CN107675798A - A kind of prefabricated open tubular column - Google Patents
A kind of prefabricated open tubular column Download PDFInfo
- Publication number
- CN107675798A CN107675798A CN201710951760.4A CN201710951760A CN107675798A CN 107675798 A CN107675798 A CN 107675798A CN 201710951760 A CN201710951760 A CN 201710951760A CN 107675798 A CN107675798 A CN 107675798A
- Authority
- CN
- China
- Prior art keywords
- hollow post
- precast hollow
- open tubular
- tubular column
- steel bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/20—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/20—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
- E04B1/21—Connections specially adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/30—Columns; Pillars; Struts
- E04C3/34—Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Rod-Shaped Construction Members (AREA)
Abstract
The present invention provides a kind of prefabricated open tubular column, is in hollow shape among the precast hollow post;There is steel bar stress stretching at the precast hollow post both ends;The steel bar stress that the precast hollow post both ends are stretched out is different in size;The steel bar stress enters line misregistration connection to steel bar stress different in size using the method mechanically connected or slip casting connects;Tapping or termination shaping are carried out to steel bar stress termination respectively before the dislocation connection;The precast hollow post steel bar stress extension elongation > 200mm;There is steel reinforcement cage insertion in the precast hollow post.
Description
Technical field
The present invention relates to a kind of assembled architecture systems technology, and in particular to a kind of prefabricated hollow column technology.
Background technology
Country widelys popularize assembled architecture, specify that specific implementation plan;And require in reinforced concrete frame knot
Extensive use in structure, reinforced concrete frame shear wall structure, steel construction and steel-concrete combined structure system, it specify that China fills
With formula architectural structure system and application field;But the assembled architecture floor ground zero of large span horizontal structure, and use
Be common laminated floor slab, technology existing defects, assembled architecture cost is too high, earth-free gas, cause country promote assembled
Built speed is obstructed.
Prior art is using common beam slab such as a kind of ZL200410082381.9 " empty stomach little Mi Lei buildings of inventor
Lid " and ZL200820126232.1 " a kind of cast-in-situ section steel concrete cavity building roof ", hollow filling body is embedded in shape in cast-in-situ floor
Into " T fonts " stress cross-section hollow layer, solve the problems, such as large span, large space, big load.In order that girt strip reinforcing bar leads in length and breadth
Steel I-beam web is crossed, forms the cast-in-situ hollow floor plate of continuous slab band, the too many simultaneously aperture in the hole reserved in steel I-beam web
It is too small, processing trouble;Meanwhile the cement hollow obturator setting and hardening time is grown, mould utilization factor is low, and hollow filling volume density is big
Matter weight, production and transport inconvenience and the defects of obturator globality poor cracky.
To realize industrialized production, inventor applies for that ZL201310332173.9 " use by a kind of cast-in-situ hollow building roof pore-forming again
Netted box component " and ZL201510331724.X " a kind of Novel steel-mixed combination cast-in-situ hollow building roof ", to it is existing pour it is hollow
Superstructure technology carries out General Promotion, realizes transition and upgrade, updates and significantly reduce the deadweight of cavity building roof, add
Self-heat preservation heat insulation performance, safety of structure is strong, solve realize large span, large space, big load hollow floor existing for ask
Topic;Inventor constantly lifts oneself cast-in-situ hollow building roof background technology, is assembled architecture large span, the horizontal structure without bright beam
The basis of hard stone is established;Although solving the problems, such as into pole production, all it is cast-in-site, dress is pushed away by force with country
It is not inconsistent with formula spirit.
Again in order to promote China's housing industrialization development, " one kind is used for sky to the ZL201620410363.7 of inventor's application
The prefabricated component of chamber superstructure " and ZL201620553181.5 " a kind of stress island cavity building roof prefabricated cavity member "
Cast-in-place concrete hollow building roof, assembled architecture field is expanded to by creating transition, solve assembled arthitecutral structure entirety
The problems such as poor, large span of property is without bright beam, component super large, component industrialization, construction quality controllability, work efficiency and environmental protection;This
, although having tamped basis for China's Process of Housing Industrialization, the prefabricated assembled cavity plate structure of long strip type also be present in a little inventions
The crackle in gap, bidirectional stress cavity floor transverse direction steel when the one-way of part stress, two pieces of prefabricated assembled cavity plate splits
The problems such as connection space limitation of muscle.
Currently, since prefabricated member also has many Ji arts Wen Ti No to have solution, popularization is caused to be obstructed;In order to promote to build
Scientific and technological progress, use is multi-functional, economy, scientific and technological content, energy-conserving and environment-protective and the market demand are big, safety coefficient is high, cost
It is low, meet the architectural structure system of national industrial policies and industrial development direction again.Therefore, inventor is again in existing background of controlling oneself
On the basis of technology, by being applied in assembled arthitecutral structure for cast-in-situ hollow building roof technology creation, new assembling is formed
Formula cassette ceiling structural system;Cast-in-place cavity building roof Technology Difficulties problem is solved in batch production, sizing production prefabricated post, prefabricated
Beam, assembled cavity floor component, steel structure member, structure be integrally forced through behind scene pour top flange plate and combination girt strip or
Prestressed mode solves, the prefabricated assembled Cavity structural member of factorial praluction and steel construction and the organic knot of reinforced concrete frame
Altogether;Again in order to promote China's housing industrialization to develop in a healthy way, recently, inventor participates in big by Tongji University in oneself production base
, civil construction institute of Central South University, national Tianjin fire research preside over largest " assembled large span is without secondary beam
Steel construction cavity floor full scale test ", " assembled large span is without bright joist steel tendon concrete structure full scale test ", " utilization assembling
The fire control smoke exhausting experiment of formula cavity floor " examines inventor's prior art innovative, advanced, reasonability and security;Examination
Test the multispan load pressurization full scale test and Assembled Building plate ultimate load loading full scale test using continuous slab band, ultimate load
The specific data of load test be done without beam assembled experimental model span 8.4m, surrounding encorbelment 1.6m, length of side 11.6m, by
Pressure surface accumulates 134.56m2, use dynamic load 2KN, actual loaded load 22KN;Limit crack national standard is 1.5mm, and actual crack is only
There is 0.5mm;It is 168mm, actural deflection 39mm by national standard calculating limit amount of deflection;Assembled architecture is in reinforcing bar by verification experimental verification
Security of the concrete structure without the structure of bright beam or steel construction without secondary beam;Single load bearing floor member is changed into by verification experimental verification
Bidirectional stress floor, the floor construction that monolithic freely-supported floor member is changed into continuous slab band;Thoroughly solves large span floor structure
The problems such as part bonding crack cracking, fire prevention, sound insulation, long-term maintenance, assembly technology, particularly assembled architecture cost have dropped
20%;Logical structure full scale test, further innovates for assembled architecture and has tamped practical basis;But experiment discloses assembled
The distribution of building structure internal force becomes rule, and also in the case where ensuring the preceding topic of assembled arthitecutral structure safety requirements, assembled is built
Build the space that technology also much optimizes.A kind of prefabricated open tubular column is researched and developed, has become assembled architecture technical field
The urgent need of innovation.
The content of the invention
It is an object of the invention to the prefabricated assembled component factorial praluction, particularly precast hollow post, at the scene
Reinforced concrete frame structure is assembled into, technology is poured after and is combined, improves the globality of assembled arthitecutral structure;
Open tubular column mitigates prefabricated post deadweight and after the assembling of precast hollow post, then pours into a mould coagulation to setting up the steel reinforcement cage among open tubular column
Soil carrys out strong post.
A kind of following prefabricated open tubular column of technical scheme, the precast hollow post centre is in hollow shape;
There is steel bar stress stretching at the precast hollow post both ends;The steel bar stress that the precast hollow post both ends are stretched out is different in size;Institute
State steel bar stress and line misregistration connection is entered to steel bar stress different in size using the method mechanically connected or slip casting connects;The mistake
Tapping or termination shaping are carried out to steel bar stress termination respectively before the connection of position;The precast hollow post steel bar stress extension elongation >
200mm;There is steel reinforcement cage insertion in the precast hollow post.
A kind of 2. prefabricated open tubular column as claimed in claim 1, it is characterised in that the precast hollow post corner chamfered edge.
The precast hollow post corner chamfered edge.
The sub-assembly of external wall structure part built in precast hollow post at least one side.
The steel reinforcement cage and steel reinforcement cage tie point inserted in the precast hollow post is in the centre of precast hollow post.
The steel reinforcement cage and rear cast concrete inserted in the precast hollow post, reinforced column is poured after formation.
A kind of prefabricated open tubular column of the present invention, is that horizontal structure is directed on the basis of Architectural Structure Design drawing
The physical dimension of superstructure and vertical stratification wallboard, Architectural Structure Design drawing is decomposed, quantization Secondary Design is carried out to assembling form,
Drawing resolves into N number of prefabricated member and wall body construction etc., and factory is produced into the specifications and models by the paper organization of decomposition
Prefabricated member, by prefabricated member be transported to engineering construction assembled in situ and after pour and form.
Specific implementation, the prefabricated assembled component of factorial praluction, particularly precast hollow post, is assembled into steel at the scene
Tendon concrete frame structure, the binding site of each component is combined by rear pouring concrete technology, improve assembled architecture
The globality of structure;The good prefabricated post reinforcing bar of colligation, in the good prefabricated post reinforcing bar keel of colligation, circular mould is laid, pours into a mould coagulation
Garden mould is taken out after native initial condensation, forms open tubular column;Open tubular column is transported to job site, is first vertically connected steel reinforcement cage, and every section perpendicular
It is the radix that open tubular column highly adds 1 meter or so to connecting length;Vertical lifting open tubular column, the steel reinforcement cage vertically connected is allowed to be inserted in
Open tubular column it is hollow in,;The steel bar stress of two section open tubular columns is entered line misregistration connection using the method mechanically connected or slip casting connects,
Strengthen the security of node;Beam steel is connected in the steel bar stress junction of two section open tubular columns, cavity board member is placed in pre-
Convex beam two sides processed, realize that assembled lowers without bright beam or bright beam;In order to strengthen the shearing in beam column crosspoint and Punching Shear
Ability, cap or haunched beam auxiliary bar are set up in beam column crosspoint, pour into a mould concrete afterwards, realized a kind of prefabricated hollow
Post.
Brief description of the drawings
Fig. 1 is a kind of prefabricated open tubular column node diagram of the present invention.
Fig. 2 is a kind of prefabricated open tubular column of the present invention and girder and haunched beam combination upward view.
Fig. 3 is a kind of sectional view of prefabricated open tubular column of the present invention
Embodiment
The present invention is further described below in conjunction with the accompanying drawings.
Fig. 1 invents a kind of prefabricated open tubular column node diagram figure embodiment, when the present invention is implemented, first vertically connects steel
Muscle cage 13, the steel reinforcement cage 13 connected is than 1 high 1000mm of precast hollow post or so, it is ensured that the connector of steel reinforcement cage 13 is in open tubular column
1 centre;Open tubular column 1 is lifted, its hollow hole 12 alignment steel reinforcement cage 13, allows steel reinforcement cage 13 to be inserted into the hollow of precast hollow post 1
In hole 12;Connection two saves the vertical applied force reinforcing bar of precast hollow post 1 up and down, and long reinforcing bar saves prefabricated sky with another in vertical applied force reinforcing bar
The vertical applied force bar dowel of stem is connected, and at the tie point of two section open tubular columns, the reinforcing bar of girder 2 of both direction also exists in length and breadth
Connected at the tie point of the two sections open tubular column;In order to strengthen the shearing in beam column crosspoint and punch resistant capability, in beam column crosspoint
Cap or the auxiliary bar of haunched beam 22 are set up, the cavity board member 3 at the reserved angle 38 of band is assembled between open tubular column 1 and girder 2,
Three space forms the bar chair of cap or haunched beam 22, pours into a mould concrete afterwards, forms the assembled with cap or haunched beam
Frame structure bean column node, solve the problems, such as that existing assembled technology beam column crossover node punching resistance is bad, realize open tubular column 1
With girder 2 and cavity board member 3 cap or the perfect adaptation of haunched beam 22.
Fig. 2 is pre- for a kind of prefabricated open tubular column of the present invention and girder and haunched beam combination upward view, a kind of assembled
Open tubular column 1 processed is combined with girder 2 and haunched beam 22, beam column crossover node punching resistance and shear resistance enhancing
Fig. 3 is a kind of sectional view of prefabricated open tubular column of the present invention, carries out the precast hollow post 1 of chamfer angle 14, shape
Into the pre-made void 15 of open tubular column 1, the insert band hoop reinforcing steel bar cage 13 in pre-made void 15, the reinforcing bar contact of steel reinforcement cage is in open tubular column
Centre, equivalent to there is uninterrupted elongated post steel bar stress in the space of bean column node, in open tubular column 1 after pouring concrete shape
Into precast hollow post 1 and inserted with the coupled column of steel reinforcement cage 13.
Finally it should be noted that:The above embodiments are merely illustrative of the technical scheme of the present invention and are not intended to be limiting thereof, to the greatest extent
The present invention is described in detail with reference to above-described embodiment for pipe, it should be understood by a person of ordinary skill in the art that still
The embodiment of the present invention can be modified or equivalent substitution, and end departs from any of spirit and scope of the invention
Modification or equivalent substitution, it all should cover among scope of the presently claimed invention.
Claims (5)
1. a kind of prefabricated open tubular column, the precast hollow post centre is in hollow shape;The precast hollow post both ends have by
Power reinforcing bar stretches out;The steel bar stress that the precast hollow post both ends are stretched out is different in size;The steel bar stress is using mechanical connection
Or the method for slip casting connection enters line misregistration connection to steel bar stress different in size;Respectively to steel bar stress before the dislocation connection
Termination carries out tapping or termination shaping;The precast hollow post steel bar stress extension elongation > 200mm;In the precast hollow post
There is steel reinforcement cage insertion.
A kind of 2. prefabricated open tubular column as claimed in claim 1, it is characterised in that the precast hollow post corner chamfered edge.
A kind of 3. prefabricated open tubular column as claimed in claim 1, it is characterised in that the precast hollow post at least one side
The sub-assembly of built-in external wall structure part.
4. a kind of prefabricated open tubular column as claimed in claim 1, it is characterised in that inserted in the precast hollow post
Steel reinforcement cage and steel reinforcement cage tie point are in the centre of precast hollow post.
5. a kind of prefabricated open tubular column as claimed in claim 1, it is characterised in that inserted in the precast hollow post
Steel reinforcement cage and rear cast concrete, reinforced column is poured after formation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710951760.4A CN107675798A (en) | 2017-10-13 | 2017-10-13 | A kind of prefabricated open tubular column |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710951760.4A CN107675798A (en) | 2017-10-13 | 2017-10-13 | A kind of prefabricated open tubular column |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107675798A true CN107675798A (en) | 2018-02-09 |
Family
ID=61140092
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710951760.4A Pending CN107675798A (en) | 2017-10-13 | 2017-10-13 | A kind of prefabricated open tubular column |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107675798A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113235732A (en) * | 2021-05-21 | 2021-08-10 | 青岛腾远设计事务所有限公司 | Construction method of prefabricated conversion beam and prefabricated column connection node on beam and connection point structure of prefabricated conversion beam and prefabricated column connection node |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104929278A (en) * | 2015-07-06 | 2015-09-23 | 沈阳建筑大学 | Assembly type dense column hollow shear wall structure |
US20160097201A1 (en) * | 2012-05-18 | 2016-04-07 | Neturen Co., Ltd. | Rebar structure and reinforced concrete member |
CN105908899A (en) * | 2016-04-21 | 2016-08-31 | 吉林省健林建筑科技有限公司 | Core-grouted assembly-type concrete column and construction method of same |
CN207469438U (en) * | 2017-10-13 | 2018-06-08 | 湖南标迪夫节能科技有限公司 | A kind of prefabricated open tubular column |
-
2017
- 2017-10-13 CN CN201710951760.4A patent/CN107675798A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20160097201A1 (en) * | 2012-05-18 | 2016-04-07 | Neturen Co., Ltd. | Rebar structure and reinforced concrete member |
CN104929278A (en) * | 2015-07-06 | 2015-09-23 | 沈阳建筑大学 | Assembly type dense column hollow shear wall structure |
CN105908899A (en) * | 2016-04-21 | 2016-08-31 | 吉林省健林建筑科技有限公司 | Core-grouted assembly-type concrete column and construction method of same |
CN207469438U (en) * | 2017-10-13 | 2018-06-08 | 湖南标迪夫节能科技有限公司 | A kind of prefabricated open tubular column |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113235732A (en) * | 2021-05-21 | 2021-08-10 | 青岛腾远设计事务所有限公司 | Construction method of prefabricated conversion beam and prefabricated column connection node on beam and connection point structure of prefabricated conversion beam and prefabricated column connection node |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107663911A (en) | A kind of assembled overlaps cavity floor | |
CN207469438U (en) | A kind of prefabricated open tubular column | |
CN107675798A (en) | A kind of prefabricated open tubular column | |
CN207469430U (en) | A kind of assembled arthitecutral structure | |
CN108086474A (en) | A kind of assembled architecture prefabricated reinforced concrete convex bearing body | |
CN107620415A (en) | A kind of assembling type steel structure cavity board member | |
CN207812658U (en) | A kind of assembled steel reinforced concrete composite frame structure with bolumn cap | |
CN208777555U (en) | A kind of prefabricated convex beam | |
CN207812832U (en) | A kind of prefabricated convex beam of assembled architecture | |
CN207812665U (en) | A kind of cavity board member for beam column combination angle | |
CN208309951U (en) | Cavity board member for stress island superstructure | |
CN107882230A (en) | A kind of cavity floor assembled using haunched beam | |
CN107630520A (en) | A kind of assembled architecture cavity board member | |
CN107700657A (en) | A kind of cavity board member for beam column combination angle | |
CN107700729A (en) | A kind of assembled cavity floor on stress island | |
CN108086475A (en) | A kind of assembled architecture prefabricated reinforced concrete bearing body | |
CN107675824A (en) | Cavity board member for stress island superstructure | |
CN107882238A (en) | A kind of assembling type steel structure laterally regenerates rib floor | |
CN207469554U (en) | A kind of assembled architecture cavity board member | |
CN208965715U (en) | Frame structure prefabricated reinforced concrete girder | |
CN107675823A (en) | A kind of dark fire control smoke exhausting road assembled cavity floor | |
CN107882237A (en) | A kind of large span assembled architecture of composite frame structure | |
CN107620384A (en) | A kind of assembled steel reinforced concrete composite frame structure with cap | |
CN107620416A (en) | A kind of assembled arthitecutral structure of reinforced concrete combination | |
CN107700734A (en) | Assembled is without bright beam bidirectional stress cavity floor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180209 |