CN107717328A - A kind of partition board of steam turbine assembly technology - Google Patents
A kind of partition board of steam turbine assembly technology Download PDFInfo
- Publication number
- CN107717328A CN107717328A CN201711080596.0A CN201711080596A CN107717328A CN 107717328 A CN107717328 A CN 107717328A CN 201711080596 A CN201711080596 A CN 201711080596A CN 107717328 A CN107717328 A CN 107717328A
- Authority
- CN
- China
- Prior art keywords
- brush
- assembly
- steam turbine
- guide vane
- dividing plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
- B23P11/00—Connecting or disconnecting metal parts or objects by metal-working techniques not otherwise provided for
- B23P11/02—Connecting or disconnecting metal parts or objects by metal-working techniques not otherwise provided for by first expanding and then shrinking or vice versa, e.g. by using pressure fluids; by making force fits
- B23P11/025—Connecting or disconnecting metal parts or objects by metal-working techniques not otherwise provided for by first expanding and then shrinking or vice versa, e.g. by using pressure fluids; by making force fits by using heat or cold
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
- B23P19/00—Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
- B23P19/02—Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes for connecting objects by press fit or for detaching same
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Turbine Rotor Nozzle Sealing (AREA)
Abstract
The invention discloses a kind of partition board of steam turbine assembly technology, the partition board of steam turbine is mainly made up of partition body, multiple guide vanes and dividing plate outer shroud, and the guide vane is mainly made up of inner platform, blade and curtain plate;The dividing plate assembly technology includes following technical measures:The listrium fitting surface of each guide vane is processed into smooth, welding divided edge structure;By the inner platform of each guide vane successively brush in the periphery of partition body, each guide vane is set to form leaf grating, partition body and leaf grating composition brush assembly in the periphery of partition body;Dividing plate outer shroud and brush assembly are subjected to brush processing;The good dividing plate outer shroud of brush is assembled on brush assembly with hot jacket assembly method, at the curtain plate for the leaf grating that the dividing plate outer shroud is in brush assembly, obtains partition board of steam turbine.The mounting technology difficulty of the present invention is small, has the characteristics that assembly period is short, efficiency of assembling is high, manufacturing cost is low, assembly precision is high.
Description
Technical field
The present invention relates to partition board of steam turbine forming technique, specifically a kind of assembly technology of partition board of steam turbine.
Background technology
Partition board of steam turbine is separation partitions at different levels in steam turbine, and it is mainly by partition body, multiple guide vanes(That is stator blade
Piece)Formed with dividing plate outer shroud, the blade both ends of guide vane have inner platform and curtain plate, i.e. guide vane is self-crown structure.
The assembling of partition board of steam turbine is to combine partition body, multiple guide vanes and dividing plate outer shroud, is formed overall.
Referring to shown in Fig. 1 and Fig. 2, the assembly technology of existing partition board of steam turbine is, first in the listrium fitting surface of each guide vane 2
On process welding groove structure, the welding groove structure is at the brush seam of guide vane 2;Again will be every by following technological process
Plate body 1, multiple guide vanes 2 and dividing plate outer shroud 3 form entirety:Guide vane brush-guide vane tack welding-robot welding leaf
Grid-leaf grating heat treatment-leaf grating processing-leaf grating hot jacket-dividing plate outer shroud hot jacket-main weld tack welding-cover plate welding-master
Weld seam welding-dividing plate bulk heat treatmet-split built-up welding-dividing plate bulk heat treatmet-line, obtains partition board of steam turbine.Thus
Assembly technology is it will be clear that the assembly technology of existing partition board of steam turbine not only needs to open up out weldering on the fitting surface of each guide vane
Groove is connect, and whole assembly process is various, and the assembly period that these technical measures will result directly in partition board of steam turbine significantly prolongs
Long, manufacture efficiency is low, and then the manufacturing cost of partition board of steam turbine is significantly increased.In addition, the assembler of existing partition board of steam turbine
There is the soldering process that multiple guide vanes form leaf grating in skill, the welding process of leaf grating easily causes leaf grating overall because of welding
And larger deformation is produced, so that the fitted position of leaf grating is difficult to ensure that, and then the assembly precision of dividing plate can be directly affected
And Forming Quality.
In summary, the assembly technology of existing partition board of steam turbine exist the cycle is long, efficiency is low, cost is high, Forming Quality not
The technical problem such as stable.
The content of the invention
The technical purpose of the present invention is:For above-mentioned the deficiencies in the prior art, there is provided a kind of cycle is short, efficiency high, into
This is low and is advantageous to improve the partition board of steam turbine assembly technology of Forming Quality.
The present invention realizes its technical purpose the technical scheme adopted is that a kind of partition board of steam turbine assembly technology, the vapour
Turbine dividing plate is mainly made up of partition body, multiple guide vanes and dividing plate outer shroud, and the guide vane is mainly by inner platform, blade and outer
Listrium is formed;The dividing plate assembly technology includes following technical measures:
- the listrium fitting surface of each guide vane processed into smooth, welding divided edge structure;
- by the inner platform of each guide vane successively brush in the periphery of partition body, each guide vane is formed leaf in the periphery of partition body
Grid, partition body and leaf grating composition brush assembly;
- dividing plate outer shroud and brush assembly be subjected to brush processing;
- assemble the good dividing plate outer shroud of brush on brush assembly with hot jacket assembly method, the dividing plate outer shroud is in brush
At the curtain plate of the leaf grating of assembly, partition board of steam turbine is obtained.
One of preferably, the periphery of the partition body has raised positioning spigot, the inner edge of the guide vane
Brush of the plate in partition body periphery is to be used as benchmark using the raised positioning spigot in partition body periphery.
One of preferably, the magnitude of interference of the hot jacket assembling is 0~0.10mm.
One of preferably, the hot jacket temperature of the hot jacket assembling is 150~250 DEG C, soaking time 3h.
The method have the benefit that:
1. the present invention need not open up welding groove structure on the listrium fitting surface of each guide vane, soldering need not be also carried out,
Mounting technology difficulty is small, so that whole assembly period significantly shortens, efficiency of assembling is largely increased, and manufacturing cost is obtained
To being greatly reduced;In addition, the problem of above-mentioned assembly technology is not in leaf grating deformation substantially, fitted position is readily obtained guarantee,
So that assembly precision is reliably ensured, Forming Quality is high;
2. brush of each guide vane of the present invention on partition body is reliable, accurate;In addition, the hot jacket assembly method energy of the present invention
Enough ensure that assembly precision is reliably ensured, can further improve molding assembly quality.
Brief description of the drawings
Fig. 1 is the structural representation of dividing plate obtained by existing partition board of steam turbine assembly technology.
Fig. 2 is the structural representation in the brush face on guide vane listrium in Fig. 1.
Fig. 3 is the structural representation of the partition body in the present invention.
Code name implication in figure:1-partition body;2-guide vane;3-dividing plate outer shroud;4-positioning spigot;5-brush benchmark
Face.
Embodiment
The present invention relates to partition board of steam turbine forming technique, specifically a kind of assembly technology of partition board of steam turbine, below with more
Individual embodiment is clearly and detailedly illustrated to the technology contents of the present invention.
Embodiment 1
The present invention be partition board of steam turbine assembly technology, wherein, the partition board of steam turbine mainly by partition body, multiple guide vanes and every
Plate outer shroud forms, and the periphery of partition body has raised positioning spigot(Shown in Figure 3,1 is partition body, and 4 be positioning spigot, 5
For brush reference plane), each guide vane is mainly to be made up of inner platform, blade and curtain plate;Assembly technology includes following technology
Measure:
- the listrium fitting surface of each guide vane processed into smooth, welding divided edge structure;
- by the inner platform of each guide vane successively brush in the periphery of partition body, be specifically to be stopped with the positioning that partition body periphery is raised
Mouthful top surface as the brush reference plane of benchmark-i.e., by the inner platform of each guide vane in the progress brush of the periphery of partition body, in brush
During, control brush gap between each guide vane, axile displacement, radial misalignments, and control each guide vane and partition body it
Between fit-up gap;So that each guide vane forms precisely corresponding leaf grating, partition body and leaf grating composition in the periphery of partition body
Brush assembly;
- dividing plate outer shroud and brush assembly be subjected to brush processing;
- by the good dividing plate outer shroud of brush with hot jacket assembly method assemble on brush assembly, hot jacket assembling technical requirements be,
Magnitude of interference control is 0.010mm, and hot jacket temperature is 250 DEG C, soaking time 3h;So that dividing plate outer shroud is in brush assembly
Leaf grating curtain plate at, obtain partition board of steam turbine.
