Prior art keywords
roll
frame
volumes
strip
rolled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610613238.0A
Other languages
Chinese (zh)
Other versions
CN107661902B (en
Inventor
曾建峰
葛良琦
卢勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baoshan Iron and Steel Co Ltd
Original Assignee
Baoshan Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baoshan Iron and Steel Co Ltd filed Critical Baoshan Iron and Steel Co Ltd
Priority to CN201610613238.0A priority Critical patent/CN107661902B/en
Publication of CN107661902A publication Critical patent/CN107661902A/en
Application granted granted Critical
Publication of CN107661902B publication Critical patent/CN107661902B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B45/00Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
    • B21B45/02Devices for surface or other treatment of work, specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills for lubricating, cooling, or cleaning
    • B21B45/0203Cooling
    • B21B45/0209Cooling devices, e.g. using gaseous coolants
    • B21B45/0215Cooling devices, e.g. using gaseous coolants using liquid coolants, e.g. for sections, for tubes
    • B21B45/0218Cooling devices, e.g. using gaseous coolants using liquid coolants, e.g. for sections, for tubes for strips, sheets, or plates
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B37/00Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
    • B21B37/74Temperature control, e.g. by cooling or heating the rolls or the product
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B37/00Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
    • B21B37/28Control of flatness or profile during rolling of strip, sheets or plates
    • B21B37/30Control of flatness or profile during rolling of strip, sheets or plates using roll camber control
    • B21B37/32Control of flatness or profile during rolling of strip, sheets or plates using roll camber control by cooling, heating or lubricating the rolls

Abstract

A kind of quick method for establishing cold-rolled process roller heat convex degree learning, belongs to metal rolled field.When collecting some frame roll change signal, the emulsification flow quantity that beam and roll change rack outlet cooling spray beam are sprayed to interstand cooling respectively enters warm control model, it is determined that need to roll the quantity set point of coil of strip, detect and record the quantity for having rolled coil of strip, proportionality coefficient is multiplied by according to former emulsion flow setting value, the emulsification flow quantity of the emulsification flow quantity and outlet cooling spray beam of interstand cooling spray beam is carried out reducing adjustment accordingly, detects whether the quantity for having rolled coil of strip recorded reaches the quantity set point for needing to roll coil of strip;It is such as no, repeat the above steps;In this way, warm control model is terminated.It can realize the quick foundation of roll thermal crown after roll replacing in cold continuous rolling process, reduce the production loss in roll warm, improve the quality control level and production stability of roll warm.Suitable for the production process control field of cold mill complex.

Description

A kind of quick method for establishing cold-rolled process roller heat convex degree learning
Technical field
The invention belongs to the rolling field of metal, more particularly to a kind of control method for being specially adapted for rolling mill for metal.
Background technology
At present in cold rolling process production process of plate, the overwhelming majority is produced using 6 roller mills or 4 roller mills, with 6 rollers Exemplified by sour tandem mill, when working roll or intermediate calender rolls are rolled when tonnage is counted to, it is necessary to be operated the replacing of roller or intermediate calender rolls.In phase Answer roll change after, because roll self-temperature is relatively low, the corresponding roll thermal crown of roll is not set up also, so when Strip Shape Control ability Difference, production process are unstable.
For this situation, common practice in the industry is that about 5-7 volumes product progress low speed production is built after roll is changed at present The vertical new roll thermal crown for changing roll, common practices are as follows:
Number is rolled up after roll change The setting speed upper limit
First volume 2 50%
The 3-4 volumes 70%
The 5-6 volumes 85%
Volume 7 and after 100%
The purpose of such a way is the roll thermal crown for progressively establishing roll, but its negative effect is also fairly obvious, a side Needs so many pre- hot rolling in face significantly reduces the production efficiency of cold continuous rolling process.Meanwhile roll thermal crown does not set up preceding production board After shape controlled level is substantially less than foundation, the quality condition of corresponding pre- hot rolling is also poor compared with normal volume.
Problem be present in prior art:
1st, so many pre- hot rolling is needed to significantly reduce the production efficiency of cold continuous rolling process.
2nd, product plate shape controlled level is substantially less than before roll thermal crown is not set up establish after, the quality condition of corresponding pre- hot rolling compared with Normal volume is poor.
Application No. CN89108636.6, the authorization day for announcing are in September, 1992 Chinese invention patent of 16 days, disclose one Kind of the convexity controllable roll of special-shaped oil pocket " have ", the oil pocket section of its roll be lens-shaped curve, the summit of curve with Mandrel (or roller set) contacts so that mandrel backing roll set, and the volume of roll oil pocket is greatly reduced, rung in favor of improving rolling Answer speed.According to width of rolling stock and rolling mill practice requirement, the oil pocket of the roll can be designed as one or more than one.This rolls Roller overcomes the shortcomings that VC rolls, has center and edge plate shape control effect good, it is not necessary to which bend roller mechanism of battery coordinates;Rolling reaction It hurry up;Mill bar quality is good;The advantages that production efficiency is high, there is significant economic benefit.
Involved by above-mentioned technical proposal is a kind of convexity controllable roll with special-shaped oil pocket, but the life of such a roll Production and maintenance cost are high, and actual use scope is extremely narrow, and general cold continuous rolling is not used, and are solved required for can not solving herein Problem.
Authorization Notice No. is CN101462124B, and authorized announcement date is the Chinese invention patent on June 15th, 2011, open A kind of strip crown for Rolling production can on-line tuning roll.Its technical scheme is:At the end at topping roll body of roll both ends A concentric toroidal cavity respectively symmetrically is respectively dug in face, and in the end face at bottom roll body of roll both ends, also each digging one is concentric respectively symmetrically Toroidal cavity;The shape of four toroidal cavities is identical, respectively sets shape identical annular sliding in each toroidal cavity Block.The technical scheme, because the roll surface spacing on upper and lower roll barrel both sides is increased, avoids the side of rolled piece 4 in rolling The phenomenon that portion is thinned, substantially reduces strip crown, improves the dimensional accuracy of rolled product;Especially by axially adjustable ring Position of the shape sliding block in toroidal cavity, then the thickness of rolled piece edge is can adjust, realizes on-line tuning and the improvement of strip crown.
Involved by above-mentioned technical proposal be a kind of strip crown can on-line tuning roll, but production and the dimension of such a roll Shield cost is high, and actual use scope is extremely narrow, and general cold continuous rolling is not used, and solution asks required for can not solving the application Topic.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of quick method for establishing cold-rolled process roller heat convex degree learning.Its The corresponding discharge for spraying the emulsion of beam by controlling and reducing each emulsion of roll change frame, realizes that roll is more in cold continuous rolling process The quick foundation of rear roll thermal crown is changed, the production loss that roll warm is brought can be reduced and improve the quality of roll warm Controlled level and production stability.
The technical scheme is that:There is provided it is a kind of quickly establish the method for cold-rolled process roller heat convex degree learning, including pass through The emulsification flow quantity of each cooling spray beam is controlled and adjusted, realizes the quick rise for being replaced roller temperature, described is each cold But the outlet cooling spray that beam comprises at least interstand cooling spray beam and roll change frame between roll change frame and previous frame is sprayed Beam;It is characterized in that:
A, according to the actual operating state of equipment, the corresponding roller replacing operation of frame progress for needing roll change, after roll change The roll change frame sends roll change signal;
B, control system, which detects or gathers each frame, whether there is roll change signal, if nothing, according to normal production technology Parameter carries out the flow control of each cooling spray beam emulsion;
C, when control system collects the roll change signal of some frame, the frame between exchange roller frame and previous frame Between cooling spray beam emulsion flow control and roll change rack outlet cooling spray beam emulsion flow control respectively enter it is pre- Thermal process control model;
D, warm is divided into three phases, A volumes of section, preceding B volumes of section and preceding C volumes of section before being respectively designated as;
E, control system determines to need to roll the quantity set point of coil of strip in preceding A volumes of section, preceding B volumes of section and preceding C volumes of section;
F, into the preceding A volumes of section control model of warm, detect and record the quantity for having rolled coil of strip;
G, during the preceding A volumes of section of warm, the first proportionality coefficient is multiplied by according to former emulsion flow setting value, it is right The emulsification flow quantity of interstand cooling spray beam between roll change frame and previous frame carries out corresponding reduce and adjusted;According to former breast Change flow quantity setting value and be multiplied by the second proportionality coefficient, the emulsification flow quantity progress for exchanging the outlet cooling spray beam of roller frame is corresponding Reduce adjustment;
H, the A volumes of quantity set point for needing to roll coil of strip before whether the quantity for having rolled coil of strip that detection is recorded reaches; As no, repetition F-step;In this way, A volumes of section control model before terminating;
I, into the preceding B volumes of section control model of warm, detect and record the quantity for having rolled coil of strip;
J, during the preceding B volumes of section of warm, the 3rd proportionality coefficient is multiplied by according to former emulsion flow setting value, it is right The emulsification flow quantity of interstand cooling spray beam between roll change frame and previous frame carries out corresponding reduce and adjusted;According to former breast Change flow quantity setting value and be multiplied by the 4th proportionality coefficient, the emulsification flow quantity progress for exchanging the outlet cooling spray beam of roller frame is corresponding Reduce adjustment;
K, the B volumes of quantity set point for needing to roll coil of strip before whether the quantity for having rolled coil of strip that detection is recorded reaches; As no, repetition I step;In this way, B volumes of section control model before terminating;
L, into the preceding C volumes of section control model of warm, detect and record the quantity for having rolled coil of strip;
M, during the preceding C volumes of section of warm, the 5th proportionality coefficient is multiplied by according to former emulsion flow setting value, it is right The emulsification flow quantity of interstand cooling spray beam between roll change frame and previous frame carries out corresponding reduce and adjusted;According to former breast Change flow quantity setting value and be multiplied by the 6th proportionality coefficient, the emulsification flow quantity progress for exchanging the outlet cooling spray beam of roller frame is corresponding Reduce adjustment;
N, the C volumes of quantity set point for needing to roll coil of strip before whether the quantity for having rolled coil of strip that detection is recorded reaches; As no, repetition L steps;In this way, warm control model is terminated;
O, the flow that each cooling spray beam emulsion is carried out according to normal processing parameter controls;
The described quick method for establishing cold-rolled process roller heat convex degree learning, by adjusting roll change frame and previous frame respectively Between interstand cooling spray beam and roll change frame outlet cooling spray beam emulsification flow quantity, improve each frame strip steel at entry Temperature reduce heat loss, by reducing the cooling flow of emulsion realize that the plate face of coil of strip to be rolled normally heats up, with The heating rate for being replaced roll is improved, the quick rise for being replaced roller temperature is realized, so as to realize cold-rolled process after roll change The quick foundation of roller heat convex degree learning, the production loss that brings of warm after roller replacing operation is reduced, is preheated after improving roller replacing operation The quality control level and production stability of process.
Further, in described warm, the 7th ratio, rise drying are multiplied by according to former drying temperature setting value The desired temperature of machine, after warm control model terminates, the desired temperature of dryer recovers to normal value.
Specifically, the preceding A volumes of section, preceding B volumes of section and preceding C volumes of section need to roll the quantity set point of coil of strip, according to be rolled The difference of the predetermined thickness after thickness and rolling before belt steel rolling processed determines.
Specifically, the quantity set point that the preceding A volumes of section needs to roll coil of strip is 1~2;The preceding B volumes of section needs to roll The quantity set point position 2~4 of coil of strip;The quantity set point that the preceding C volumes of section needs to roll coil of strip is 3~6.
Specifically, the first described proportionality coefficient is 40%-85%;The second described proportionality coefficient is 50%-90%;Institute The 3rd proportionality coefficient stated is 50%-90%;The 4th described proportionality coefficient is 60%-95;The 5th described proportionality coefficient is 60%-95%;The 6th described proportionality coefficient is 70%-100%.
Specifically, the 7th described proportionality coefficient is 110%-130%.
Further, described each proportionality coefficient, with before belt steel rolling to be rolled, rolling after thickness difference, into positive Guan Xing.
Further, when some frame performs roller replacing operation, to the emulsion of the outlet cooling spray beam of the frame in itself Flow carries out described reduction adjustment.
Further, when some frame performs roller replacing operation, the emulsion of beam is sprayed to the interstand cooling before the frame Flow carries out described reduction adjustment.
Further, no matter which frame performs roller replacing operation, the 7th ratio is multiplied by according to former drying temperature setting value, Raise the desired temperature of dryer.
Compared with the prior art, it is an advantage of the invention that:
, can be with the case where ensureing production stability 1. the method by quickly establishing cold-rolled process roller heat convex degree learning By corresponding hot-rolling amount from former technique about need rolling volume 7 reduce at least only need rolling 3-4 volumes, significantly improve operating efficiency and Improve the quality control level during hot-rolling.
2. because it provides a kind of processing method to emulsion process optimization and operation of rolling process optimization, so It is not limited by specific emulsion technique and dryer process conditions, can be widely used for various tandem mills, is had wide Market prospects.
Brief description of the drawings
Fig. 1 is the structure arrangement schematic diagram that the frame of 6 roller 5 of the invention is rolled and accordingly emulsion sprays beam;
Fig. 2 is the quick method flow block diagram for establishing cold-rolled process roller heat convex degree learning of the invention.
1 is upper backup roll in figure, and 2 be upper intermediate calender rolls, and 3 be top working roll, and 4 be bottom working roll, and 5 be lower intermediate calender rolls, under 6 are Support roller.
1ETW~5ETW be respectively on the entrance of 1~No. 5 frame emulsion spray beam, 1EBW~for 5EBW be respectively 1~No. 5 The emulsified liquid spray beam of entrance of frame, 1DT~5DT are respectively that spray beam is cooled down in the outlet of 1~No. 5 frame, 1DB~5DB difference For cooling spray beam under the outlet of 1~No. 5 frame, 1MT~4MT be respectively 2~No. 5 frames frame between upper cooling spray beam, 1MB~ 4MB be respectively 2~No. 5 frames frame between lower cooling spray beam, 5SP be No. 5 frames outlet under cooling spray beam.
Embodiment
The present invention will be further described with reference to the accompanying drawings and examples.
In Fig. 1, by taking the most frequently used machine frame rolling mill of 6 roller 5 of cold continuous rolling as an example, wherein solid between upper and lower working roll Line is the running route of coil of strip strip to be rolled, is represented with belt steel rolling center line in figure.
Involved support roller, intermediate calender rolls and working roll are that upper and lower corresponding is set in figure, therefore support roller, intermediate calender rolls And working roll has upper and lower point;It is corresponding, entrance emulsion spray beam, outlet cooling spray beam and the interstand cooling of each frame Spray beam is also to have upper and lower point.Because each equipment and emulsion spray beam involved in figure is existing equipment, therefore it has Body structure and annexation will not be described in detail herein.
Each corresponding emulsion spray beam deployment scenarios can be seen that from figure has upper and lower emulsification in each frame entrance Liquid spray beam (numbering is i ETW and i ETW, wherein i=1,2,3,4), its main function is to provide the lubrication of the operation of rolling;Every Individual rack outlet is also provided with upper and lower emulsion spray beam (numbering be iDT and iDB, wherein i=1,2,3,4), its main function To provide the roll cooling effect of the operation of rolling.Meanwhile between each two frame, it is also equipped with emulsion between upper and lower frame Spray beam (numbering iMT, iMB, wherein i=1,2,3,4), there is provided the cooling on the upper and lower surface of strip.
Speed of production takes lower value in roll warm, and the purpose is to had enough time so that in low speed production process Roll is obtained to be fully warmed-up.And according to cold continuous rolling production technology, in low speed production process, emulsion corresponding discharge and speed For linear approximate relationship.But such a setting have ignored an important difference, i.e., roller temperature is relatively low during chilling roller state after roll change, Required cooling is horizontal different with cooling requirement required under mill speed being during hot-rolling state after rolling a period of time, and mesh Preceding emulsion flow set is entirely to be set on the basis of emulsification flow quantity during hot-rolling state.
Thus, first measure in control method described in the technical program is drawn, when system acquisition is to roll change signal, Accordingly reduce for cooling spray beam flow after the frame of roll change frame in warm (each DT, DB in Fig. 1 and 5SP sprays beam).Because now roller temperature is relatively low, its refrigerating function emulsification flow quantity does not need the flow set under hot-rolling state Value, therefore the quick rise of roller temperature can be realized by reducing cooling flow.
While cooling spray beam flow is reduced after frame, because mill speed is low under chilling roller state, roller temperature is low, plate face Temperature is also low under more normal hot-rolling high-speed production state, and the demand of plate face cooling emulsion is also compared with normal water between frame now It is flat low, therefore can be by the corresponding reduction of interstand cooling flow (each MT, MB in Fig. 1 spray beam), to realize that plate face is normal Heating, accelerate roll heating rate.
While emulsion technique adjustment, heat loss can also be reduced by the raising of strip steel at entry temperature, accelerated Roll heats up, and tandem mills can realize that the region of fast temperature adjustment sets for pickling section dryer temperature, can pass through drying The raising of incoming band steel temperature is realized in the quick adjustment of machine desired temperature.
After above-mentioned corresponding measure collects, you can it is as shown in the table to obtain a kind of method for quickly establishing roller heat convex degree learning:
While stating measure on the implementation, according to following execution principle control and adjust accordingly:
1st, during some specific frame roll change, the outlet cooling spray beam parameter adjustment of the frame in itself.
2nd, during some specific frame roll change, the interstand cooling spray beam parameter adjustment before the frame.
3rd, whichever frame roll change, dryer relevant parameter adjust.
The each technical measures of summary and step, you can obtain that the present invention shown in Fig. 2 is quick to be established cold-rolled process and roll The method flow block diagram of roller roll thermal crown.
In Fig. 2, technical scheme provides a kind of quick method for establishing cold-rolled process roller heat convex degree learning, and it is sent out Bright point is:
1st, in normal productive process, if system does not send roll change signal, emulsion technique and dryer technique are not Adjust, control program logic continues to operate according to normal production technology;
If the 2, sending roll change signal in production process, the quantity (referred to as volume number) of coil of strip has been rolled after roll change in A volumes of model In enclosing, dryer temperature is automatically adjusted according to gG, the emulsion flow value (letter of the rack outlet cooling spray beam of roll change frame Referred to as flow value, similarly hereinafter) be automatically adjusted according to aX, the flow of strip cooling spray beam between roll change frame and previous frame frame Value is according to dD adjust automaticallies;
If the 3, having rolled coil of strip quantity (B > A) in the range of B volumes after roll change, dryer temperature is adjusted automatically according to gG Whole, the flow value of the rack outlet cooling spray beam of roll change frame is automatically adjusted according to bY, roll change frame and previous frame machine The flow value of strip cooling spray beam is according to eE adjust automaticallies between frame;
If the 4, having rolled coil of strip quantity (C > B) in the range of C volumes after roll change, dryer temperature is adjusted automatically according to gG Whole, the flow value of the rack outlet cooling spray beam of roll change frame is automatically adjusted according to cZ, roll change frame and previous frame machine Strip cooling spray beam is according to fF adjust automaticallies between frame;
5th, coil of strip quantity has been rolled after roll change more than after C, dryer Parameter reconstruction returns normal value level, and control program Logic continues to control the flow value of each cooling spray beam according to normal processing parameter.
Embodiment:
Carried out by taking certain 5 Stands Cold Tandem Mill as an example, after 1-3 frames working roll tonnage is counted in its normal productive process normal Roll change operation, it is as follows according to former technique, its hot-rolling process:
Number is rolled up after roll change The setting speed upper limit
First volume 2 50%
3-4 volumes 70%
5-6 volumes 85%
Volume 7 and after 100%
After the roll crown quickly regulating method corresponding system of technical scheme comes into operation, in roll change operation When, systems inspection to roll change signal and specific roll change frame signal, now perform roller heat convex degree learning quickly regulating method such as automatically Under:
By the implementation of technical scheme, the level of being produced by below is realized:
Number is rolled up after roll change The setting speed upper limit
Volume 1 50%
Volume 2 70%
Volume 3 85%
Volume 4 and after 100%
It can be seen that by the implementation of technical scheme, can be by corresponding hot-rolling in the case where ensureing production stability During need the quantity of rolled band steel, from former technique, volume about 7 are reduced to 3-4 volumes, are significantly improved operating efficiency and are improved Quality control level during hot-rolling.
Due to technical scheme, by controlling each emulsion of roll change frame to spray the corresponding discharge of beam emulsion, The quick foundation of roll thermal crown after roll is changed in cold continuous rolling process is realized, will be corresponding in the case where ensureing production stability Hot-rolling amount about needs rolling volume 7 to reduce to 3-4 volumes of rolling is at least only needed from former technique, significantly improves operating efficiency, can reduce Production loss that roll warm is brought simultaneously improves the quality control level and production stability of roll warm, so its Do not limited by specific emulsion technique and dryer process conditions, can be widely used for various tandem mills, had wide Market prospects.
It the method can be widely used in the production process control field of cold mill complex.

Claims (10)

1. a kind of quick method for establishing cold-rolled process roller heat convex degree learning, including by controlling and adjusting the breast of each cooling spray beam Change flow quantity, realize the quick rise for being replaced roller temperature, described each cooling spray beam comprises at least roll change frame with before The outlet cooling spray beam of interstand cooling spray beam and roll change frame between one frame;It is characterized in that:
A, according to the actual operating state of equipment, for needing the frame of roll change to carry out corresponding roller replacing operation, this is changed after roll change Roller frame sends roll change signal;
B, control system, which detects or gathers each frame, whether there is roll change signal, if nothing, according to normal processing parameter Carry out the flow control of each cooling spray beam emulsion;
C, it is cold between the frame between exchange roller frame and previous frame when control system collects the roll change signal of some frame But the flow control of spray beam emulsion and the flow control of roll change rack outlet cooling spray beam emulsion respectively enter preheated Process control pattern;
D, warm is divided into three phases, A volumes of section, preceding B volumes of section and preceding C volumes of section before being respectively designated as;
E, control system determines to need to roll the quantity set point of coil of strip in preceding A volumes of section, preceding B volumes of section and preceding C volumes of section;
F, into the preceding A volumes of section control model of warm, detect and record the quantity for having rolled coil of strip;
G, during the preceding A volumes of section of warm, the first proportionality coefficient is multiplied by according to former emulsion flow setting value, to roll change The emulsification flow quantity of interstand cooling spray beam between frame and previous frame carries out corresponding reduce and adjusted;According to former emulsion Flow setting value is multiplied by the second proportionality coefficient, and the emulsification flow quantity for exchanging the outlet cooling spray beam of roller frame is reduced accordingly Adjustment;
H, the A volumes of quantity set point for needing to roll coil of strip before whether the quantity for having rolled coil of strip that detection is recorded reaches;As no, Repeat F-step;In this way, A volumes of section control model before terminating;
I, into the preceding B volumes of section control model of warm, detect and record the quantity for having rolled coil of strip;
J, during the preceding B volumes of section of warm, the 3rd proportionality coefficient is multiplied by according to former emulsion flow setting value, to roll change The emulsification flow quantity of interstand cooling spray beam between frame and previous frame carries out corresponding reduce and adjusted;According to former emulsion Flow setting value is multiplied by the 4th proportionality coefficient, and the emulsification flow quantity for exchanging the outlet cooling spray beam of roller frame is reduced accordingly Adjustment;
K, the B volumes of quantity set point for needing to roll coil of strip before whether the quantity for having rolled coil of strip that detection is recorded reaches;As no, Repeat I step;In this way, B volumes of section control model before terminating;
L, into the preceding C volumes of section control model of warm, detect and record the quantity for having rolled coil of strip;
M, during the preceding C volumes of section of warm, the 5th proportionality coefficient is multiplied by according to former emulsion flow setting value, to roll change The emulsification flow quantity of interstand cooling spray beam between frame and previous frame carries out corresponding reduce and adjusted;According to former emulsion Flow setting value is multiplied by the 6th proportionality coefficient, and the emulsification flow quantity for exchanging the outlet cooling spray beam of roller frame is reduced accordingly Adjustment;
N, the C volumes of quantity set point for needing to roll coil of strip before whether the quantity for having rolled coil of strip that detection is recorded reaches;As no, Repeat L steps;In this way, warm control model is terminated;
O, the flow that each cooling spray beam emulsion is carried out according to normal processing parameter controls;
The described quick method for establishing cold-rolled process roller heat convex degree learning, by adjusting respectively between roll change frame and previous frame Interstand cooling spray beam and roll change frame outlet cooling spray beam emulsification flow quantity, improve the temperature of each frame strip steel at entry Spend to reduce heat loss, realize that the plate face of coil of strip to be rolled normally heats up by reducing the cooling flow of emulsion, to improve The heating rate of roll is replaced, the quick rise for being replaced roller temperature is realized, so as to realize cold-rolled process roll after roll change The quick foundation of roll thermal crown, the production loss that brings of warm after roller replacing operation is reduced, improves warm after roller replacing operation Quality control level and production stability.
2. according to the quick method for establishing cold-rolled process roller heat convex degree learning described in claim 1, it is characterized in that described pre- In thermal process, the 7th ratio is multiplied by according to former drying temperature setting value, the desired temperature of dryer is raised, when preheated program control After molding formula terminates, the desired temperature of dryer recovers to normal value.
3. according to the quick method for establishing cold-rolled process roller heat convex degree learning described in claim 1, it is characterized in that described first A volumes Section, preceding B volumes of section and preceding C volumes of section need to roll the quantity set point of coil of strip, according to the thickness before belt steel rolling to be rolled and rolling The difference of predetermined thickness afterwards determines.
4. according to the quick method for establishing cold-rolled process roller heat convex degree learning described in claim 3, it is characterized in that the preceding A volumes of section The quantity set point for needing to roll coil of strip is 1~2;The preceding B volumes of section needs to roll the quantity set point position 2~4 of coil of strip;It is described The quantity set point that preceding C volumes of section needs to roll coil of strip is 3~6.
5. according to the quick method for establishing cold-rolled process roller heat convex degree learning described in claim 1, it is characterized in that described first Proportionality coefficient is 40%-85%;The second described proportionality coefficient is 50%-90%;The 3rd described proportionality coefficient is 50%- 90%;The 4th described proportionality coefficient is 60%-95;The 5th described proportionality coefficient is 60%-95%;The 6th described ratio Coefficient is 70%-100%.
6. according to the quick method for establishing cold-rolled process roller heat convex degree learning described in claim 2, it is characterized in that the described the 7th Proportionality coefficient is 110%-130%.
7. according to the quick method for establishing cold-rolled process roller heat convex degree learning described in claim 5 or 6, it is characterized in that described is each Thickness difference before individual proportionality coefficient, with belt steel rolling to be rolled, after rolling, into positive correlation.
8. according to the quick method for establishing cold-rolled process roller heat convex degree learning described in claim 1, it is characterized in that working as some frame When performing roller replacing operation, the emulsification flow quantity that spray beam is cooled down to the outlet of the frame in itself carries out described reduction adjustment.
9. according to the quick method for establishing cold-rolled process roller heat convex degree learning described in claim 1, it is characterized in that working as some frame When performing roller replacing operation, the reduction described in the emulsification flow quantity progress of beam is sprayed to the interstand cooling before the frame and is adjusted.
10. according to the quick method for establishing cold-rolled process roller heat convex degree learning described in claim 1 or 2, no matter it is characterized in which Individual frame performs roller replacing operation, is multiplied by the 7th ratio according to former drying temperature setting value, raises the desired temperature of dryer.
CN201610613238.0A 2016-07-29 2016-07-29 A method of quickly establishing cold-rolled process roller heat convex degree learning Active CN107661902B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610613238.0A CN107661902B (en) 2016-07-29 2016-07-29 A method of quickly establishing cold-rolled process roller heat convex degree learning

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610613238.0A CN107661902B (en) 2016-07-29 2016-07-29 A method of quickly establishing cold-rolled process roller heat convex degree learning

Publications (2)

Publication Number Publication Date
CN107661902A true CN107661902A (en) 2018-02-06
CN107661902B CN107661902B (en) 2019-09-20

Family

ID=61115652

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610613238.0A Active CN107661902B (en) 2016-07-29 2016-07-29 A method of quickly establishing cold-rolled process roller heat convex degree learning

Country Status (1)

Country Link
CN (1) CN107661902B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112387783A (en) * 2020-10-29 2021-02-23 厦门厦顺铝箔有限公司 Shape control method of aluminum foil for lithium ion battery
CN114011884A (en) * 2021-10-19 2022-02-08 武汉钢铁有限公司 Plate shape control method of cold-rolled wide plate
CN114798755A (en) * 2022-04-26 2022-07-29 东北大学 Method for analyzing influence of hot crown on plate shape in cold continuous rolling process
CN116351868A (en) * 2023-03-23 2023-06-30 首钢智新迁安电磁材料有限公司 Method for improving thickness precision of strip steel

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005305473A (en) * 2004-04-19 2005-11-04 Nisshin Steel Co Ltd Circulation type rolling liquid supplying method in cold rolling
JP2010094704A (en) * 2008-10-15 2010-04-30 Jfe Steel Corp Method of cold-rolling metal strip, method of manufacturing cold-rolled steel strip and cold-rolling equipment
CN104858241A (en) * 2014-02-20 2015-08-26 宝山钢铁股份有限公司 Emulsion flow comprehensive optimization method in cold continuous rolling set ultrathin strip steel rolling
CN105312321A (en) * 2014-07-31 2016-02-10 宝山钢铁股份有限公司 Method for optimizing technological lubrication system of cold continuous rolling unit

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005305473A (en) * 2004-04-19 2005-11-04 Nisshin Steel Co Ltd Circulation type rolling liquid supplying method in cold rolling
JP2010094704A (en) * 2008-10-15 2010-04-30 Jfe Steel Corp Method of cold-rolling metal strip, method of manufacturing cold-rolled steel strip and cold-rolling equipment
CN104858241A (en) * 2014-02-20 2015-08-26 宝山钢铁股份有限公司 Emulsion flow comprehensive optimization method in cold continuous rolling set ultrathin strip steel rolling
CN105312321A (en) * 2014-07-31 2016-02-10 宝山钢铁股份有限公司 Method for optimizing technological lubrication system of cold continuous rolling unit

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112387783A (en) * 2020-10-29 2021-02-23 厦门厦顺铝箔有限公司 Shape control method of aluminum foil for lithium ion battery
CN114011884A (en) * 2021-10-19 2022-02-08 武汉钢铁有限公司 Plate shape control method of cold-rolled wide plate
CN114798755A (en) * 2022-04-26 2022-07-29 东北大学 Method for analyzing influence of hot crown on plate shape in cold continuous rolling process
CN114798755B (en) * 2022-04-26 2023-02-17 东北大学 Method for analyzing influence of hot crown on plate shape in cold continuous rolling process
CN116351868A (en) * 2023-03-23 2023-06-30 首钢智新迁安电磁材料有限公司 Method for improving thickness precision of strip steel
CN116351868B (en) * 2023-03-23 2023-09-19 首钢智新迁安电磁材料有限公司 Method for improving thickness precision of strip steel

Also Published As

Publication number Publication date
CN107661902B (en) 2019-09-20

Similar Documents

Publication Publication Date Title
CN107661902B (en) A method of quickly establishing cold-rolled process roller heat convex degree learning
CN111889512B (en) Method for producing thin steel plate by single-stand rolling mill
CN107413856B (en) It is a kind of that roller method is removed based on the change online roll change of specification of ESP mm finishing mill unit
CN111069282A (en) High-precision multi-segmentation hot-rolled steel bar grading and controlled cooling process method
CN101829687A (en) Method for controlling roll gap of strip steel finishing mill to eliminate influence of specification change
CN103372575B (en) Pickling and rolling mill load distribution method
CN104438355A (en) Hot rolling flattening technology for eliminating strip steel wave shape defects
CN115193911A (en) Bar short-process production method based on deformation temperature cooperative control
CN109663809A (en) Large-scale and ultra-large H-beam rolling mill practice
CN108907131B (en) Secondary cooling control method for reducing surface cracks of head and tail blanks of slab continuous casting
CN110052497A (en) A kind of complete roller shape of hot-tandem unit and board-shape control method
CN103433298A (en) Method for controlling tail portion of thin rolled container plate
CN111570509B (en) Titanium strip rolling method for hot continuous rolling strip steel production line
CN110639950B (en) Method for producing thin-specification low-alloy high-strength checkered plate based on CSP (chip Scale Package) process
CN111842505A (en) Roll inclination control method for five-frame six-roll cold continuous rolling unit
CN108213087B (en) A method of dispersion CVC working roll roll shifting position
CN108889778B (en) Rolling method for controlling residual stress of high-strength hot-rolled steel plate
CN206936012U (en) Heavy section steel rolled steel production system
CN108941213A (en) Control the milling method of high tensile hot rolled steel sheet structural homogenity
CN113275385B (en) Method for dynamically controlling to-be-rolled position of single-stand rolling mill
CN109513752A (en) A method of controlling thin narrow specification mild steel tail portion middle wave
WO2021239163A1 (en) H-beam flexible rolling rough-rolling pass system and rolling method
CN105710131A (en) Method for axial distribution of water yield of hot continuous rolling roller cooling water outlet
CN110355216A (en) Eliminate the control method of short route Thin Strip Steel tail portion lateral vibration line offset
CN101954376A (en) Method for medium plate of controlled rolling at two stages in non-recrystallization region

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant