CN107724954A - A kind of Fractured carbonate strata is drilled well method and system - Google Patents

A kind of Fractured carbonate strata is drilled well method and system Download PDF

Info

Publication number
CN107724954A
CN107724954A CN201710946183.XA CN201710946183A CN107724954A CN 107724954 A CN107724954 A CN 107724954A CN 201710946183 A CN201710946183 A CN 201710946183A CN 107724954 A CN107724954 A CN 107724954A
Authority
CN
China
Prior art keywords
pressure
completion
well
drilling
fractured carbonate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710946183.XA
Other languages
Chinese (zh)
Other versions
CN107724954B (en
Inventor
胡贵
黄雪琴
张国辉
李余成
张希文
徐卫强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201710946183.XA priority Critical patent/CN107724954B/en
Publication of CN107724954A publication Critical patent/CN107724954A/en
Application granted granted Critical
Publication of CN107724954B publication Critical patent/CN107724954B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/08Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/08Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
    • E21B21/085Underbalanced techniques, i.e. where borehole fluid pressure is below formation pressure
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/02Subsoil filtering
    • E21B43/10Setting of casings, screens, liners or the like in wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Geophysics (AREA)
  • Earth Drilling (AREA)

Abstract

The present invention provides a kind of Fractured carbonate strata and is drilled well method and system, and the Fractured carbonate strata, which bores completion method, to be included:By under protective casing at the top of reservoir and cementing the well;Under balance pressure drilling is implemented to Reservoir Section, and monitors formation fluid quantum of output situation;When monitoring formation fluid quantum of output exception, the fluidity of formation fluid is determined;When formation fluid is crude oil or natural gas or oil water mixture, implements drillstem test and determine production information;Completion mode is determined according to the production information.The Fractured carbonate strata of present embodiment, which bores completion method, can solve high salinity complexity oil water relation Fractured carbonate strata because being difficult to accurately identify distribution of oil and water layers by well-log information can not determine the technical barrier of suitable completion mode, suitable for the completion of high salinity complexity oil water relation Fractured carbonate strata.

Description

A kind of Fractured carbonate strata is drilled well method and system
Technical field
The present invention relates to oil-gas geology to be drilled well field, particularly a kind of suitable for high salinity complexity oil water relation Fractured carbonate strata is drilled well method and system.
Background technology
During oil-gas exploration and development, it is most important that efficient, safety completion is drilled well operations.Wherein, it is " efficient " to need To use advanced suitable drilling technology to improve drill footage speed, drillng operation is completed with most fast speed, complete drilling well and make The maximization of oil and gas production is ensured after industry from suitable well-completing process;" safely " need to ensure using suitable technological measure and bore Well operations are smoothly implemented, and avoid the occurrence of the accidents such as leakage, spill and leakage, blocked portion complexity, while ensure the well after Completion Operations and completion Cylinder safety.
In high salinity complexity oil water relation Fractured carbonate strata, because it has complicated oil-water-layer relation, Before brill can not the specific water layer of Accurate Prediction and oil reservoir position, also can not accurately estimate bore meet oil-water-layer pressure and production water Oil-producing situation.Complex accident is relatively more during this uncertainty causes conventional drilling (overbalance), exists while opens not With the oil-water-layer of pressure, the narrow Density Window situation of safety drilling be present, drilling well overflow and circulation problems are protruded, even sent out when serious Raw bit freezing is complicated.Generally use routine Overbalance Drilling operation in the prior art, once drilling strata overflow, then asked by closing well Pressure calculates actual strata pressure, and improves the density kill-job good ground fluid of drilling fluid.In fact, in fractured reservoir, Stratum liquid usually contains certain gas, and slippage effect, closing well can occur once the gas in formation fluid after the overflow of stratum The pressure asked for not is stratum true pressure, improves drilling fluid density or higher than actual formation pressure or less than being practically laminated Power.If density is too high, leakage complexity occurs, need to further reduce drilling fluid density;If density is too low, continue that overflow occurs Complexity, it need to further improve drilling fluid density.Therefore the generation spill and leakage conversion that can be continued using conventional drilling mode, influences to bore Well operations efficiency.
, it is necessary to completion after the completion of drillng operation.Completion refer to uncased wellbore bore reach target well depth after, make shaft bottom and oil reservoir with The technique that certain fabric connectivity gets up, is that drilling well works last important step, and the beginning of petroleum production engineering.Reasonable selection Oil gas well completion mode is most important, and the quality of total completion time directly influences oily capacity of well and economic life.Crack Property hydrochlorate reservoir conventional completed well mode is broadly divided into based on the completion method do not cemented the well and casing cementing completion mode.Do not cement the well Completion method is divided into barefoot completion, sieve tube completion, open hole packer completion etc. again.The high yield reservoir of usual fracture development is to avoid High-density cement mortar blocks crack during cased hole completion and space reduces reservoir yield, use the completion mode do not cemented the well more, And low yield multilayer or oil water relation complicated reservoirs are more using set to meet effectively to insulate water layer or later stage reservoir measures to reform needs Pipe completion mode.High salinity complexity oil water relation Fractured carbonate strata preferably uses because its oil water relation is complex Casing cementing completion, but the risk that well cementing operation high-density cement mortar blocks high productivity layer be present;And use the completion side not cemented the well Method, if selection barefoot completion, sieve tube completion are unfavorable for later stage reservoir measures to reform operation, while the envelope of oil-water-layer is also not implemented Every;And select open hole packer completion to need by well logging recognition oil-water-layer, water layer is effectively insulated.Because of such reservoir formation water Salinity is higher, and to maintain wellbore stability, drilling process is needed using the higher drilling fluid drilling of salinity, and existing well logging skill Art identifies that fluid properties there is a problem, influence the implementation of open hole packer completion mode under high salinity.
In summary, prior art can not effectively solve Fractured carbonate strata under high salinity complexity oil water relation It is drilled well technical barrier, it is therefore necessary to propose that Fractured carbonate strata is drilled well side under high salinity complexity oil water relation Method.
The content of the invention
In view of the deficiencies in the prior art, it is an object of the invention to provide a kind of suitable for high salinity complexity oil water relation Fractured carbonate strata is drilled well method and system.
The scheme that patent of the present invention uses is:
A kind of Fractured carbonate strata bores completion method, including:
By under protective casing at the top of reservoir and cementing the well;
Under balance pressure drilling is implemented to Reservoir Section, and monitors formation fluid quantum of output situation;
When monitoring formation fluid quantum of output exception, the fluidity of formation fluid is determined;
When formation fluid is crude oil or natural gas or oil water mixture, implements drillstem test and determine production information;
Completion mode is determined according to the production information.
As a preferred embodiment, described determine that completion mode step includes according to the production information:
When the production information is higher than the first preset value, using open hole packer mode completion;
When the production information is less than the second preset value, using casing cementing completion mode completion.
As a preferred embodiment, described determine that completion mode step also includes according to the production information:
When the production information is less than preset value, continue to implement described to implement under balance pressure drilling step to Reservoir Section.
As a preferred embodiment, also include:
When monitoring formation fluid quantum of output is not abnormal, using casing cementing completion mode completion.
As a preferred embodiment, in the implementation under balance pressure drilling step to Reservoir Section, according to target well The pore pressure in predicted shaft bottom, drilling fluid density is set, and ensures that bottom pressure compares the small 1~4MPa of formation void pressure.
As a preferred embodiment, the mode of the pore pressure that shaft bottom is predicted according to target well is:
When there is offset well to go into operation, then according to the strata pressure of Measured formation pressure coefficient prediction target well;
When offset well is not gone into operation, then the strata pressure of target well is predicted according to offset well well-log information.
As a preferred embodiment, in the implementation under balance pressure drilling step to Reservoir Section, in well head drilling well Liquid outlet line sets back-pressure valve and sets wellhead back pressure, to ensure the poor relative constancy of bottom pressure and formation void pressure.
As a preferred embodiment, exceed the one of the rated pressure of well mouth rotary preventer in the wellhead back pressure When half, drilling fluid density is improved to reduce wellhead back pressure.
As a preferred embodiment, also include:
When the formation fluid is stratum water and quantum of output is more than predetermined value, implement the decompression that discharges water.
As a preferred embodiment, the implementation discharges water, depressurization step includes:
The choke pressure of back-pressure valve is reduced, stratum water nature output is allowed using under balance pressure drilling equipment.
As a preferred embodiment, in the pressure reduction that discharges water, per output stratum 300~1000m of water3, Then closing well seeks pressure once to calculate formation void pressure coefficient;Stop discharging water when the reservoir pressure coefficient reduces by more than 0.2 Decompression, implement described to Reservoir Section implementation under balance pressure drilling step.
As a preferred embodiment, also include:
On accumulative output stratum, water reaches 10000m3When, closing well calculates formation void pressure after seeking pressure;It is determined that earth bore When gap pressure does not reduce, implement expansion tube packing high pressure water layer;Implement described pair of storage after expansion tube packing high pressure water layer is implemented Interval implements under balance pressure drilling step.
As a preferred embodiment, also include:
When the formation fluid is that stratum water and quantum of output are less than predetermined value, continue to implement it is described Reservoir Section is implemented it is deficient Balanced drilling step.
A kind of Fractured carbonate strata bores completion system, including:
Cementing unit, for by under protective casing at the top of reservoir and cementing the well;
Drilling well monitoring device, for implementing under balance pressure drilling to Reservoir Section, and monitor formation fluid quantum of output situation;
Fluidity determining device, for when monitoring formation fluid quantum of output exception, determining the fluidity of formation fluid;
Test device, for when formation fluid is crude oil or natural gas or oil water mixture, it is true to implement drillstem test Determine production information;
Completion system, for determining completion mode according to the production information.
Beneficial effect:
By above description as can be seen that the Fractured carbonate strata of present embodiment bores completion method by monitoring ground Layer fluid quantum of output situation, and when monitoring formation fluid quantum of output exception, the fluidity of formation fluid is determined, then on stratum When fluid is crude oil or natural gas or oil water mixture, implements drillstem test and determine production information, believe further according to the yield Breath determines completion mode, in this way, the Fractured carbonate strata brill completion method of present embodiment can solve high salinity and answer Miscellaneous oil water relation Fractured carbonate strata can not determine properly because being difficult to accurately identify distribution of oil and water layers by well-log information Completion mode technical barrier, suitable for the completion of high salinity complexity oil water relation Fractured carbonate strata.
With reference to following explanation and accompanying drawing, only certain exemplary embodiments of this invention is disclose in detail, specifies the original of the present invention Reason can be in a manner of adopted.It should be understood that embodiments of the present invention are not so limited in scope.In appended power In the range of the spirit and terms that profit requires, embodiments of the present invention include many changes, modifications and are equal.
The feature for describing and/or showing for a kind of embodiment can be in a manner of same or similar one or more Used in individual other embodiment, it is combined with the feature in other embodiment, or substitute the feature in other embodiment.
It should be emphasized that term "comprises/comprising" refers to the presence of feature, one integral piece, step or component when being used herein, but simultaneously It is not excluded for the presence or additional of one or more further features, one integral piece, step or component.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those skilled in the art, without having to pay creative labor, can be with root Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is that a kind of Fractured carbonate strata of one embodiment of the present invention offer is drilled well method flow diagram;
Fig. 2 is that a kind of Fractured carbonate strata of one embodiment of the present invention offer is drilled well method flow diagram;
Fig. 3 is the case casing programme schematic diagram using Fig. 2;
Fig. 4 is that a kind of Fractured carbonate strata of one embodiment of the present invention offer is drilled well system schematic.
Embodiment
In order that those skilled in the art more fully understand the technical scheme in the present invention, below in conjunction with of the invention real The accompanying drawing in example is applied, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described implementation Example only part of the embodiment of the present invention, rather than whole embodiments.It is common based on the embodiment in the present invention, this area The every other embodiment that technical staff is obtained on the premise of creative work is not made, should all belong to guarantor of the present invention The scope of shield.
It should be noted that when element is referred to as " being arranged at " another element, it can be directly on another element Or there may also be element placed in the middle.When an element is considered as " connection " another element, it can be directly connected to To another element or it may be simultaneously present centering elements.Term as used herein " vertical ", " horizontal ", " left side ", For illustrative purposes only, it is unique embodiment to be not offered as " right side " and similar statement.
Unless otherwise defined, all of technologies and scientific terms used here by the article is with belonging to technical field of the invention The implication that technical staff is generally understood that is identical.Term used in the description of the invention herein is intended merely to description tool The purpose of the embodiment of body, it is not intended that in the limitation present invention.Term as used herein "and/or" includes one or more The arbitrary and all combination of related Listed Items.
Fig. 1, Fig. 2 are referred to, one embodiment of the present invention provides a kind of Fractured carbonate strata and bores completion method, splits Stitch acid carbonate stratum and bore the well completion work that completion method is applied under high salinity complexity oil water relation.Specifically, the crack Bore completion method and comprise the following steps in acid carbonate stratum:
S10, by under protective casing at the top of reservoir and cementing the well;
In this step, first drilling well is at the top of reservoir, then tripping in protective casing and cements the well, can so ensure Reservoir Section The pit shaft safety of drilling process middle and upper part well section.
S20, under balance pressure drilling is implemented to Reservoir Section, and monitor formation fluid quantum of output situation;
Wherein, under balance pressure drilling is called underbalanced drilling, refers to that bottom pressure is less than strata pressure, the stream of ground end in drilling well Body controlledly enters pit shaft and is recycled to the drilling technology on ground.
In the implementation under balance pressure drilling step to Reservoir Section, the pore pressure in shaft bottom is predicted according to target well, if Drilling fluid density is put, and ensures that bottom pressure compares the small 1~4MPa of formation void pressure.
The mode of the pore pressure that shaft bottom is predicted according to target well is:When there is offset well to go into operation, then according to reality The strata pressure of geodetic stressor layer coefficient prediction target well;When offset well is not gone into operation, then target is predicted according to offset well well-log information The strata pressure of well.
In the implementation under balance pressure drilling step to Reservoir Section, back-pressure valve is set in wellhead drilling fluid outlet line and set Wellhead back pressure (back-pressure valve can set choke pressure) is put, to ensure the poor relative constancy of bottom pressure and formation void pressure. When exceeding the half of the rated pressure of well mouth rotary preventer in the wellhead back pressure, improve drilling fluid density and returned with reducing well head Pressure.
In this way, in step S20, formation fluid flows into pit shaft under differential pressure action and with circulation of drilling fluid to ground Face, into oil gas water separator, and formation fluid is monitored by sensor device and overflows situation (quantum of output situation).Wherein, pass Sensor equipment can be gas-monitoring sensing equipment, hydro carbons position monitoring sensor, chlorine root monitoring sensor etc..
S30, when monitoring formation fluid quantum of output exception, determine the fluidity of formation fluid;
In this step, when judging that the quantum of output (or spill-out) of formation fluid is abnormal, can in units of the time output Trend that measurer is significantly increased (for example the quantum of output of unit interval is being stepped up or quantum of output reaches empirical value with first-class Deng), the fluidity of overflow substance is judged by oil gas water separator or sensor device.
This fluid allowed in usual stratum can be water, is oil, be gas, when liquid and the drilling well in drilling process Liquid (generally water-base drilling fluid) mixes, it is difficult to judges the fluid of stratum out for which kind of fluid.By oil and gas and water From rear, oil, gas, drilling fluid can be collected into respectively, then can distinguish in stratum out for which kind of fluidity.Wherein, ground laminar flow The fluidity of body is usually stratum water (also referred to as formation brine), crude oil, natural gas, oil water mixture.
S40, when formation fluid is crude oil or natural gas or oil water mixture, implement drillstem test determine yield believe Breath;
Wherein, drillstem test is also known as drill stem testing, the drillstem test refer in drilling one it is found that oil/gas show with Afterwards, stop to bore the simultaneously special tester of tripping in immediately, the passage on oil gas outflow ground, the bore hole in drilling well midway are done using drilling rod The test carried out in well (section).
S50, completion mode determined according to the production information.
In this step, when the production information is higher than the first preset value, using open hole packer mode completion;Or Person, when the production information is less than the second preset value, using casing cementing completion mode completion.Wherein, believe in the yield Breath may determine that this well is high-yield well when being higher than the first preset value, illustrates reservoir fissure development, now fractured-vuggy reservoir, should use Open hole packer completion mode completion.The open hole packer completion mode completion can be by external packer of pipe and sleeve pipe point The mode of section completion carries out completion.
It is stripper well that this is may determine that when production information is less than the second preset value, is not fractured-vuggy reservoir, in this way, can To use casing cementing completion mode completion in time according to geological reservoir requirement.The casing cementing completion mode completion can be set Pipe perforation completion, and according to oil-water-layer selective perforation section.
In one embodiment, the first preset value can be 50 tpds, and the second preset value can be 5 tpds, i.e. on ground Well of the yield of layer fluid higher than 50 tpds is high yield, is then low yield less than 5 tons.
In a further embodiment, in the production information, less than preset value, (preset value can be preset with above-mentioned second Be worth it is identical, can also be different) when, completion (than such as above-mentioned casing cementing completion mode completion) can be selected, can also be without Completion and selecting continues to implement described to implement under balance pressure drilling step to Reservoir Section.
