CN107725060A - Constructing metro tunnel method containing complicated geological and without shield launching place - Google Patents

Constructing metro tunnel method containing complicated geological and without shield launching place Download PDF

Info

Publication number
CN107725060A
CN107725060A CN201711111239.6A CN201711111239A CN107725060A CN 107725060 A CN107725060 A CN 107725060A CN 201711111239 A CN201711111239 A CN 201711111239A CN 107725060 A CN107725060 A CN 107725060A
Authority
CN
China
Prior art keywords
shield
section
sky
tunneling
tunneling section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711111239.6A
Other languages
Chinese (zh)
Other versions
CN107725060B (en
Inventor
李艳辉
李建军
吴世红
黄四华
曹志勇
赵香萍
李晓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CN201711111239.6A priority Critical patent/CN107725060B/en
Publication of CN107725060A publication Critical patent/CN107725060A/en
Application granted granted Critical
Publication of CN107725060B publication Critical patent/CN107725060B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/003Linings or provisions thereon, specially adapted for traffic tunnels, e.g. with built-in cleaning devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/107Reinforcing elements therefor; Holders for the reinforcing elements
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/0607Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield being provided with devices for lining the tunnel, e.g. shuttering
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Abstract

The present invention relates to subway work technical field, constructing metro tunnel method specially containing complicated geological and without shield launching place, solve the problems, such as in existing subway work because Subway Tunnel contains complicated geological and can not provide shield launching place on time, in default transit tunnel, one shield vertical shaft is set, the both ends of shield vertical shaft shield sky of being constructed respectively using Mining Method is pushed away tunneling section and synchronous construction tunneling section and applies preliminary bracing in time, shield sky pushes away tunneling section and is connected with shield driving section, the shield machine main body and Backup system transferred and assembled through shield vertical shaft push away progress shield driving when tunneling section reaches shield driving section through shield sky using separate launching mode and originated, synchronous construction tunneling section is excavated to subway station using Mining Method.The present invention gives full play to the strong point of respective engineering method relative to single shield-tunneling construction, and it is fast to have the characteristics that to reduce cutterhead abrasion, the tool changing that avoids frequently opening a position, reduction security risk, construction speed.

Description

Constructing metro tunnel method containing complicated geological and without shield launching place
Technical field
The present invention relates to subway work technical field, specially containing complicated geological and without the subway tunnel in shield launching place Construction method.
Background technology
With the quickening of Chinese Urbanization step, metro construction has been enter into golden period period of expansion.Existing subway is applied Work scheme generally use first carries out metro station construction, and then shield machine originates carry out shield-tunneling construction from subway station, and shield goes out The conveying of slag and shield piece utilizes subway station;After either being got through in subway station, separately shield at one is selected in Subway Tunnel Structure vertical shaft, shield is slagged tap and the conveying of shield piece coordinates vertical shaft to carry out jointly using subway station.Because city underground is commonly designed For shallow tunnel, and above route, structures are more, densely populated, heavy traffic, are often asked because earth clearance or traffic change Topic influences the integral construction of engineering, can not provide place for originating for shield on time, because subway tunnel section is longer, pole be present The possibility of the special geology such as hard rock or boulder group is larger, and shield machine will accelerate cutter abrasion, reduction in the work of such a stratum Driving speed, frequently changing cutter will be such that cost of labor and engineering cost constantly rises, and construction safety risk is very big, not only applies Work difficulty is big, and the duration of engineering and cost can not obtain fine control.
The content of the invention
The present invention is in order to solve because Subway Tunnel contains complicated geological to add using shield-tunneling construction in existing subway work Fast cutter abrasion, driving speed is reduced, while place is originated because earth clearance or traffic change to provide for shield on time A kind of problem, there is provided constructing metro tunnel method containing complicated geological and without shield launching place.
The present invention is achieved through the following technical solutions:A kind of subway tunnel containing complicated geological and without shield launching place Pipeline construction method, one shield vertical shaft is set in default transit tunnel, the both ends of shield vertical shaft are constructed shield respectively using Mining Method Structure sky pushes away tunneling section and synchronous construction tunneling section and applies preliminary bracing in time, and shield sky pushes away tunneling section towards shield driving side To synchronous construction tunneling section pushes away tunneling section and be connected with shield driving section towards shield driving opposite direction, shield sky, through shield vertical shaft The shield machine main body and Backup system transferred and assembled push away tunneling section arrival shield through shield sky using separate launching mode and pushed away Progress shield driving originates after entering section, and synchronous construction tunneling section is excavated to subway station using Mining Method.
Complicated geological includes any one or a few combination in extremely hard rock, boulder group or upper-soft lower-hard ground.
Shield sky pushes away tunneling section and synchronous construction tunneling section is arranged in the range of complicated geological.
The bottom that shield sky pushes away tunneling section is provided with the shield machine guide table of arc, and the length of shield machine guide table is shield vertical shaft Untill apart from 1.5 meters of shield driving section starting point, shield sky pushes away landfill in tunneling section and had pushes away the beans originated for shield sky for end face Grain stone.
Separate launching mode refers to push away tunneling section in shield sky, before shield machine main body carrying connecting bridge and No. 1 chassis sky push away OK, remaining 2-No. 6 chassis is placed on synchronous construction tunneling section and is attached by pipeline extension.
Shield machine guide table is constructed using C30~C45 plain concretes, and thickness is 400mm~450mm, in shield machine guide table Heart line overlaps with tunnel center line and shield machine guide table is along tunnel center line symmetrical setting, shield machine guide table section arc length and tunnel Center angle is 60 °.
Beans stone pushes away tunneling section tunneling boring landfill in the range of the 10m shield vertical shaft in shield sky, remaining length Shield sky pushes away tunneling section landfill beans stone to tunnel 1/3-1/2 height.
Preliminary bracing refers to carry out supporting using gunite concrete, anchor pole, bar-mat reinforcement, bracing members.
Shield machine pushes away the intersection termination wall area of tunneling section to shield driving section and shield sky before shield driving originates Face carries out consolidation process, and consolidation process substitutes reinforcing bar and gunite concrete using glass fibre, high by 3 to 9 meters of minister on face The soil body scope of rice uses grouting and reinforcing, and injection slurry is using cement and the mixed liquor of waterglass.
The present invention in urban subway tunnel construction, to run into extremely hard rock, boulder group or over long distances it is upper it is soft it is lower it is hard poorly Duan Shi, achieved noticeable achievement using the engineering method of " Mining Method excavation+shield method lining cutting ", it is often more important that, construction party of the present invention Method, which only relies on a shield vertical shaft, realizes the transport slagged tap with shield piece of shield-tunneling construction, can not applied in subway station Prior involvement is constructed under work state, substantially increases project progress, relative to single shield-tunneling construction, technology of the present invention Scheme can give full play to the strong point of respective engineering method, have and reduce cutterhead abrasion, avoid the tool changing that frequently opens a position, having reduces safety wind Nearly, the advantages that construction speed is fast.
Brief description of the drawings
Fig. 1 is the process chart of the present invention;
Fig. 2 is the structural representation of the present invention;
Fig. 3 is shield machine separate launching structural representation;
Fig. 4 is shield machine guide table schematic diagram;
Fig. 5 beans clitters fill out structural representation.
In figure:1- shield vertical shafts, 2- shield skies push away tunneling section, 3- synchronous construction tunneling sections, 4- shield driving sections, 5- subways Station, 7- preliminary bracings, 8- shield machine guide table, 9- beans stones, 10- cutterheads, 11- shield machine main bodys, H- shield drivings direction.
Embodiment
The present invention is further elaborated 1~Fig. 5 of reference picture, a kind of containing complicated geological and without the ground in shield launching place Iron method for tunnel construction, one shield vertical shaft 1 is set in default transit tunnel, the both ends of shield vertical shaft 1 are distinguished using Mining Method Construction shield sky pushes away tunneling section 2 and synchronous construction tunneling section 3 and applies preliminary bracing 7 in time, and shield sky pushes away tunneling section 2 towards shield Structure direction of propulsion H, synchronous construction tunneling section 3 push away tunneling section 2 and are connected with shield driving section towards shield driving opposite direction, shield sky 4, the shield machine main body 11 and Backup system transferred and assembled through shield vertical shaft 1 are pushed away secretly using separate launching mode through shield sky Dig progress shield driving after section 2 reaches shield driving section 4 to originate, synchronous construction tunneling section 3 is excavated to subway using Mining Method Stand 5.The position selection of shield vertical shaft 1 is carried out according to complicated geological, i.e., makees the section of the special geologies such as extremely hard rock or boulder group For synchronous construction tunneling section 3, shield sky pushes away tunneling section 2 and synchronous construction tunneling section 3 is arranged in the range of complicated geological.By shield The location that basement rock projection or boulder in the both sides section of vertical shaft 1 be present uses mining method construction, and shield driving direction H uses Mining Method The just branch construction of excavation+shotcrete, later stage progress shield sky pushes away uses Tunneling by mining method with pipe sheet assembling operation, shield driving opposite direction Construction, for shield machine go into the well assembling and sky push away when deposit shield machine after supporting chassis, untill subway station is excavated to.
The present invention pushes away tunneling section 2 using Mining Method completion shield sky and Partial synchronization is applied after the completion of the construction of shield vertical shaft 1 Work tunneling section 3, wherein shield sky, which push away the length of tunneling section 2, must be more than shield machine main body 11, cutterhead 10, connecting bridge and No. 1 chassis Total length;The length of Partial synchronization construction tunneling section 3 need to be more than the total length of remaining 2-No. 6 chassis.When shield machine air pushing passes through Cross after shield sky pushes away tunneling section 2 and start shield driving, remaining synchronous construction tunneling section 3 constructed completion using Mining Method, Untill being connected with subway station 5.
Shield machine before shield driving originates, slap by the intersection termination wall that tunneling section 2 is pushed away to shield driving section 4 and shield sky Sub- face carries out consolidation process, and consolidation process substitutes reinforcing bar and gunite concrete using glass fibre, to 9 meters of minister on face, High 3 meters of soil body scope uses grouting and reinforcing, and injection slurry is using cement and the mixed liquor of waterglass.
Shield sky after Mining Method excavates preliminary bracing 7 pushes away tunneling section 2 and synchronous construction tunneling section 3 is non-circular, Shield, which can not be realized, to be carried out shield sky and pushes away the sky of tunneling section 2 pushing away, and the bottom of tunneling section 2 construction shield machine guide table 8, shield are pushed away in shield sky Structure machine guide table 8 can provide accurate guiding while shield machine is supported for the driving of shield machine, it is ensured that shield machine has when sky pushes away Good propulsion posture, pipe sheet assembling quality and waterproof effect can also reach construction requirement.Shield machine guide table 8 uses C30~C45 Plain concrete is constructed, thickness 400mm, and the section arc length of shield machine guide table 8 and tunnel center angle are 60 °, and shield at interface The absolute altitude of structure machine guide table 8 is lower 2~3cm than design face, it is ensured that shield machine ensures shield body while can smoothly stepping into shield machine guide table 8 There are enough contact surfaces with guide table.The center line of shield machine guide table 8 overlaps with tunnel center line, and relative to tunnel center line pair Claim to set, pay attention to not applying guide table close to face 1.5m when applying, reserve the space that cutterhead 10 rotates, avoid cutterhead 10 from blocking Extremely.
The construction of shield machine guide table 8 complete and reach design strength 90% after, pushed away in shield sky and beans carried out in tunneling section 2 The landfill of stone 9, for beans stone 9 in addition to filling the space of section of jurisdiction behind, main function is to provide the counter-force of shield driving, ensures section of jurisdiction Sealing rod is closely connected, reaches good water-stagnating effect.Shield sky push away tunneling section 2 be it is totally enclosed, can not be when shield sky pushes away from knife Beans stone 9 is transported in the front of disk 10, can only fill in the heap of beans stone 9 before shield steps into shield machine guide table 8, the landfill of beans stone 9 Side's amount must be calculated, and side's amount is very few, there is provided counter-force be less than section of jurisdiction sealing rod minimum extruding force 3000kN, the waterproof in tunnel is imitated Fruit is poor, results even in failure, and thrust is excessive, shield machine guide table 8 can be caused to be damaged during shield machine air pushing, or go out Now knock the safety problem in first branch face.By Force Calculation, 10m tunneling borings landfill beans stone, remaining heap before Tunneling by mining method It is filled to the 1/3-1/2 height in tunnel.During practice of construction, it is difficult to fill up whole section, section can only be expired as far as possible Backfill.
Such as run into sharp radius curve sky and push away originating case, shield body can not turn before not fully entering the soil body during shield launching To hole can only be entered along form of straight lines.The line style feature that section line is originated according to section is fitted to tunnel line, takes secant to begin Hair, calculates the offset of shield launching, and then extrapolate the position for originating frame.Center line and shield will be ensured by originating when frame is fixed Secant coincidence is originated, the gradient is consistent with the Tunnel Design gradient.
Originate after rack position determines, according to originating segment array and the external length of 0 endless tube piece determines the position of reaction frame, Reaction frame will ensure reaction frame end face and originate frame Horizontal-shaft vertical when installing, so as to reaction frame stress equalization.
After shield launching frame and reaction frame determine position and reinforced, the assembly working of going into the well of shield machine is carried out, is further adopted With shield separate launching method.Shield is still not finished at station when shield vertical shaft 1 originates, and originating opposite direction can not also reserve The material such as material hole for hoist, section of jurisdiction, grease during shield driving can only go into the well from shield vertical shaft 1, realize that shield smoothly originates Must be by the way of separate launching.Shield sky pushes away shield main body when originating and moved ahead with band connection bridge, No. 1 chassis, matches somebody with somebody after remaining Set chassis is retained in synchronous construction tunneling section 2, and arranging connection by pipe is extended.
Shield separate launching bears endless tube piece by the way of semi-ring is assembled, so as to the vertical transport of shield-tunneling construction material.Half The position of negative ring and reaction frame vacancy carried out with bracing members during ring assembly to contact support, enables the thrust of domain section of jurisdiction uniformly Be delivered on reaction frame, ensure that the assembled quality of positive ring and negative endless tube piece.
After shield separate launching when connecting bridge enters and originates vertical shaft, i.e., cutterhead 10 enter hole in 10m, due to space by Limit will be unable to carry out section of jurisdiction under well operations, it is necessary to transform connecting bridge and No. 1 chassis.By the measurement to the device space, The diagonal brace on connecting bridge top is cut off, and removes the diagonal brace and belt holder on No. 1 chassis top, just can meet that section of jurisdiction goes into the well will Ask.Lifting go into the well it should be noted that must steadily transfer in section of jurisdiction, it is impossible to collided with equipment.When connecting bridge and No. 1 chassis enter in tunnel, Diagonal brace and belt holder need to be recovered again, prevent equipment unbalance stress to be deformed.
To observe cutter on the outside of cutterhead in advance before shield machine guide table 8 when sky pushes away in shield Tunneling by mining method, on shield machine is It is no to interfere with guide table and guide rail, the cutter of interference is removed, with anti-jam cutterhead.Shield machine is pushed ahead along guide table, timely Monitor shield machine and promote situation, check that shield sky pushes away section whether deficient digging, shield machine housing and the shield machine guide table 8 of tunneling section 2 Combination, both sides beans stone 9 situations such as backfilling, while to keep a close eye on cutter head of shield machine periphery and lining cutting, cyclic section of jurisdiction and shield The gap of tail, it is ensured that shield machine moves ahead along the center line of guide rail.The fltting speed of strict control shield machine, guarantee beans stone 9, Synchronous grouting and second pulp feeding filling are closely knit, prevent shield body torsion or section of jurisdiction sidesway, early stage, fltting speed control was in 20mm/min Within, skillfully rear speed can reach 40mm/min to technique.
Tunneling section 2 is pushed away for fully closed shield sky in front of cutterhead, wet-spraying machine can not be used to carry out beans stone 9 and sprayed, removed The automatic filling under squeezing action of beans stone 9 is outer during driving, at the same by the way of human assistance by beans stone 9 to cutterhead or so Two side clearances are filled, and surround a cofferdam in the otch surrounding of the shield machine sand material that is packed in bag every 5m, cofferdam scope is not less than 3 The clock position of point~9 point, to prevent being altered before the beans stone of section of jurisdiction behind, mortar.
Synchronous grouting is carried out after every endless tube piece beans stone manually backfill, synchronous with shield machine propulsion, using manual control Mode slip casting, flow rate of grouting, speed and pressure are adjusted according to field condition.To ensure mortar effectively filling out to section of jurisdiction behind space Fill, prevent mortar from altering to cutterhead, grouting pressure is controlled in 0.05~0.1MPa, but grouting pressure cannot function as slip casting and terminate Standard, when grouting amount reach can jacking consolidate section of jurisdiction when, you can terminate slip casting, about 2~2.5m3 of note.Add in slip casting process The observation deformed to the cofferdam outside shield machine surrounding and shield shell by force, discovery have slurries to leak, should temporarily cease slip casting.Shield It is unlimited in front of machine, synchronous grouting is ineffective, it is necessary to carries out supplement slip casting behind to section of jurisdiction.The abjection tail shield 5~6 in section of jurisdiction After ring, in and 9 positions dual slurry is injected by tunnel segment hanging hole at 3 points, prevent section of jurisdiction sidesway;A ring is carried out every 10 rings Closure, and dual slurry is injected by 1: 11 position hole for hoist, carry out vault backfill.Multiple slip casting just can ensure that section of jurisdiction behind Gap filling it is closely knit.
Shield machine air can carry out originating portal temporary sealing after promoting hole, and brick laid on edge wall blocks outside the section of jurisdiction of hole, and Assembling reinforcement mesh sheet, then carry out spray anchor and consolidate, prevent beans gravel and slurries outflow in tunnel.It is pre- in hole top before spray anchor The slip casting mouth of pipe and exhaust outlet are stayed, the later stage carries out slip casting at top, fills gap between section of jurisdiction top and just branch, it is ensured that tunnel duct piece Assembled quality.
When shield machine will reach headwall face, i.e., filling beans stone as much as possible, filling around shield body are finished It will clean out, the support removed cutterhead deformation when empty push away is prevented inside cutterhead and welded, and will be subsequently retained before cutterhead afterwards Chassis be connected with shield machine.From shield body preformed hole injection low-strength cement slurry, shield shell is set to the greatest extent may be used with tunnel Chu Zhijian spaces It can fill up, to increase shield body rotational resistance, be further continued for tunneling after cement mortar initial set.Shield machine top starts simultaneously to face to be turned Movable knife disc, promoted using the method for small moment of torsion, low velocity, while adjustment cutterhead left-hand rotation right-hand rotation direction is changed according to roll angle, directly Untill shield body enters the change less of soil body roll angle.
When in Xiamen, subway Line 11 marks general's ancestral temple~literary stove station section construction, the station of shield launching and reception is because of room Room is removed and traffic road changes influence and can not constructed by original plan, and section also has basement rock projection, upper soft lower hard and boulder bad Geology, using traditional construction method, it is necessary to which waiting station construction to complete 120m structures just possesses shield launching condition, and shield exists Cutterhead and tool wear are serious when basement rock projection and boulder group stratum are constructed, construction speed only 1~2 ring/day, the risk of construction and Cost is very big.Successfully solve above-mentioned problem using construction method of the present invention, provide shield launching place within 10 months in advance, The bad geological section in section is used into mining method construction simultaneously, construction cost is greatly reduced, achieves good social benefit And economic benefit.

Claims (9)

  1. A kind of 1. constructing metro tunnel method containing complicated geological and without shield launching place, it is characterised in that:In default tunnel Section sets a shield vertical shaft(1), shield vertical shaft(1)Both ends shield sky of being constructed respectively using Mining Method push away tunneling section(2) With synchronous construction tunneling section(3)And preliminary bracing is applied in time(7), shield sky pushes away tunneling section(2)Towards shield driving direction (H), synchronous construction tunneling section(3)Towards shield driving opposite direction, shield sky pushes away tunneling section(2)It is connected with shield driving section(4), Through shield vertical shaft(1)The shield machine main body transferred and assembled(11)And Backup system is pushed away using separate launching mode through shield sky Tunneling section(2)Reach shield driving section(4)Carry out shield driving afterwards to originate, synchronous construction tunneling section(3)Excavated using Mining Method To subway station(5).
  2. 2. the constructing metro tunnel method according to claim 1 containing complicated geological and without shield launching place, its feature It is:Complicated geological includes any one or a few combination in extremely hard rock, boulder group or upper-soft lower-hard ground.
  3. 3. the constructing metro tunnel method according to claim 2 containing complicated geological and without shield launching place, its feature It is:Shield sky pushes away tunneling section(2)With synchronous construction tunneling section(3)It is arranged in the range of complicated geological.
  4. 4. the constructing metro tunnel method according to claim 1 containing complicated geological and without shield launching place, its feature It is:Shield sky pushes away tunneling section(2)Bottom be provided with the shield machine guide table of arc(8), shield machine guide table(8)Length be shield Structure vertical shaft(1)End face is to apart from shield driving section(4)Untill 1.5 meters of starting point, shield sky pushes away tunneling section(2)Interior landfill has for shield Structure sky pushes away the beans stone originated(9).
  5. 5. the constructing metro tunnel method containing complicated geological and without shield launching place according to claim 1 or 3, it is special Sign is:Separate launching mode refers to push away tunneling section in shield sky(2), shield machine main body(11)Carry connecting bridge and No. 1 chassis Sky pushes away forward, and remaining 2-No. 6 chassis is placed on synchronous construction tunneling section(3)And it is attached by pipeline extension.
  6. 6. the constructing metro tunnel method according to claim 4 containing complicated geological and without shield launching place, its feature It is:Shield machine guide table(8)Constructed using C30~C45 plain concretes, thickness is 400mm~450mm, shield machine guide table(8)'s Center line is overlapped with tunnel center line and shield machine guide table(8)Along tunnel center line symmetrical setting, shield machine guide table(8)Section arc Long and tunnel center angle is 60 °.
  7. 7. the constructing metro tunnel method according to claim 4 containing complicated geological and without shield launching place, its feature It is:Beans stone(9)Tunneling section is pushed away in shield sky(2)From shield vertical shaft(1)Tunneling boring landfill in the range of the 10m of beginning, remaining The shield sky of length pushes away tunneling section(2)Landfill beans stone(9)To tunnel 1/3-1/2 height.
  8. 8. the constructing metro tunnel method according to claim 1 containing complicated geological and without shield launching place, its feature It is:Preliminary bracing(7)Refer to carry out supporting using gunite concrete, anchor pole, bar-mat reinforcement, bracing members.
  9. 9. the constructing metro tunnel method according to claim 1 containing complicated geological and without shield launching place, its feature It is:Shield machine is before shield driving originates, to shield driving section(4)Tunneling section is pushed away with shield sky(2)Intersection termination wall Face carries out consolidation process, and consolidation process substitutes reinforcing bar and gunite concrete using glass fibre, to minister on face 9 Rice, high 3 meters of soil body scope use grouting and reinforcing, and injection slurry is using cement and the mixed liquor of waterglass.
CN201711111239.6A 2017-11-13 2017-11-13 Subway tunnel construction method containing complex geology and without shield originating site Active CN107725060B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711111239.6A CN107725060B (en) 2017-11-13 2017-11-13 Subway tunnel construction method containing complex geology and without shield originating site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711111239.6A CN107725060B (en) 2017-11-13 2017-11-13 Subway tunnel construction method containing complex geology and without shield originating site

Publications (2)

Publication Number Publication Date
CN107725060A true CN107725060A (en) 2018-02-23
CN107725060B CN107725060B (en) 2023-12-01

Family

ID=61215852

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711111239.6A Active CN107725060B (en) 2017-11-13 2017-11-13 Subway tunnel construction method containing complex geology and without shield originating site

Country Status (1)

Country Link
CN (1) CN107725060B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108775244A (en) * 2018-05-28 2018-11-09 中铁十六局集团有限公司 A kind of Mining Method receives shield machine and shield sky pushes away construction method
CN109026043A (en) * 2018-09-18 2018-12-18 中铁第六勘察设计院集团有限公司 A kind of long range submerged tunnel mine shield dynamic lays pattern and method from joint
CN109057810A (en) * 2018-08-30 2018-12-21 中国水利水电第十四工程局有限公司 A kind of shield sky pushes away construction method and auxiliary device by Tunneling by mining method
CN110685699A (en) * 2019-10-15 2020-01-14 中铁十二局集团有限公司 Mine method tunnel shield empty pushing starting construction method
CN110761800A (en) * 2019-12-05 2020-02-07 中铁十二局集团第二工程有限公司 Air-assisted launching construction method of launching well in underground excavation tunnel shield machine
CN110905527A (en) * 2019-12-11 2020-03-24 中铁二十局集团第四工程有限公司 Construction method of tunnel with upper soft and lower hard strata
CN111305856A (en) * 2020-02-24 2020-06-19 上海应用技术大学 Shield construction starting method for subway in narrow section
CN111577300A (en) * 2020-04-20 2020-08-25 中铁十二局集团有限公司 Construction method for shield to penetrate through dense holes in boulder and boulder stratum
CN111927477A (en) * 2020-08-24 2020-11-13 上海市城市建设设计研究总院(集团)有限公司 Shield overall launching and receiving method for ultra-deep long-distance tunnel
WO2021120991A1 (en) * 2019-12-16 2021-06-24 中铁一局集团有限公司 Method for reconstructing shield tunnel for mining construction
CN113914872A (en) * 2021-09-01 2022-01-11 武汉市政工程设计研究院有限责任公司 Long-distance drainage deep tunnel shield method for penetrating complex stratum
CN113931640A (en) * 2021-10-15 2022-01-14 中国建筑第六工程局有限公司 Construction method for empty pushing and starting of shield in mine tunnel

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000345790A (en) * 1999-06-08 2000-12-12 Kajima Corp Shield machine, drive method for shield machine, and construction method for inclined shaft or vertical shaft
JP2005179941A (en) * 2003-12-17 2005-07-07 San Shield Kk Base for main push device
CN103114857A (en) * 2013-02-26 2013-05-22 中铁十九局集团第二工程有限公司 Shield tunnel construction method
CN105041349A (en) * 2015-07-26 2015-11-11 北京工业大学 Underground excavation construction method for expanded excavation of station on basis of metro regional shield tunnel
CN106223963A (en) * 2016-08-05 2016-12-14 中国水利水电第十四工程局有限公司 A kind of shield machine air pushing construction method by subsurface excavation method tunnel

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000345790A (en) * 1999-06-08 2000-12-12 Kajima Corp Shield machine, drive method for shield machine, and construction method for inclined shaft or vertical shaft
JP2005179941A (en) * 2003-12-17 2005-07-07 San Shield Kk Base for main push device
CN103114857A (en) * 2013-02-26 2013-05-22 中铁十九局集团第二工程有限公司 Shield tunnel construction method
CN105041349A (en) * 2015-07-26 2015-11-11 北京工业大学 Underground excavation construction method for expanded excavation of station on basis of metro regional shield tunnel
CN106223963A (en) * 2016-08-05 2016-12-14 中国水利水电第十四工程局有限公司 A kind of shield machine air pushing construction method by subsurface excavation method tunnel

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
皮景坤: "盾构分体始发技术在某地铁施工中的应用" *
赵岗领等: "城市地铁盾构通过暗挖隧道施工案例" *

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108775244A (en) * 2018-05-28 2018-11-09 中铁十六局集团有限公司 A kind of Mining Method receives shield machine and shield sky pushes away construction method
CN109057810A (en) * 2018-08-30 2018-12-21 中国水利水电第十四工程局有限公司 A kind of shield sky pushes away construction method and auxiliary device by Tunneling by mining method
CN109057810B (en) * 2018-08-30 2023-08-22 中国水利水电第十四工程局有限公司 Construction method and auxiliary device for shield air-pushing through mine tunnel
CN109026043A (en) * 2018-09-18 2018-12-18 中铁第六勘察设计院集团有限公司 A kind of long range submerged tunnel mine shield dynamic lays pattern and method from joint
CN109026043B (en) * 2018-09-18 2023-11-10 中铁第六勘察设计院集团有限公司 Dynamic self-joint laying type and method for long-distance underwater tunnel mine shield
CN110685699A (en) * 2019-10-15 2020-01-14 中铁十二局集团有限公司 Mine method tunnel shield empty pushing starting construction method
CN110761800B (en) * 2019-12-05 2021-10-01 中铁十二局集团第二工程有限公司 Air-assisted launching construction method of launching well in underground excavation tunnel shield machine
CN110761800A (en) * 2019-12-05 2020-02-07 中铁十二局集团第二工程有限公司 Air-assisted launching construction method of launching well in underground excavation tunnel shield machine
CN110905527A (en) * 2019-12-11 2020-03-24 中铁二十局集团第四工程有限公司 Construction method of tunnel with upper soft and lower hard strata
CN110905527B (en) * 2019-12-11 2021-09-03 中铁二十局集团第四工程有限公司 Construction method of tunnel with upper soft and lower hard strata
WO2021120991A1 (en) * 2019-12-16 2021-06-24 中铁一局集团有限公司 Method for reconstructing shield tunnel for mining construction
CN111305856B (en) * 2020-02-24 2021-11-05 上海应用技术大学 Shield construction starting method for subway in narrow section
CN111305856A (en) * 2020-02-24 2020-06-19 上海应用技术大学 Shield construction starting method for subway in narrow section
CN111577300A (en) * 2020-04-20 2020-08-25 中铁十二局集团有限公司 Construction method for shield to penetrate through dense holes in boulder and boulder stratum
CN111927477A (en) * 2020-08-24 2020-11-13 上海市城市建设设计研究总院(集团)有限公司 Shield overall launching and receiving method for ultra-deep long-distance tunnel
CN111927477B (en) * 2020-08-24 2022-02-11 上海市城市建设设计研究总院(集团)有限公司 Shield overall launching and receiving method for ultra-deep long-distance tunnel
CN113914872A (en) * 2021-09-01 2022-01-11 武汉市政工程设计研究院有限责任公司 Long-distance drainage deep tunnel shield method for penetrating complex stratum
CN113931640A (en) * 2021-10-15 2022-01-14 中国建筑第六工程局有限公司 Construction method for empty pushing and starting of shield in mine tunnel
CN113931640B (en) * 2021-10-15 2024-04-12 中国建筑第六工程局有限公司 Construction method for shield empty pushing and starting in mine tunnel

Also Published As

Publication number Publication date
CN107725060B (en) 2023-12-01

Similar Documents

Publication Publication Date Title
CN107725060A (en) Constructing metro tunnel method containing complicated geological and without shield launching place
CN207377565U (en) Constructing metro tunnel structure containing complicated geological and without shield launching place
CN100501124C (en) Construction method for tunnel contact passage in shield section of underground railway
CN102606167B (en) Settlement control construction method for transverse grouting guide pipe of shallow underground excavation tunnel
CN104500082B (en) In Tunneling by mining method, shield receives construction method
CN106907164A (en) A kind of water-bed combination of mine shield tunnel docking structure form and its construction method
CN102562099B (en) Method for carrying out rapid face excavation construction of loess tunnel by double rows of small conduits
CN103899323B (en) A kind of construction method of shield crossing rail yard
CN105201518B (en) Disassembling method is received in a kind of major diameter slurry balance shield hole
CN109594990B (en) Large-section jacking pipe construction method for complex stratum
CN108442943A (en) A kind of branch-cut bridge section tunnel and Double side heading method construction method
CN107091101A (en) Mine shield handing-over tunnel folded type joint design and construction method in the middle part of marine site
CN203961994U (en) Under balancing earth-pressure shielding machine, wear the concealed tunneling structure of having runed shield tunnel
CN107023300A (en) A kind of use canopy, which is defended the doctrine, builds the construction method of subway station
CN106014449A (en) Construction method of double-track small-clear distance large-section jointed rock mass subway tunnel
CN110130936B (en) Construction method for sudden encountering untreated karst cave or crack in shield tunneling process
CN102400694A (en) Reinforcement method for combined part of shield tunnel and mining-method tunnel
CN206888992U (en) A kind of water-bed mine shield tunnel combination docking structure form
CN105909263A (en) Eolian sand stratum highway tunnel structure and construction method thereof
CN110864162A (en) Construction process of argillaceous sandstone geological pipe jacking
CN109386293A (en) The sealed reception construction method of large section rectangular top pipe
CN109707388A (en) The method of surface collapse when preventing shield launching from wearing existing shield tunnel down
CN110578525A (en) micro-disturbance construction method for crossing operation subway tunnel by overlapping shield tunnel
CN105041327B (en) Bored tunnel is counter to dig shield method of reseptance
CN110259490A (en) A kind of Underground Subway Station construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant