree sectional drawing method for visualizing Download PDFInfo
- Publication number
- CN107729550A CN107729550A CN201711062939.0A CN201711062939A CN107729550A CN 107729550 A CN107729550 A CN 107729550A CN 201711062939 A CN201711062939 A CN 201711062939A CN 107729550 A CN107729550 A CN 107729550A
- Authority
- CN
- China
- Prior art keywords
- floor
- depth
- underground building
- underground
- building thing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 13
- 238000010276 construction Methods 0.000 claims abstract description 26
- 238000012800 visualization Methods 0.000 claims abstract description 10
- 230000001186 cumulative effect Effects 0.000 claims description 6
- 238000010586 diagram Methods 0.000 claims description 6
- 238000011835 investigation Methods 0.000 claims description 3
- 238000009430 construction management Methods 0.000 abstract 1
- 230000001105 regulatory effect Effects 0.000 abstract 1
- 238000005516 engineering process Methods 0.000 description 4
- 238000007726 management method Methods 0.000 description 3
- 238000004458 analytical method Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/29—Geographical information databases
Abstract
The invention discloses a kind of underground building object depth degree section drawing generating method, belongs to geospatial information field, and the present invention carries out underground building thing floor Depth Information Acquistion first;Then construction of structures each floor depth in underground is demarcated;Finally carry out the visualization of underground building object depth degree sectional drawing.The present invention is in existing underground space data basis, the demand browsed when browsing underground building thing data according to user for different depth underground building thing floor, realize by depth or depth intervals generation underground building thing floor plan, regulatory authorities are aided in provide support according to the corresponding underground building thing of Exploitation Depth searching and managing for urban underground space planning construction management.
Description
Technical field
The invention belongs to each layer depth sectional drawing visualization display of geospatial information field, particularly underground building thing
Method.
Background technology
GIS-Geographic Information System is a kind of specific highly important space information system.It is in computer hardware and software system
Under system is supported, the relevant geographic distribution data in earth top layer space all or in part is acquired, stored, is managed, computing, point
The technological system analyse, being shown and described.
Sectional drawing, after referring to that imagination splits object with cutting, only draw the orthographic projection of the cutting plane and object contact portion
The figure of gained.For in Process of Engineering Construction, currently used is cross-sectional view and skiagraph, and wherein cross-sectional view refers to
Perpendicular to the cutaway perspective form of engineering construction centerline direction, and skiagraph is then the profile of engineering construction centerline direction
Form, both figures are the spatial relations for reflecting each several part in engineering construction by way of abstract, are engineering constructions
Conventional avatars mode.
Underground space depth information is mainly used in representing depth water of the present utilization of the underground space below earth's surface
It is flat, according to the difference of the local geological conditions in underground space development city, and the difference of the type of the underground space of exploitation, meeting
The underground space construction of structures of different levels depth is produced on vertical;Due to the buried underground of the exploitation of the underground space, unlike
Table construction project is the same intuitively to be understood, therefore how by effective method for visualizing, intuitively understands different depth
The position relationship of underground space development construction, plane construction situation, turn into present technology urgent problem.
The content of the invention
In view of the above-mentioned deficiency of prior art, the technical problems to be solved by the invention are to provide a kind of underground building
Object depth degree sectional drawing method for visualizing.
To achieve the above object, the invention provides a kind of underground building object depth degree sectional drawing method for visualizing, by with
Lower step is carried out:
Step 1: underground building thing floor Depth Information Acquistion;
Step 2: each floor depth demarcation of underground building thing;
Step 3: underground building object depth degree sectional drawing visualizes.
Preferably, the underground building thing floor Depth Information Acquistion described in step 1, including obtain underground building
Each floor floor height information of thing and cumulative each high layer by layer;
Each floor floor height information of underground building thing is obtained, is the top bottom mark using each floor in underground space generaI investigation
What height was calculated, when underground building number of floor levels is 1, floor height=floor top mark height-floor bottom absolute altitude of the floor;Ground
When lower construction of structures is more than 1, bottom floor height=bottom top mark height-bottom bottom absolute altitude, other respectively high layer by layer=layer tops
The top mark height of absolute altitude-next layer;
It is cumulative each high layer by layer, it is by each floor floor height information of the underground building thing of acquisition, passes through the current floor that adds up
With the floor height information of more than floor each layer, the depth information of each floor of underground building thing is obtained.
Preferably, each floor depth demarcation of underground building thing described in step 2 is carried out according to the following steps:
Construction of structures data basis under A1, base area, obtains the planogram data of its each floor, and stores each floor level
Figure and construction unit, management unit, parking stall number, the attribute information of construction area;
A2, increase its depth attribute field in the database for storing each floor level diagram data, while according to step 1
Each floor depth information of underground building thing of acquisition, the attribute calibration of its corresponding depth is carried out to corresponding floor plan;
Preferably, the visualization of the degree of underground building object depth described in step 3 sectional drawing is carried out according to the following steps:
B1, according to the calibrated database achievement of each floor depth of underground building thing in step 2, in underground building
When object depth degree sectional drawing visualizes, spatial dimension selected first, the relation of construction of structures and selected scope is shown under base area
Those underground building things in the range of, the relation includes underground building thing in selected scope, or underground building
Thing intersects with selected scope;
B2, some depth value or a depth bounds are set, by by the numerical value or number range and database
The depth attribute value of underground building object plane figure is matched, and obtains the floor set for meeting depth value condition;
B3, the plane coordinates information according to each building angle point in each planogram data of floor set, will be each with geometrical line
Angle point draws connection, forms the designated floor plan of the underground building thing of a certain depth bounds of closure.
The beneficial effects of the invention are as follows:For different depths when the present invention can browse underground building thing data according to user
The demand that degree underground building thing floor browses, realizes and carries out underground building thing floor plan by depth or depth intervals
Visualization, analytically descend spatial depth information, the planning management and application of the auxiliary relevant departments progress underground space.
Brief description of the drawings
Fig. 1 is the schematic flow sheet of the specific embodiment of the invention.
Fig. 2 is that each layer depth of underground building thing calculates signal.
Fig. 3 is the related underground space present situation index schematic diagram adaptively counted.
Fig. 4 is underground building object depth degree section effect of visualization figure in certain limit.
Embodiment
The invention will be further described with reference to the accompanying drawings and examples:
As shown in figure 1, to achieve the above object, the invention provides a kind of visualization of underground building object depth degree sectional drawing
Method, carry out according to the following steps:
Step 1: underground building thing floor Depth Information Acquistion;
Step 2: each floor depth demarcation of underground building thing;
Step 3: underground building object depth degree sectional drawing visualizes.
Underground building thing floor Depth Information Acquistion described in step 1, including obtain underground building Wu Ge buildings
High information and cumulative each high layer by layer layer by layer;
Each floor floor height information of underground building thing is obtained, is the top bottom mark using each floor in underground space generaI investigation
What height was calculated, when underground building number of floor levels is 1, floor height=floor top mark height-floor bottom absolute altitude of the floor;Ground
When lower construction of structures is more than 1, bottom floor height=bottom top mark height-bottom bottom absolute altitude, other respectively high layer by layer=layer tops
The top mark height of absolute altitude-next layer;
It is cumulative each high layer by layer, it is by each floor floor height information of the underground building thing of acquisition, passes through the current floor that adds up
With the floor height information of more than floor each layer, the depth information of each floor of underground building thing is obtained.
Each floor depth demarcation of underground building thing described in step 2 is carried out according to the following steps:
Construction of structures data basis under A1, base area, obtains the planogram data of its each floor, and stores each floor level
Figure and construction unit, management unit, parking stall number, the attribute information of construction area;
A2, increase its depth attribute field in the database for storing each floor level diagram data, while according to step 1
Each floor depth information of underground building thing of acquisition, the attribute calibration of its corresponding depth is carried out to corresponding floor plan;
The visualization of the degree of underground building object depth described in step 3 sectional drawing is carried out according to the following steps:
B1, according to the calibrated database achievement of each floor depth of underground building thing in step 2, in underground building
When object depth degree sectional drawing visualizes, spatial dimension selected first, the relation of construction of structures and selected scope is shown under base area
Those underground building things in the range of, the relation includes underground building thing in selected scope, or underground building
Thing intersects with selected scope;
B2, some depth value or a depth bounds are set, by by the numerical value or number range and database
The depth attribute value of underground building object plane figure is matched, and obtains the floor set for meeting depth value condition;
B3, the plane coordinates information according to each building angle point in each planogram data of floor set, will be each with geometrical line
Angle point draws connection, forms the designated floor plan of the underground building thing of a certain depth bounds of closure;Complete the model
After the angle point drafting connection for enclosing all underground building thing certain floors under interior certain depth, the underground in the range of this is just completed
The drafting of construction of structures depth sectional drawing.
As shown in Fig. 2 each floor depth calculation schematic diagram of underground building thing.
As shown in figure 3, underground building object depth degree sectional schematic diagram in certain limit.
As shown in figure 4, underground building object depth degree section effect of visualization figure in certain limit.
Preferred embodiment of the invention described in detail above.It should be appreciated that one of ordinary skill in the art without
Creative work can is needed to make many modifications and variations according to the design of the present invention.Therefore, all technologies in the art
Personnel are available by logical analysis, reasoning, or a limited experiment on the basis of existing technology under this invention's idea
Technical scheme, all should be in the protection domain being defined in the patent claims.
Claims (4)
1. a kind of underground building object depth degree sectional drawing method for visualizing, it is characterised in that carry out according to the following steps:
Step 1: underground building thing floor Depth Information Acquistion;
Step 2: each floor depth demarcation of underground building thing;
Step 3: underground building object depth degree sectional drawing visualizes.
2. underground building object depth degree sectional drawing method for visualizing as claimed in claim 1, it is characterized in that:Described in step 1
Underground building thing floor Depth Information Acquistion, including obtain underground building thing each floor floor height information and add up each layer
Floor height;
Each floor floor height information of underground building thing is obtained, is the top bottom absolute altitude meter using each floor in underground space generaI investigation
Obtain, when underground building number of floor levels is 1, floor height=floor top mark height-floor bottom absolute altitude of the floor;Underground is built
When structures are more than 1, bottom floor height=bottom top mark height-bottom bottom absolute altitude, other respectively high layer by layer=this layer of top mark height-
Next layer of top mark height;
It is cumulative each high layer by layer, it is by each floor floor height information of the underground building thing of acquisition, by cumulative current floor and is somebody's turn to do
The floor height information of more than floor each layer, obtains the depth information of each floor of underground building thing.
3. underground building object depth degree sectional drawing method for visualizing as claimed in claim 1, it is characterized in that:Described in step 2
Each floor depth demarcation of underground building thing is carried out according to the following steps:
Construction of structures data basis under A1, base area, obtains the planogram data of its each floor, and store each floor plan and
Construction unit, management unit, parking stall number, the information of construction area;
A2, increase its depth attribute field in the database for storing each floor level diagram data, while obtained according to step 1
Each floor depth information of underground building thing, the attribute calibration of its corresponding depth is carried out to corresponding floor plan.
4. underground building object depth degree sectional drawing method for visualizing as claimed in claim 1, it is characterized in that:Described in step 3
The visualization of underground building object depth degree sectional drawing is carried out according to the following steps:
B1, according to the calibrated database achievement of each floor depth of underground building thing in step 2, in underground building object depth
When spending sectional drawing visualization, spatial dimension selected first, the relation of construction of structures and selected scope shows those under base area
Underground building thing in the range of, the relation include underground building thing in selected scope, or underground building thing with
Selected scope intersects;
B2, some depth value or a depth bounds are set, by by the numerical value or number range and the underground in database
The depth attribute value of construction of structures plan is matched, and obtains the floor set for meeting depth value condition;
B3, the plane coordinates information according to each building angle point in each planogram data of floor set, with geometrical line by each angle point
Connection is drawn, forms the designated floor plan of the underground building thing of a certain depth bounds of closure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711062939.0A CN107729550B (en) | 2017-11-02 | 2017-11-02 | Underground construction depth profile visualization method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711062939.0A CN107729550B (en) | 2017-11-02 | 2017-11-02 | Underground construction depth profile visualization method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107729550A true CN107729550A (en) | 2018-02-23 |
CN107729550B CN107729550B (en) | 2021-11-02 |
Family
ID=61221298
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711062939.0A Active CN107729550B (en) | 2017-11-02 | 2017-11-02 | Underground construction depth profile visualization method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107729550B (en) |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050078110A1 (en) * | 2003-09-29 | 2005-04-14 | Autodesk, Inc. | Interactive triangulated irregular network (TIN) surfaces design |
CN101404090A (en) * | 2008-11-18 | 2009-04-08 | 上海城市发展信息研究中心 | Underground structure three-dimensional digitalization model construction method used for spatial analysis |
CN101533529A (en) * | 2009-01-23 | 2009-09-16 | 北京建筑工程学院 | Range image-based 3D spatial data processing method and device |
CN101630419A (en) * | 2009-08-13 | 2010-01-20 | 苏州市数字城市工程研究中心有限公司 | Structuring method for three-dimensional visualizing system of urban synthesis pipeline network |
CN101673407A (en) * | 2009-02-13 | 2010-03-17 | 龚建新 | Drawing method for showing three-dimensional figure of underground pipelines by using plane figure |
CN101901244A (en) * | 2010-01-07 | 2010-12-01 | 深圳市勘察测绘院有限公司 | Geological geographic information system processing method |
CN103150407A (en) * | 2013-03-29 | 2013-06-12 | 安科智慧城市技术(中国)有限公司 | Building facility visual display method and building facility visual display device |
CN103413297A (en) * | 2013-07-16 | 2013-11-27 | 南京师范大学 | Cutting method based on integrated three-dimensional GIS model |
CN105069218A (en) * | 2015-07-31 | 2015-11-18 | 山东工商学院 | Underground pipeline visualization system with adjustable ground two-way transparency |
CN106846466A (en) * | 2017-01-19 | 2017-06-13 | 湖北省基础地理信息中心(湖北省北斗卫星导航应用技术研究院) | A kind of smart city three-dimensional visualization display systems |
-
2017
- 2017-11-02 CN CN201711062939.0A patent/CN107729550B/en active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050078110A1 (en) * | 2003-09-29 | 2005-04-14 | Autodesk, Inc. | Interactive triangulated irregular network (TIN) surfaces design |
CN101404090A (en) * | 2008-11-18 | 2009-04-08 | 上海城市发展信息研究中心 | Underground structure three-dimensional digitalization model construction method used for spatial analysis |
CN101533529A (en) * | 2009-01-23 | 2009-09-16 | 北京建筑工程学院 | Range image-based 3D spatial data processing method and device |
CN101673407A (en) * | 2009-02-13 | 2010-03-17 | 龚建新 | Drawing method for showing three-dimensional figure of underground pipelines by using plane figure |
CN101630419A (en) * | 2009-08-13 | 2010-01-20 | 苏州市数字城市工程研究中心有限公司 | Structuring method for three-dimensional visualizing system of urban synthesis pipeline network |
CN101901244A (en) * | 2010-01-07 | 2010-12-01 | 深圳市勘察测绘院有限公司 | Geological geographic information system processing method |
CN103150407A (en) * | 2013-03-29 | 2013-06-12 | 安科智慧城市技术(中国)有限公司 | Building facility visual display method and building facility visual display device |
CN103413297A (en) * | 2013-07-16 | 2013-11-27 | 南京师范大学 | Cutting method based on integrated three-dimensional GIS model |
CN105069218A (en) * | 2015-07-31 | 2015-11-18 | 山东工商学院 | Underground pipeline visualization system with adjustable ground two-way transparency |
CN106846466A (en) * | 2017-01-19 | 2017-06-13 | 湖北省基础地理信息中心(湖北省北斗卫星导航应用技术研究院) | A kind of smart city three-dimensional visualization display systems |
Non-Patent Citations (3)
Title |
---|
戴春政: "多源数据集成的三维可视化在地下空间开发利用的作用", 《城市建设理论研究(电子版)》 * |
朱良峰等: "三维地质建模及可视化系统的设计与开发", 《岩土力学》 * |
陈良超等: "新型三维测绘地理信息产品集成建库研究技术", 《地理信息世界》 * |
Also Published As
Publication number | Publication date |
---|---|
CN107729550B (en) | 2021-11-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11302072B2 (en) | System for constructing urban design digital sand table | |
CN102332056B (en) | Information visualization technology-based house property data visualization system | |
Niu et al. | A BIM-GIS integrated web-based visualization system for low energy building design | |
CN105825550B (en) | Take the complex three-dimensional building model cutting modeling method of consistency into account | |
KR101659779B1 (en) | Method for Constructing Three Dimentional Drawing of GIS | |
CN101404090B (en) | Underground structure three-dimensional digitalization model construction method used for spatial analysis | |
CN103699731A (en) | Method for constructing real scene model collaborative design platform of railway engineering | |
US7830373B1 (en) | System and methods of civil engineering objects model | |
CN103049595A (en) | Three-dimension design cooperative working method used for hydraulic and hydro-power engineering | |
US20130132041A1 (en) | System and method for 3-d massing of a building envelope | |
CN106702995A (en) | BIM-based building method of geotechnical engineering monitoring model | |
CN112465968B (en) | Building map mixed data model construction method for positioning navigation | |
CN103345540A (en) | Method for stimulating and displaying geological drilling information on digital earth software platform | |
Bansal | Use of geographic information systems in spatial planning: A case study of an institute campus | |
CN105261067A (en) | Overground and underground integrated modeling method based on true 3D volumetric display technique and system | |
CN106355640A (en) | Ground-underground three-dimensional integrated space processing method and system | |
CN105761302A (en) | Three-dimensional digital navigation channel system and application thereof | |
García et al. | 3D modeling and representation of the Spanish Cadastral cartography | |
US20200050713A1 (en) | Dynamic determination of building fit on lot parcels | |
CN108168429A (en) | A kind of large-scale cave depot capacity measuring method based on three-dimensional laser scanner | |
AU2005217987A1 (en) | House Siting and Costing System | |
CN107729550A (en) | Underground building object depth degree sectional drawing method for visualizing | |
Wu et al. | Construction of spatial information model of 3D real estate: case study of the Nanjing gulou central business district | |
US20050110800A1 (en) | Method for dynamically updating a planar topology | |
CN115391871A (en) | Commercial automatic layout method, electronic device, and storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20240306 Address after: 401120 No. 6, Qingzhu East Road, Dazhulin, Yubei District, Chongqing Patentee after: Chongqing Institute of Surveying and Mapping Science and Technology (Chongqing Map Compilation Center) Country or region after: China Address before: 400020 Jiangbei District, Chongqing electric measuring Village No. 231 Patentee before: CHONGQING SURVEY INSTITUTE Country or region before: China |
|
TR01 | Transfer of patent right |