CN107677985A - The intelligent meter hanging frame of laboratory three-phase electric energy meter calibrating - Google Patents

The intelligent meter hanging frame of laboratory three-phase electric energy meter calibrating Download PDF

Info

Publication number
CN107677985A
CN107677985A CN201711146146.7A CN201711146146A CN107677985A CN 107677985 A CN107677985 A CN 107677985A CN 201711146146 A CN201711146146 A CN 201711146146A CN 107677985 A CN107677985 A CN 107677985A
Authority
CN
China
Prior art keywords
bar
elevating lever
electric energy
hanging frame
phase electric
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711146146.7A
Other languages
Chinese (zh)
Inventor
常亮
王思伟
侯军
郭淑新
刘小康
常建
卜令伟
郑伟书
常青
李永伟
郭金峰
席文娣
高军
苏万武
安乐
蒲业宏
葛传平
周群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Zibo Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Zibo Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Zibo Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201711146146.7A priority Critical patent/CN107677985A/en
Publication of CN107677985A publication Critical patent/CN107677985A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R35/00Testing or calibrating of apparatus covered by the other groups of this subclass
    • G01R35/04Testing or calibrating of apparatus covered by the other groups of this subclass of instruments for measuring time integral of power or current

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

The present invention relates to a kind of intelligent meter hanging frame of laboratory three-phase electric energy meter calibrating, belong to kilowatt-hour meter Calibration Technology field.It includes pocket watch bar, elevating lever, support frame, pocket watch seat, base, support bar, junction block and thimble, the pocket watch bar is fixed on elevating lever, the plug division of elevating lever is plugged in the chute for being opened in support frame, elevating lever can move up and down along chute, the junction block is fixed on base by support bar, below pocket watch bar, the thimble is connected the junction block with electric current line, pressure-wire, signal wire respectively.This intelligent meter hanging frame instead of the poorly efficient manual Connection Mode of tradition, using intelligent wiring, avoid because misconnection caused by the artificial fatigue of high-volume inspection table wiring misses phenomenon.

Description

The intelligent meter hanging frame of laboratory three-phase electric energy meter calibrating
Technical field
The present invention relates to a kind of intelligent meter hanging frame of laboratory three-phase electric energy meter calibrating, belong to kilowatt-hour meter Calibration Technology neck Domain.
Background technology
The meter hanging frame part of equipment for three-phase electrical energy meter need to carry out electric current line, pressure-wire, letter manually after pocket watch at present Number line, the crimping of Multifunctional data line, clamping connection.Because it is most of need to carry out manual wiring, staff is also easy to produce fatigue operation and Mistakes and omissions wiring phenomenon, stage body boosting are pinpointed the problems after flowing up and problem searched again so as to reduce calibrating efficiency and time; Meanwhile human factor causes the phenomenon layer of unnecessary damage to go out not broken string and error connection caused by the operation repeatedly of signal wire Thoroughly.
The content of the invention
In view of the foregoing defects the prior art has, the present invention proposes a kind of new laboratory three-phase electric energy meter calibrating and used Intelligent meter hanging frame.
The present invention is realized using following technical scheme:
A kind of intelligent meter hanging frame of laboratory three-phase electric energy meter calibrating, including pocket watch bar, elevating lever, support frame, pocket watch seat, Base, support bar, junction block and thimble, the pocket watch bar are fixed on elevating lever, and the plug division of elevating lever, which is plugged on, to be opened in In the chute of support frame, elevating lever can be moved up and down along chute, and the junction block is fixed on base by support bar, described to connect Below pocket watch bar, the thimble is connected line seat with electric current line, pressure-wire, signal wire respectively.
The support bar is bolted on base.
The base is provided with multiple rows of screw, and the support bar can be fixed in the screw of different height, on realizing Lower movement, by the movement of support bar, the calibrating of different model kilowatt-hour meter can be met.
The thimble is connected by brute spring with junction block, brute spring ensure thimble with three-phase electric energy meter terminal hole There is certain degree of allowing in contact process and provide extruding force of the thimble to energy meter terminal afterwards in place in elevating lever motion, it is ensured that Reliable electric between thimble and energy meter terminal contacts.
The elevating lever is provided at both ends with handle.
The thimble is arc moon type.
The beneficial effects of the invention are as follows:Using the intelligent meter hanging frame of laboratory three-phase electric energy meter of the present invention calibrating:
1. it can be improved on the basis of existing meter hanging frame, it is not necessary to integral replacing, while can also fit completely For existing inspection list procedure.
2. signal wire end, be fixed on junction block using firm welding manner and be connected with signal top, avoid due to Misconnection caused by the artificial fatigue of high-volume inspection table wiring misses phenomenon, and retains original circuit segment pulse to greatest extent, real The existing problematic disassembling, assembling and replacing of pulse plate is convenient.
3. by Optimizing Reconstruction, ensure that each binding post contacts well with electric energy meter, even if 100A high current is without beating Screw, the speed of verification is improved, hang the time of more than 1 times than saving before transformation of a collection of table.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention.
In figure:1st, support frame;2nd, elevating lever;3rd, chute;4th, pocket watch bar;5th, support bar;6th, thimble;7th, bolt;8th, wiring Seat;9th, base.
Embodiment
In order that the object of the invention, technical scheme are more clearly understood, below in conjunction with the accompanying drawings, the present invention is made further detailed Describe in detail bright.
As shown in figure 1, the intelligent meter hanging frame of three-phase electric energy meter calibrating in laboratory of the present invention, including pocket watch bar 4, liter Drop bar 2, support frame 1, pocket watch seat, base 9, support bar 5, junction block 8 and thimble 6, the pocket watch bar 4 are fixed on elevating lever 2, The plug division of elevating lever 2 is plugged in the chute 3 for being opened in support frame 1, and elevating lever 2 is provided at both ends with handle, and elevating lever 2 can edge Chute 3 is moved up and down, and the junction block 8 is fixed on support bar 5, and the support bar 5 is fixed on base 9 by bolt 7, institute Junction block 8 is stated located at the lower section of pocket watch bar 4, the thimble 6 is arc moon type, and thimble 6 connects with electric current line, pressure-wire, signal wire respectively Connect, thimble 6 is connected by brute spring with junction block 8.The base 9 is provided with multiple rows of screw, and the support bar 5 can be fixed on In the screw of different height, moved up and down so as to realize.
In use, intelligent meter hanging frame of the present invention is formed a line, three-phase electric energy meter is hung on pocket watch bar 4, hung The handle of elevating lever 2 is pulled after full, moves downward electric energy meter, the height of pre-adjusted support bar 5 so that elevating lever 2 When dropping to bottom, the binding post joint with three phase watt-hour meter just of thimble 6, so as to realize the calibrating of three-phase electric energy meter.
Because the line that three phase watt-hour meter needs connect is more, the achievement of raising efficiency is more obvious after transformation;Such as 16 table Voltage and current signal all manual wiring before the three phase watt-hour meter transformation of position;After transformation positioning, it can not only reduce the hair of error connection It is raw, and realize that the successively crimping fixation of electric current and signal can examine table, need also to check wiring before transformation within 30 minutes, after transformation 16 epitope 5-7 minutes can complete inspection table.
The present invention can be widely used in kilowatt-hour meter calibrating occasion.

Claims (6)

1. the intelligent meter hanging frame of a kind of laboratory three-phase electric energy meter calibrating, it is characterised in that including pocket watch bar (4), elevating lever (2), support frame (1), pocket watch seat, base (9), support bar (5), junction block (8) and thimble (6), the pocket watch bar (4) are fixed on On elevating lever (2), the plug division of elevating lever (2) is plugged in the chute (3) for being opened in support frame (1), and elevating lever (2) can be along cunning Groove (3) is moved up and down, and the junction block (8) is fixed on base (9) by support bar (5), and the junction block (8) is located at pocket watch Below bar (4), the thimble (6) is connected with electric current line, pressure-wire, signal wire respectively.
2. the intelligent meter hanging frame of three-phase electric energy meter calibrating in laboratory according to claim 1, it is characterised in that the support Bar (5) is fixed on base (9) by bolt (7).
3. the intelligent meter hanging frame of three-phase electric energy meter calibrating in laboratory according to claim 2, it is characterised in that the base (9) multiple rows of screw is provided with, the support bar (5) can be fixed in the screw of different height, be moved up and down so as to realize.
4. the intelligent meter hanging frame of three-phase electric energy meter calibrating in laboratory according to claim 1, it is characterised in that the thimble (6) it is connected by brute spring with junction block (8).
5. the intelligent meter hanging frame of three-phase electric energy meter calibrating in laboratory according to claim 1, it is characterised in that the lifting Bar (2) is provided at both ends with handle.
6. the intelligent meter hanging frame of three-phase electric energy meter calibrating in laboratory according to claim 1, it is characterised in that the thimble (6) it is arc moon type.
CN201711146146.7A 2017-11-17 2017-11-17 The intelligent meter hanging frame of laboratory three-phase electric energy meter calibrating Pending CN107677985A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711146146.7A CN107677985A (en) 2017-11-17 2017-11-17 The intelligent meter hanging frame of laboratory three-phase electric energy meter calibrating

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711146146.7A CN107677985A (en) 2017-11-17 2017-11-17 The intelligent meter hanging frame of laboratory three-phase electric energy meter calibrating

Publications (1)

Publication Number Publication Date
CN107677985A true CN107677985A (en) 2018-02-09

Family

ID=61149948

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711146146.7A Pending CN107677985A (en) 2017-11-17 2017-11-17 The intelligent meter hanging frame of laboratory three-phase electric energy meter calibrating

Country Status (1)

Country Link
CN (1) CN107677985A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109254260A (en) * 2018-11-23 2019-01-22 国网辽宁省电力有限公司沈阳供电公司 Recycling meter calibrating detection device and calibrating detection method applied to substation
WO2023066369A1 (en) * 2021-10-22 2023-04-27 浙江万胜智能科技股份有限公司 Module power-on test device for electricity meter based on internet of things

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000175312A (en) * 1998-12-02 2000-06-23 Togami Electric Mfg Co Ltd Electrical apparatus installing device, electrical apparatus removing device, electrical apparatus attaching/detaching device consisting thereof, and removal thereof
CN201281757Y (en) * 2008-08-12 2009-07-29 杭州海兴电器有限公司 Rapid connection fixture for checking electric energy meter
CN201852933U (en) * 2010-12-01 2011-06-01 飞跃联合科技集团有限公司 Calibrating device for single-phase electric energy meter
CN202110274U (en) * 2011-05-24 2012-01-11 北京市电力公司 Association test tool for meter switch
CN202614926U (en) * 2012-05-31 2012-12-19 重庆市电力公司电力科学研究院 Automatic wiring unit of electric energy meter verifying system
CN105572622A (en) * 2015-11-30 2016-05-11 深圳市鸿志软件有限公司 Pluggable-connection compatible electric energy meter detection method and device
CN205384361U (en) * 2015-12-28 2016-07-13 漳州科能电器有限公司 Roof pressure pocket watch device of electric energy meter and car of having good luck

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000175312A (en) * 1998-12-02 2000-06-23 Togami Electric Mfg Co Ltd Electrical apparatus installing device, electrical apparatus removing device, electrical apparatus attaching/detaching device consisting thereof, and removal thereof
CN201281757Y (en) * 2008-08-12 2009-07-29 杭州海兴电器有限公司 Rapid connection fixture for checking electric energy meter
CN201852933U (en) * 2010-12-01 2011-06-01 飞跃联合科技集团有限公司 Calibrating device for single-phase electric energy meter
CN202110274U (en) * 2011-05-24 2012-01-11 北京市电力公司 Association test tool for meter switch
CN202614926U (en) * 2012-05-31 2012-12-19 重庆市电力公司电力科学研究院 Automatic wiring unit of electric energy meter verifying system
CN105572622A (en) * 2015-11-30 2016-05-11 深圳市鸿志软件有限公司 Pluggable-connection compatible electric energy meter detection method and device
CN205384361U (en) * 2015-12-28 2016-07-13 漳州科能电器有限公司 Roof pressure pocket watch device of electric energy meter and car of having good luck

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109254260A (en) * 2018-11-23 2019-01-22 国网辽宁省电力有限公司沈阳供电公司 Recycling meter calibrating detection device and calibrating detection method applied to substation
WO2023066369A1 (en) * 2021-10-22 2023-04-27 浙江万胜智能科技股份有限公司 Module power-on test device for electricity meter based on internet of things

Similar Documents

Publication Publication Date Title
CN107677985A (en) The intelligent meter hanging frame of laboratory three-phase electric energy meter calibrating
CN104133104A (en) Novel telescopic type low-voltage tong-type ammeter
CN202421361U (en) Comprehensive test platform for transformer
CN110133344B (en) Simple device for quick replacement of electric energy meter without power-off
CN201724997U (en) Quick cable corrector
CN203365481U (en) A foldable insulating bar withstand voltage test support
CN205230671U (en) Clavate suspension insulator
CN204945168U (en) 35KV leakage current of an arrester live testing Special wiring bar
CN204012127U (en) A kind of Crimping Pliers with test netting twine conducting function
CN212675757U (en) Live-line detection training device for insulator
CN205426966U (en) LED aging testing appearance
CN204424795U (en) For entering the stick type insulator steel cap holding clamp of highfield along insulator string
CN208720542U (en) Slidably energy storage type photovoltaic panel
CN209230743U (en) A kind of quick test fixture of concentrator
CN213749975U (en) Mutual inductor verification large-current lead access device
CN107910754B (en) The isolation baffle plate device and electrical verification auxiliary device of switchgear route room
CN207459548U (en) A kind of maintenance device of power regulation station
CN202961564U (en) Convenient-to-assemble type safety belt hanging frame
CN207490129U (en) Ground wire device is hung used in a kind of 10kV power distribution networks opening and closing
CN208015248U (en) A kind of wing wire lifting device of duplex pull rod
CN207098445U (en) 500kV compact transmission lines are with carrying the Line tool
CN202386255U (en) Emergency hammock for outdoor power grid maintenance
CN206038727U (en) Current clamp for high -voltage testing
CN205193110U (en) Upper air wiring clamp
CN205539430U (en) Hall principle current transformer detection platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination