CN107679028A - GPR layer data file process and the method for drawing - Google Patents
GPR layer data file process and the method for drawing Download PDFInfo
- Publication number
- CN107679028A CN107679028A CN201710965150.XA CN201710965150A CN107679028A CN 107679028 A CN107679028 A CN 107679028A CN 201710965150 A CN201710965150 A CN 201710965150A CN 107679028 A CN107679028 A CN 107679028A
- Authority
- CN
- China
- Prior art keywords
- group
- file
- gpr
- layer data
- data file
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F40/00—Handling natural language data
- G06F40/10—Text processing
- G06F40/166—Editing, e.g. inserting or deleting
- G06F40/174—Form filling; Merging
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F40/00—Handling natural language data
- G06F40/10—Text processing
- G06F40/12—Use of codes for handling textual entities
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T11/00—2D [Two Dimensional] image generation
- G06T11/20—Drawing from basic elements, e.g. lines or circles
- G06T11/203—Drawing of straight lines or curves
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T11/00—2D [Two Dimensional] image generation
- G06T11/20—Drawing from basic elements, e.g. lines or circles
- G06T11/206—Drawing of charts or graphs
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- Artificial Intelligence (AREA)
- Audiology, Speech & Language Pathology (AREA)
- Computational Linguistics (AREA)
- General Health & Medical Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Radar Systems Or Details Thereof (AREA)
- Processing Or Creating Images (AREA)
Abstract
A kind of GPR layer data file process and the method for drawing, choose pending GPR layer data file;Import Excel;Thickness degrees of data information imports in Excel and obtains the secondary lining thickness value of this document;Recognition detection position and corresponding mileage section, by identifying storage secondary lining thickness value at defined location in data source region;One file lower thickness file carries out layer data file process successively as a batch by abovementioned steps;Draw first group of group figure;More reorganize the title element in figure per pictures, the picture after change is turned into the curve map suitable for new detection object;The quantity of curve map chart is calculated according to the mileage length gauge of every group of group figure;First group of repeat replication, stickup, modification group figure generate total curve map;Storage name, forms Outcome Document.The batch processing of GPR layer data file is the method achieve, data processing and drawing are organically combined, operating efficiency is improved, avoids maloperation.
Description
Technical field
The invention belongs to Tunnel Engineering detection technique field, is related to a kind of GPR layer data file(.LAY .CSV)
The method of processing and drawing.
Background technology
GPR is a kind of emerging physical prospecting equipment, has the advantage such as efficient, quick, accurate, reliable, lossless, extensively
Inspection of Tunnel Quality applied to fields such as railway, highway, water conservancies detects, it has also become quality control and tunnel pass through in tunnel construction
The important means of inspection of quality and essential project after logical.GPR in Tunnel testing mainly the thickness to secondary lining, lining
Whether block comes to nothing behind or the laying situation of closely knit, reinforcing bar and bow member is detected, and wherein secondary lining thickness detection is every
Lining thickness value corresponding to each detection position of individual mileage points extracts, and then draws lining thickness according to these thickness values
Curve map, whether design requirement judges intuitively can be met to thickness of tunnel linings.
Before the drawing of GPR curve map, first have to complete GPR layer data file(.LAY .CSV)Handle work
Make, for the layer data file generated by labor Thunder God department different editions(.LAY .CSV)Processing, typically by following steps
Come what is completed:
Step 1:Using importing external data → importing data ... below the menu bar in Excel, pop-up dialogue box, directly
Enter under " my data source " file;
Step 2:Folder path is adjusted, the file entered where pending data file, selectes pending file;
Step 3:Text import wizard is entered, layer thickness information is imported into Excel using 3 small steps of the guide;
Step 4:Delete the redundant information imported in Excel intima-media thickness information;
Step 5:Complementation calculating is carried out using mod function pairs measuring point;
Step 6:Using screening function, thickness value corresponding to each whole mileage measuring point is filtered out;
Step 7:Conversion of measurement unit is carried out to thickness value;
Step 8:These thickness values are selected, are copied and pasted to data source region;
Whole processing procedure is time-consuming, dull, easily occurs mouse in prolonged data handling procedure and clicks on mistake, input error
Deng maloperation, operating efficiency is influenceed, and a layer data file can only be handled every time.
In Inspection of Tunnel Quality detection, GPR Non-Destructive Testing staff often need to by vault in each mileage section,
Left haunch, right haunch, leftwall, RightWall etc.(Generally more than arrangement five survey line positions)Each detection position is surveyed
Secondary lining thickness value be depicted as secondary lining thickness curve map.By a certain amount value(As per 100m mileage sections)By each inspection
Survey position and be depicted as one group of chart, the chart of each detection position is a chart in this group of chart, and every three charts are put
In a page, five or six detection positions need two pages altogether, and seven detection positions then need three pages.
Existing drafting method is by the thickness data information of some mileage section of some tunnel(Containing mileage and its each detection
Thickness value corresponding to position)It is converted into chart-information(That is curve map).Whole process is realized in Excel, specific steps
It is as follows:
Step 1:Using the drafting instrument in Excel first each detection position of 100m mileage sections(Usually vault/left side
5 detection positions such as right haunch/left and right abutment wall)Chart is depicted as respectively, and the chart of drafting is put together and forms first group
Group figure;
Step 2:First group of group figure is subjected to duplication stickup, generates second group of group figure, and reference axis is carried out on second group of group figure
Scope is changed, mainly the start-stop position of X-axis, becomes second group of group figure corresponding to second 100m;
Step 3:Mileage paragraph below all presses the operating method of step 2, sequentially generates the 3rd group of group figure, the 4th group of group
Figure ..., until completing the drawing work of all data in data source;
Existing drafting method needs constantly to replicate Table Header information in stickup, the mileage coordinate value for changing X-axis, chart etc.,
It is the very high work of repeatability, and changes X-axis coordinate values in prolonged drawing course and input mistake also easily occur
By mistake, drawing efficiency is reduced.
For this dull, cumbersome work, it is necessary to propose a kind of new thinking or method to improve traditional GPR
Layer data file(.LAY .CSV)Processing with drawing mode.
The content of the invention
It is an object of the invention to provide a kind of GPR layer data file process and the method for drawing, repetition is greatly reduced
Sex work, pole increase substantially efficiency.
To achieve the above object, the technical solution adopted in the present invention is:A kind of GPR layer data file process with
The method of drawing, specifically carry out according to the following steps:
1)Pending GPR layer data is chosen using the Application.GetOpenFilename methods in Excel
File where file, then the file path by variable FilePath and variable FileName pending layer data file
It is delivered to filename in Excel ActiveSheet.Query-Tables.Add (), completes the pending GPR number of plies
According to the selection of file;
2)By ActiveSheet.Query-Tables.-Add () by step 1)In select GPR layer data file
It imported into Excel office softwares;
3)The deletion, whole of redundant data is carried out to the content of the GPR layer data file of importing in Excel office softwares
The thickness value of the screening of mileage point data, unit conversion and Tunnel Second Lining replicates, and obtains the GPR layer data file
Tunnel Second Lining thickness value;
4)In step 3)In obtained the Tunnel Second Lining thickness value of a certain GPR layer data file after, automatic identification inspection
Position and corresponding mileage section are surveyed, and the Tunnel Second Lining thickness value of acquisition is stored in corresponding position in data source region automatically
Put;
5)Using the file search sentence FileSearch All Fileses searched under specified folder or utilize DIR sentences traversal
All Files under specified folder, using qualified file under specified folder as a batch, to wherein each symbol
The file of conjunction condition presses step 1 successively)To step 4)Carry out layer data file process;
6)First each detection position of 100m mileage sections is depicted as chart respectively using the drafting instrument in Excel, painted
Into all pictures form first group of group figure;Then, for the difference of detection object, with " variable+text in first group of group figure
Originally form " more reorganizes Chart Title, engineering name, detection unit, unit in charge of construction and the detection date in figure in every pictures
Deng element, the picture after change is set to turn into the curve map suitable for new detection object;
7)The data source region of the making curve map generated in Excel reads the length of detection mileage section automatically, according to every group of group
The mileage length gauge of figure calculates the quantity of curve map chart;The detection mileage length and the proportional relation of chart quantity;
8)First group of group figure is selected, is replicated, then pastes first group of group figure in the clear area that existing curve map is close to;Connect
, modified on first group of selected group figure, curve map is incrementally completed with 1 group of group figure/100m increment size from
Beginning mileage charts to the whole of mileage are terminated;
9)The curve map of generation is stored in new file, be named, form the curve map file of achievement form.
Layer data file of the present invention(.LAY .CSV)Processing with drafting method by GPR layer data file (.LAY,
.CSV) processing draws an organic whole that permeates with curve map;It is effective realize GPR layer data file batch at
Function is managed, and pilot process backstageization is operated, realizes the combination of data processing and work of charting, pole increases substantially
Operating efficiency, avoid the maloperation of centre.It the method achieve only to need to input and GPR can be achieved after relevant parameter
The batch processing of layer data file simultaneously automatically generates GPR thickness map, and the survey line position of curve map can freely be selected
It is fixed;Operating efficiency greatly improves, and relative to traditional data processing and drawing mode, operating efficiency improves more than 30 times, and
Data volume is bigger, and operating efficiency is higher.The GPR thickness map simple, intuitive generated with this method, easily judges tunnel
The position of lining thickness deficiency, has high practicality and popularization.
Brief description of the drawings
Fig. 1 is data documents disposal of the present invention and a picture in one group of group figure in drafting method, refers to a survey line portion
Position.
Fig. 2 is data documents disposal of the present invention and group figure generating process flow chart in drafting method.
Embodiment
The present invention is described in detail with reference to the accompanying drawings and detailed description.
The invention provides a kind of GPR layer data file process and the method for drawing, is specially:
1)Data file is freely chosen:Where freely choosing pending GPR layer data file (.LAY .CSV)
File, and the non-GPR layer data file (.LAY .CSV) in file is foreclosed, i.e., using in Excel
Application.GetOpenFilename methods freely choose pending GPR layer data file (.LAY,
.CSV the file where), then by variable FilePath and variable FileName pending layer data file (.LAY,
.CSV file path and filename) is delivered to Excel ActiveSheet.Query-Tables.Add ()(In inquiry table
A worksheet is generated in the data that each object represents to return from external data source)In, complete the pending GPR number of plies
According to freely choosing for file (.LAY .CSV);
2)The importing of external data:By ActiveSheet.Query-Tables.-Add () by step 1)In the spy selected
Radar layer data file (.LAY .CSV) is imported into Excel office softwares;Realize the work(that external data is imported into Excel
Energy;
3)The intermediate treatment of data:Content progress to the GPR layer data file of importing in Excel office softwares is more
Remainder evidence(Data in addition to thickness value corresponding to mileage value, scanning road numerical value and mileage points)Deletion, whole mileage point data
Screening, the thickness value of unit conversion and Tunnel Second Lining replicate operation, obtain the tunnel of the GPR layer data file
Secondary lining thickness value;
4)The automatic identification of thickness value position:In step 3)In obtained the secondary lining in tunnel of a certain GPR layer data file
After building thickness value, automatic identification(Because data source region belongs to two-dimensional coordinate system, it need to only determine that lateral coordinates position and longitudinal direction are sat
Cursor position can determine the regional location where thickness data value, determine longitudinal coordinate position using mileage value, recycle text
Survey line location information in part name can determine abscissa positions, then certain survey line position mileage section actual measurement secondary lining thickness
Data source zone position corresponding to value can determine that, and can utilize mileage value and survey line title automatic identification secondary lining thickness
It is worth the position in data source region)Detection position and corresponding mileage section, and the Tunnel Second Lining thickness value of acquisition is automatic
It is stored in corresponding position in data source region(Determined by detection mileage points and survey line position automatic identification);
Such as:The right haunch .LAY of WEST QINLING tunnel DIK419+508-DIK419+730--, the type of file is identified by .LAY;
Pass through " right haunch " recognition detection position;It is right in its data source region to be determined by mileage value corresponding to GPR thickness degrees of data
The mileage position answered.
5)Data file batch processing:The All Files searched for using file search sentence FileSearch under specified folder
Or using the All Files under DIR sentences traversal specified folder, using qualified file under specified folder as one
Individual batch, step 1 is pressed successively to wherein each qualified file)To step 4)Operation carry out layer data file process;
Preceding 4 steps complete the processing work of a layer data file, the function of step 5 be allow it is all under a file
Qualified file(Just refer to GPR layer data file)It is sequentially completed the operation of step 1~step 4.
6)Using the drafting instrument in Excel first each detection position of 100m mileage sections(Usually vault/left and right
5 detection positions such as haunch/left and right abutment wall)Chart is depicted as respectively, and 5 plotted picture forms first group of group figure;But have
A bit in particular cases, indivedual surveys line detect, now freely choosing survey line with regard to needs is combined, and is then grouped
Figure.Under regular situation, 5 vault, left haunch, right haunch, leftwall and RightWall thickness maps form one group of group figure, special
In the case of, wherein any several surveys line can be selected to form new survey line composition as needed.Citing:During normal detection, vault, a left side
Haunch, right haunch, leftwall and RightWall form one group of group figure, and vault, left haunch, right haunch are placed on one page, leftwall, the right
Wall is placed on one page.During special circumstances, such as left haunch is when detecting, can be to select vault, right haunch, leftwall and RightWall 4
Bar survey line forms one group of group figure, and vault, right haunch, leftwall are placed on one page, and RightWall is placed on one page.
After first group of group figure is determined, you can for the difference of detection object, with " variable+text in first group of group figure
Originally form " more reorganizes Chart Title, engineering name, detection unit, unit in charge of construction and the detection date in figure in every pictures
Deng element, turn into the picture after change and be applied to new detection object(Other tunnels)Curve map;
The form of " variable+text " is:Group figure chart in, with detection object change and change use variable format, not with
The use textual form that detection object changes and changed.It can be changed by the form of " variable+text " by parameter region several
Simple parameter can complete the elements such as Chart Title in group figure, engineering name, detection unit, unit in charge of construction and detection date
Change work.
In Table Header information in Fig. 1 " the left haunch two of two water tunnels serves as a contrast thickness profile degree ", " two water tunnels " is variable, can be with
By changing the variate-value from the parameter region in data source, and " the left thickness of the liner degree profile of haunch two " is textual portions, utilizes language
The sentence left haunches two of Selection.Characters.Text=Worksheets (" Sheet1 ") .Range (" j2 ") & " serve as a contrast
Thickness profile figure " can be achieved can only complete the renewal of whole group of figure in the several parameters of parameter region adjustment beside data source
Work, and it is applied to new detection object.
7)The data source region generated in Excel(Make the data source region of curve map)The automatic length for reading detection mileage section
Degree, the quantity of curve map chart is calculated according to the mileage length gauge of every group of group figure;The detection mileage length is with chart quantity in just
The relation of ratio;
8)First group of group figure is selected, is replicated using copy function, then pastes the in the clear area that existing curve map is close to
One group of group figure;Then, modified on selected first group of group figure, make curve map(First group of group artwork plate before drawing
Through carrying out, it can reuse infinitely afterwards, it is no longer necessary to make new template before every use)With 1 group of group figure/100m's
Increment size is incrementally completed, from starting mileage to the whole drawing work for terminating mileage, often to perform and once replicate, paste, modification function
Just one group of new group figure is produced, as shown in Fig. 2 after carrying out first time duplication, stickup, modification to first group of group figure, produces second
Group group figure, at this moment, second group of group figure and first group of group figure are simultaneously deposited;First group of group figure is replicated for the second time again, pasted, repaiied
After changing, the 3rd group of group figure is produced, now, the 3rd group of group figure, first group of group figure and second group of group figure are simultaneously deposited;Again to first group of group
After figure carries out third time duplication, stickup, modification, produce the 4th group of group figure, now, the 4th group of group figure, first group of group figure, second group
Group figure and the 3rd group of group figure are simultaneously deposited;Then, the 4th time is carried out to first group of group figure to replicate, paste, after modification, produces the 5th group of group
Figure, now, the 5th group of group figure, first group of group figure, second group of group figure, the 3rd group of group figure and the 4th group of group figure are simultaneously deposited;By that analogy,
Until completing all to replicate, pasting, after modification circulation, first group of group figure is once replicated again, pasted, then deletes first
Group group figure, you can obtain whole curve maps of aligned orderly(The work that data source region total data is converted into curve map can be completed
Make);
The content pasted is replicated every time to be different from, and is to be modified on first group of group figure every time, is become newly-increased after modification
The one group of group figure added, and it is replicated and pasted on the position of curve map immediately as the one group of group figure newly increased;
9)The curve map of generation is stored in new file, and is named, avoid interfering with existing curve map file,
Beneficial to the management of curve map.
During name:It is first determined whether there is file of the same name, if file of the same name, then behind file name+character
" 1 ", file of the same name is then determined whether there is again, if file also of the same name, continues behind newly-generated filename+character
" 1 ", untill without file of the same name, and filename now is assigned to newly-generated curve map file.
Embodiment
Certain detection of Lan Yu Railway WEST QINLING tunnel, scene spend the Coherent Noise in GPR Record of 2 day time collection, totally 53 layers
Thickness data(.LAY)File, data processing and drawing need of work more than 180 minutes are carried out using existing method, uses this hair
Bright method for drafting only needs 5 minutes to complete whole work.
Claims (5)
1. a kind of GPR layer data file process and the method for drawing, it is characterised in that specifically carry out according to the following steps:
1)Pending GPR layer data is chosen using the Application.GetOpenFilename methods in Excel
File where file, then the file path by variable FilePath and variable FileName pending layer data file
It is delivered to filename in Excel ActiveSheet.Query-Tables.Add (), completes the pending GPR number of plies
According to the selection of file;
2)By ActiveSheet.Query-Tables.-Add () by step 1)In select GPR layer data file lead
Enter into Excel office softwares;
3)The deletion, whole of redundant data is carried out to the content of the GPR layer data file of importing in Excel office softwares
The thickness value of the screening of mileage point data, unit conversion and Tunnel Second Lining replicates, and obtains the GPR layer data file
Tunnel Second Lining thickness value;
4)In step 3)In obtained the Tunnel Second Lining thickness value of a certain GPR layer data file after, automatic identification inspection
Position and corresponding mileage section are surveyed, and the Tunnel Second Lining thickness value of acquisition is stored in corresponding position in data source region automatically
Put;
5)Using the file search sentence FileSearch All Fileses searched under specified folder or utilize DIR sentences traversal
All Files under specified folder, using qualified file under specified folder as a batch, to wherein each symbol
The file of conjunction condition presses step 1 successively)To step 4)Carry out layer data file process;
6)First each detection position of 100m mileage sections is depicted as chart respectively using the drafting instrument in Excel, painted
Into all pictures form first group of group figure;Then, for the difference of detection object, with " variable+text in first group of group figure
Originally form " more reorganizes Chart Title, engineering name, detection unit, unit in charge of construction and the detection date in figure in every pictures
Deng element, the picture after change is set to turn into the curve map suitable for new detection object;
7)The data source region of the making curve map generated in Excel reads the length of detection mileage section automatically, according to every group of group
The mileage length gauge of figure calculates the quantity of curve map chart;The detection mileage length and the proportional relation of chart quantity;
8)First group of group figure is selected, is replicated, then pastes first group of group figure in the clear area that existing curve map is close to;Connect
, modified on first group of selected group figure, curve map is incrementally completed with 1 group of group figure/100m increment size from
Beginning mileage charts to the whole of mileage are terminated;
9)The curve map of generation is stored in new file, be named, form the curve map file of achievement form.
2. GPR layer data file process according to claim 1 and the method for drawing, it is characterised in that the step
Rapid 6)In, the form of " variable+text " is:In the chart of group figure, what is changed with detection object and change uses variable format, no
The use textual form for changing with detection object and changing;It can be changed by the form of " variable+text " by parameter region several
Individual simple parameter can complete the elements such as Chart Title in group figure, engineering name, detection unit, unit in charge of construction and detection date
Change work.
3. GPR layer data file process according to claim 1 and the method for drawing, it is characterised in that the step
Rapid 8)In, during drawing, often perform once replicate, paste, modification function just produces one group of new group figure.
4. GPR layer data file process according to claim 3 and the method for drawing, it is characterised in that often perform
Once replicate, paste, modification function just produces the detailed process of one group of new group figure and is:First group of group figure is carried out multiple for the first time
System, paste, after modification, produce second group of group figure, at this moment, second group of group figure and first group of group figure and deposit;Again to first group of group
Figure carries out second and replicates, pastes, after modification, produces the 3rd group of group figure, now, the 3rd group of group figure, first group of group figure and second
Group group is schemed and deposited;After carrying out third time duplication, stickup, modification to first group of group figure again, the 4th group of group figure is produced, now, the
Four groups of group figures, first group of group figure, second group of group figure and the 3rd group of group figure are simultaneously deposited;Then, the 4th time is carried out to first group of group figure again
System, paste, after modification, produce the 5th group of group figure, now, the 5th group of group figure, first group of group figure, second group of group figure, the 3rd group of group
Figure and the 4th group of group figure are simultaneously deposited;By that analogy, until completing all to replicate, pasting, after modification circulation, first group of group figure is entered again
Row is once replicated, pasted, and then deletes first group of group figure, you can obtain whole curve maps of aligned orderly;
The content pasted is replicated every time to be different from, and is to be modified on first group of group figure every time, is become newly-increased after modification
The one group of group figure added, and it is replicated and pasted on the position of curve map immediately as the one group of group figure newly increased.
5. GPR layer data file process according to claim 1 and the method for drawing, it is characterised in that the step
Rapid 9)In, during name:It is first determined whether there is file of the same name, if file of the same name, then behind file name+character " 1 ",
Then file of the same name is determined whether there is again, if file also of the same name, continues behind newly-generated filename+character " 1 ",
Untill without file of the same name, and filename now is assigned to newly-generated curve map file.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710965150.XA CN107679028B (en) | 2017-10-17 | 2017-10-17 | The method of Ground Penetrating Radar layer data file process and drawing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710965150.XA CN107679028B (en) | 2017-10-17 | 2017-10-17 | The method of Ground Penetrating Radar layer data file process and drawing |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107679028A true CN107679028A (en) | 2018-02-09 |
CN107679028B CN107679028B (en) | 2018-11-16 |
Family
ID=61140705
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710965150.XA Active CN107679028B (en) | 2017-10-17 | 2017-10-17 | The method of Ground Penetrating Radar layer data file process and drawing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107679028B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111858758A (en) * | 2020-07-08 | 2020-10-30 | 北京科技大学 | Transparent visual analysis method and system for underground resource digital management shell |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101877020A (en) * | 2009-12-04 | 2010-11-03 | 煤炭科学研究总院西安研究院 | Method for drawing drilling track graph in AutoCAD by using VBA module |
CN104142827A (en) * | 2014-07-29 | 2014-11-12 | 上海自仪泰雷兹交通自动化系统有限公司 | Method for fast analyzing performance of rail transit data communication system |
CN105159685A (en) * | 2015-09-28 | 2015-12-16 | 武汉中冶易新科技有限公司 | Method for extracting detail content of computer aided design (CAD) drawing to Excel form |
CN106202009A (en) * | 2016-07-12 | 2016-12-07 | 朱臻 | A kind of do not use grand recording data processing method based on VBA module and system |
-
2017
- 2017-10-17 CN CN201710965150.XA patent/CN107679028B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101877020A (en) * | 2009-12-04 | 2010-11-03 | 煤炭科学研究总院西安研究院 | Method for drawing drilling track graph in AutoCAD by using VBA module |
CN104142827A (en) * | 2014-07-29 | 2014-11-12 | 上海自仪泰雷兹交通自动化系统有限公司 | Method for fast analyzing performance of rail transit data communication system |
CN105159685A (en) * | 2015-09-28 | 2015-12-16 | 武汉中冶易新科技有限公司 | Method for extracting detail content of computer aided design (CAD) drawing to Excel form |
CN106202009A (en) * | 2016-07-12 | 2016-12-07 | 朱臻 | A kind of do not use grand recording data processing method based on VBA module and system |
Non-Patent Citations (1)
Title |
---|
赵常要 等: "探地雷达在隧道检测中里程偏差修正方法探讨", 《现代隧道技术》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111858758A (en) * | 2020-07-08 | 2020-10-30 | 北京科技大学 | Transparent visual analysis method and system for underground resource digital management shell |
CN111858758B (en) * | 2020-07-08 | 2021-10-15 | 北京科技大学 | Transparent visual analysis method and system for underground resource digital management shell |
Also Published As
Publication number | Publication date |
---|---|
CN107679028B (en) | 2018-11-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103366633B (en) | Water conservation map data model-based flood risk map drawing method and system thereof | |
CN102800052B (en) | Semi-automatic digital method of non-standard map | |
CN103955558B (en) | Method for collecting and processing engineering investigation data of different industries | |
CN110490100A (en) | Ground automatic identification based on deep learning names method and system | |
CN105574259A (en) | Internet word frequency-based city cognitive map generation method | |
CN112685382B (en) | BIM + GIS-based highway engineering quantity table extraction, classification and reconstruction method and system | |
KR102308457B1 (en) | The embodiment method of 3D PDF drawing from 3D modeling of plant | |
CN102609402A (en) | Device and method for generation and management of ontology model based on real-time strategy | |
CN106294572A (en) | A kind of elevation map rapid generation based on AutoCAD data source and ArcGIS instrument | |
CN104699758B (en) | The commanding document intelligent generating system and method for a kind of graphics and text library association | |
CN103455896A (en) | Paperless assembling quality control method based on internet of things | |
CN104516813A (en) | Method and device for selecting testing node of web page | |
CN107679028A (en) | GPR layer data file process and the method for drawing | |
CN114201795A (en) | Data transmission method and device for three-dimensional geological BIM model and finite element model | |
CN101650750B (en) | Rapid and intuitive interpretive system and method for petroleum well logging data | |
CN116303448B (en) | Method, system, equipment and storage medium for generating foundation core drilling method detection report file | |
Zhaoguo et al. | Traditional village protection based on big data under the impact of covid-19 | |
CN102467573B (en) | Digital mapping simplicity compiling method and internal sort method are auxiliary bee-line ranking method | |
CN114386573A (en) | Static sounding soil layer dividing method and system based on multilayer perceptron | |
Palmer | A computer method for transcribing information graphically from oblique aerial photographs to maps | |
CN110390170B (en) | Gas pipe network communication inspection method and pipe network online editing system | |
Ekkawong et al. | SMARTDRAIN: an intelligent workflow for well-placement optimisation by integrating streamlines time-of-flight and exhaustive search algorithm | |
Xu et al. | Intelligent recognition of drill cores and automatic RQD analytics based on deep learning | |
Qiu et al. | Information extraction and knowledge linkage of geological profiles and related contextual texts from mineral exploration reports for geological knowledge graphs construction | |
Al Riyami et al. | Petroleum Development Oman Forecasting Management System |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |