CN107725070A - A kind of shield segment assembling location lug set and its application in shield segment assembling - Google Patents

A kind of shield segment assembling location lug set and its application in shield segment assembling Download PDF

Info

Publication number
CN107725070A
CN107725070A CN201711203674.1A CN201711203674A CN107725070A CN 107725070 A CN107725070 A CN 107725070A CN 201711203674 A CN201711203674 A CN 201711203674A CN 107725070 A CN107725070 A CN 107725070A
Authority
CN
China
Prior art keywords
location lug
shield
duct piece
lug set
shield duct
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711203674.1A
Other languages
Chinese (zh)
Inventor
杨辉
任正龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Xuntuo Machinery Co Ltd
Original Assignee
Jiangsu Xuntuo Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Xuntuo Machinery Co Ltd filed Critical Jiangsu Xuntuo Machinery Co Ltd
Priority to CN201711203674.1A priority Critical patent/CN107725070A/en
Publication of CN107725070A publication Critical patent/CN107725070A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • E21D11/083Methods or devices for joining adjacent concrete segments
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/0001Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor characterised by the choice of material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/14Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor incorporating preformed parts or layers, e.g. injection moulding around inserts or for coating articles
    • B29C45/14598Coating tubular articles
    • CCHEMISTRY; METALLURGY
    • C08ORGANIC MACROMOLECULAR COMPOUNDS; THEIR PREPARATION OR CHEMICAL WORKING-UP; COMPOSITIONS BASED THEREON
    • C08KUse of inorganic or non-macromolecular organic substances as compounding ingredients
    • C08K3/00Use of inorganic substances as compounding ingredients
    • C08K3/38Boron-containing compounds
    • CCHEMISTRY; METALLURGY
    • C08ORGANIC MACROMOLECULAR COMPOUNDS; THEIR PREPARATION OR CHEMICAL WORKING-UP; COMPOSITIONS BASED THEREON
    • C08KUse of inorganic or non-macromolecular organic substances as compounding ingredients
    • C08K7/00Use of ingredients characterised by shape
    • C08K7/02Fibres or whiskers
    • C08K7/04Fibres or whiskers inorganic
    • C08K7/14Glass
    • CCHEMISTRY; METALLURGY
    • C08ORGANIC MACROMOLECULAR COMPOUNDS; THEIR PREPARATION OR CHEMICAL WORKING-UP; COMPOSITIONS BASED THEREON
    • C08KUse of inorganic or non-macromolecular organic substances as compounding ingredients
    • C08K3/00Use of inorganic substances as compounding ingredients
    • C08K3/38Boron-containing compounds
    • C08K2003/387Borates
    • CCHEMISTRY; METALLURGY
    • C08ORGANIC MACROMOLECULAR COMPOUNDS; THEIR PREPARATION OR CHEMICAL WORKING-UP; COMPOSITIONS BASED THEREON
    • C08LCOMPOSITIONS OF MACROMOLECULAR COMPOUNDS
    • C08L2201/00Properties
    • C08L2201/02Flame or fire retardant/resistant

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Medicinal Chemistry (AREA)
  • Architecture (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Organic Chemistry (AREA)
  • Polymers & Plastics (AREA)
  • Health & Medical Sciences (AREA)
  • Structural Engineering (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Civil Engineering (AREA)
  • Geology (AREA)
  • Geochemistry & Mineralogy (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Injection Moulding Of Plastics Or The Like (AREA)

Abstract

A kind of shield segment assembling location lug set and its application in shield segment assembling, belong to construction nylon products processing technique field.The present invention has been abandoned in the prior art with the design of the complicated shield duct piece of locating bar or concavo-convex tongue-and-groove, in shield duct piece side(Joint face)The position of prefabricated detent; installation location lug covers spacing for installing between two panels section of jurisdiction; and can is effectively protected arc connecting bolt while ensure that section of jurisdiction construction assembling spacing requirement; make punching block design processing technology optimization; steel bushing insertion production is also added inside location lug set, pipe sheet assembling cyclization construction quality is effectively ensured.

Description

A kind of shield segment assembling location lug set and its application in shield segment assembling
Technical field
The present invention relates to a kind of shield segment assembling location lug set and its application in shield segment assembling, belong to construction Nylon products processing technique field.
Background technology
Shield duct piece occurs " faulting of slab ends " phenomenon during to prevent assembly when constructing assembled, influences that construction is assembled, structure stress State, waterproof effect, serious entail dangers to safety for tunnel engineering.As shown in Fig. 1-1,1-2, when initial shield duct piece designs, Blocking surface(Joint face)Concavo-convex tongue-and-groove is designed, it is spacing during ensureing pipe sheet assembling, though to facilitate construction assembled for the design, to knot Structure designs and cost of manufacture brings adverse effect.Influence to reduce this respect, taken as shown in Fig. 2-1,2-2, during Segment design Disappeared the design of rebate, increases locating bar
Carry out it is spacing, which be blocking surface on preset semi-circular recesses, locating bar is set when assembled in groove, this mode compared with Initial design is slightly lifted, but which increases segment die cost of manufacture, and arc connecting bolt also cannot be protected effectively.
The content of the invention
The purpose of the present invention is the deficiency for above-mentioned existing pipe sheet assembling technology, preferably to reduce mould for shielding pipe piece Cost of manufacture, effectively protection arc connecting bolt, there is provided a kind of shield segment assembling location lug covers and its spelled in shield duct piece Application in dress.This method is in blocking surface(The joint face of section of jurisdiction)The prefabricated detent in arc connecting bolt hole site, and spelling Set during dress nylon location lug cover for it is assembled when it is spacing, it be arc connecting bolt that it is internal, is effectively protected while positioning Arc connecting bolt is protected, avoids the situation for causing bolt fracture because external force is excessive.
Technical scheme is as follows:A kind of shield segment assembling location lug set, it is characterized in that, the location lug set is by two Individual bottom surface is identical and overlaps the round platform of connection composition, and the taper of two round platforms is different, and location lug set is axially arranged with connecting cavity;Should Location lug covers injection molding, including following each component is prepared:Polyhexamethylene adipamide, synergistic fire retardant, expansion type flame-retarding Agent, compatilizer, glass fibre.
Further, the mass percent of each component is in the location lug set:Polyhexamethylene adipamide 60%, collaboration resistance Fire agent 13%, expansion type flame retardant 3%, compatilizer 2%, glass fibre 22%.
Further, the synergistic fire retardant is Firebrake ZB.
Further, the location lug set is internal is embedded with steel bushing.
Further, one of round platform lateral surface is provided with some annular bonding agent conduits.
Further, the annular bonding agent conduit is arranged on the less round platform lateral surface of taper, and another taper is larger Round platform, its lateral surface is made up of the outside conical surface, the inner side conical surface, and the taper of the inner side conical surface is more than the taper of the outside conical surface.
Further, the location lug set connecting cavity is made up of the cylinder chamber at middle part and the tubaeform chamber of both sides.
Above-mentioned location lug is enclosed on the application in shield segment assembling, it is characterized in that, comprise the following steps:
1)Prefabricated shield duct piece:Mould for shielding pipe piece, production shield duct piece are made according to construction requirement, when shield duct piece makes, Arc link bolt hole is set respectively at the joint face of its both sides, and arc link bolt hole is in one end of shield duct piece joint face Detent is set, is provided with bolt installation counterbore in the inner side cambered surface of shield duct piece, the counterbore is another with arc link bolt hole One end communicates;The madial wall of the detent is the cone structure that matches with round platform lateral surface, two neighboring shield duct piece Junction, the detent of one of joint face, its cross section is circle, and the detent of another joint face, it is horizontal Ring-shaped section and ring-shaped elongated hole-shape;
2)Prepare location lug set:1. making mould, design taper cut-off rule is die parting line, by four types of uniformly arranging from top to bottom Chamber;
2. poly- adipoyl hexamethylene diamine, glass fibre are put into 110 DEG C of vacuum drying chamber and are dried in vacuo, after the completion of add Synergistic fire retardant, expansion type flame retardant, compatilizer are uniformly mixed;
3. location lug mold is installed in screw injection molding machine, adjusting bolt barrel temperature:Back segment temperature be 260-300 DEG C, Stage casing temperature is 265-295 DEG C, front-end temperature is 260-290 DEG C, and nozzle temperature is 250-270 DEG C, mold temperature 30-80 DEG C, injection pressure 75-130MPa, screw speed 70-110r/min, a mould four, location lug set is finally made;
3)Assembled shield duct piece is covered using location lug:When section of jurisdiction cyclization is assembled, add in the annular bonding agent conduit of location lug set Add bonding agent, one end of location lug cuff bonding agent screwed in the circular detent of shield duct piece, after the completion of it is assembled next Block shield duct piece;Next piece of section of jurisdiction allows the other end of location lug set slowly to enter by the tangential direction rotation of location lug set center line Enter in the block section of jurisdiction annular elongated hole-shape detent;After the completion of, the arc using arc connecting bolt through two shield duct pieces The connecting cavity of link bolt hole and location lug set, adjacent two pieces of shield duct pieces progress bolt connection is fixed, location lug is enclosed on Also arc connecting bolt is effectively protected while positioning;Ring it is assembled with hold it is identical to assembling method, during shield segment assembling Annular elongated hole-shape detent adjustment good position must be utilized, the tangential direction that center line is then covered along location lug allows location lug Set enters in next piece of section of jurisdiction detent, carries out successively assembled.
Further, step 2)In, during injection after die sinking by steel bushing location and installation in mold cavity, then matched moulds, adds Pay attention to adjustment shot after entering steel bushing, prevent that overlap is closed in excessive salivation, eventually form the internal location lug for being embedded with steel bushing Set.
Further, step 1)In, set arch screw bolt to shape plug, positioning mold insert, arc in mould for shielding pipe piece Bolt shaping plug one end is connected with core rod, and the other end is connected with positioning mold insert, and positioning mold insert is installed on section of jurisdiction mould by bolt In the positioning hole for having side form, vestibule is provided with inside positioning mold insert;After shield duct piece is made, arch screw bolt shaping plug, shape are removed Into link bolt hole, positioning mold insert is removed, forms detent.
Location lug set in the present invention uses nylon66 fiber, and for major ingredient, nylon66 fiber quality is lighter, is readily transported and installs, uses Injection molding, fabrication cycle is short, high mechanical strength, good toughness, has higher tension, compression strength, specific tensile strength is higher than gold Category, it is strong to the absorbability of impacting, answer force vibration, it is not easy to break.Nylon66 fiber also has preferable heat-resisting, wear-resisting, corrosion resistance Can, after glass fiber reinforcement, its mechanical strength, rigidity, heat resistance, creep resistant and endurance life increase substantially.
In the present invention, location lug set uses the frustum cone structure of two different tapers, and in the less round platform lateral surface of taper Annular bonding agent conduit is set, and the round platform of different tapers, which is advantageous to distinguish when mounted, cuts plumage side and near coal-mine side.Location lug is nested with In the locating slot of shield duct piece, tenon set in position additionally uses bonding agent with shield duct piece and is connected, with tapered frustum cone structure and With tapered positioning slot structure, the contact area of both sides is increased, makes connection more firm.Location lug set is divided into compared with Small Taper The round platform of round platform and larger taper, the round platform of larger taper are designed to the lateral surface of two different tapers, can so disperseed again Stress, prevent stress from concentrating and bringing fracture.A circle steel bushing is embedded with location lug set, further enhances location lug set Intensity, its fracture is prevented, improve the protection to arc connecting bolt.
The present invention has been abandoned in the prior art with the design of the complicated shield duct piece of locating bar or concavo-convex tongue-and-groove, in shield pipe Piece side(Joint face)The position of prefabricated detent, install location lug between two panels section of jurisdiction additional and cover spacing for installing, ensureing And can is effectively protected arc connecting bolt while section of jurisdiction construction assembling spacing requirement, makes punching block design processing technology excellent Change, steel bushing insertion production is also added inside location lug set, pipe sheet assembling cyclization construction quality is effectively ensured.
Location lug set in the present invention is made using injection molding manner, product high mechanical strength, because its crystallinity is high, therefore Its rigidity, heat resistance are all higher, can meet the requirement of shield-tunneling construction well, and design a mould four, in location lug set Portion adds steel bushing, the injection production technology of dual reinforcement, production efficiency high, significantly reduces fabrication cycle and cost.The present invention Method is simple, reasonable science, and the location lug set of steel bushing is internally embedded during making, and its indices can be obviously improved, be effectively ensured Pipe sheet assembling positions and effectively protects connecting bolt;Same this method can be widely used for the production of various construction class nylon guidees, Improve subsequent construction quality, performance and service life.
Brief description of the drawings
Fig. 1-1 is the shield duct piece schematic diagram that concavo-convex tongue-and-groove is used in background technology;
Fig. 1-2 is A direction views in Fig. 1-1;
Fig. 2-1 is the shield duct piece schematic diagram that locating bar is used in background technology;
Fig. 2-2 is A direction views in Fig. 2-1;
Fig. 3-1 is the schematic diagram of shield duct piece in the present invention;
Fig. 3-2 is cambered surface schematic diagram on the inside of shield duct piece in the present invention;
Fig. 4 is that arch screw bolt shapes plug, positions the connection diagram of mold insert in mould for shielding pipe piece in the present invention;
Fig. 5-1 is the cover half schematic diagram of location lug mold in the present invention(Comprising die cavity, sliding block push pedal, push rod, guide pillar, bottom plate, Limited block etc.);
Fig. 5-2 is the dynamic model of location lug mold in the present invention(Cavity plate)(Include die cavity, Angle Pin, guide pin bushing, bottom plate, limited block Deng);
Fig. 6-1 is the sectional view that location lug covers in the present invention;
Fig. 6-2 is the stereogram that location lug covers in the present invention;
Fig. 6-3 is the sectional view that location lug covers in the present invention;
Fig. 6-4 is the side view that location lug covers in the present invention;
Fig. 6-5 be in Fig. 6-4 A-A to sectional view;
Fig. 6-6 is the stereogram that location lug covers in the present invention;
In figure:1 location lug set connecting cavity, 2 location lugs set in steel bushing, 3 annular bonding agent conduits, the less round platform of 4 tapers, The inner side conical surface, 8 positioning in the larger round platform of the outside conical surface, 7 tapers in the larger round platform of the larger round platform of 5 tapers, 6 tapers The cylinder chamber at tenon set middle part, the tubaeform chamber of 9 location lugs set both sides, 10 arc link bolt hole, 11 bolts installation counterbore, 12 circles Shape detent, 13 annular elongated hole-shape detents, 14 arch screw bolts shaping plug, 15 positioning mold inserts, 16 segment die side forms, 17 arc connecting bolts.
Embodiment
Feature of present invention and other correlated characteristics are described further below in conjunction with accompanying drawing.
As shown in Fig. 6-1 to 6-6, a kind of shield segment assembling location lug set is identical by two bottom surfaces and overlap connection Round platform form, location lug set is internal to be embedded with steel bushing 2, and location lug set is axially arranged with connecting cavity 1, connecting cavity by middle part cylinder chamber 8 and the tubaeform chambers 9 of both sides form.
The taper of two round platforms is different, and one of round platform lateral surface is provided with some annular bonding agent conduits 3, annular bonding Agent conduit is arranged on the less lateral surface of round platform 4 of taper, the larger round platform 5 of another taper, its lateral surface by the outside conical surface 6, The inner side conical surface 7 is formed, and the taper of the inner side conical surface is more than the taper of the outside conical surface.
The location lug covers injection molding, including following each component is prepared:Polyhexamethylene adipamide, synergistic fire retardant (Firebrake ZB), expansion type flame retardant, compatilizer, glass fibre, the mass percent of each component is:Polyhexamethylene adipamide 60%, Synergistic fire retardant 13%, expansion type flame retardant 3%, compatilizer 2%, glass fibre 22%.
In location lug set, whole length 91mm, the shared basal diameter of two round platforms is 86.8mm;The less round platform of taper 4, its end face diameter is 75.8mm, and the length of round platform 4 is 45.5mm;The larger round platform 5 of taper, the end face of its outside conical surface 6 are straight Footpath is 75.8mm, and the segment length is 35.5mm, and the minimum diameter of its inner side conical surface 7 is 82.8mm, and the segment length is 10mm;Connection In chamber, the internal diameter of cylinder chamber 8 is 51.8mm, and the depth of cylinder chamber is 61mm, and the maximum inner diameter of horn chamber is 54.9mm, horn chamber Depth be 15mm.Location lug set under the size connects to section of jurisdiction and the protection of connecting bolt is optimum state, location lug Cover too small, protection is inadequate, and location lug set is excessive, increases production cost and cost of transportation.
As shown in Fig. 3-1,3-2, when shield duct piece designs, the Design Orientation groove at joint face, section of jurisdiction Qie Yu sides are circle Shape detent 12, it is easy to positioning sleeve installation to fix, near coal-mine side is ring elongated hole detent 13, is easy to assembled adjustment positioning, The junction of i.e. two neighboring shield duct piece, the detent of one of joint face is circle 12, and another joint face is determined Position groove elongated hole-shape 13 in a ring.As shown in figure 4, arch screw bolt is set to shape plug 14, positioning edge in mould for shielding pipe piece Part 15, arch screw bolt shaping plug one end are connected with core rod, and the other end is connected with positioning mold insert, and positioning mold insert is installed by bolt In in the positioning hole of segment die side form 16, vestibule is provided with inside positioning mold insert;After shield duct piece is made, remove arch screw bolt into Shape plug, link bolt hole is formed, remove positioning mold insert, form detent.
Positioning nylon tenon Analysis of Nested Design, consider positioning sleeve work progress stress, there are between section of jurisdiction and section of jurisdiction during pipe sheet assembling For certain shearing force to ensure positioning sleeve intensity, material selection strengthens nylon;Location lug set is first assembled side fixation and set using surface Count out storage bonding agent conduit 3, be effectively kept bonding agent strengthen it is firm with shield duct piece.Specific practice is as follows:
1. making mould, design taper cut-off rule is die parting line, by four die cavities of uniformly arranging from top to bottom;
2. poly- adipoyl hexamethylene diamine, glass fibre are put into 110 DEG C of vacuum drying chamber and are dried in vacuo, after the completion of add Synergistic fire retardant, expansion type flame retardant, compatilizer are uniformly mixed;
3. location lug mold is installed in screw injection molding machine, adjusting bolt barrel temperature:Back segment temperature be 260-300 DEG C, Stage casing temperature is 265-295 DEG C, front-end temperature is 260-290 DEG C, and nozzle temperature is 250-270 DEG C, mold temperature 30-80 DEG C, injection pressure 75-130MPa, screw speed 70-110r/min, a mould four, location lug set is finally made.
Notice that shield duct piece is near coal-mine with cutting plumage direction during pipe sheet assembling, when section of jurisdiction cyclization is assembled, in the annular of location lug set Addition bonding agent in bonding agent conduit, one end of location lug cuff bonding agent is screwed in the circular detent of shield duct piece, After the completion of assembled next piece of shield duct piece;Next piece of section of jurisdiction allows location lug set by the tangential direction rotation of location lug set center line The other end slowly enter in the block section of jurisdiction annular elongated hole-shape detent;After the completion of, pass through two using arc connecting bolt 17 The connecting cavity of arc link bolt hole and the location lug set of individual shield duct piece, bolt connection is carried out by adjacent two pieces of shield duct pieces It is fixed, arc connecting bolt is also effectively protected while location lug is enclosed on positioning;Ring assembly is identical to assembling method with holding, Annular elongated hole-shape detent adjustment good position must be utilized during shield segment assembling, then covers cutting for center line along location lug Line direction allows location lug set to enter in next piece of section of jurisdiction detent, carries out successively assembled.
Location lug set notes also when preparing:
1. location lug mold designs tapered cut-off rule as die parting line, by four die cavities of uniformly arranging from top to bottom, a mould Four, and shaped using slide block movement and mold location lug surface conduit, dynamic model(Cavity plate)For overall circular cone die cavity.Such as Fig. 5-1 For cover half(Include die cavity, sliding block push pedal, push rod, guide pillar, bottom plate, limited block etc.), Fig. 5-2 is dynamic model(Cavity plate)(Comprising die cavity, Angle Pin, guide pin bushing, bottom plate, limited block etc.).
2. by location lug mould installion in screw injection molding machine, adjustment mold clamping force, opening speed, opening stroke etc..Lock Mould:Quickly → middling speed → low pressure → high pressure, fast locked mode fast speed, when using general quick, speed is set to 55-75%, pressure Power is set in 50-75%, and position section presses the length dimension of location lug, to mold the 1/3 of width.Middling speed section, after quick fraction terminates Middling speed is converted into, the position of middling speed is usually to be closed to template untill one piece, and specific length should regard template plate interval, speed one As be arranged between 30%-50%, pressure is then between 20%-45%.Low pressure is set, and low speed setting is usually a flash in template contacts Between, particular location is just located at the numeral in a flash that board display screen is shown and is defined, using this point as standard, i.e., in putting then this not High pressure, it is then big higher than this point, high pressure is played easily;The speed of setting is usually 15%-25%, depending on depending on different machines, pressure one As be set in 1-2%, some machines can then be located at 5-15%, and depend on different machines different.High pressure set, the board by and Speech, locations of high pressure board has all set when dispatching from the factory, comparatively, cannot at will changed, for example shakes male machine and exist 50P, speed relatively low pressure is slightly higher, about in 30-35% or so, and depending on pressure then depends on mould, can value be in 55-85% Can.
3. melten gel uses middling speed, be set to 45%-75%, melten gel it is simultaneously important be back pressure use, Product Precision will Ask bigger, the use of back pressure is then bigger, and structure is closer between back pressure can make raw molecule, and then size is more steady for the product molded Fixed, outward appearance is better.But back pressure is too big, then salivation can be produced, so the use of back pressure takes into full account formed product;Melten gel process is another One important link is exactly that pine moves back, and pine moves back a point preceding pine and moved back to be moved back with rear pine, and it is acted on to prevent from salivating and reel off raw silk from cocoons, set point speed And pressure, all between 20%-50%, for the stroke of setting typically between 2-5cm, too long of stroke may make storage inside barrel empty Gas, it can cause next mould that more bubble occurs.
4. carry out cast filling after the completion of colloidal sol, injection time during filling, the dwell time, cool time is according to mold temperature It is adjusted.
5. product then has the process of a die sinking after cooling and shaping, die sinking is substantially the inverse process die sinkings of matched moulds Latter end then has one to set at a slow speed, after the completion of die sinking, process that product must eject:
1)Before top:Qian Fenliangge classes are pushed up, the first stage is divided into middle pressure at a slow speed, is that product is gently ejected a part, then It is middle pressure middling speed top, middle pressure middling speed is generally referred to as 35%-55%, and low speed is then possible to low to 5%, and ejection stroke setting is top It is slightly bigger 1-2cm than product vertical depth to go out length;Push rod, which retracts, includes two processes and the process of roof fall is basically identical, top The terminal moved back should reserve 1-3cm space, to protect thimble oil pipe not to be damaged, the ejection of thimble mode single;
2)Material road part is trimmed after ejection, notices that trimming prevents product the defect caused by trimming during trimming.
6. nylon location lug set is internal plus during steel bushing, steel bushing of first sizing out, steel bushing is positioned after die sinking during injection In die cavity, then matched moulds, pays attention to adjustment shot after adding steel bushing, prevents that overlap is closed in excessive salivation.
7., need to be by nylon because interiors of products residual stress need to eliminate and using in wet area after the completion of nylon location lug set Tenon set carries out heat treatment and damping moisture absorption processing, and packaging is shipped to construction site after nylon location lug set completes.

Claims (10)

1. a kind of shield segment assembling location lug set, it is characterized in that, the location lug set is identical by two bottom surfaces and overlaps connection Round platform form, the taper of two round platforms is different, and location lug set is axially arranged with connecting cavity(1);The location lug covers injection molding, bag Following each component is included to be prepared:Polyhexamethylene adipamide, synergistic fire retardant, expansion type flame retardant, compatilizer, glass fibre.
2. a kind of shield segment assembling location lug set according to claim 1, it is characterized in that, each group in the location lug set Part mass percent be:Polyhexamethylene adipamide 60%, synergistic fire retardant 13%, expansion type flame retardant 3%, compatilizer 2%, glass Fiber 22%.
3. a kind of shield segment assembling location lug set according to claim 1, it is characterized in that, the synergistic fire retardant is boron Sour zinc.
4. a kind of shield segment assembling location lug set according to claim 1, it is characterized in that, the location lug set is internal embedding There is steel bushing(2).
5. a kind of shield segment assembling location lug set according to claim 1, it is characterized in that, one of round platform lateral surface Provided with some annular bonding agent conduits(3).
6. a kind of shield segment assembling location lug set according to claim 5, it is characterized in that, the annular bonding agent conduit It is arranged on the less round platform of taper(4)Lateral surface, the larger round platform of another taper(5), its lateral surface is by the outside conical surface(6)、 The inner side conical surface(7)Form, the taper of the inner side conical surface is more than the taper of the outside conical surface.
7. a kind of shield segment assembling location lug set according to claim 1, it is characterized in that, the location lug covers connecting cavity By the cylinder chamber at middle part(8)With the tubaeform chamber of both sides(9)Form.
8. the location lug according to any one of claim 1-7 is enclosed on the application in shield segment assembling, it is characterized in that, bag Include following steps:
1)Prefabricated shield duct piece:Mould for shielding pipe piece, production shield duct piece are made according to construction requirement, when shield duct piece makes, Arc link bolt hole is set respectively at the joint face of its both sides(10), arc link bolt hole is in shield duct piece joint face One end sets detent, and bolt installation counterbore is provided with the inner side cambered surface of shield duct piece(11), the counterbore is connected spiral shell with arc The other end of keyhole communicates;The madial wall of the detent is the cone structure to match with round platform lateral surface, two neighboring The junction of shield duct piece, the detent of one of joint face, its cross section are circle(12), another joint face determines Position groove, its cross section elongated hole-shape in a ring(13);
2)Prepare location lug set:1. making mould, design taper cut-off rule is die parting line, by four types of uniformly arranging from top to bottom Chamber;
2. poly- adipoyl hexamethylene diamine, glass fibre are put into 110 DEG C of vacuum drying chamber and are dried in vacuo, after the completion of add Synergistic fire retardant, expansion type flame retardant, compatilizer are uniformly mixed;
3. location lug mold is installed in screw injection molding machine, adjusting bolt barrel temperature:Back segment temperature be 260-300 DEG C, Stage casing temperature is 265-295 DEG C, front-end temperature is 260-290 DEG C, and nozzle temperature is 250-270 DEG C, mold temperature 30-80 DEG C, injection pressure 75-130MPa, screw speed 70-110r/min, a mould four, location lug set is finally made;
3)Assembled shield duct piece is covered using location lug:When section of jurisdiction cyclization is assembled, add in the annular bonding agent conduit of location lug set Add bonding agent, one end of location lug cuff bonding agent screwed in the circular detent of shield duct piece, after the completion of it is assembled next Block shield duct piece;Next piece of section of jurisdiction allows the other end of location lug set slowly to enter by the tangential direction rotation of location lug set center line Enter in the block section of jurisdiction annular elongated hole-shape detent;After the completion of, utilize arc connecting bolt(17)Through two shield duct pieces The connecting cavity of arc link bolt hole and location lug set, adjacent two pieces of shield duct pieces progress bolt connection is fixed, location lug Also arc connecting bolt is effectively protected while being enclosed on positioning;Ring is assembled with holding, shield duct piece spelling identical to assembling method Annular elongated hole-shape detent adjustment good position must be utilized during dress, it is fixed then to be allowed along the tangential direction of location lug set center line Position tenon set enters in next piece of section of jurisdiction detent, carries out successively assembled.
9. location lug according to claim 8 is enclosed on the application in shield segment assembling, it is characterized in that, step 2)In, note After being molded during modeling by steel bushing location and installation in mold cavity, then matched moulds, pays attention to adjustment shot after adding steel bushing, prevents from producing Overlap is closed in raw excessive salivation, eventually forms the internal location lug set for being embedded with steel bushing.
10. location lug according to claim 8 is enclosed on the application in shield segment assembling, it is characterized in that, step 1)In, Arch screw bolt is set to shape plug in mould for shielding pipe piece(14), positioning mold insert(15), arch screw bolt shaping plug one end and mould Core is connected, and the other end is connected with positioning mold insert, and positioning mold insert is installed on segment die side form by bolt(16)Positioning hole in, Vestibule is provided with inside positioning mold insert;After shield duct piece is made, arch screw bolt shaping plug is removed, link bolt hole is formed, removes Mold insert is positioned, forms detent.
CN201711203674.1A 2017-11-27 2017-11-27 A kind of shield segment assembling location lug set and its application in shield segment assembling Pending CN107725070A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711203674.1A CN107725070A (en) 2017-11-27 2017-11-27 A kind of shield segment assembling location lug set and its application in shield segment assembling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711203674.1A CN107725070A (en) 2017-11-27 2017-11-27 A kind of shield segment assembling location lug set and its application in shield segment assembling

Publications (1)

Publication Number Publication Date
CN107725070A true CN107725070A (en) 2018-02-23

Family

ID=61219432

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711203674.1A Pending CN107725070A (en) 2017-11-27 2017-11-27 A kind of shield segment assembling location lug set and its application in shield segment assembling

Country Status (1)

Country Link
CN (1) CN107725070A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756959A (en) * 2018-07-11 2018-11-06 中国铁建重工集团有限公司 A kind of section of jurisdiction vacuum grabbing device and development machine
CN109653768A (en) * 2018-12-29 2019-04-19 北京城建信捷轨道交通工程咨询有限公司 Adjustable support, shield duct piece and adjusting method for shield duct piece inner wall

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007023541A (en) * 2005-07-13 2007-02-01 C I Kasei Co Ltd Water cut-off structure of segment for shield tunnel
CN106703830A (en) * 2016-11-11 2017-05-24 中铁二院工程集团有限责任公司 Shield segment lining connector structure with limiting function
CN106869950A (en) * 2017-03-06 2017-06-20 中交天和机械设备制造有限公司 Shield tail with refrigerating plant

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007023541A (en) * 2005-07-13 2007-02-01 C I Kasei Co Ltd Water cut-off structure of segment for shield tunnel
CN106703830A (en) * 2016-11-11 2017-05-24 中铁二院工程集团有限责任公司 Shield segment lining connector structure with limiting function
CN106869950A (en) * 2017-03-06 2017-06-20 中交天和机械设备制造有限公司 Shield tail with refrigerating plant

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
四川迈铁龙科技有限公司: "盾构管片装配式定位榫", 成都市标准信息自我声明公开服务平台, pages 5 - 13 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756959A (en) * 2018-07-11 2018-11-06 中国铁建重工集团有限公司 A kind of section of jurisdiction vacuum grabbing device and development machine
CN108756959B (en) * 2018-07-11 2024-02-02 中国铁建重工集团股份有限公司 Segment vacuum grabbing device and heading machine
CN109653768A (en) * 2018-12-29 2019-04-19 北京城建信捷轨道交通工程咨询有限公司 Adjustable support, shield duct piece and adjusting method for shield duct piece inner wall

Similar Documents

Publication Publication Date Title
CN107725070A (en) A kind of shield segment assembling location lug set and its application in shield segment assembling
CN102896279B (en) Production process for water channel sand core of cylinder cap of single cylinder diesel engine by using cold core technology
CN101486071B (en) Technique and equipment for pouring flanged fitting combination
CN207813627U (en) A kind of shield segment assembling location lug set
CN106735057A (en) A kind of die casting
CN103100669A (en) Valve body combined casting process for sluice valve with flange casting bolt hole
CN204799897U (en) Wall tile precision casting mould floats in combustion chamber
CN103240398B (en) For the production of the method for Aluminum Hollow die-cast product
CN1078842C (en) Mould for injection moulding
KR101350431B1 (en) A precision casting mold for comprehensive turbine housing by using a shell mold
CN208483182U (en) A kind of balance sand core exhaust structure of hollow clump weight casting
CN203875291U (en) Exhaust manifold casting mold
CN205651611U (en) Battery case injection mold's side shrinkage pool device of loosing core
CN209682956U (en) Manufacture the mold of composite material inlet lip
CN205343686U (en) Take air -bleed system's injection mold
CN102886885A (en) Extrusion die head
CN204488030U (en) A kind of injection moulding blowing double mould
CN105856535A (en) Eight-core lamp cover mold and working method thereof
CN206009751U (en) Six cylinder camshaft frock of Iron Mould Coated Sand
CN105034282A (en) Ejection cold-runner mould of automobile rubber vent pipe
CN101269402A (en) Engine cavity cooling core
CN108326240A (en) A kind of balance sand core exhaust structure of hollow clump weight casting
CN203622862U (en) Conformal cooling device based on laser selective molding technology
CN205588580U (en) Boxing glove mould
CN211161851U (en) Cutting die mould for splicing and die cutting of multiple movable knives

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination