CN107662349A - Magnetic double level gauge and its processing method for connecting tubule liner - Google Patents

Magnetic double level gauge and its processing method for connecting tubule liner Download PDF

Info

Publication number
CN107662349A
CN107662349A CN201710919511.7A CN201710919511A CN107662349A CN 107662349 A CN107662349 A CN 107662349A CN 201710919511 A CN201710919511 A CN 201710919511A CN 107662349 A CN107662349 A CN 107662349A
Authority
CN
China
Prior art keywords
ring bodies
cylinder
processing method
liner
tubule
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710919511.7A
Other languages
Chinese (zh)
Inventor
盛井德
黄河振
陈之聪
龙亮东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Jiwei Automations Ltd
Original Assignee
Shenzhen Jiwei Automations Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Jiwei Automations Ltd filed Critical Shenzhen Jiwei Automations Ltd
Priority to CN201710919511.7A priority Critical patent/CN107662349A/en
Publication of CN107662349A publication Critical patent/CN107662349A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C65/00Joining or sealing of preformed parts, e.g. welding of plastics materials; Apparatus therefor
    • B29C65/02Joining or sealing of preformed parts, e.g. welding of plastics materials; Apparatus therefor by heating, with or without pressure
    • B29C65/10Joining or sealing of preformed parts, e.g. welding of plastics materials; Apparatus therefor by heating, with or without pressure using hot gases (e.g. combustion gases) or flames coming in contact with at least one of the parts to be joined
    • B29C65/12Joining or sealing of preformed parts, e.g. welding of plastics materials; Apparatus therefor by heating, with or without pressure using hot gases (e.g. combustion gases) or flames coming in contact with at least one of the parts to be joined and welding bar
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C66/00General aspects of processes or apparatus for joining preformed parts
    • B29C66/01General aspects dealing with the joint area or with the area to be joined
    • B29C66/02Preparation of the material, in the area to be joined, prior to joining or welding
    • B29C66/022Mechanical pre-treatments, e.g. reshaping
    • B29C66/0222Mechanical pre-treatments, e.g. reshaping without removal of material, e.g. cleaning by air blowing or using brushes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C66/00General aspects of processes or apparatus for joining preformed parts
    • B29C66/01General aspects dealing with the joint area or with the area to be joined
    • B29C66/03After-treatments in the joint area
    • B29C66/032Mechanical after-treatments
    • B29C66/0326Cutting, e.g. by using waterjets, or perforating
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C66/00General aspects of processes or apparatus for joining preformed parts
    • B29C66/01General aspects dealing with the joint area or with the area to be joined
    • B29C66/03After-treatments in the joint area
    • B29C66/034Thermal after-treatments
    • B29C66/0342Cooling, e.g. transporting through welding and cooling zone
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C66/00General aspects of processes or apparatus for joining preformed parts
    • B29C66/70General aspects of processes or apparatus for joining preformed parts characterised by the composition, physical properties or the structure of the material of the parts to be joined; Joining with non-plastics material
    • B29C66/71General aspects of processes or apparatus for joining preformed parts characterised by the composition, physical properties or the structure of the material of the parts to be joined; Joining with non-plastics material characterised by the composition of the plastics material of the parts to be joined
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01FMEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
    • G01F23/00Indicating or measuring liquid level or level of fluent solid material, e.g. indicating in terms of volume or indicating by means of an alarm
    • G01F23/30Indicating or measuring liquid level or level of fluent solid material, e.g. indicating in terms of volume or indicating by means of an alarm by floats
    • G01F23/64Indicating or measuring liquid level or level of fluent solid material, e.g. indicating in terms of volume or indicating by means of an alarm by floats of the free float type without mechanical transmission elements
    • G01F23/72Indicating or measuring liquid level or level of fluent solid material, e.g. indicating in terms of volume or indicating by means of an alarm by floats of the free float type without mechanical transmission elements using magnetically actuated indicating means

Abstract

A kind of magnetic double level gauge of disclosure and its processing method for connecting tubule liner, wherein the first ring bodies separates with cylinder, can be separately manufactured as prefabricated component, then be welded to one again after connection tubule is installed to.First ring bodies and cylinder are separately manufactured, therefore can beyond the compression molding by the way of be made, such as injection or turnery processing, also be not in the problems such as producing bubble, fracture and shrink, so as to improve etch-proof effect even if using perfluoroethylene-propylene (other materials can also be used).

Description

Magnetic double level gauge and its processing method for connecting tubule liner
Technical field
The application is related to the liner processing method of a kind of magnetic double level gauge, especially magnetic double level gauge.
Background technology
Magnetic double level gauge can be used for the medium level sensing of the equipment such as various towers, tank, groove.In general, magnetic turnover panel liquid level The mounting means of meter has a variety of, and side-mounted is a kind of common mode.Generally, side-mounted magnetic double level gauge include floating drum and Tubule is connected, the floating drum connects by connecting tubule with tested container, is provided with magnetic float in floating drum, and the magnetic float is direct in itself Float on liquid level, the floating drum is externally provided with magnetic turning plate indicator, the magnetic turning plate indicator and the magnetic float magnetic couplings.Pass through coupling Effect, when being tested liquid level lifting in container, the magnetic float in floating drum also lifts therewith, and the permanent-magnet steel in float passes through magnetic Magnetic flaps outside coupling driving floating drum overturns 180 °.It (is usually red and white that flaps two sides, which is coated respectively with different colours, Color), to indicate the position of liquid level, usually, when liquid level rises in container, flaps is changed into red by white, when in container When liquid level declines, flaps is changed into white by red, and the red white intersection of indicator is the actual height of liquid level in container.
When fluid to be measured is corrosive liquids, it usually needs using lining-design, to prevent fluid to be measured from corroding floating drum And connection tubule, so as to cause work safety accident.In existing magnetic turnover panel inner lining process structure, the liner for connecting tubule is usual It is to include cylinder, the first ring bodies and the second ring bodies, the cylinder is arranged in the passage of connection tubule, the first ring bodies The both ends of connection tubule are separately positioned on the second ring bodies.For the peace realized liner be connected this special construction of tubule Dress, typically using compression molding method by liner one manufacture connection tubule on.Meanwhile in order to improve anticorrosion Property, the liner is typically made of perfluoroethylene-propylene molding.But this perfluoroethylene-propylene liner have in compression molding with Lower shortcoming:
First, perfluoroethylene-propylene easily produces bubble and fracture in molding, and in this case, corrosive liquids will Infiltrate, do not reach the effect of liner sealing, so that sealed liner effect is ineffective, cause whole magnetic turnover panel liquid level Meter can not work, and influence production operation.
2nd, due to the material property of perfluoroethylene-propylene, contraction can be produced after molding so that in liner with being connected tubule Can not tight seal, the problem of equally causing corrosive liquids to permeate so that whole liner sealing effectiveness is ineffective, so as to Cause magnetic double level gauge cisco unity malfunction, made troubles to production.
The content of the invention
The application provides a kind of processing method of new connection tubule liner and used manufactured by the processing method Liner magnetic double level gauge.
According to the one side of the application, a kind of embodiment, which provides, connects adding for tubule liner in a kind of magnetic double level gauge Work method, the liner, which includes being arranged on, connects intratubular cylinder and the first ring bodies positioned at cylinder both ends and the Two ring bodies, first ring bodies are used to connect with container sealing, and second ring bodies is used to connect with floating drum sealing, institute Stating processing method includes:
Preparation process:The first ring bodies, the second ring bodies and cylinder are provided, second ring bodies is fixed with cylinder Connection, first ring bodies separate with cylinder;
Installation steps:The cylinder is encased in connection tubule;
Fixing step:First ring bodies and cylinder is integrally welded.
As the further alternative of the processing method, first ring bodies, cylinder and the second ring bodies are adopted It is made of perfluoroethylene-propylene.
As the further alternative of the processing method, first ring bodies is made of Shooting Technique, described Cylinder and the second ring bodies are formed integrally structure by Shooting Technique.
As the further alternative of the processing method, in the fixing step, to first ring bodies and Before cylinder is welded, oil processing at least first is carried out with alcohol to the welding region of first ring bodies and cylinder.
As the further alternative of the processing method, in the fixing step, to first ring bodies and During cylinder is welded, the non-solder region of the first ring bodies and cylinder is compacted.
As the further alternative of the processing method, the compacting is included to first ring bodies and cylinder Upper welding region side end face is compacted.
As the further alternative of the processing method, the outer peripheral face of the cylinder has first chamfering of circle Face, first ring bodies have the inner peripheral surface coordinated with cylinder outer peripheral face, and the inner peripheral surface has second fillet surface of circle, First fillet surface and the second fillet surface surround welding groove.
As the further alternative of the processing method, in the fixing step, to first ring bodies and Before cylinder is welded, first at least the welding region of first ring bodies and cylinder is cleaned with liquid detergent;Clearly The first ring bodies and cylinder after washing are deoiled with alcohol again after drying.
As the further alternative of the processing method, in the fixing step, to first ring bodies and During cylinder is welded, welding rod used is Meltability polytetrafluorethyletubular welding rod.
According to the one side of the application, a kind of embodiment provides a kind of magnetic double level gauge, and it includes floating drum and connection Tubule, in addition to it is arranged on connection according to liner made of any one processing method, the cylinder of the liner as described above In the passage of tubule, first ring bodies is positioned at one end that connection tubule is used to be connected with container, the second ring-type position In one end that connection tubule is used to be connected with floating drum.
The beneficial effect of the application is:
The processing method for the connection tubule liner that the application provides, wherein the first ring bodies separates with cylinder, can be independent Prefabricated component is manufactured into, is then welded to one again after connection tubule is installed to.First ring bodies and cylinder are the systems that separates Make, thus can beyond the compression molding by the way of be made, such as injection or turnery processing, therefore even if using poly- perfluor Second propylene (can also use other materials) is also not in the problems such as producing bubble, fracture and shrink, so as to improve anti-corrosion The effect of erosion.
Brief description of the drawings
Fig. 1 is the sectional view at the connection tubule and floating drum of magnetic double level gauge in a kind of embodiment of the application;
Fig. 2 is the structural representation of cylinder, the first ring bodies and the second ring bodies in a kind of embodiment of the application;
Fig. 3 is cooperation schematic diagram of the structure shown in Fig. 2 with being connected tubule;
Fig. 4 is the schematic diagram after Standard shown in Fig. 3 (before welding).
Embodiment
The present invention is described in further detail below by embodiment combination accompanying drawing.The application can be with a variety of Different forms is realized, however it is not limited to embodiment described by the present embodiment.The purpose of detailed description below is provided It is easy for becoming apparent from present disclosure thorough explanation, the words of the wherein indicating position such as upper and lower, left and right is only pin To shown structure in respective figure for position.
However, those skilled in the art may be aware that one or more detail description can be by Omit, or other methods, component or material can also be used.In some instances, some embodiments are not described Or it is not described later in detail.
In addition, technical characteristic described herein, technical scheme can also be closed arbitrarily in one or more embodiments Suitable mode combines.For those skilled in the art, should be readily appreciated that with provided herein is embodiment relevant method Step or operation order can also change.Therefore, any order in drawings and examples is merely illustrative purposes, not secretly Show requirement in a certain order, require unless expressly stated according to a certain order.
It is herein part institute serialization number itself, such as " first ", " second " etc., is only used for distinguishing described object, Without any order or art-recognized meanings.And " connection ", " connection " described in the application, unless otherwise instructed, include directly and It is indirectly connected with (connection).
Embodiment one:
The application provides a kind of processing method for being used in magnetic double level gauge connect the liner of tubule.It is especially side-mounted A kind of processing method of liner of magnetic double level gauge.The liner is used to protect connection tubule, avoids fluid to be measured, especially rotten Corrosion liquid causes to corrode to connection tubule.
Fig. 1 is refer to, the magnetic double level gauge includes being used to set the floating drum 100 of magnetic float and for connecting tested appearance The connection tubule 200 of device.The connection tubule 200 is connected with floating drum 100, and floating drum 100 is connected by connecting tubule 200 with tested container Logical, the fluid to be measured in tested container can enter floating drum 100 through connecting tubule 200.
Floating drum 100 can be used for installing magnetic float, and the magnetic float is directly floated on liquid level in itself, and the floating drum 100 is externally provided with magnetic Turning plate indicator, the magnetic turning plate indicator and the magnetic float magnetic couplings.By coupling, lifted when being tested liquid level in container When, the magnetic float in floating drum 100 is also lifted therewith, and the permanent-magnet steel in float is driven outside floating drum 100 by magnetic couplings Magnetic flaps is overturn, so as to indicate the height of fluid to be measured.
Connection tubule 200 plays conducting effect between floating drum 100 and tested container, and its one end is connected simultaneously with floating drum 100 Ensure that the through hole of connection tubule 200 communicates with the inner chamber of floating drum 100.
Please continue to refer to Fig. 1, floating drum 100 can be with one radially or the connector 120 that opens up of other directions, the company Connect tubule 200 and fix and seal with connector 120 and connect.
In order to avoid corrosion of the fluid to be measured to floating drum 100 and the connection inwall of tubule 200, set in the inwall of floating drum 100 At least one layer of floating drum liner 300 is equipped with, the inwall of connection tubule 200 is provided with least one layer of liner 400.Floating drum liner 300 Divide and stretched out from connector 120 and form substantially tubular first sealing 310.
It refer to Fig. 1-3, in a kind of embodiment, the liner 400 includes the cylinder 420 being arranged in connection tubule 200 And the first ring bodies 410 and the second ring bodies 430 positioned at the both ends of cylinder 420, first ring bodies 410 is used for and container Sealing connection, second ring bodies 430 are used to connect with the sealing of floating drum 100.First ring bodies 410 has through hole 411, and this One ring bodies 410 can be arranged on the periphery of cylindrical body 420 by the through hole 411.
It is different by compression molding from existing liner, as shown in figure 1, in the present embodiment liner 400 the first ring bodies 410 With cylinder 420 fixation is realized by welding.Wherein, a regions shown in Fig. 1 is a kind of weld part of embodiment.
First ring bodies 410 and cylinder 420 be it is separately manufactured, can beyond the compression molding by the way of system Into, such as injection or turnery processing, therefore be also not in even if using perfluoroethylene-propylene (other materials can also be used) The problems such as producing bubble, fracture and shrinking, so as to improve etch-proof effect.
Simultaneously as the particularity of magnetic double level gauge use environment, it usually needs customized.Existing compression molding processing Mode spends the time long, during in particular by perfluoroethylene-propylene as 400 material of liner, due to the material flowability Difference, successively molding need to expend a few hours or longer time.In the present embodiment, first ring bodies 410 divides with cylinder 420 From prefabricated component can be separately manufactured as.Therefore can first be made a number of prefabricated component it is standby, it is necessary to when only need to be by liner 400 Connection tubule is installed to, then realizes and fixes quickly through welding, for existing compression molding, its production efficiency carries significantly It is high.
In fact, when making connection tubule 200 and liner 400, it is difficult to expect using welding that those skilled in the art, which are, Mode the first ring bodies 410 and cylinder 420 are realized into fixation.Its reason is that the liner 400 after compression molding is one Body structure, those skilled in the art would generally pay the utmost attention to this integrative-structure in structure design, so that liner 400 has Sufficiently large intensity.
In addition, when using perfluoroethylene-propylene as liner 400, those skilled in the art are just more difficult to expect using weldering The mode connect makes liner 400.Because contain fluorine in the material one's share of expenses for a joint undertaking of perfluoroethylene-propylene, because fluorine material adheres to Power is small so that the material flowability is poor, therefore is difficult to be welded together.Therefore, when making the liner 400 of connection tubule 200, Those skilled in the art are typically the fixation that the first ring bodies 410 and cylinder 420 will not be realized by the way of welding, this Even if the problems such as why compression molding can cause the bubble of liner 400, fracture and shrink illustrated from another point of view, in this area Liner 400 is still made by this way.
Fig. 1-4 are refer to, in one embodiment, the processing method of the liner 400 includes:
Preparation process:First ring bodies 410, the second ring bodies 430 and cylinder 420 be provided, second ring bodies 430 with Cylinder 420 is fixedly connected, and first ring bodies 410 separates with cylinder 420;
Installation steps:Cylinder 420 is encased in connection tubule 200;
Fixing step:First ring bodies 410 and cylinder 420 is integrally welded.
In preparation process, first ring bodies 410 can be made of Shooting Technique, the ring-type of cylinder 420 and second Body 430 is formed integrally structure by Shooting Technique.
Certainly, it by other means, such as can also weld, realize solid between the ring bodies 430 of cylinder 420 and second Fixed connection.
First ring bodies 410, the second ring bodies 430 and cylinder 420 can effectively avoid gas using after injection molding The generation of bubble, prevented also from Materials Fracture and contraction.
In addition to injection, the first ring bodies 410, the second ring bodies 430 and cylinder 420 also can by other means, example As turnery processing is made.
Further, in one embodiment, the first ring bodies 410, the ring bodies 430 of cylinder 420 and second are using poly- Perfluoroethylene-propylene (copolymer) is made, so that liner 400 has preferable anticorrosive property.
In order to improve the adhesion of perfluoroethylene-propylene, and then the welding effect of perfluoroethylene-propylene material is improved, one After-treatment is carried out to perfluoroethylene-propylene material in kind embodiment.
For example, in fixing step, before being welded to the first ring bodies 410 and cylinder 420, first at least to first The welding region of ring bodies 410 and cylinder 420 carries out oil processing with alcohol, so as to improve welding effect.
In addition, in fixing step, during being welded to the first ring bodies 410 and cylinder 420, to first The non-solder region of ring bodies 410 and cylinder 420 is compacted.This compacting can be realized by fixture.
In a kind of embodiment, Fig. 4 is refer to, the compacting is included to welding region on the first ring bodies 410 and cylinder 420 Side end face 412,425 is compacted.
In addition, compacting can also include being compacted the barrel of cylinder 420 (as shown in Fig. 2 423).For example, adopt It is inserted into a cylinder in cylinder 420, so as to complete to be compacted to barrel.
Further, in order to improve the effect of welding, Fig. 1,2 and 4 are refer to, the outer peripheral face of the cylinder 420 has one The first fillet surface 424 is enclosed, first ring bodies 410 has the inner peripheral surface coordinated with the outer peripheral face of cylinder 420, and the inner peripheral surface has One the second fillet surface 413 of circle, the fillet surface 413 of the first fillet surface 424 and second surround welding groove b.In welding process, solder And first the surfacing melting of fillet surface 424 and the second fillet surface 413 cross and fill up welding groove b, formed firm Connection.
In one embodiment, when fixing step is welded to the first ring bodies 410 and cylinder 420, welding rod used For Meltability polytetrafluorethyletubular welding rod, to improve the effect of welding.
In addition, in one embodiment, fixing step is welded to the first ring bodies 410 and cylinder 420 Before, first at least the welding region of the first ring bodies 410 and cylinder 420 is cleaned with liquid detergent, by the first ring bodies 410 With the impurity wash clean on the surface of cylinder 420.After the first ring bodies 410 and cylinder 420 after cleaning dry, then gone with alcohol Oil.
In order to improve welding effect, in a kind of embodiment, the first ring bodies 410 and the surface temperature of cylinder 420 during welding Should not be too high, otherwise, perfluoroethylene-propylene can crack, and produce pernicious gas, while welding effect can be greatly reduced, and be caused Not prison welding is consolidated, and easily produces phenomenon of rupture, causes magnetic double level gauge cisco unity malfunction, is made troubles to production.
Need to continuously it be welded in order to obtain the melt of uniformity, during welding, it is impossible to spot welding or intermittently welding.
In addition, need natural cooling after the completion of welding, during cooling, it is impossible to get wet, otherwise, the welding effect of perfluoroethylene-propylene It will be greatly reduced.
Further, since the reason for hot air welding, face of weld occurs surface irregularity, the phenomenon that color differs, in order to So that the sealing effectiveness of cylinder 420 reaches more preferable, it is necessary to turnery processing be carried out to face of weld, by car at surface irregularity It is flat.
Fig. 1-3 are refer to, in one embodiment, second ring bodies 430 forms taper type.Floating drum 100 is provided with the A connection piece 110, connection tubule 200 are provided with the second connector 210, and the first connector 110 can be logical with the second connector 210 Cross screw element 500 to lock, the first sealing 310 and the second ring bodies 430 are compressed and to form sealing.First connector 110 and Two connectors 210 can be adpting flange or the connector of other shapes.
Fig. 1 and 4 are refer to, liner 400 is used to be connected with tested container away from one end of connector 120.During assembling, this Sealing is formed between one ring bodies 410 and tested container, ensures that the sealing of fluid to be measured flows into.
In terms of fixation, an adpting flange or the connector of other shapes 220 can also be set on tubule 200 by connecting, with It is easy to connect tubule 200 and tested container realization fixation.
Embodiment two
The present embodiment two provides magnetic double level gauge, and it includes floating drum and connection tubule.Meanwhile the magnetic double level gauge Also include according to liner made of processing method shown in embodiment one, the cylinder of the liner is arranged on the passage of connection tubule Interior, first ring bodies is used for positioned at one end that connection tubule is used to be connected with container, second ring bodies positioned at connection tubule The one end being connected with floating drum.
Above content is to combine specific embodiment further description made for the present invention, it is impossible to assert this hair Bright specific implementation is confined to these explanations.For general technical staff of the technical field of the invention, do not taking off On the premise of from present inventive concept, some simple deduction or replace can also be made.

Claims (10)

1. connecting the processing method of tubule liner in a kind of magnetic double level gauge, the liner includes intratubular installed in connecting Cylinder and the first ring bodies and the second ring bodies positioned at cylinder both ends, first ring bodies are used to seal with container Connection, second ring bodies are used to connect with floating drum sealing, it is characterised in that the processing method includes:
Preparation process:The first ring bodies, the second ring bodies and cylinder are provided, second ring bodies is fixed with cylinder to be connected Connect, first ring bodies separates with cylinder;
Installation steps:The cylinder is encased in connection tubule;
Fixing step:First ring bodies and cylinder is integrally welded.
2. processing method as claimed in claim 1, it is characterised in that first ring bodies, cylinder and the second ring bodies It is made of perfluoroethylene-propylene.
3. processing method as claimed in claim 2, it is characterised in that first ring bodies is made of Shooting Technique, institute State cylinder and the second ring bodies is formed integrally structure by Shooting Technique.
4. the processing method as described in claim any one of 1-3, it is characterised in that in the fixing step, to described Before one ring bodies and cylinder are welded, first at least the welding region of first ring bodies and cylinder is carried out with alcohol Go oil processing.
5. processing method as claimed in claim 4, it is characterised in that in the fixing step, to first ring bodies During being welded with cylinder, the non-solder region of the first ring bodies and cylinder is compacted.
6. processing method as claimed in claim 5, it is characterised in that the compacting is included to first ring bodies and cylinder Welding region side end face is compacted on body.
7. processing method as claimed in claim 4, it is characterised in that the outer peripheral face of the cylinder has first chamfering of circle Face, first ring bodies have the inner peripheral surface coordinated with cylinder outer peripheral face, and the inner peripheral surface has second fillet surface of circle, First fillet surface and the second fillet surface surround welding groove.
8. processing method as claimed in claim 4, it is characterised in that in the fixing step, to first ring bodies Before being welded with cylinder, first at least the welding region of first ring bodies and cylinder is cleaned with liquid detergent; The first ring bodies and cylinder after cleaning are deoiled with alcohol again after drying.
9. processing method as claimed in claim 4, it is characterised in that in the fixing step, to first ring bodies During being welded with cylinder, welding rod used is Meltability polytetrafluorethyletubular welding rod.
10. a kind of magnetic double level gauge, it includes floating drum and connection tubule, it is characterised in that also includes according to such as claim Liner made of any one of 1-9 processing methods, the cylinder of the liner are arranged in the passage of connection tubule, and described the One ring bodies is positioned at one end that connection tubule is used to be connected with container, and second ring bodies is used for positioned at connection tubule and floating drum One end of connection.
CN201710919511.7A 2017-09-30 2017-09-30 Magnetic double level gauge and its processing method for connecting tubule liner Pending CN107662349A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710919511.7A CN107662349A (en) 2017-09-30 2017-09-30 Magnetic double level gauge and its processing method for connecting tubule liner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710919511.7A CN107662349A (en) 2017-09-30 2017-09-30 Magnetic double level gauge and its processing method for connecting tubule liner

Publications (1)

Publication Number Publication Date
CN107662349A true CN107662349A (en) 2018-02-06

Family

ID=61097585

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710919511.7A Pending CN107662349A (en) 2017-09-30 2017-09-30 Magnetic double level gauge and its processing method for connecting tubule liner

Country Status (1)

Country Link
CN (1) CN107662349A (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1064439A (en) * 1992-03-23 1992-09-16 第九冶金建设公司机电安装工程公司化工设备厂 Steel-plastic composite pipe
CN2427708Y (en) * 2000-05-18 2001-04-25 郎丰生 Pipe section connection device used in process for internally lining plastic tube in steel pipe
CN2672627Y (en) * 2003-03-19 2005-01-19 张忠贵 Main guide tube of anti-corrosion liquid level meter
CN101571214A (en) * 2008-05-04 2009-11-04 巢国平 Pump pipeline
CN101788321A (en) * 2010-02-01 2010-07-28 如皋市万通防腐有限公司 Magnetic turning column liquid level meter, integral molding method of lining at joint and stretching die
CN201765030U (en) * 2010-02-01 2011-03-16 如皋市万通防腐有限公司 Magnetic reversing column liquid level gauge
CN203464981U (en) * 2013-09-11 2014-03-05 胡亚男 Magnetic liquid level meter
CN103672299A (en) * 2013-12-05 2014-03-26 浙江波威钢构有限公司 Transportation pipeline for chemical industry
CN104791580A (en) * 2015-05-07 2015-07-22 山东柯林瑞尔管道工程有限公司 Pipeline lined with anti-corrosion plastic pipe
CN206161113U (en) * 2016-11-03 2017-05-10 深圳计为自动化技术有限公司 Magnetism turns over display panel of piece level gauge and display panel's port seal structure
CN206378182U (en) * 2016-08-31 2017-08-04 深圳计为自动化技术有限公司 The inner lining structure of magnetic double level gauge

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1064439A (en) * 1992-03-23 1992-09-16 第九冶金建设公司机电安装工程公司化工设备厂 Steel-plastic composite pipe
CN2427708Y (en) * 2000-05-18 2001-04-25 郎丰生 Pipe section connection device used in process for internally lining plastic tube in steel pipe
CN2672627Y (en) * 2003-03-19 2005-01-19 张忠贵 Main guide tube of anti-corrosion liquid level meter
CN101571214A (en) * 2008-05-04 2009-11-04 巢国平 Pump pipeline
CN101788321A (en) * 2010-02-01 2010-07-28 如皋市万通防腐有限公司 Magnetic turning column liquid level meter, integral molding method of lining at joint and stretching die
CN201765030U (en) * 2010-02-01 2011-03-16 如皋市万通防腐有限公司 Magnetic reversing column liquid level gauge
CN203464981U (en) * 2013-09-11 2014-03-05 胡亚男 Magnetic liquid level meter
CN103672299A (en) * 2013-12-05 2014-03-26 浙江波威钢构有限公司 Transportation pipeline for chemical industry
CN104791580A (en) * 2015-05-07 2015-07-22 山东柯林瑞尔管道工程有限公司 Pipeline lined with anti-corrosion plastic pipe
CN206378182U (en) * 2016-08-31 2017-08-04 深圳计为自动化技术有限公司 The inner lining structure of magnetic double level gauge
CN206161113U (en) * 2016-11-03 2017-05-10 深圳计为自动化技术有限公司 Magnetism turns over display panel of piece level gauge and display panel's port seal structure

Similar Documents

Publication Publication Date Title
CN204677934U (en) A kind of novel alloy flange
CN106678462A (en) Two-flap locking tube joint
CN107662349A (en) Magnetic double level gauge and its processing method for connecting tubule liner
CN105345390A (en) Repairing method for split sealing surface of pressure resistant vessel
CN213239742U (en) Flange pipe weld pressure testing device
RU2375217C2 (en) Air tank for automatic brake
CN102936743B (en) Electroplated micro-crack chromium slot, manufacture method and leakage detection method
CN211289095U (en) Multi-sealing corrosion-resistant flange
CN206958428U (en) Flange connecting apparatus and pressure vessel assemblies
CN205138723U (en) Float head heat -exchanger pressure test tool
CN207555019U (en) A kind of effluent outfall pipeline connecting structure of Acid of Hydrofluoric Acid Production system
CN207117094U (en) Crane span structure segmented assemblies and cable testing bridge
CN110333057A (en) A kind of deep well submerged electric pump motor water pressure test tank
CN206656053U (en) A kind of flange assembly for seal for pipe joints
CN202432145U (en) Magnetic seal welding joint of steel-plastic composition pipe
CN207018719U (en) A kind of plastic union pipe head seal
CN101855369B (en) Stave cooler for blast furnace
CN110186311A (en) Seal structure for heat exchanger and heat exchanger
CN211398874U (en) Composite process structure for manhole of tower making device made of composite plate
CN212745370U (en) Corrosion-resistant steel lining glass tube
CN106102195B (en) Heating pipe and manufacturing method thereof
CN209501843U (en) A kind of cement grinding mill end plate connection structure
CN108556862A (en) A kind of electric tracing draining defecation guide tube used for rail vehicle
CN109900559A (en) Test experimental provision and experimental method that deformation joint buried water strip bears hydraulic pressure
CN207437970U (en) A kind of composite material polyurethane liner pipe flange connection

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180206

RJ01 Rejection of invention patent application after publication