- CN107666142A CN107666142A CN201710956025.2A CN201710956025A CN107666142A CN 107666142 A CN107666142 A CN 107666142A CN 201710956025 A CN201710956025 A CN 201710956025A CN 107666142 A CN107666142 A CN 107666142A
- Authority
- CN
- China
- Prior art keywords
- power supply
- equipment
- time
- automatic throw
- emergency power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H7/00—Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
- H02H7/26—Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured
- H02H7/28—Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured for meshed systems
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02H—EMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
- H02H7/00—Emergency protective circuit arrangements specially adapted for specific types of electric machines or apparatus or for sectionalised protection of cable or line systems, and effecting automatic switching in the event of an undesired change from normal working conditions
- H02H7/26—Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured
- H02H7/266—Sectionalised protection of cable or line systems, e.g. for disconnecting a section on which a short-circuit, earth fault, or arc discharge has occured involving switching on a spare supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
- Y04S10/52—Outage or fault management, e.g. fault detection or location
Landscapes
- Stand-By Power Supply Arrangements (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
The present invention relates to technical field of relay protection, is a kind of input strategy of the automatic throw-in equipment of emergency power supply of power distribution network unconditional crank, is characterized in, comprises the step of:The cooperation of setting time is acted by distribution line unconditional crank setting time and prepared auto restart, is connected in interconnection loop networks switch on the premise of bus do not have failure, any single-phase voltage is in most long fault clearing time tsetOutside be still below setting valve, automatic throw-in equipment of emergency power supply is quickly put into.With scientific and reasonable, it is accurate to differentiate, self-healing property is strong, high sensitivity, the advantages that can shortening the power off time of user.Power distribution network especially suitable for 20kV " petal " shape is without passage overcurrent protection.
Description
Technical field
The present invention relates to technical field of relay protection, is that a kind of alternate power autocast of power distribution network unconditional crank fills
The input strategy put, the power distribution network especially suitable for 20kV " petal " shape is without passage overcurrent protection.
Technical background
Due to the factor of engineering technology, investment etc., so in China's 20kV distribution systems, typically using traditional three
Segmentation overcurrent protection.So, it is only capable of quickly cutting off the failure of partial sector in every circuit, the failure of All other routes section is then
It could be cut off through prolonged delay.With the fast development of China's economy, the property of power load, the net of 20kV power distribution networks
There occurs huge change, traditional three-stage overcurrent protection with requirement of the user to distribution network reliability for network composition
Scope is small, poor selectivity, responsiveness are slow, can not meet the requirement of China's power distribution network relay protection, is badly in need of improving power distribution network
The responsiveness of middle protection, and increase the protection domain of protection.If directly the high speed relay protective plan in power transmission network is answered
Power distribution network is made, for example with carrier wave or optical fiber differential protective, then has very high requirement to communication system, builds, safeguard branch
Go out high, and need configuration back-up protection in addition, therefore do not meet economic principle.This, which just needs to find, a kind of is used only single-ended electricity
The successive Trip of tolerance or the protection of all fronts quick acting, the securely and reliably power supply to power distribution network are significant.
The content of the invention
The technical problems to be solved by the invention are overcome the deficiencies in the prior art, there is provided it is a kind of scientific and reasonable, differentiate accurate
Really, self-healing property is strong, the input strategy of the automatic throw-in equipment of emergency power supply of the power distribution network unconditional crank of high sensitivity.
The technical scheme for solving the use of its technical problem is a kind of alternate power autocast of power distribution network unconditional crank
The input strategy of device, it is characterized in that, it is comprised the step of:
(1) setting time is acted by distribution line unconditional crank setting time and automatic throw-in equipment of emergency power supply
Coordinate;
A) automatic throw-in equipment of emergency power supply time setting value tsetWith the cooperation of the maximum fault clearing time of circuit
In order to ensure that automatic throw-in equipment of emergency power supply is not put on faulty line after acting, alternate power autocast
Setup time setting valve tsetIt must be greater than the maximum fault clearing time of circuit;
B) interconnection automatic throw-in equipment of emergency power supply closure loop networks switch L1Afterwards, the time between power distribution network two " petal "
Coordinate
If a certain transformer station 20kV bus-bar faults or maintenance, interconnection automatic throw-in equipment of emergency power supply closure, power distribution network
Two " petal " loads turn the adjacent ring network power supply of adjacent substations by contact point, now, two radial circuits of the transformer station
Most long fault clearing time be necessarily less than the minimum fault clearing time of adjacent substations power distribution network " petal ", otherwise will cause
Adjacent substations protection misoperation, expand the excision extension of failure.
(2) connect in interconnection loop networks switch on the premise of bus do not have failure, any single-phase voltage is cut in most long failure
Except time tsetOutside be still below setting valve, automatic throw-in equipment of emergency power supply is quickly put into;
Automatic throw-in equipment of emergency power supply operating criterion is:Connect bus in interconnection loop networks switch and do not have faulty premise
Under, any single-phase voltage is in most long fault clearing time tsetOutside be less than setting valve, criterion is formula (1);
ΣIpi=0&US< Uset&t > tset (1)
In formula, Σ IpiIt is standby during in order to prevent contact point busbar short-circuit failure for each connecting element electric current sum of bus
Power supply automatic throw-in equipment acts, it is necessary to is meeting Σ IpiInterconnection automatic throw-in equipment of emergency power supply R when=01It could start,
Due to protecting R1、R2、R3In a switchyard, information sharing between three protections can be formed a small region and be protected
Shield;UsFor current voltage effective value;A certain phase in subscript behalf a, b, c three-phase;UsetFailure adjusts voltage, general to set
For 30% rated voltage;T is the time;tsetIt is time setting value, is traditionally arranged to be the distribution line failure most long mute time.
A kind of input strategy of the automatic throw-in equipment of emergency power supply of power distribution network unconditional crank of the present invention, it is particularly suitable
In 20kV " petal " shape power distribution networks without passage overcurrent protection, pass through distribution line unconditional crank setting time and stand-by power supply
Automatic throw-in equipment acts the cooperation of setting time, connects in interconnection loop networks switch on the premise of bus do not have failure, arbitrarily
Single-phase voltage is in most long fault clearing time tsetOutside be still below setting valve, automatic throw-in equipment of emergency power supply is quickly put into.Can
To significantly improve the reliability of system and self-healing property, shorten the power off time of user.With scientific and reasonable, it is accurate to differentiate, self-healing
Property is strong, the advantages that high sensitivity.
Brief description of the drawings
Fig. 1 is a kind of input strategy flow chart of the automatic throw-in equipment of emergency power supply of power distribution network unconditional crank;
Fig. 2 is 20kV " petal " shape simplified model of distribution networks schematic diagram;
Fig. 3 is contact point automatic throw-in equipment of emergency power supply action flow chart;
Fig. 4 is the responsive state schematic diagram of automatic throw-in equipment of emergency power supply;
Fig. 5 is that BC phase faults protection R occurs for circuit BC3Booster response view;
BC phase faults protection R occurs for Fig. 6 circuits BC3Responsive state schematic diagram.
Embodiment
Technical scheme is clearly and completely described below in conjunction with drawings and examples.
Embodiment 1:
Embodiment 1 provides a kind of automatic throw-in equipment of emergency power supply input strategy of power distribution network unconditional crank, works as 20kV
When the loop grid failure of " petal " shape power distribution network or maintenance cause petal open loop operation, situation about being broken down in petal.Such as
Shown in Fig. 2, such as after circuit EF failures or maintenance, BC phase faults occur again for circuit AB, comprise the following steps:
S1:Setting time is acted by distribution line unconditional crank setting time and automatic throw-in equipment of emergency power supply
Coordinate;
When step S1 is adjusted by distribution line unconditional crank setting time and automatic throw-in equipment of emergency power supply action
Between cooperation, specifically include:
S11:Automatic throw-in equipment of emergency power supply time setting value tsetWith the cooperation of the maximum fault clearing time of circuit
In order to ensure that automatic throw-in equipment of emergency power supply is not put on faulty line after acting, alternate power autocast
Setup time setting valve tsetIt must be greater than the maximum fault clearing time of circuit;
S12:Interconnection automatic throw-in equipment of emergency power supply closure loop networks switch L1Afterwards, between power distribution network two " petal " when
Between coordinate
If a certain transformer station 20kV bus-bar faults or maintenance, interconnection automatic throw-in equipment of emergency power supply closure, power distribution network
" petal " load turns the adjacent ring network power supply of adjacent substations by contact point, and now, two radial circuits of the transformer station are most
Long fault clearing time is necessarily less than the minimum fault clearing time of adjacent substations power distribution network " petal ", otherwise will cause adjacent
Transforming plant protecting malfunctions, and expands the excision extension of failure;
S2:Connect in interconnection loop networks switch on the premise of bus do not have failure, any single-phase voltage is cut in most long failure
Except time tsetOutside be still below setting valve, automatic throw-in equipment of emergency power supply is quickly put into;
Step S2 is included in interconnection loop networks switch and connected on the premise of bus do not have failure, and any single-phase voltage is most long
Fault clearing time tsetOutside be still below setting valve, automatic throw-in equipment of emergency power supply is quickly put into, and is specifically included:
S21:Automatic throw-in equipment of emergency power supply operating criterion is:Interconnection loop networks switch connect bus do not have it is faulty
Under the premise of, any single-phase voltage is in most long fault clearing time tsetOutside be less than setting valve.Criterion is shown in shown in formula (1).
ΣIpi=0&US< Uset&t > tset (1)
In formula, Σ IpiIt is standby during in order to prevent contact point busbar short-circuit failure for each connecting element electric current sum of bus
Power supply automatic throw-in equipment acts, it is necessary to is meeting Σ IpiInterconnection automatic throw-in equipment of emergency power supply R when=01It could start.
Due to protecting R1、R2、R3In a switchyard, information sharing between three protections can be formed a small region and be protected
Shield;USFor current voltage effective value;A certain phase in subscript behalf a, b, c three-phase;UsetFailure adjusts voltage, general to set
For 30% rated voltage;T is the time;tsetIt is time setting value, is traditionally arranged to be the distribution line failure most long mute time.Fig. 3
For contact point automatic throw-in equipment of emergency power supply action flow chart.
According to above-mentioned steps, Fig. 4 is the response of automatic throw-in equipment of emergency power supply, and circuit FE is because failure or maintenance are exited
After operation, BC phase faults occur for 0s moment, circuit AB, now A transformer stations mesh portion circuit decompression.Stand-by power supply is thrown automatically
Entering device detects BC phase voltages after falling with protecting R1~R2And R8~R11It is synchronous in the startup at 0s moment, due to protecting R8
0.4s is acted at first, protects R9~R11Return, protect R2Current break is detected in acceleration time 0.4~0.45s of section,
0.45s accelerated motion excision failures, automatic throw-in equipment of emergency power supply detect voltage less than setting valve and timing ever since
Loop networks switch is closed a floodgate after to 0.8s, powered to the load on bus C, D, E.
Embodiment 2:
Embodiment 2 provides a kind of automatic throw-in equipment of emergency power supply input strategy of power distribution network unconditional crank, works as 20kV
The system jam of " petal " shape power distribution network normal operation, protection act, after alternate power autocast, system switchs to temporarily
Mode is run, and is comprised the following steps:
As shown in Fig. 2 after A transformer substation side 20kV bus-bar faults or maintenance, contact point closure, contact is passed through by B transformer stations
Put to decompression ring network power supply.Now, A power distribution networks are changed into two radiation networks from closure looped network.If f2BC phase faults occur for place, this
When decompression ring network power supply obtain failure mute time it is most long.Fig. 5 is that BC phase faults protection R occurs for circuit BC3Booster response.
As shown in figure 5, the protection R close to mains side9Protect and be operating normally according to time delay over-current, actuation time 0.7s, action
A phase currents decline rapidly in 0.7s~0.75s afterwards, meet accelerated motion condition.As shown in fig. 6, load side direction over current protection
Protect R3Short circuit current will be can't detect, detects B buses per phase R at the 0s momentU、RIIncrease simultaneously and cross threshold value to start
Protection, in 0.7s~0.75s acceleration time section, protect R3Detect that A phase currents are mutated, acceleration protection acts in 0.75s.
It need to note it is to be noted that in f2After short circuit occurs for place, R in B transformer stations looped network13、R14、R15、R22、R23、R24Also will start, but due to
Their operation time limit needs 1.0s at the soonest, so will not malfunction.Embodiment 2 provides a kind of power distribution network without passage
The automatic throw-in equipment of emergency power supply input strategy of protection, by distribution line unconditional crank setting time and stand-by power supply from
The cooperation of dynamic feeding device action setting time, connect in interconnection loop networks switch on the premise of bus do not have failure, arbitrarily singly
Phase voltage is in most long fault clearing time tsetOutside be still below setting valve, automatic throw-in equipment of emergency power supply is quickly put into, can be with
The reliability and self-healing property of system are significantly improved, shortens the power off time of user.
Obviously, above-described embodiment is only intended to clearly illustrate example, and is not the restriction to embodiment.It is right
For those of ordinary skill in the art, can also make on the basis of the above description it is other it is various forms of change or
Change.There is no necessity and possibility to exhaust all the enbodiments.And the obvious change thus extended out or
Among changing still in the protection domain of the invention.
Claims (1)
1. a kind of input strategy of the automatic throw-in equipment of emergency power supply of power distribution network unconditional crank, it is characterized in that, what it included
Step has:
(1) matching somebody with somebody for setting time is acted by distribution line unconditional crank setting time and automatic throw-in equipment of emergency power supply
Close;
A) automatic throw-in equipment of emergency power supply time setting value tsetWith the cooperation of the maximum fault clearing time of circuit
In order to ensure that automatic throw-in equipment of emergency power supply is not put on faulty line after acting, automatic throw-in equipment of emergency power supply
Time setting value tsetIt must be greater than the maximum fault clearing time of circuit;
B) interconnection automatic throw-in equipment of emergency power supply closure loop networks switch L1Afterwards, the time coordination between power distribution network two " petal "
If a certain transformer station 20kV bus-bar faults or maintenance, interconnection automatic throw-in equipment of emergency power supply closure, power distribution network two
" petal " load turns the adjacent ring network power supply of adjacent substations by contact point, and now, two radial circuits of the transformer station are most
Long fault clearing time is necessarily less than the minimum fault clearing time of adjacent substations power distribution network " petal ", otherwise will cause adjacent
Transforming plant protecting malfunctions, and expands the excision extension of failure.
(2) connect in interconnection loop networks switch on the premise of bus do not have failure, any single-phase voltage is in most long failure removal
Between tsetOutside be still below setting valve, automatic throw-in equipment of emergency power supply is quickly put into;
Automatic throw-in equipment of emergency power supply operating criterion is:Connect in interconnection loop networks switch on the premise of bus do not have failure,
Any single-phase voltage is in most long fault clearing time tsetOutside be less than setting valve, criterion is formula (1);
ΣIpi=0&US< Uset&t > tset (1)
In formula, Σ IpiFor each connecting element electric current sum of bus, stand-by power supply during in order to prevent contact point busbar short-circuit failure
Automatic throw-in equipment acts, it is necessary to is meeting Σ IpiInterconnection automatic throw-in equipment of emergency power supply R when=01It could start, due to
Protect R1、R2、R3In a switchyard, information sharing between three protections can be formed a small locality protection;Us
For current voltage effective value;A certain phase in subscript behalf a, b, c three-phase;UsetFailure adjusts voltage, is traditionally arranged to be
30% rated voltage;T is the time;tsetIt is time setting value, is traditionally arranged to be the distribution line failure most long mute time.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710956025.2A CN107666142B (en) | 2017-10-15 | 2017-10-15 | The input strategy of the automatic throw-in equipment of emergency power supply of power distribution network unconditional crank |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710956025.2A CN107666142B (en) | 2017-10-15 | 2017-10-15 | The input strategy of the automatic throw-in equipment of emergency power supply of power distribution network unconditional crank |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107666142A true CN107666142A (en) | 2018-02-06 |
CN107666142B CN107666142B (en) | 2019-03-29 |
Family
ID=61098297
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710956025.2A Expired - Fee Related CN107666142B (en) | 2017-10-15 | 2017-10-15 | The input strategy of the automatic throw-in equipment of emergency power supply of power distribution network unconditional crank |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107666142B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108711852A (en) * | 2018-06-22 | 2018-10-26 | 天津大学 | A kind of distribution network failure parametric sensitivity computational methods based on fault estimator |
CN112701778A (en) * | 2020-12-22 | 2021-04-23 | 雅砻江流域水电开发有限公司 | Three-section type auxiliary power automatic switching method with contact bus |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103887879A (en) * | 2014-03-25 | 2014-06-25 | 广州供电局有限公司 | Petal type power distribution network protection control system |
CN106058831A (en) * | 2016-08-05 | 2016-10-26 | 江苏方天电力技术有限公司 | Intelligent distributed rapid protection and fault isolation method of self-adaptive power distribution network |
CN205693346U (en) * | 2016-06-15 | 2016-11-16 | 国网江苏省电力公司无锡供电公司 | Petal-shaped distribution line optical fiber differential protective circuit |
-
2017
- 2017-10-15 CN CN201710956025.2A patent/CN107666142B/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103887879A (en) * | 2014-03-25 | 2014-06-25 | 广州供电局有限公司 | Petal type power distribution network protection control system |
CN205693346U (en) * | 2016-06-15 | 2016-11-16 | 国网江苏省电力公司无锡供电公司 | Petal-shaped distribution line optical fiber differential protective circuit |
CN106058831A (en) * | 2016-08-05 | 2016-10-26 | 江苏方天电力技术有限公司 | Intelligent distributed rapid protection and fault isolation method of self-adaptive power distribution network |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108711852A (en) * | 2018-06-22 | 2018-10-26 | 天津大学 | A kind of distribution network failure parametric sensitivity computational methods based on fault estimator |
CN112701778A (en) * | 2020-12-22 | 2021-04-23 | 雅砻江流域水电开发有限公司 | Three-section type auxiliary power automatic switching method with contact bus |
CN112701778B (en) * | 2020-12-22 | 2023-02-07 | 雅砻江流域水电开发有限公司 | Three-section type auxiliary power automatic switching method with contact bus |
Also Published As
Publication number | Publication date |
---|---|
CN107666142B (en) | 2019-03-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104539043A (en) | Automatic-switching device system and method of standby power source | |
CN104362599A (en) | Method for protecting low-voltage bus of intelligent substation | |
CN104300580A (en) | Reclosure method involving distributed generation power distribution network based on wide area information | |
CN109245101B (en) | Method for improving power supply reliability of series-supply transformer substation | |
CN112421761B (en) | Relay protection reconstruction self-healing method for hub traction power supply system | |
CN109245072B (en) | Self-adaptive in-situ feeder automation fault processing method based on regional sequence number | |
CN102593798B (en) | Comprehensive relay protection method applied to intelligent switch | |
CN104319743B (en) | The method and apparatus of the main transformer high-pressure side Fast Operating Backup Protection based on station domain information | |
CN107666142A (en) | The input strategy of the automatic throw-in equipment of emergency power supply of power distribution network unconditional crank | |
CN113890093A (en) | Relay protection system of distributed power supply after diamond-type power grid is connected | |
CN110323821B (en) | Control method for spare power automatic switching of multi-section ring network switch cabinet | |
CN111856213A (en) | Fault positioning method for looped network operation | |
CN103779843A (en) | Substation area protection system and substation area protection method based on differential flexible overlapping division | |
CN204271745U (en) | Automatic switching device of standby power supply system | |
CN103972865A (en) | Control method for preventing motor from being switched into short-circuit fault | |
CN104734117B (en) | A kind of breaker fail protection method of substation | |
CN103532111A (en) | Incoming line and outgoing line protector of switching station | |
CN204947582U (en) | Loop is distributed in the jumping of 220kV failure protection connection rationally | |
CN103545787A (en) | Protecting system of unified power quality controller and protection control method of protecting system | |
CN103915826A (en) | Automatic power distribution network fault judging and control method of full-breaker ring main unit power supply | |
CN110676824B (en) | 110kV line disconnection protection method for collecting bus voltage of line load end | |
CN209844638U (en) | Power supply system with high-voltage quick-switching device | |
CN109861179B (en) | Bus protection voltage switching method suitable for hand-in-hand power supply mode | |
CN203674688U (en) | Unified electric energy quality controller protection system | |
CN107086552B (en) | Protection circuit of extended cell wiring system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190329 Termination date: 20201015 |