CN107727355B - 一种流体挑出水平距离测算方法及其应用 - Google Patents
一种流体挑出水平距离测算方法及其应用 Download PDFInfo
- Publication number
- CN107727355B CN107727355B CN201710886554.XA CN201710886554A CN107727355B CN 107727355 B CN107727355 B CN 107727355B CN 201710886554 A CN201710886554 A CN 201710886554A CN 107727355 B CN107727355 B CN 107727355B
- Authority
- CN
- China
- Prior art keywords
- fluid
- chooses
- horizontal distance
- formula
- choose
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01M—TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
- G01M10/00—Hydrodynamic testing; Arrangements in or on ship-testing tanks or water tunnels
Landscapes
- Physics & Mathematics (AREA)
- Fluid Mechanics (AREA)
- General Physics & Mathematics (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Abstract
本发明公开了一种流体挑出水平距离测算方法及其应用。所述测算方法首先通过确定流体容重和流体中固体物质容重,计算得到流体体积含沙量;然后通过确定流体挑出点流深和流体挑出点流速,计算得到挑出点流体傅汝德数;接着根据流体体积含沙量和挑出点流体傅汝德数,计算流体挑出水平距离修正系数;最后根据流体挑出水平距离修正系数,计算得到流体挑出水平距离。该方法适用于清水、含沙水流、泥石流等不同性质流体,能够合理确定不同流体性质、不同挑出点流体流深、不同流体挑出速度、不同流体挑出角度、不同挑出点流体垂向深度、不同挑出点与下游床面高差下的流体挑出水平距离,且计算方法简便有效,适应实际工程需要。
Description
技术领域
本发明涉及一种适用于不同性质流体的流体挑出水平距离测算方法,及其在水利水电枢纽工程、水土保持工程以及泥石流防治工程中的应用。
背景技术
在泥石流防治措施中,拦砂坝和排导槽具有防治效果良好、施工维护简便、使用周期长、费效比高等特点,是目前泥石流防治实践中使用最为广泛的工程措施。
随着拦砂坝和排导槽大量实施,遇到了许多新的工程实际问题。如,在采用拦砂坝对泥石流沟开展工程治理时,为保证拦砂坝的安全,通常在拦砂坝下游设置消能工以消耗上游流体能量,这就需要科学合理地测算流体流舌的水平挑距(即流体挑出水平距离),以确定冲刷坑的位置,进而在此基础上确定消能工的长度。此外,对于梯潭结构排导槽,也需科学合理地测算流体流舌的水平挑距,从而确定消能工(潭)的长度。
目前,中华人民共和国水利行业标准《混凝土重力坝设计规范》(SL319-2005)对水舌水平挑距作出明确说明该公式经由大量清水室内试验数据和实际工程数据验证,计算效果较好,但该公式仅针对清水,而对于含沙水流和泥石流,由于流体内固体物质含量较高,体积含沙量大,流体容重最大可达清水的2-3倍,流体自身物理性质发生显著改变,如果仍然采用该公式计算含沙水流和泥石流的流舌水平挑距,计算值通常偏大,在实际应用中存在较大问题。
发明内容
本发明的目的就是针对现有技术的不足,提供一种适用于清水、含沙水流、泥石流等不同性质流体的流体挑出水平距离测算方法其在水利工程、水土保持工程和泥石流防治工程中的应用,该方法基于理论推导,能够合理确定不同流体性质、不同挑出点流体流深、不同流体挑出速度、不同流体挑出角度、不同挑出点流体垂向深度、不同挑出点与下游床面高差下的流体流舌水平挑距(即流体挑出水平距离),且计算方法简便有效,适应实际工程需要。
为实现上述目的,本发明的技术方案是:
本发明提出一种流体挑出水平距离测算方法,所述测算方法的技术思想及理论推导过程如下:
1)建立适用不同流体性质的流体流舌水平挑距计算公式(即流体挑出水平距离计算公式)
首先,通过查阅文献、实际调查、比较分析,确定除流体挑出速度v、流体挑出角度θ、挑出点流体垂向深度h1、挑出点与下游床面高差h2等因素外,影响流体流舌挑距的主要是流体的流变参数和傅汝德数(Fr),而流体的体积含沙量(CV)是影响流体流变参数的关键因素,因此影响流体流舌挑距的主要是流体体积含沙量(CV)和傅汝德数(Fr)。本发明采用η作为修正系数来反映体积含沙量和傅汝德数对流体流舌水平挑距的影响,在考虑了易于获取的两个参量CV和Fr基础上,为了获得较高的计算精度且保证量纲和谐,采用不完全自相似理论进行η的建模,η可表达为:
η=Φ((1-CV),Fr)(1)
假定(1-CV)和Fr满足不完全自相似,则η可表达为如下两种形式:
式中,f1和f2是Fr的函数;g1和g2是(1-CV)的函数。对公式(2)和(3)取对数,然后对Fr求微分得到如下两个公式
公式(4)和公式(5)左边的偏微分是相等的,则得到:
进一步,我们注意到g2是(1-CV)的函数、f1和f2是Fr的函数,那么我们可以得到.
式(7)和(8)中const是常数,对式(7)和式(8)分别积分,得到
f2=m3ln(Fr)+m4 (10)
将公式(9)和公式(10)代入公式(2),可得到修正系数η的计算公式
式中,m1、m2、m3和m4为待定参数;结合自由抛射体理论,则不同性质流体流舌水平挑距(即流体挑出水平距离)测算公式为:
然后,搜集大量清水、含沙水流、泥石流三种流体流舌水平挑距室内试验观测数据和原型观测数据,通过对以上数据的回归分析,确定待定参数m1=0.887,m2=-0.008,m3=0.518,m4=0.004。
误差分析表明,本发明提出的流体挑出水平距离计算值误差绝对值的均值为9.0%,如果采用《混凝土重力坝设计规范》(SL319-2005)推荐的流体流舌水平挑距计算值误差绝对值的均值为18.5%,本发明提出的测算方法误差绝对值的均值较已有方法减小约9.5%。更重要的是,本发明提出的方法克服了已有方法(即《混凝土重力坝设计规范》中仅适用于清水水舌水平挑距的计算方法)高估含沙水流和泥石流流体流舌水平挑距的问题。
2)通过不同性质流体流舌水平挑距计算公式,计算出流体流舌水平挑距后,再乘以相应的安全系数,即可确定下游消能工的长度。
具体而言,所述适用于不同性质流体的流体挑出水平距离测算方法具体步骤如下:
(一)通过野外容重试验,确定流体容重γd、单位kN/m3;通过室内试验,确定流体中固体物质容重γS、单位kN/m3;将γd、γS代入公式计算得到流体体积含沙量CV,式中,γw为水的容重、取值9810kN/m3;
(二)通过现场调查,确定流体挑出点的流深h、单位m;通过现场调查,确定流体挑出点的流速v、单位m/s;将h、v代入公式计算得到挑出点流体傅汝德数Fr,式中,g为重力加速度、取值9.81m/s2;
(三)通过以下公式确定流体挑出水平距离修正系数η
式中,η—流体挑出水平距离修正系数;
CV—流体体积含沙量,由步骤(一)确定;
Fr—挑出点流体傅汝德数,由步骤(二)确定;
(四)通过以下公式确定流体挑出水平距离L
式中,L—流体挑出水平距离,单位m;
η—流体挑出水平距离修正系数,由步骤(三)确定;
g—重力加速度,取值9.81m/s2;
v—流体挑出点的流速,单位m/s,由步骤(二)确定;
θ—流体挑出角度,单位度,通过现场调查确定;
h1—挑出点流体垂向深度,单位m,通过现场调查确定;
h2—挑出点与下游床面高差,单位m,通过现场调查确定。
为了保证大坝或拦砂坝的安全,所述适用于不同性质流体的流体挑出水平距离测算方法可用于确定不同性质流体坝后(槛后)的下游消能工长度。通过公式Le=kL,计算得到下游消能工长度Le、单位m;式中,k为安全系数、取值1.4-1.6,L为流体挑出水平距离、单位m、由上述步骤(四)确定。
所述流体挑出水平距离测算方法适用于流体挑出点的流速v小于40m/s、流体容重γd大于等于9810kN/m3同时小于等于22563kN/m3的清水或含沙水流或泥石流的挑出水平距离测算。
与现有技术相比,本发明的有益效果是:仅考虑了易于获取的两个参量(即流体体积含沙量和挑出点流体傅汝德数)对流体运动的影响,通过理论推导得到水平挑距修正系数和水平挑距计算公式,能够唯一确定流体挑出水平距离修正系数,进而能沟合理确定不同性质流体挑出水平距离,避免了采用水舌水平挑距计算方法导致的高估含沙水流和泥石流流体流舌水平挑距的缺陷;本发明方法适用性广泛,适用流体容重范围为9810kN/m3-22563kN/m3的清水、或含沙水流、或泥石流,能够为不同性质流体坝后(槛后)消能工的优化设计提供有效的技术支撑,并且计算方法简便,适应实际工程需要。
附图说明
图1是流体挑出示意图。
图中标号如下:
v流体挑出点的流速 h流体挑出点的流深
L流体挑出水平距离 θ流体挑出角度
h1挑出点流体垂向深度 h2挑出点与下游床面高差
Le下游消能工长度
具体实施方式
下面对本发明的优选实施例作进一步的描述。
如图1所示。某泥石流流域面积1.76km2,主沟长度2.95km,主沟沟床比降为387‰,流域宽度约在310~850m之间,流域内坡度较陡、在25°~65°。近年来,该流域多次暴发大规模泥石流,对沟口公路造成严重损毁,多次堵断主河并形成堰塞湖。为减轻泥石流灾害,拟在泥石流沟主沟修建拦砂坝。拦砂坝采用主坝加副坝的形式,主坝和副坝之间的部分就是消能工,为保证拦砂坝安全,采用本发明的流体挑出水平距离测算方法确定消能工长度。具体步骤如下:
第一步,通过野外容重试验,确定该沟流体容重γd=19620kN/m3;通过室内试验,确定流体中固体物质容重γs=25996.5kN/m3;将γd、γS代入公式计算得到流体体积含沙量CV=0.606。
第二步,通过现场调查,确定流体挑出点的流深h=0.70m;通过现场调查,确定流体挑出点的流速v=5.0m/s;将h、v代入公式计算得到挑出点流体傅汝德数Fr=1.908。
第三步,通过以下公式,确定流体挑出水平距离修正系数η
第四步,通过现场调查,确定流体挑出角度θ=0°,挑出点流体垂向深度h1=0.70m,挑出点与下游床面高差h2=6.50m。通过以下公式确定流体挑出水平距离L
第五步,通过公式Le=kL=1.5×2.77=4.16m,计算得到下游消能工长度Le为4.16m。
Claims (4)
1.一种流体挑出水平距离测算方法,其特征在于:所述流体挑出水平距离测算方法步骤如下:
(一)通过野外容重试验,确定流体容重γd、单位kN/m3;通过室内试验,确定流体中固体物质容重γS、单位kN/m3;将γd、γS代入公式计算得到流体体积含沙量CV,式中,γw为水的容重、取值9810kN/m3;
(二)通过现场调查,确定流体挑出点的流深h、单位m;通过现场调查,确定流体挑出点的流速v、单位m/s;将h、v代入公式计算得到挑出点流体傅汝德数Fr,式中,g为重力加速度、取值9.81m/s2;
(三)通过以下公式确定流体挑出水平距离修正系数η
式中,η—流体挑出水平距离修正系数;
CV—流体体积含沙量,由步骤(一)确定;
Fr—挑出点流体傅汝德数,由步骤(二)确定;
(四)通过以下公式确定流体挑出水平距离L
式中,L—流体挑出水平距离,单位m;
η—流体挑出水平距离修正系数,由步骤(三)确定;
g—重力加速度,取值9.81m/s2;
v—流体挑出点的流速,单位m/s,由步骤(二)确定;
θ—流体挑出角度,单位度,通过现场调查确定;
h1—挑出点流体垂向深度,单位m,通过现场调查确定;
h2—挑出点与下游床面高差,单位m,通过现场调查确定。
2.如权利要求1所述流体挑出水平距离测算方法的应用,其特征在于:适用于确定下游消能工长度。
3.根据权利要求2所述的应用,其特征在于:通过公式Le=kL,计算得到下游消能工长度Le、单位m;式中,k为安全系数、取值1.4-1.6,L为流体挑出水平距离、单位m、由步骤(四)确定。
4.如权利要求1所述流体挑出水平距离测算方法的应用,其特征在于:适用于流体挑出点的流速v小于40m/s、流体容重γd大于等于9810kN/m3同时小于等于22563kN/m3的清水或含沙水流或泥石流的挑出水平距离测算。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710886554.XA CN107727355B (zh) | 2017-09-27 | 2017-09-27 | 一种流体挑出水平距离测算方法及其应用 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710886554.XA CN107727355B (zh) | 2017-09-27 | 2017-09-27 | 一种流体挑出水平距离测算方法及其应用 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107727355A CN107727355A (zh) | 2018-02-23 |
CN107727355B true CN107727355B (zh) | 2019-03-29 |
Family
ID=61208070
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710886554.XA Expired - Fee Related CN107727355B (zh) | 2017-09-27 | 2017-09-27 | 一种流体挑出水平距离测算方法及其应用 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107727355B (zh) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110865170B (zh) * | 2018-08-27 | 2022-08-05 | 中国石油天然气股份有限公司 | 确定含砂量的方法、装置及存储介质 |
CN110069801B (zh) * | 2018-11-26 | 2022-05-24 | 南昌工程学院 | 一种基于人工神经网络的挑距估算方法 |
CN110004872B (zh) * | 2019-04-04 | 2024-02-09 | 天津大学 | 一种测定低气压环境模型水舌外缘挑距空中移位量的方法 |
CN110765650B (zh) * | 2019-11-12 | 2023-06-13 | 中国科学院、水利部成都山地灾害与环境研究所 | 一种泥石流体积含沙量的测算方法 |
CN112100567B (zh) * | 2020-09-11 | 2023-06-06 | 中国科学院、水利部成都山地灾害与环境研究所 | 稀性泥石流垂向流速分布、表面流速、平均流速测量方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104652380A (zh) * | 2015-01-22 | 2015-05-27 | 河海大学 | 一种基于变坡度溢洪道的新型配套泄洪系统 |
CN107100145A (zh) * | 2017-06-28 | 2017-08-29 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种水垫塘结构及其施工方法 |
-
2017
- 2017-09-27 CN CN201710886554.XA patent/CN107727355B/zh not_active Expired - Fee Related
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104652380A (zh) * | 2015-01-22 | 2015-05-27 | 河海大学 | 一种基于变坡度溢洪道的新型配套泄洪系统 |
CN107100145A (zh) * | 2017-06-28 | 2017-08-29 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种水垫塘结构及其施工方法 |
Non-Patent Citations (3)
Title |
---|
Computing the Trajectory of Free Jets;Tony L.Wahl 等;《Journal Of Hydraulic Engineering》;20080229;第256-260页 * |
平底差动坎的流态和水舌挑距;孙红娟 等;《水电能源科学》;20170331;第35卷(第3期);第98-100页 * |
挑流水舌挑距及其影响因素概述;宁利中 等;《水资源与水工程学报》;20040930;第15卷(第3期);第35-39页 * |
Also Published As
Publication number | Publication date |
---|---|
CN107727355A (zh) | 2018-02-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107727355B (zh) | 一种流体挑出水平距离测算方法及其应用 | |
CN104794362B (zh) | 一种泥石流断面平均流速的测算方法及应用 | |
Dufresne et al. | Experimental investigation of flow pattern and sediment deposition in rectangular shallow reservoirs | |
Ikramov et al. | The height of the pumping unit suction pipe inlet relative to the riverbed bottom | |
Ahmed et al. | Effect of corrugated beds on characteristics of submerged hydraulic jump | |
Ghaderi et al. | Experimental investigation on effective scouring parameters downstream from stepped spillways | |
Fuentes-Pérez et al. | Modeling water-depth distribution in vertical-slot fishways under uniform and nonuniform scenarios | |
Madadi et al. | Investigation of flow characteristics above trapezoidal broad-crested weirs | |
Wu et al. | Impacts of ice cover on local scour around semi-circular bridge abutment | |
Guven et al. | Experimental investigation on discharge coefficient for a combined broad crested weir-box culvert structure | |
Ni et al. | A 2D hydrodynamic model for shallow water flows with significant infiltration losses | |
Schalla et al. | Limitations of traditional capacity equations for long curb inlets | |
CN106680454A (zh) | 一种具拦沙坝已治理崩岗土壤侵蚀模数测算方法 | |
Fahmy | Effect of sediment deposition on the efficiency of Fayoum weir | |
Hoseini | Experimental investigation of flow over a triangular broad-crested weir | |
Nozari et al. | Experimental study of the temporal variation of drain water salinity at different drain depths and spacing in the presence of saline groundwater | |
Zheng et al. | A novel explicit-implicit coupled solution method of SWE for long-term river meandering process induced by dambreak | |
Hussain et al. | Sustainable sediment management in a reservoir through flushing using HEC-RAS model: case study of Thakot Hydropower Project (D-3) on the Indus river | |
Cross et al. | The East Kent Chalk Aquifer during the 1988‐92 Drought | |
Guo et al. | Numerical modeling of hyper-concentrated sediment transport in the lower Yellow River | |
Sadeghian et al. | Discharge characteristics of triangular labyrinth side weirs (with inclined bed) located on a straight channel | |
Mahdian Khalili et al. | Experimental evaluation of dune formation downstream of pier scour hole with upstream debris accumulation | |
Mustaffa et al. | Dealing with Supercritical Flow in Culvert | |
Abdulhussein et al. | Hydraulic Interaction between Composite Structure and Block Obstacle | |
Radecki-Pawlik et al. | Comparative research of interlocked-carpet block ramp (ICBR) made of natural stone with rapid hydraulic structures (RHS) of Peterka type [in:] Carvalho RF |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190329 Termination date: 20190927 |
|
CF01 | Termination of patent right due to non-payment of annual fee |