Embodiment 2
The present invention be partition board of steam turbine assembly technology, wherein, the partition board of steam turbine mainly by partition body, multiple guide vanes and every
Plate outer shroud forms, and the periphery of partition body has raised positioning spigot(Shown in Figure 3,1 is partition body, and 4 be positioning spigot, 5
For brush reference plane), each guide vane is mainly to be made up of inner platform, blade and curtain plate;Assembly technology includes following technology
Measure:
- the listrium fitting surface of each guide vane processed into smooth, welding divided edge structure;
- by the inner platform of each guide vane successively brush in the periphery of partition body, be specifically to be stopped with the positioning that partition body periphery is raised
Mouthful top surface as the brush reference plane of benchmark-i.e., by the inner platform of each guide vane in the progress brush of the periphery of partition body, in brush
During, control brush gap between each guide vane, axile displacement, radial misalignments, and control each guide vane and partition body it
Between fit-up gap;So that each guide vane forms precisely corresponding leaf grating, partition body and leaf grating composition in the periphery of partition body
Brush assembly;
- dividing plate outer shroud and brush assembly be subjected to brush processing;
- by the good dividing plate outer shroud of brush with hot jacket assembly method assemble on brush assembly, hot jacket assembling technical requirements be,
Magnitude of interference control is 0.050mm, and hot jacket temperature is 180 DEG C, soaking time 3h;So that dividing plate outer shroud is in brush assembly
Leaf grating curtain plate at, obtain partition board of steam turbine.
Embodiment 3
The present invention be partition board of steam turbine assembly technology, wherein, the partition board of steam turbine mainly by partition body, multiple guide vanes and every
Plate outer shroud forms, and the periphery of partition body has raised positioning spigot(Shown in Figure 3,1 is partition body, and 4 be positioning spigot, 5
For brush reference plane), each guide vane is mainly to be made up of inner platform, blade and curtain plate;Assembly technology includes following technology
Measure:
- the listrium fitting surface of each guide vane processed into smooth, welding divided edge structure;
- by the inner platform of each guide vane successively brush in the periphery of partition body, be specifically to be stopped with the positioning that partition body periphery is raised
Mouthful top surface as the brush reference plane of benchmark-i.e., by the inner platform of each guide vane in the progress brush of the periphery of partition body, in brush
During, control brush gap between each guide vane, axile displacement, radial misalignments, and control each guide vane and partition body it
Between fit-up gap;So that each guide vane forms precisely corresponding leaf grating, partition body and leaf grating composition in the periphery of partition body
Brush assembly;
- dividing plate outer shroud and brush assembly be subjected to brush processing;
- by the good dividing plate outer shroud of brush with hot jacket assembly method assemble on brush assembly, hot jacket assembling technical requirements be,
Magnitude of interference control is 0.10mm, and hot jacket temperature is 150 DEG C, soaking time 3h;So that dividing plate outer shroud is in brush assembly
Leaf grating curtain plate at, obtain partition board of steam turbine.
Embodiment 4
The present invention be partition board of steam turbine assembly technology, wherein, the partition board of steam turbine mainly by partition body, multiple guide vanes and every
Plate outer shroud forms, and the periphery of partition body has raised positioning spigot(Shown in Figure 3,1 is partition body, and 4 be positioning spigot, 5
For brush reference plane), each guide vane is mainly to be made up of inner platform, blade and curtain plate;Assembly technology includes following technology
Measure:
- the listrium fitting surface of each guide vane processed into smooth, welding divided edge structure;
- by the inner platform of each guide vane successively brush in the periphery of partition body, be specifically to be stopped with the positioning that partition body periphery is raised
Mouthful top surface as the brush reference plane of benchmark-i.e., by the inner platform of each guide vane in the progress brush of the periphery of partition body, in brush
During, control brush gap between each guide vane, axile displacement, radial misalignments, and control each guide vane and partition body it
Between fit-up gap;So that each guide vane forms precisely corresponding leaf grating, partition body and leaf grating composition in the periphery of partition body
Brush assembly;
- dividing plate outer shroud and brush assembly be subjected to brush processing;
- by the good dividing plate outer shroud of brush with hot jacket assembly method assemble on brush assembly, hot jacket assembling technical requirements be,
Magnitude of interference control is 0.030mm, and hot jacket temperature is 220 DEG C, soaking time 3h;So that dividing plate outer shroud is in brush assembly
Leaf grating curtain plate at, obtain partition board of steam turbine.
Various embodiments above is only to illustrate the present invention, rather than its limitations.Although with reference to the various embodiments described above to this hair
It is bright to be described in detail, it will be understood by those within the art that:It still can be in the various embodiments described above
Concrete technical scheme is modified, or carries out equivalent substitution to which part technical characteristic;And these modifications or replacement, and
The essence of appropriate technical solution is not set to depart from the spirit and scope of the present invention.
Claims (4)
1. a kind of partition board of steam turbine assembly technology, the partition board of steam turbine is mainly by partition body, multiple guide vanes and dividing plate outer shroud
Composition, the guide vane are mainly made up of inner platform, blade and curtain plate;Characterized in that, the dividing plate assembly technology includes
Following technical measures:
- the listrium fitting surface of each guide vane processed into smooth, welding divided edge structure;
- by the inner platform of each guide vane successively brush in the periphery of partition body, each guide vane is formed leaf in the periphery of partition body
Grid, partition body and leaf grating composition brush assembly;
- dividing plate outer shroud and brush assembly be subjected to brush processing;
- assemble the good dividing plate outer shroud of brush on brush assembly with hot jacket assembly method, the dividing plate outer shroud is in brush
At the curtain plate of the leaf grating of assembly, partition board of steam turbine is obtained.
2. partition board of steam turbine assembly technology according to claim 1, it is characterised in that the periphery of the partition body has projection
Positioning spigot, the brush of the inner platform of the guide vane in partition body periphery is made with the raised positioning spigot in partition body periphery
On the basis of.
3. partition board of steam turbine assembly technology according to claim 1, it is characterised in that the magnitude of interference of the hot jacket assembling is 0
~0.10mm.
4. according to the partition board of steam turbine assembly technology of claim 1 or 3, it is characterised in that the hot jacket temperature of the hot jacket assembling
Spend for 150~250 DEG C, soaking time 3h.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711080596.0A CN107717328B (en) | 2017-11-06 | 2017-11-06 | Steam turbine partition plate assembling process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711080596.0A CN107717328B (en) | 2017-11-06 | 2017-11-06 | Steam turbine partition plate assembling process |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107717328A true CN107717328A (en) | 2018-02-23 |
CN107717328B CN107717328B (en) | 2020-03-20 |
Family
ID=61221888
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711080596.0A Active CN107717328B (en) | 2017-11-06 | 2017-11-06 | Steam turbine partition plate assembling process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107717328B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108818368A (en) * | 2018-06-20 | 2018-11-16 | 哈尔滨汽轮机厂有限责任公司 | A kind of assembling jig and assembly method for insertion slot type partition |
CN111230414A (en) * | 2020-01-15 | 2020-06-05 | 哈尔滨汽轮机厂有限责任公司 | Method for assembling turbine partition plate cascade with forward and reverse integrated structure |
CN111558806A (en) * | 2020-04-20 | 2020-08-21 | 哈尔滨汽轮机厂有限责任公司 | Hook type guide blade and rail type guide blade fitting and detecting method |
CN112475855A (en) * | 2020-10-27 | 2021-03-12 | 浙江基力思汽车空调有限公司 | Automatic embedding device for spacer plug of liquid collecting pipe of condenser |
CN113385885A (en) * | 2021-05-20 | 2021-09-14 | 中国电子科技集团公司第十四研究所 | Device for intelligently monitoring interference assembly of rotary table in real time and assembly method |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5835204A (en) * | 1981-08-28 | 1983-03-01 | Hitachi Ltd | Diaphragm for steam turbine |
CN101403320A (en) * | 2001-07-19 | 2009-04-08 | 株式会社东芝 | Assembly type nozzle diaphragm |
CN102767399A (en) * | 2011-05-05 | 2012-11-07 | 阿尔斯通技术有限公司 | Diaphragm for turbomachines and manufacturing method |
CN103201460A (en) * | 2011-02-28 | 2013-07-10 | 三菱重工业株式会社 | Stator blade unit of rotary machine, method for producing stator blade unit of rotary machine, and method for joining stator blade unit of rotary machine |
EP2881543A1 (en) * | 2013-12-06 | 2015-06-10 | Honeywell International Inc. | Stationary airfoils configured to form improved slip joints in bi-cast turbine engine components and the turbine engine components including the same |
CN105917081A (en) * | 2013-11-25 | 2016-08-31 | 通用电器技术有限公司 | Guide vane assembly on the basis of modular structure |
CN104763479B (en) * | 2007-01-12 | 2016-08-31 | 通用电器技术有限公司 | The method manufacturing turbine diaphragm |
CN106103901A (en) * | 2013-12-20 | 2016-11-09 | 通用电器技术有限公司 | Rotor blade or guide vane assembly |
-
2017
- 2017-11-06 CN CN201711080596.0A patent/CN107717328B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5835204A (en) * | 1981-08-28 | 1983-03-01 | Hitachi Ltd | Diaphragm for steam turbine |
CN101403320A (en) * | 2001-07-19 | 2009-04-08 | 株式会社东芝 | Assembly type nozzle diaphragm |
CN104763479B (en) * | 2007-01-12 | 2016-08-31 | 通用电器技术有限公司 | The method manufacturing turbine diaphragm |
CN103201460A (en) * | 2011-02-28 | 2013-07-10 | 三菱重工业株式会社 | Stator blade unit of rotary machine, method for producing stator blade unit of rotary machine, and method for joining stator blade unit of rotary machine |
CN102767399A (en) * | 2011-05-05 | 2012-11-07 | 阿尔斯通技术有限公司 | Diaphragm for turbomachines and manufacturing method |
CN105917081A (en) * | 2013-11-25 | 2016-08-31 | 通用电器技术有限公司 | Guide vane assembly on the basis of modular structure |
EP2881543A1 (en) * | 2013-12-06 | 2015-06-10 | Honeywell International Inc. | Stationary airfoils configured to form improved slip joints in bi-cast turbine engine components and the turbine engine components including the same |
CN106103901A (en) * | 2013-12-20 | 2016-11-09 | 通用电器技术有限公司 | Rotor blade or guide vane assembly |
Non-Patent Citations (1)
Title |
---|
陈义亮等: "《船用锅炉与汽轮机》", 30 June 1995, 大连海事大学出版社 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108818368A (en) * | 2018-06-20 | 2018-11-16 | 哈尔滨汽轮机厂有限责任公司 | A kind of assembling jig and assembly method for insertion slot type partition |
CN111230414A (en) * | 2020-01-15 | 2020-06-05 | 哈尔滨汽轮机厂有限责任公司 | Method for assembling turbine partition plate cascade with forward and reverse integrated structure |
CN111558806A (en) * | 2020-04-20 | 2020-08-21 | 哈尔滨汽轮机厂有限责任公司 | Hook type guide blade and rail type guide blade fitting and detecting method |
CN112475855A (en) * | 2020-10-27 | 2021-03-12 | 浙江基力思汽车空调有限公司 | Automatic embedding device for spacer plug of liquid collecting pipe of condenser |
CN112475855B (en) * | 2020-10-27 | 2021-09-17 | 浙江基力思汽车空调有限公司 | Automatic embedding device for spacer plug of liquid collecting pipe of condenser |
CN113385885A (en) * | 2021-05-20 | 2021-09-14 | 中国电子科技集团公司第十四研究所 | Device for intelligently monitoring interference assembly of rotary table in real time and assembly method |
Also Published As
Publication number | Publication date |
---|---|
CN107717328B (en) | 2020-03-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107717328A (en) | A kind of partition board of steam turbine assembly technology | |
US7726938B2 (en) | Turbine blade and diaphragm construction | |
US8702385B2 (en) | Welded nozzle assembly for a steam turbine and assembly fixtures | |
US20150337664A1 (en) | Turbomachine blade, corresponding turbomachine and method of manufacturing a turbine blade | |
CN103237959B (en) | Steam turbine stator blade and steam turbine | |
CN104797825A (en) | Method for producing centrifugal fan | |
JP5557433B2 (en) | Welding nozzle assembly for steam turbine and associated assembly fixture | |
EP1808577A2 (en) | A welded nozzle assembly for a steam turbine and methods of assembly | |
RU2692597C2 (en) | Blade for turbomachine, comprising aerodynamic part, method of making such blade and turbomachine comprising such blades | |
RU2349437C2 (en) | Method for manufacture of hollow vane for gas-turbine engine | |
US20160215643A1 (en) | Shim seal assemblies and assembly methods for stationary components of rotary machines | |
JP2017502188A (en) | Method for manufacturing a steam turbine stage | |
US20110217175A1 (en) | Turbine rotor blade | |
RU2013133634A (en) | GAS TURBINE INJECTION COOLING OF ROTARY BLADES AND STATOR BLADES | |
US10221709B2 (en) | Gas turbine vane | |
CN205025759U (en) | Novel vacuum pump blade and vacuum pump | |
US1470502A (en) | Method of making blade rings for elastic-fluid turbines | |
JP2014224533A (en) | Modified turbine buckets and methods for modifying turbine buckets | |
CN205955009U (en) | Cross post | |
KR101418442B1 (en) | The method of manufacturing runner for cross flow water current turbine | |
CN208961261U (en) | Copper wire coil structures | |
US20180230810A1 (en) | Interlocking modular airfoil for a gas turbine | |
CN106694635B (en) | A kind of gas spring stent exempts from fractionation bending method | |
CN103890319B (en) | Moving vane supporting structure | |
JP2016011625A (en) | Stator vane, stator vane unit, and steam turbine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |