CN107719724A - It is a kind of to be used for quantitative canned pneumatic ball valve valve group and packaging process - Google Patents

It is a kind of to be used for quantitative canned pneumatic ball valve valve group and packaging process Download PDF

Info

Publication number
CN107719724A
CN107719724A CN201711061631.4A CN201711061631A CN107719724A CN 107719724 A CN107719724 A CN 107719724A CN 201711061631 A CN201711061631 A CN 201711061631A CN 107719724 A CN107719724 A CN 107719724A
Authority
CN
China
Prior art keywords
ball valve
pneumatic ball
hole
valve
pneumatic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711061631.4A
Other languages
Chinese (zh)
Inventor
胡旭东
林富赟
谌华强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Prevo Fluid Control Technology (wuhu) Co Ltd
Original Assignee
Prevo Fluid Control Technology (wuhu) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Prevo Fluid Control Technology (wuhu) Co Ltd filed Critical Prevo Fluid Control Technology (wuhu) Co Ltd
Priority to CN201711061631.4A priority Critical patent/CN107719724A/en
Publication of CN107719724A publication Critical patent/CN107719724A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B1/00Packaging fluent solid material, e.g. powders, granular or loose fibrous material, loose masses of small articles, in individual containers or receptacles, e.g. bags, sacks, boxes, cartons, cans, or jars
    • B65B1/30Devices or methods for controlling or determining the quantity or quality or the material fed or filled
    • B65B1/32Devices or methods for controlling or determining the quantity or quality or the material fed or filled by weighing
    • B65B1/34Adjusting weight by trickle feed
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B1/00Packaging fluent solid material, e.g. powders, granular or loose fibrous material, loose masses of small articles, in individual containers or receptacles, e.g. bags, sacks, boxes, cartons, cans, or jars
    • B65B1/04Methods of, or means for, filling the material into the containers or receptacles
    • B65B1/06Methods of, or means for, filling the material into the containers or receptacles by gravity flow
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B1/00Packaging fluent solid material, e.g. powders, granular or loose fibrous material, loose masses of small articles, in individual containers or receptacles, e.g. bags, sacks, boxes, cartons, cans, or jars
    • B65B1/30Devices or methods for controlling or determining the quantity or quality or the material fed or filled
    • B65B1/36Devices or methods for controlling or determining the quantity or quality or the material fed or filled by volumetric devices or methods
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B3/00Packaging plastic material, semiliquids, liquids or mixed solids and liquids, in individual containers or receptacles, e.g. bags, sacks, boxes, cartons, cans, or jars
    • B65B3/04Methods of, or means for, filling the material into the containers or receptacles
    • B65B3/06Methods of, or means for, filling the material into the containers or receptacles by gravity flow
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B3/00Packaging plastic material, semiliquids, liquids or mixed solids and liquids, in individual containers or receptacles, e.g. bags, sacks, boxes, cartons, cans, or jars
    • B65B3/26Methods or devices for controlling the quantity of the material fed or filled

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Quality & Reliability (AREA)
  • Taps Or Cocks (AREA)

Abstract

It is a kind of to be used for quantitative canned pneumatic ball valve valve group, the pneumatic ball valve of inside nominal diameter identical first and the second pneumatic ball valve including series connection, the core of first pneumatic ball valve, which is provided with, is used for the first pneumatic ball valve first through hole that material passes through, the core of second pneumatic ball valve, which is provided with, is used for the second pneumatic ball valve first through hole that material passes through, first pneumatic ball valve first through hole is equal with the aperture of the second pneumatic ball valve first through hole, second the second through hole of pneumatic ball valve is provided with inside the core of second pneumatic ball valve, second the second through hole of pneumatic ball valve passes perpendicularly through the second pneumatic ball valve first through hole, the aperture of second the second through hole of pneumatic ball valve is less than the aperture of the second pneumatic ball valve first through hole.Also disclose a kind of method that quantitative filling is carried out using above-mentioned pneumatic ball valve valve group.The present invention is simple to operate, and control is flexible, easy to maintenance, and can be realized and automatically controlled by computer programming.

Description

It is a kind of to be used for quantitative canned pneumatic ball valve valve group and packaging process
Technical field
The present invention relates to material-filling technical field, more particularly to a kind of it is used for quantitative canned pneumatic ball valve valve group and filling Dress method.
Background technology
The requirement quantitative filling liquid or powder material according to production technology are often needed in Chemical Manufacture, in order to improve work It is filling to carry out that the quantitative pot-type equipment of efficiency often sets larger flow in canned beginning, in order to accurately control filling total amount to need Will i.e. by it is filled into when reduce filling flow carry out it is filling, until filling.In the prior art frequently with the Pneumatic ball of parallel connection Valve group controls filling flow, i.e., realizes the conversion of small-large flow using the different Pneumatic ball valve group of inside nominal diameter, but by When big flow is transformed into low discharge, because big flow operated pneumatic valve is closed, the filling tube all the way connected with big flow operated pneumatic valve The appearance of a street easily occurs to block (during filling split material) or hydrops (during filling liquid material), influences being normally carried out for production.
The content of the invention
In order to solve the above technical problems, it is used for quantitative canned pneumatic ball valve valve group and filling side this application provides a kind of Method.
The application adopts the technical scheme that:
It is a kind of to be used for quantitative canned pneumatic ball valve valve group, including the pneumatic ball valve of inside nominal diameter identical first of series connection and Second pneumatic ball valve, the core of the first pneumatic ball valve, which is provided with, is used for the first pneumatic ball valve first through hole that material passes through, the second gas The core of dynamic ball valve, which is provided with, is used for the second pneumatic ball valve first through hole that material passes through, the first pneumatic ball valve first through hole and second The aperture of pneumatic ball valve first through hole is equal, and it is logical that the second pneumatic ball valve second is provided with inside the core of second pneumatic ball valve Hole, second the second through hole of pneumatic ball valve pass perpendicularly through the second pneumatic ball valve first through hole, the hole of second the second through hole of pneumatic ball valve Footpath is less than the aperture of the second pneumatic ball valve first through hole.
Further, the centre of sphere that the through hole of the second pneumatic ball valve second passes through the second pneumatic ball valve.Using the second through hole By the design of the centre of sphere, on the one hand make the well-balanced uniform force of core structure, on the other hand when the second through hole is opened, favorably Pass through ball valve in material is smooth.
Further, the aperture of the through hole of the second pneumatic ball valve second is the aperture of the second pneumatic ball valve first through hole 1/4~1/2.It is to realize the conversion of small-large flow to limit first through hole and the aperture ratio of the second through hole.
Further, second the second through hole of pneumatic ball valve is divided into independent two by the second pneumatic ball valve first through hole Part, the first through hole of material approaching side is straight hole, and its aperture of the first through hole of material outflow side is gradually reduced from inside to outside.Adopt The design for being with this can by enter core inner chamber side the second through hole open greatly, by limit material flow go out side first lead to The minimum-value aperture limitation flow in hole, reduces resistance when material flows through pneumatic ball valve and the material into centre of sphere inner chamber is easy to suitable Smooth discharge does not block.
Further, the minimum-value aperture of the through hole of the second pneumatic ball valve second is the 1/ of the second pneumatic ball valve first through hole 4~1/2.It is to realize the conversion of small-large flow to limit first through hole and the aperture ratio of the second through hole.
Further, the company of the adpting flange of the first pneumatic ball valve valve body side and the second pneumatic ball valve valve body side Acting flange is by sealing gasket by bolt to wearing connection.Two pneumatic ball valves are directly connected to, and connecting pipe is save in centre can reduce thing The dynamic resistance of stream, and reduce leakage point.
A kind of method for being quantitatively used for quantitative filling using above-mentioned pneumatic valve group, is comprised the following steps successively:
(1) when, canned initial, the first pneumatic ball valve and the second pneumatic ball valve are completely in open position, filling material warp It is canned that first pneumatic ball valve first through hole and the second pneumatic ball valve first through hole inflow storage tank start big flow;
(2), when canned amount reaches the 90% of total amount, the first pneumatic ball valve maintains the original state, and 90 degree of rotations second are pneumatic The core of ball valve closes the second pneumatic ball valve first through hole, and second the second through hole of pneumatic ball valve is opened, and filling material is through first It is canned that pneumatic ball valve first through hole and second the second through hole of pneumatic ball valve inflow storage tank start low discharge;
(3) it is, filling to finish, the first pneumatic ball valve is closed, is stopped filling.
Can be chain by the reserves signal of the pneumatic signal of the pneumatic actuator in the present invention and live filling apparatus, pass through inspection The conversion that reserves signal realizes small-large flow automatically is surveyed, realization automatically controls.
The beneficial effect of the application:
1st, the technical scheme provided by the application can turn mass flow down when material-filling is up to setting value, Realize quantitative filling material.
2nd, the present invention is simple to operate, and control is flexible, easy to maintenance, can be widely applied to the row such as oil, chemical industry, chemistry painting industry The automation such as control system, chemical industry storehouse receive-transmit system, the canned system of coating are received and dispatched in the oil depot oil plant automation of industry.
3rd, the present invention can be realized by computer programming and automatically controlled.
Brief description of the drawings
Fig. 1 is the mounting structure schematic diagram of the present invention.
Fig. 2 is sectional views of the Fig. 1 along the first pneumatic ball valve core of A-A directions section view.
Fig. 3 is a kind of sectional view of embodiments of the Fig. 1 along the second pneumatic ball valve core of A-A directions section view.
Fig. 4 is the sectional view of another embodiments of the Fig. 1 along the second pneumatic ball valve core of A-A directions section view.
Embodiment
The present invention is described in detail below in conjunction with the accompanying drawings.
It is a kind of to be used to quantify canned pneumatic ball valve valve group, including the first pneumatic ball valve 1 refering to Fig. 1, Fig. 2 and Fig. 3, the The valve element 10 of one pneumatic operated valve 1 is fixedly connected with pneumatic actuator 13, the second pneumatic ball valve 2, the valve element 20 and gas of the second pneumatic operated valve 2 Dynamic actuator 23 is fixedly connected, and the valve body of the first pneumatic ball valve 1 includes left and right two parts, and left half valve body 11 is provided with connection method Orchid 111, the pipe flange of adpting flange 111 and material conveying pipe is bolted, and right half valve body 12 is provided with connection Flange 121, the valve body of the second pneumatic ball valve 2 include left and right two parts, and right half valve body 22 is provided with adpting flange 221, connection The pipe flange of flange 221 and material conveying pipe is bolted, and left half valve body 21 is provided with adpting flange 211, the The adpting flange 211 of the adpting flange 121 of one pneumatic ball valve 1 and the second pneumatic ball valve 2 is linked together by bolt 6, connection Sealing gasket 5 is provided between flange 121 and adpting flange 211;Refering to Fig. 4, second pneumatic ball valve the second through hole 202 is pneumatic by first Ball valve first through hole 201 is separated into independent two parts 2021 and 2022, enters second the second through hole of pneumatic ball valve in material Side (the A directions shown in figure), second the second through hole of pneumatic ball valve 2021 are set to straight hole, and aperture is second in the present embodiment The 1/2 of the aperture of pneumatic ball valve first through hole 201, in the side of material outflow, second the second through hole of pneumatic ball valve 2022 is set to The bellmouth that aperture gradually reduces from inside to outside, the aperture at bellmouth minimum is the second pneumatic ball valve first in the present embodiment The 1/4 of the aperture of through hole 201.
The above-mentioned operation principle for being used for quantitative canned pneumatic ball valve valve group describes in detail in following packaging process.
It is using the above-mentioned packaging process for being used for quantitative canned pneumatic ball valve valve group progress quantitative filling:
Material conveying pipe will be arranged on for quantitatively canned pneumatic ball valve valve group;
(1) when, canned initial, the first pneumatic ball valve 1 and the second pneumatic ball valve 2 are completely in open position, filling material It is canned to start big flow through the first pneumatic ball valve first through hole 101 and the second pneumatic ball valve first through hole 201 inflow storage tank;
(2), when canned amount reaches the 90% of total amount, the first pneumatic ball valve 1 maintains the original state, and 90 degree of rotations second are pneumatic The core 20 of ball valve 2 closes the second pneumatic ball valve first through hole 201, and second the second through hole of pneumatic ball valve 202 is opened, filling thing Material through the first pneumatic ball valve first through hole 101 and second the second through hole of pneumatic ball valve 202 flows into storage tank, and to start low discharge canned;
(3) it is, filling to finish, the first pneumatic ball valve 1 is closed, is stopped filling.

Claims (7)

1. it is used for quantitative canned pneumatic ball valve valve group a kind of, including the pneumatic ball valve of inside nominal diameter identical first of series connection and the Two pneumatic ball valves, the core of the first pneumatic ball valve, which is provided with, is used for the first pneumatic ball valve first through hole that material passes through, and second is pneumatic The core of ball valve, which is provided with, is used for the second pneumatic ball valve first through hole that material passes through, the first pneumatic ball valve first through hole and the second gas The aperture of dynamic ball valve first through hole is equal, it is characterised in that:The second Pneumatic ball is provided with inside the core of second pneumatic ball valve The through hole of valve second, second the second through hole of pneumatic ball valve pass perpendicularly through the second pneumatic ball valve first through hole, the second pneumatic ball valve second The aperture of through hole is less than the aperture of the second pneumatic ball valve first through hole.
2. pneumatic ball valve valve group according to claim 1, it is characterised in that:The through hole of second pneumatic ball valve second passes through The centre of sphere of second pneumatic ball valve.
3. pneumatic ball valve valve group according to claim 1, it is characterised in that:The hole of the through hole of second pneumatic ball valve second Footpath is the 1/4~1/2 of the aperture of the second pneumatic ball valve first through hole.
4. pneumatic ball valve valve group according to claim 1, it is characterised in that:The second pneumatic ball valve first through hole is by Two the second through holes of pneumatic ball valve are divided into independent two parts, and the first through hole of material approaching side is straight hole, material outflow side Its aperture of first through hole is gradually reduced from inside to outside.
5. pneumatic ball valve valve group according to claim 4, it is characterised in that:The through hole of second pneumatic ball valve second is most Small-bore is the 1/4~1/2 of the aperture of the second pneumatic ball valve first through hole.
6. pneumatic ball valve valve group according to claim 1, it is characterised in that:First pneumatic ball valve and the second pneumatic ball valve bag Include the company of the valve body of flange connection, the adpting flange of the first pneumatic ball valve valve body side and the second pneumatic ball valve valve body side Acting flange is by sealing gasket by bolt to wearing connection.
A kind of 7. method of quantitative filling, it is characterised in that usage right requires canned for quantifying described in 1~6 any one Pneumatic ball valve valve group, it is characterised in that comprise the following steps successively:
(1) when, canned initial, the first pneumatic ball valve and the second pneumatic ball valve are completely in open position, and filling material is through first It is canned that pneumatic ball valve first through hole and the second pneumatic ball valve first through hole inflow storage tank start big flow;
(2), when canned amount reaches the 90% of total amount, the first pneumatic ball valve maintains the original state, 90 degree of second pneumatic ball valves of rotation Valve element when the second pneumatic ball valve first through hole close, second the second through hole of pneumatic ball valve open, filling material is through through the first gas It is canned that dynamic ball valve first through hole and second the second through hole of pneumatic ball valve inflow storage tank start low discharge;
(3) it is, filling to finish, the first pneumatic ball valve is closed, is stopped filling.
CN201711061631.4A 2017-10-31 2017-10-31 It is a kind of to be used for quantitative canned pneumatic ball valve valve group and packaging process Pending CN107719724A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711061631.4A CN107719724A (en) 2017-10-31 2017-10-31 It is a kind of to be used for quantitative canned pneumatic ball valve valve group and packaging process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711061631.4A CN107719724A (en) 2017-10-31 2017-10-31 It is a kind of to be used for quantitative canned pneumatic ball valve valve group and packaging process

Publications (1)

Publication Number Publication Date
CN107719724A true CN107719724A (en) 2018-02-23

Family

ID=61222127

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711061631.4A Pending CN107719724A (en) 2017-10-31 2017-10-31 It is a kind of to be used for quantitative canned pneumatic ball valve valve group and packaging process

Country Status (1)

Country Link
CN (1) CN107719724A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109159987A (en) * 2018-09-23 2019-01-08 烟台市帅恒机械科技有限公司 A kind of cosmetics automatic production line and control method
CN110686094A (en) * 2019-10-30 2020-01-14 广船国际有限公司 Ball valve

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10103533A (en) * 1996-10-01 1998-04-21 Sekisui Chem Co Ltd Ball valve
CN2436732Y (en) * 2000-08-13 2001-06-27 吴军标 Double-linkage adjustable ball valve
CN2469271Y (en) * 2001-03-26 2002-01-02 王建敏 Straight tube regulating globe-valve with leakage-proof function
CN203670875U (en) * 2014-01-15 2014-06-25 浙江欧意阀门有限公司 Flow regulation ball valve
CN204985804U (en) * 2015-06-18 2016-01-20 温岭市农丰软管有限公司 Ball valve
CN105782490A (en) * 2014-12-23 2016-07-20 天津强森机械零部件有限公司 Ball valve
CN206175711U (en) * 2016-10-25 2017-05-17 欧维克集团有限公司 Pair ball valve of online sample in area
CN207565881U (en) * 2017-10-31 2018-07-03 普雷沃流体控制科技(芜湖)有限公司 It is a kind of to be used for quantitative canned pneumatic ball valve valve group

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10103533A (en) * 1996-10-01 1998-04-21 Sekisui Chem Co Ltd Ball valve
CN2436732Y (en) * 2000-08-13 2001-06-27 吴军标 Double-linkage adjustable ball valve
CN2469271Y (en) * 2001-03-26 2002-01-02 王建敏 Straight tube regulating globe-valve with leakage-proof function
CN203670875U (en) * 2014-01-15 2014-06-25 浙江欧意阀门有限公司 Flow regulation ball valve
CN105782490A (en) * 2014-12-23 2016-07-20 天津强森机械零部件有限公司 Ball valve
CN204985804U (en) * 2015-06-18 2016-01-20 温岭市农丰软管有限公司 Ball valve
CN206175711U (en) * 2016-10-25 2017-05-17 欧维克集团有限公司 Pair ball valve of online sample in area
CN207565881U (en) * 2017-10-31 2018-07-03 普雷沃流体控制科技(芜湖)有限公司 It is a kind of to be used for quantitative canned pneumatic ball valve valve group

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109159987A (en) * 2018-09-23 2019-01-08 烟台市帅恒机械科技有限公司 A kind of cosmetics automatic production line and control method
CN110686094A (en) * 2019-10-30 2020-01-14 广船国际有限公司 Ball valve

Similar Documents

Publication Publication Date Title
CN107719724A (en) It is a kind of to be used for quantitative canned pneumatic ball valve valve group and packaging process
CN207565881U (en) It is a kind of to be used for quantitative canned pneumatic ball valve valve group
CN208011034U (en) A kind of adjustable ball-cock assembly of flow
CN207034197U (en) A kind of Flange-type gauge valve group
CN204420135U (en) Flow-rate adjustment piston type axial flow modulating valve
CN207296895U (en) A kind of double buffering choke manifold
CN212251227U (en) Multiple parallel cyclone unit with on-line sampling device
CN204647447U (en) A kind of rotary type one-way throttle valve
CN202301990U (en) Fluid control device with multiple fluid flowage control components and butterfly valve
CN203146835U (en) Corrugated pipe sealing stop valve with handwheel
CN204587594U (en) A kind of small package barrelling drawing mechanism
CN204125156U (en) A kind of 200kg packing barrel drawing mechanism
CN102786018A (en) Quantitative filling device and filling method thereof
CN101526143A (en) Pneumatic knife-shape gate valve of blowing and sweeping type
CN201696016U (en) Quantitative and adjustable sleeve throttling valve for extracting oil and gas
CN208169569U (en) Mitigate the sewage draining valve of spot residual flow
CN206395214U (en) A kind of preventing materials accumulation collects feed bin
CN208169570U (en) Convenient for the blowdown valve of control throttling blowdown state
CN203146836U (en) Bellows seal stop valve with packing
CN108506511A (en) Realize the sewage draining valve of purging
CN208816448U (en) A kind of pneumatic actuator rod chamber stroke adjusting device
RU77461U1 (en) HIGH PRESSURE LIQUID OR GAS FLOW REGULATOR
CN209943537U (en) Valve clack nut component of soft sealing butterfly valve
CN206972945U (en) A kind of chemical pipeline valve
CN209325104U (en) A kind of concentration integrated liquid ink dispenses valve

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180223