By above description as can be seen that the Fractured carbonate strata of present embodiment bores completion method by monitoring ground Layer fluid quantum of output situation, and when monitoring formation fluid quantum of output exception, the fluidity of formation fluid is determined, then on stratum When fluid is crude oil or natural gas or oil water mixture, implements drillstem test and determine production information, believe further according to the yield Breath determines completion mode, in this way, the Fractured carbonate strata brill completion method of present embodiment can solve high salinity and answer Miscellaneous oil water relation Fractured carbonate strata can not determine properly because being difficult to accurately identify distribution of oil and water layers by well-log information Completion mode technical barrier, suitable for the completion of high salinity complexity oil water relation Fractured carbonate strata.
Meanwhile the Fractured carbonate strata brill completion method of present embodiment can also solve high salinity complexity profit Can not the specific water layer of Accurate Prediction and oil reservoir position, the pressure of oil-water-layer and production aquatic products oil in relation Fractured carbonate strata The low technical barrier of overflow leakage conversion caused by situation, drillng operation efficiency.
In one embodiment, the Fractured carbonate strata bores completion method and can also included:In monitoring ground laminar flow When body quantum of output is not abnormal, using casing cementing completion mode completion.Specifically, the completion step can be according to drill footage situation And geological reservoir requirement uses casing cementing completion mode completion in time.
In one embodiment, the Fractured carbonate strata bores completion method and can also comprised the following steps:S41、 When the formation fluid is stratum water and quantum of output is more than predetermined value, implement the decompression that discharges water.Other, described Fractured carbon Completion method is bored on hydrochlorate stratum can also include step:S42, in the formation fluid it is that stratum water and quantum of output are less than predetermined value When, continue to implement described to implement under balance pressure drilling step to Reservoir Section.
The implementation depressurization step that discharges water includes:The choke pressure of back-pressure valve is reduced, allows ground using under balance pressure drilling equipment Layer water nature output.Wherein, ground need to carry out the disposing task of output water in the pressure reduction that discharges water, and avoid polluting environment.
In the pressure reduction that discharges water, per output stratum 300~1000m of water3, then closing well, which is asked, presses once to calculate stratum Pore pressure coefficient.Stop the decompression that discharges water when the reservoir pressure coefficient reduces by more than 0.2, implement described to Reservoir Section implementation Under balance pressure drilling step.
In addition, it is determined that strata pressure do not decline predetermined amplitude (during than such as above-mentioned 0.2), the crack acid carbonate Layer, which bores completion method, can also include step:On accumulative output stratum, water reaches 10000m3When, closing well calculates stratum sky after seeking pressure Gap pressure;When it is determined that formation pore pressure does not reduce, implement expansion tube packing high pressure water layer;Implementing expansion tube packing high pressure Implement after water layer described to Reservoir Section implementation under balance pressure drilling step.
Completion method is bored below by the Fractured carbonate strata for implementing present embodiment to case block shown in Fig. 3, In order to understand the present invention.
Refer to Fig. 2, Fig. 3, case block (in general drilling process, often gets into a depthkeeping using three body structures that drive a well more After degree, in order to ensure subsequent well safety, it is necessary to which next layer of sleeve pipe and the stratum bored out with cement sealing, prevent the borehole wall from collapsing Collapse, leakage, overflow accident complexity.The drill bit of each size bores deep and tripping in correspondingly-sized sleeve pipe, and being so referred to as one opens It is secondary, and the size of a upper beginning is bigger than the next size opened time.Minimum in usual drilling well to start for 2, i.e., two open, It may at most be opened using 7-8.Domestic generally use 3 is opened, and is at most opened using 5), an exploitation is drilled under 1600m with 311.2mm drill bits Enter 244.5mm sleeve pipes, cementing slurry returns to ground;Two exploitations are drilled into tripping in 177.8mm skills at the top of reservoir with 215.9mm drill bits Art sleeve pipe is simultaneously cemented the well, and cementing slurry returns to ground.Reservoir Section drilling process middle and upper part well section is ensured by tripping in protective casing Pit shaft safety.
Opened in case well shown in Fig. 3 three after Reservoir Section spuds in, implement under balance pressure drilling.According to the prediction of offset well drilling well Reservoir pressure coefficient is 1.75, considers the influence of differential pressure, casing annulus drilling fluid frictional resistance, wellhead back pressure, and setting is bored Well liquid density is 1.65~1.7.It is expected that differential pressure is 2~4MPa;The strata pressure comprehensive reference of the prediction of case well neighbour Well the Measured formation pressure of brought in well, offset well drilled well Reservoir Section drilling fluid density, completion well-log information.
In underbalance operation process is implemented, back-pressure valve is set in wellhead drilling fluid outlet line and choke pressure is set, Also referred to as wellhead back pressure, to ensure the poor relative constancy of bottom pressure and formation void pressure.If wellhead back pressure exceedes well mouth rotary During the half of the rated pressure of preventer, then drilling fluid density is improved to reduce wellhead back pressure.Formation fluid is in differential pressure action stream Enter pit shaft and with circulation of drilling fluid to ground, into oil gas water separator, formation fluid is monitored by sensor device and overflowed Situation.
In drilling process, if monitoring formation fluid quantum of output exception, i.e., the quantum of output of unit interval has obvious increase When adding trend, the fluidity of overflow substance is judged by oil gas water separator or sensor device.Stratum that may be present in case well Production fluid (formation fluid) is salt solution, crude oil, oil water mixture.
If the fluidity of stratum production fluid that may be present is salt solution in case well, and spillway discharge (quantum of output) is larger, according to When the drilling well density of back pressure lifting result in leakage situation, then implement waterproof decompression technique.Otherwise (the less situation of spillway discharge) Continue to implement under balance pressure drilling.
The described decompression technique that discharges water, refer to use former under balance pressure drilling equipment, the appropriate throttling for reducing wellhead back pressure valve Pressure, allows stratum water nature output, and ground need to carry out the disposing task of output water, avoids polluting environment.
In the pressure reduction that discharges water, per output stratum 300~1000m of water3, closing well, which is asked, presses once, calculates formation void pressure Force coefficient, if reservoir pressure coefficient reduces by more than 0.2, stop the decompression technique that discharges water, continue to return and implement under balance pressure drilling work Industry.
When reservoir pressure coefficient reduces and is less than 0.2, if accumulative output stratum water reaches 10000m3, closing well ask pressure after count Calculate formation void pressure does not reduce yet, then implements expansion tube packing water under high pressure layer process.After completing the packing of high pressure water layer, continue Implement under balance pressure drilling technique.
It is real if the fluidity of stratum production fluid that may be present is crude oil or natural gas or oil water mixture in case well Apply drillstem test technique.When it is high yield that drillstem test, which seeks postpartum yield, illustrate reservoir fissure development, S6B bore holes should be used to seal Every device completion mode completion.When it is low yield that drillstem test, which seeks postpartum yield, it is determined whether completion, however, it is determined that not completion then after It is continuous that drilling well is continued using under-balance drilling operation.In addition, sleeve pipe can also be used according to geological reservoir requirement in time in low yield Well cementation completion mode completion.
When formation fluid quantum of output abnormal conditions being not present in case well drilling process, it is determined whether completion.True Surely need that casing cementing completion mode completion can be used in time according to drill footage situation and geological reservoir requirement during completion.
By that with upper type, can ensure that Fractured carbonate strata highly effective and safe bores under high salinity complexity oil water relation The smooth implementation of completion practice.
Referring to Fig. 4, one embodiment of the present invention, which also provides a kind of Fractured carbonate strata, bores completion system, bag Include:Cementing unit 1, for by under protective casing at the top of reservoir and cementing the well;Drilling well monitoring device 2, for implementing to Reservoir Section Under balance pressure drilling, and monitor formation fluid quantum of output situation;Fluidity determining device 3, for monitoring formation fluid quantum of output When abnormal, the fluidity of formation fluid is determined;Test device 4, for being crude oil or natural gas or oil mixing with water in formation fluid During thing, implement drillstem test and determine production information;Completion system 5, for determining completion mode according to the production information.
Wherein, Fractured carbonate strata brill completion system is referred to the above-mentioned Fractured carbonate strata and is drilled well Method, no longer repeat one by one herein.
Herein cited any digital value all include between lower limit to higher limit with the lower value of an incremented and The all values of upper value, the interval of at least two units between any lower value and any much higher value be present.For example, such as Fruit elaborates that the quantity of part or the value of process variable (such as temperature, pressure, time etc.) are from 1 to 90, preferably from 20 To 80, more preferably from 30 to 70, then purpose is to illustrate that such as 15 to 85,22 are also clearly listed in the specification arrives 68th, 43 to 51,30 to 32 is equivalent.For the value less than 1, it is 0.0001,0.001,0.01,0.1 suitably to think a unit. These are only intended to the example clearly expressed, it is believed that the numerical value enumerated between minimum and peak is possible to Combination is all expressly set forth in the specification in a similar manner.
Unless otherwise indicated, all scopes all include all numerals between end points and end points.It is used together with scope " about " or " approximation " be suitable for two end points of the scope.Thus, " about 20 to 30 " are intended to covering " about 20 to about 30 ", including at least the end points indicated.
All articles and reference disclosed, including patent application and publication, for various purposes by quoting knot Together in this.Describe the term " substantially by ... forms " of combination should include determined by element, composition, part or step and reality Other elements, composition, part or the step of the basic novel feature of the combination are not influenceed in matter.Using term "comprising" or " comprising " describes the combination of element here, composition, part or step it is also contemplated that substantially by these elements, composition, part Or the embodiment that step is formed.Here by using term " can with ", it is intended to which illustrate that " can with " include is described any Attribute is all optional.
Multiple element, composition, part or step can be provided by single integrated component, composition, part or step.It is alternative Ground, single integrated component, composition, part or step can be divided into multiple element, composition, part or the step of separation.It is used for The open "a" or "an" for describing element, composition, part or step is not said to exclude other elements, composition, part Or step.
It should be understood that above description is to illustrate rather than to be limited.By reading above-mentioned retouch State, many embodiments and many applications outside the example provided all will be aobvious and easy for a person skilled in the art See.Therefore, the scope of this teaching should not determine with reference to foregoing description, but should with reference to appended claims and this The four corner of the equivalent that a little claims are possessed determines.It is for comprehensive purpose, all articles and special with reference to including The disclosure of profit application and bulletin is all by reference to being incorporated herein.Theme disclosed herein is omitted in preceding claims Any aspect is not intended to abandon the body matter, also should not be considered as inventor the theme is not thought of as it is disclosed A part for subject matter.

Claims (14)

1. a kind of Fractured carbonate strata bores completion method, it is characterised in that including:
By under protective casing at the top of reservoir and cementing the well;
Under balance pressure drilling is implemented to Reservoir Section, and monitors formation fluid quantum of output situation;
When monitoring formation fluid quantum of output exception, the fluidity of formation fluid is determined;
When formation fluid is crude oil or natural gas or oil water mixture, implements drillstem test and determine production information;
Completion mode is determined according to the production information.
2. Fractured carbonate strata as claimed in claim 1 bores completion method, it is characterised in that described according to the yield Information determines that completion mode step includes:
When the production information is higher than the first preset value, using open hole packer mode completion;
When the production information is less than the second preset value, using casing cementing completion mode completion.
3. Fractured carbonate strata as claimed in claim 2 bores completion method, it is characterised in that described according to the yield Information determines that completion mode step also includes:
When the production information is less than preset value, continue to implement described to implement under balance pressure drilling step to Reservoir Section.
4. Fractured carbonate strata as claimed in claim 1 bores completion method, it is characterised in that also includes:
When monitoring formation fluid quantum of output is not abnormal, using casing cementing completion mode completion.
5. Fractured carbonate strata as claimed in claim 1 bores completion method, it is characterised in that described real to Reservoir Section Apply under balance pressure drilling step, the pore pressure in shaft bottom is predicted according to target well, drilling fluid density is set, and ensure that shaft bottom is pressed Power compares the small 1~4MPa of formation void pressure.
6. Fractured carbonate strata as claimed in claim 5 bores completion method, it is characterised in that described according to target well institute The mode of pore pressure for predicting shaft bottom is:
When there is offset well to go into operation, then according to the strata pressure of Measured formation pressure coefficient prediction target well;
When offset well is not gone into operation, then the strata pressure of target well is predicted according to offset well well-log information.
7. Fractured carbonate strata as claimed in claim 5 bores completion method, it is characterised in that described real to Reservoir Section Apply under balance pressure drilling step, back-pressure valve is set in wellhead drilling fluid outlet line and wellhead back pressure is set, to ensure that shaft bottom is pressed The poor relative constancy of power and formation void pressure.
8. Fractured carbonate strata as claimed in claim 7 bores completion method, it is characterised in that
When exceeding the half of the rated pressure of well mouth rotary preventer in the wellhead back pressure, drilling fluid density is improved to reduce well Mouth back pressure.
9. Fractured carbonate strata as claimed in claim 1 bores completion method, it is characterised in that also includes:
When the formation fluid is stratum water and quantum of output is more than predetermined value, implement the decompression that discharges water.
10. Fractured carbonate strata as claimed in claim 9 bores completion method, it is characterised in that described to implement the drop that discharges water Pressure step includes:
The choke pressure of back-pressure valve is reduced, stratum water nature output is allowed using under balance pressure drilling equipment.
11. Fractured carbonate strata as claimed in claim 10 bores completion method, it is characterised in that
In the pressure reduction that discharges water, per output stratum 300~1000m of water3, then closing well, which is asked, presses once to calculate formation void Pressure coefficient;Stop the decompression that discharges water when the reservoir pressure coefficient reduces by more than 0.2, implement described deficient to Reservoir Section implementation flat Weigh drilling phase.
12. Fractured carbonate strata as claimed in claim 11 bores completion method, it is characterised in that also includes:
On accumulative output stratum, water reaches 10000m3When, closing well calculates formation void pressure after seeking pressure;It is determined that stratum Pore Pressure When power does not reduce, implement expansion tube packing high pressure water layer;Implement after expansion tube packing high pressure water layer is implemented described to Reservoir Section Implement under balance pressure drilling step.
13. Fractured carbonate strata as claimed in claim 1 bores completion method, it is characterised in that also includes:
When the formation fluid is that stratum water and quantum of output are less than predetermined value, continue to implement described to Reservoir Section implementation underbalance Drilling phase.
14. a kind of Fractured carbonate strata bores completion system, it is characterised in that including:
Cementing unit, for by under protective casing at the top of reservoir and cementing the well;
Drilling well monitoring device, for implementing under balance pressure drilling to Reservoir Section, and monitor formation fluid quantum of output situation;
Fluidity determining device, for when monitoring formation fluid quantum of output exception, determining the fluidity of formation fluid;
Test device, production is determined for when formation fluid is crude oil or natural gas or oil water mixture, implementing drillstem test Measure information;
Completion system, for determining completion mode according to the production information.
CN201710946183.XA 2017-10-12 2017-10-12 A kind of Fractured carbonate strata is drilled well method and system Active CN107724954B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710946183.XA CN107724954B (en) 2017-10-12 2017-10-12 A kind of Fractured carbonate strata is drilled well method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710946183.XA CN107724954B (en) 2017-10-12 2017-10-12 A kind of Fractured carbonate strata is drilled well method and system

Publications (2)

Publication Number Publication Date
CN107724954A true CN107724954A (en) 2018-02-23
CN107724954B CN107724954B (en) 2019-09-10

Family

ID=61210995

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710946183.XA Active CN107724954B (en) 2017-10-12 2017-10-12 A kind of Fractured carbonate strata is drilled well method and system

Country Status (1)

Country Link
CN (1) CN107724954B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3796273A (en) * 1971-10-22 1974-03-12 Global Marine Inc Underwater well structure
US3958639A (en) * 1974-06-28 1976-05-25 Daniel Arlie H Method of drilling an oil well to recover casings
CN86107208A (en) * 1985-10-17 1987-07-01 威廉姆·普尔曼 Improving one's methods of multiple-stage coal seam fracing
CN108222983A (en) * 2018-03-12 2018-06-29 太原科技大学 A kind of column boost-up circuit of hydraulic support

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3796273A (en) * 1971-10-22 1974-03-12 Global Marine Inc Underwater well structure
US3958639A (en) * 1974-06-28 1976-05-25 Daniel Arlie H Method of drilling an oil well to recover casings
CN86107208A (en) * 1985-10-17 1987-07-01 威廉姆·普尔曼 Improving one's methods of multiple-stage coal seam fracing
CN108222983A (en) * 2018-03-12 2018-06-29 太原科技大学 A kind of column boost-up circuit of hydraulic support

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
信廷富等: "海相油气田超深井完井固井技术", 《石油钻采工艺》 *

Also Published As

Publication number Publication date
CN107724954B (en) 2019-09-10

Similar Documents

Publication Publication Date Title
Khalifeh et al. Techniques and materials for North Sea plug and abandonment operations
US10415330B2 (en) Thixotropic cement slurry and placement method to cure lost circulation
CN104047556A (en) Method for preventing Chang7 oil shale from collapsing
CN106223898B (en) Two horizontal well cementing and completion integrated pipe column devices that open
CN107724954B (en) A kind of Fractured carbonate strata is drilled well method and system
CN206071532U (en) The solid completion tubular pile device of two boiled water horizontal wells of one kind
CN115653536A (en) Circulating pressure control method and system for liquid rubber plug packing production zone in drilling process
Dupriest Use of new hydrostatic-packer concept to manage lost returns, well control, and cement placement in field operations
Elgibaly Well control during drilling and workover operations
AU2020293054A1 (en) Closed hole circulation drilling with continuous downhole monitoring
Jianhua et al. Use of liner drilling technology as a solution to hole instability and loss intervals: A case study offshore Indonesia
Rosenberg et al. Liner drilling technology as a mitigation to hole instability and loss intervals: a case study in the Gulf of Mexico
Ma et al. Reservoir Protection and Cementing Techniques
McCarthy et al. The evolution of sand control completion practices for the enfield deep water development
Urdaneta et al. Case Studies in the Kingdom of Saudi Arabia Demonstrate the Ability to Drill and Ream–in Casing with Multi Stage Cementing Devices and Well Bore Barriers
Azi Casing Design using the Maximum Load Method on Offshore Development Wells
Al-Dujaili et al. The efficient and economical application of a cement slurry programme for sandstone and carbonate reservoirs. A case study of the Zubair, Mauddud, and Mishrif formations in a supergiant oilfield, in southern Iraq
Ma et al. Design of Hole Structure and Casing String in UGS Drilling
Mohammed et al. Appraisal Well Design in" X" Oil Field
Taheri Nakhost et al. A Simulation of Managed Pressure Drilling in Iranian Darquain Oil Field
Alasgarov Analysis of Equivalent Circulation Density Management in Drilling Operations
De Grandis et al. The Combined Application of Continuous Circulation and Wellbore Strengthening Allowed to Save an Expandable Liner: Successful Field Test Offshore Italy
Parsons Caliper logging
Ahmed et al. Openhole mini-frac stress tests in unconsolidated shallow formations
Marhoon High pressure High temperature (HPHT) wells technologies while drilling

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant