CN107657333A - 一种智能电网中能源交易的动态激励契约设计方法 - Google Patents

一种智能电网中能源交易的动态激励契约设计方法 Download PDF

Info

Publication number
CN107657333A
CN107657333A CN201710721137.XA CN201710721137A CN107657333A CN 107657333 A CN107657333 A CN 107657333A CN 201710721137 A CN201710721137 A CN 201710721137A CN 107657333 A CN107657333 A CN 107657333A
Authority
CN
China
Prior art keywords
msub
mrow
ses
omega
theta
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710721137.XA
Other languages
English (en)
Inventor
赵楠
刘睿
陈洋
樊鹏飞
范孟林
田超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei University of Technology
Original Assignee
Hubei University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei University of Technology filed Critical Hubei University of Technology
Priority to CN201710721137.XA priority Critical patent/CN107657333A/zh
Publication of CN107657333A publication Critical patent/CN107657333A/zh
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/01Customer relationship services
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/04Trading; Exchange, e.g. stocks, commodities, derivatives or currency exchange
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Development Economics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Operations Research (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Educational Administration (AREA)
  • Technology Law (AREA)
  • Coloring Foods And Improving Nutritive Qualities (AREA)

Abstract

本发明属于智能电网能源交易技术领域,具体涉及一种智能电网中能源交易的动态激励契约设计方法。针对智能电网能源交易中小型电能供应商自私性的需求和信息非对称的特点,提出了一种基于契约理论的动态激励机制设计方法。考虑能源交易需求与环境多变的特点,在建立电能消费者和小型电能供应商模型基础上,研究两阶段动态契约激励模型,在满足小型电能供应商激励相容约束和参与约束的前提下,通过甄别小型电能供应商真实的成本信息,激励SES参与长期的能源交易,以避免重新谈判或另选交易对象而产生的额外成本,使电能消费者获得最大的期望效用。

Description

一种智能电网中能源交易的动态激励契约设计方法
技术领域
本发明属于智能电网能源交易技术领域,具体涉及一种智能电网中能源交易的动态激励契约设计方法。
背景技术
随着智能电网的发展,大量私人家庭作为小型电能供应商(small-scaleelectricity supplier,SES),通过搭建小型风力发电平台或太阳能电板,出售自身盈余电能。然而,由于SES和电能消费者(electricity consumer,EC)的自私性,双方均希望获得自身效用的最大化。针对上述问题,需要研究有效的能源交易激励机制,以调动双方参与的积极性。在能源交易中,由于SES的发电与输电成本为其私有信息,EC无法保证获知数据的真实性,这种信息非对称成为激励机制设计中必须解决的问题。同时,由于居民用电负荷的变化以及电能高峰期输电成本的不同,SES的私有成本信息会发生变化,这使得激励机制必须更具灵活性。
最常见的能源交易激励方法为博弈论,但该方法存在着计算复杂、纳什均衡解过多时无从选择等问题。于是,基于契约理论的激励机制进入了研究者的视野。然而,现阶段智能电网所采用的契约理论主要围绕着静态模型进行研究,针对动态契约机制的设计很少,而在实际电网能源交易中,居民用电负荷以及电能高峰时段输电成本随时间进行变化,静态契约机制在智能电网能源交易中显得缺乏弹性。针对上述问题,EC需设计一个长期承诺的动态契约来避免重新谈判或另选交易对象产生额外交易成本,从而降低预期能源交易效益的损失。
发明内容
为了克服上述现有技术存在的不足,本发明的目的在于提出一种智能电网中能源交易的动态激励契约设计方法。
为了达到上述目的,本发明所采用的技术方案是:一种智能电网中能源交易的动态激励契约设计方法,其特征在于,所述方法包括如下步骤:
步骤1,通过运用委托代理理论,结合智能电网能源交易特点,建立电能消费者EC模型和小型电能供应商SES模型;
步骤2,针对智能电网中能源交易需求与环境多变的特点,建立贯穿SES两阶段能源交易的动态契约模型,通过构建SES激励相容约束和参与约束,实现对SES真实成本信息的甄别,以激励SES积极参与能源交易,从而实现能源交易效益优化预测。
进一步地,步骤1中,所述建立电能消费者EC模型实现过程包括:
假设EC支付给SES报酬π以购买q个单位电能,从中获得收益为V(q),
于是,EC的效用为自身获得的收益减去支付给SES的报酬π,即:
U=V(q)-π。
进一步地,步骤1中,所述建立小型电能供应商SES模型实现过程包括:
ES的效用为EC支付的报酬π减去自身发电与输电的成本,可表示为:
ω=π-θq,
其中,θ为每单位电量的成本系数,包含着SES的私有成本信息;
假设SES可以分为高效SES与低效SES两种类型,且二者的成本系数分别为θH和θLH<θL),高效SES出现的概率为p,低效SES出现的概率为1-p,且先验分布p已知;θ越低,代表SES供电效率越高,意味着该SES拥有更好的发电设备(高效发电与储能)与环境(输电环境)。
进一步地,步骤2中,所述建立贯穿SES两阶段能源交易的动态契约模型实现过程包括:
构建两阶段能源交易时序图,表示第二阶段SES可选契约,分别为在第一阶段和第二阶段高效SES与低效SES所获报酬,其中表示SES第一阶段选择的契约类型,θ1和θ2分别为在第一阶段和第二阶段SES的成本系数,分别为在第一阶段和第二阶段高效SES与低效SES出售给EC的电能;
假设两个阶段SES的私有成本信息θ1与θ2发生改变,且2个阶段的成本信息分别独立于Θ={θH,θL}的情形,其概率分别为p和1-p,于是,高效SES与低效SES在两个阶段获得的总期望效用分别为:
其中,分别表示在第一阶段和第二阶段高效SES与低效SES的效用;
为了实现对供电效率高低的甄别,需构建激励相容约束,保证SES只有在选择真实信息对应的契约时才会获得最大的效用,谎报私有成本信息所签订契约则会使SES无法获得最大化效用,整个能源交易过程需要满足如下的激励相容约束条件:
同时,为了激励SES参与长期的能源交易,需要保证所有参加能源交易的SES都能至少获得保留效用,整个交易过程需要满足如下的跨时参与约束条件:
其中,为SES的保留效用,且
于是,两个阶段的动态契约优化问题为:在满足上述跨时参与约束与激励相容约束的条件下,EC的期望效用最大化,即
进一步地,所述建立贯穿SES两阶段能源交易的动态契约模型的实现过程包括:
由于θH<θL,于是在动态契约模型中有
上述不等式恒成立,于是,两阶段动态契约优化问题可以简化为:
针对两个阶段动态契约优化问题,可借助Kuhn-Tucker最优条件获得其最优解。
与现有技术相比,本发明的有益效果是:本发明运用委托代理理论,提出一种智能电网中能源交易的动态激励契约设计方法。针对智能电网中能源交易需求与环境多变的特点,设计贯穿SES两阶段能源交易的动态契约模型,通过构建SES激励相容约束和参与约束,实现对SES真实成本信息的甄别,激励SES参与长期的能源交易,以避免重新谈判或另选交易对象而产生的额外成本,从而获得更多的预估效益。
说明书附图
图1为本发明的两阶段能源交易时序图。
具体实施方式
为了便于本领域普通技术人员理解和实施本发明,下面结合实施例对本发明作进一步的详细描述,应当理解,此处所描述的实施示例仅用于说明和解释本发明,并不用于限定本发明。
本实施示例环境为智能电网能源交易市场。其中,电能消费者(electricityconsumer,EC)是雇主,小型电能供应商(small-scale electricity supplier,SES)是雇员,可提供供电服务。EC作为主动缔约方,向SES提供由一系列合约条款组成的动态契约,契约条款包括其报酬和所提供电量。
具体过程如下:
(1)SES获知θ1的取值;
(2)EC提供一个长期契约{π1(q1);π2(q1,q2)};
(3)SES选择接受或拒绝契约;
(4)第1阶段电量交易q1和报酬支付π1实现;
(5)SES获知θ2的取值;
(6)第2阶段工作量q2和报酬支付π2实现。
在智能电网能源交易中,一方面,EC需要SES低价提供其所需的电能,另一方面,SES则希望从EC处获得更多的报酬。为了解决EC与SES之间的上述矛盾,本发明借助委托代理理论,EC作为委托方,向代理方SES提供交易契约,通过双方签订关于供电与报酬的契约,以激励SES高效地参与到能源交易中,从而获更多的预估效益。在双方签订契约后,由于信息的非对称性和SES的自私性,SES有可能故意隐瞒自身私有成本信息,以期获取更多的效用。针对上述问题,本发明通过设计激励相容约束条件,实现SES私有成本信息的甄别。
(1)、电能消费者EC模型。
假设EC支付给SES报酬π以购买q个单位电能,从中获得收益为V(q)。
于是,EC的效用为自身获得的收益减去支付给SES的报酬π,即:
U=V(q)-π。
(2)、小型电能供应商SES模型。
ES的效用为EC支付的报酬π减去自身发电与输电的成本,可表示为:
ω=π-θq,
其中,θ为每单位电量的成本系数,包含着SES的私有成本信息。
假设SES可以分为高效SES与低效SES两种类型,且二者的成本系数分别为θH和θLH<θL),高效SES出现的概率为p,低效SES出现的概率为1-p,且先验分布p已知。θ越低,代表SES供电效率越高,意味着该SES拥有更好的发电设备(高效发电与储能)与环境(输电环境)。
(3)、贯穿SES两阶段能源交易的动态契约模型。
构建两阶段能源交易时序图,如图1所示。在本发明中,假设表示第二阶段SES可选契约,分别为在第一阶段和第二阶段高效SES与低效SES所获报酬,其中表示SES第一阶段选择的契约类型,θ1和θ2分别为在第一阶段和第二阶段SES的成本系数,分别为在第一阶段和第二阶段高效SES与低效SES出售给EC的电能。
假设两个阶段SES的私有成本信息θ1与θ2发生改变,且2个阶段的成本信息分别独立于Θ={θH,θL}的情形,其概率分别为p和1-p。于是,高效SES与低效SES在两个阶段获得的总期望效用分别为:
其中,分别表示在第一阶段和第二阶段高效SES与低效SES的效用。
为了实现对供电效率高低的甄别,需构建激励相容约束,保证SES只有在选择真实信息对应的契约时才会获得最大的效用,谎报私有成本信息所签订契约则会使SES无法获得最大化效用。整个能源交易过程需要满足如下的激励相容约束条件:
同时,为了激励SES参与长期的能源交易,需要保证所有参加能源交易的SES都能至少获得保留效用。整个交易过程需要满足如下的跨时参与约束条件:
其中,为SES的保留效用,且
于是,两个阶段的动态契约优化问题为:在满足上述跨时参与约束与激励相容约束的条件下,EC的期望效用最大化,即
进一步地,所述两阶段能源交易的动态契约模型求解的实现过程包括:
由于θH<θL,于是在动态契约模型中有
上述不等式恒成立,于是,两阶段动态契约优化问题可以简化为:
针对两个阶段动态契约优化问题,可借助Kuhn-Tucker最优条件获得其最优解。
应当理解的是,本说明书未详细阐述的部分均属于现有技术。
应当理解的是,上述针对较佳实施例的描述较为详细,并不能因此而认为是对本发明专利保护范围的限制,本领域的普通技术人员在本发明的启示下,在不脱离本发明权利要求所保护的范围情况下,还可以做出替换或变形,均落入本发明的保护范围之内,本发明的请求保护范围应以所附权利要求为准。

Claims (5)

1.一种智能电网中能源交易的动态激励契约设计方法,其特征在于,所述方法包括如下步骤:
步骤1,通过运用委托代理理论,结合智能电网能源交易特点,建立电能消费者EC模型和小型电能供应商SES模型;
步骤2,针对能源交易需求与环境多变的特点,建立贯穿SES两阶段能源交易的动态契约模型,通过构建SES激励相容约束和参与约束,实现对SES真实成本信息的甄别,以激励SES积极参与能源交易,从而实现能源交易效益优化预测。
2.根据权利要求1所述的智能电网中能源交易的动态激励契约设计方法,其特征在于,步骤1中,所述建立电能消费者EC模型实现过程包括:
假设EC支付给SES报酬π以购买q个单位电能,从中获得收益为V(q),于是,EC的效用为自身获得的收益减去支付给SES的报酬π,即:
U=V(q)-π。
3.根据权利要求2所述的智能电网中能源交易的动态激励契约设计方法,其特征在于,步骤1中,所述建立小型电能供应商SES模型实现过程包括:
ES的效用为EC支付的报酬π减去自身发电与输电的成本,可表示为:
ω=π-θq
其中,θ为每单位电量的成本系数,包含着SES的私有成本信息;
假设SES可以分为高效SES与低效SES两种类型,且二者的成本系数分别为θH和θLH<θL),高效SES出现的概率为p,低效SES出现的概率为1-p,且先验分布p已知;θ越低,代表SES供电效率越高,意味着该SES拥有更好的发电设备与环境。
4.根据权利要求3所述的智能电网中能源交易的动态激励契约设计方法,其特征在于,步骤2中,所述建立贯穿SES两阶段能源交易的动态契约模型实现过程包括:
构建两阶段能源交易时序图,表示第二阶段SES可选契约,分别为在第一阶段和第二阶段高效SES与低效SES所获报酬,其中表示SES第一阶段选择的契约类型,θ1和θ2分别为在第一阶段和第二阶段SES的成本系数,分别为在第一阶段和第二阶段高效SES与低效SES出售给EC的电能;
假设两个阶段SES的私有成本信息θ1与θ2发生改变,且2个阶段的成本信息分别独立于Θ={θH,θL}的情形,其概率分别为p和1-p,于是,高效SES与低效SES在两个阶段获得的总期望效用分别为:
<mrow> <msub> <mi>&amp;omega;</mi> <mi>H</mi> </msub> <mo>=</mo> <msub> <mi>&amp;omega;</mi> <msub> <mi>H</mi> <mn>1</mn> </msub> </msub> <mo>+</mo> <mi>&amp;sigma;</mi> <mo>&amp;lsqb;</mo> <msub> <mi>p&amp;omega;</mi> <msub> <mi>H</mi> <mn>2</mn> </msub> </msub> <mrow> <mo>(</mo> <msub> <mover> <mi>&amp;theta;</mi> <mo>~</mo> </mover> <mn>1</mn> </msub> <mo>)</mo> </mrow> <mo>+</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>-</mo> <mi>p</mi> <mo>)</mo> </mrow> <msub> <mi>&amp;omega;</mi> <msub> <mi>L</mi> <mn>2</mn> </msub> </msub> <mrow> <mo>(</mo> <msub> <mover> <mi>&amp;theta;</mi> <mo>~</mo> </mover> <mn>1</mn> </msub> <mo>)</mo> </mrow> <mo>&amp;rsqb;</mo> <mo>,</mo> </mrow>
<mrow> <msub> <mi>&amp;omega;</mi> <mi>L</mi> </msub> <mo>=</mo> <msub> <mi>&amp;omega;</mi> <msub> <mi>L</mi> <mn>1</mn> </msub> </msub> <mo>+</mo> <mi>&amp;sigma;</mi> <mo>&amp;lsqb;</mo> <msub> <mi>p&amp;omega;</mi> <msub> <mi>H</mi> <mn>2</mn> </msub> </msub> <mrow> <mo>(</mo> <msub> <mover> <mi>&amp;theta;</mi> <mo>~</mo> </mover> <mn>1</mn> </msub> <mo>)</mo> </mrow> <mo>+</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>-</mo> <mi>P</mi> <mo>)</mo> </mrow> <msub> <mi>&amp;omega;</mi> <msub> <mi>L</mi> <mn>2</mn> </msub> </msub> <mrow> <mo>(</mo> <msub> <mover> <mi>&amp;theta;</mi> <mo>~</mo> </mover> <mn>1</mn> </msub> <mo>)</mo> </mrow> <mo>&amp;rsqb;</mo> </mrow>
其中,分别表示在第一阶段和第二阶段高效SES与低效SES的效用。
5.根据权利要求4所述的智能电网中能源交易的动态激励契约设计方法,其特征在于,步骤2中,所述建立贯穿SES两阶段能源交易的动态契约模型优化实现过程包括:
为了实现对供电效率高低的甄别,需构建激励相容约束,保证SES只有在选择真实信息对应的契约时才会获得最大的效用,谎报私有成本信息所签订契约则会使SES无法获得最大化效用,整个能源交易过程需要满足如下的激励相容约束条件:
<mrow> <msub> <mi>&amp;omega;</mi> <msub> <mi>H</mi> <mn>1</mn> </msub> </msub> <mo>+</mo> <mi>&amp;sigma;</mi> <mo>&amp;lsqb;</mo> <msub> <mi>p&amp;omega;</mi> <msub> <mi>H</mi> <mn>2</mn> </msub> </msub> <mo>+</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>-</mo> <mi>p</mi> <mo>)</mo> </mrow> <msub> <mi>&amp;omega;</mi> <msub> <mi>L</mi> <mn>2</mn> </msub> </msub> <mo>&amp;rsqb;</mo> <mo>&amp;GreaterEqual;</mo> <msub> <mi>&amp;omega;</mi> <msub> <mi>L</mi> <mn>1</mn> </msub> </msub> <mo>+</mo> <mrow> <mo>(</mo> <msub> <mi>&amp;theta;</mi> <mi>L</mi> </msub> <msub> <mi>q</mi> <msub> <mi>L</mi> <mn>1</mn> </msub> </msub> <mo>-</mo> <msub> <mi>&amp;theta;</mi> <mi>H</mi> </msub> <msub> <mi>q</mi> <msub> <mi>L</mi> <mn>1</mn> </msub> </msub> <mo>)</mo> </mrow> <mo>+</mo> <mi>&amp;sigma;</mi> <mo>&amp;lsqb;</mo> <msub> <mi>p&amp;omega;</mi> <msub> <mi>H</mi> <mn>2</mn> </msub> </msub> <mo>+</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>-</mo> <mi>p</mi> <mo>)</mo> </mrow> <msub> <mi>&amp;omega;</mi> <msub> <mi>L</mi> <mn>2</mn> </msub> </msub> <mo>&amp;rsqb;</mo> <mo>,</mo> </mrow>
<mrow> <msub> <mi>&amp;omega;</mi> <msub> <mi>L</mi> <mn>1</mn> </msub> </msub> <mo>+</mo> <mi>&amp;sigma;</mi> <mo>&amp;lsqb;</mo> <msub> <mi>p&amp;omega;</mi> <msub> <mi>H</mi> <mn>2</mn> </msub> </msub> <mo>+</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>-</mo> <mi>P</mi> <mo>)</mo> </mrow> <msub> <mi>&amp;omega;</mi> <msub> <mi>L</mi> <mn>2</mn> </msub> </msub> <mo>&amp;rsqb;</mo> <mo>&amp;GreaterEqual;</mo> <msub> <mi>&amp;omega;</mi> <msub> <mi>H</mi> <mn>1</mn> </msub> </msub> <mo>+</mo> <mrow> <mo>(</mo> <msub> <mi>&amp;theta;</mi> <mi>H</mi> </msub> <msub> <mi>q</mi> <msub> <mi>H</mi> <mn>1</mn> </msub> </msub> <mo>-</mo> <msub> <mi>&amp;theta;</mi> <mi>L</mi> </msub> <msub> <mi>q</mi> <msub> <mi>H</mi> <mn>1</mn> </msub> </msub> <mo>)</mo> </mrow> <mo>+</mo> <mi>&amp;sigma;</mi> <mo>&amp;lsqb;</mo> <msub> <mi>p&amp;omega;</mi> <msub> <mi>H</mi> <mn>2</mn> </msub> </msub> <mo>+</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>-</mo> <mi>p</mi> <mo>)</mo> </mrow> <msub> <mi>&amp;omega;</mi> <msub> <mi>L</mi> <mn>2</mn> </msub> </msub> <mo>&amp;rsqb;</mo> </mrow>
同时,为了激励SES参与长期的能源交易,需要保证所有参加能源交易的SES都能至少获得保留效用,整个交易过程需要满足如下的跨时参与约束条件:
其中,为SES的保留效用,且
于是,两个阶段的动态契约优化问题为:在满足上述跨时参与约束与激励相容约束的条件下,EC的期望效用最大化,即
<mrow> <munder> <mi>max</mi> <mrow> <mo>{</mo> <msub> <mi>&amp;pi;</mi> <msub> <mi>H</mi> <mn>1</mn> </msub> </msub> <mo>,</mo> <msub> <mi>&amp;pi;</mi> <msub> <mi>L</mi> <mn>1</mn> </msub> </msub> <mo>,</mo> <msub> <mi>&amp;pi;</mi> <msub> <mi>H</mi> <mn>2</mn> </msub> </msub> <mo>,</mo> <msub> <mi>&amp;pi;</mi> <msub> <mi>L</mi> <mn>2</mn> </msub> </msub> <mo>,</mo> <msub> <mi>q</mi> <msub> <mi>H</mi> <mn>1</mn> </msub> </msub> <mo>,</mo> <msub> <mi>q</mi> <msub> <mi>L</mi> <mn>1</mn> </msub> </msub> <mo>,</mo> <msub> <mi>q</mi> <msub> <mi>H</mi> <mn>2</mn> </msub> </msub> <mo>,</mo> <msub> <mi>q</mi> <msub> <mi>L</mi> <mn>2</mn> </msub> </msub> <mo>}</mo> </mrow> </munder> <msub> <mi>pU</mi> <msub> <mi>H</mi> <mn>1</mn> </msub> </msub> <mo>+</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>-</mo> <mi>p</mi> <mo>)</mo> </mrow> <msub> <mi>U</mi> <msub> <mi>L</mi> <mn>1</mn> </msub> </msub> <mo>+</mo> <mi>&amp;sigma;</mi> <mo>&amp;lsqb;</mo> <msub> <mi>pU</mi> <msub> <mi>H</mi> <mn>2</mn> </msub> </msub> <mo>+</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>-</mo> <mi>p</mi> <mo>)</mo> </mrow> <msub> <mi>U</mi> <msub> <mi>L</mi> <mn>2</mn> </msub> </msub> <mo>&amp;rsqb;</mo> </mrow>
<mrow> <mtable> <mtr> <mtd> <mrow> <mi>s</mi> <mo>.</mo> <mi>t</mi> <mo>.</mo> </mrow> </mtd> <mtd> <mrow> <msub> <mi>&amp;omega;</mi> <msub> <mi>H</mi> <mn>1</mn> </msub> </msub> <mo>+</mo> <mi>&amp;sigma;</mi> <mo>&amp;lsqb;</mo> <msub> <mi>p&amp;omega;</mi> <msub> <mi>H</mi> <mn>2</mn> </msub> </msub> <mo>+</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>-</mo> <mi>p</mi> <mo>)</mo> </mrow> <msub> <mi>&amp;omega;</mi> <msub> <mi>L</mi> <mn>2</mn> </msub> </msub> <mo>&amp;rsqb;</mo> <mo>&amp;GreaterEqual;</mo> <msub> <mi>&amp;omega;</mi> <msub> <mi>L</mi> <mn>1</mn> </msub> </msub> <mo>+</mo> <mrow> <mo>(</mo> <msub> <mi>&amp;theta;</mi> <mi>L</mi> </msub> <msub> <mi>q</mi> <msub> <mi>L</mi> <mn>1</mn> </msub> </msub> <mo>-</mo> <msub> <mi>&amp;theta;</mi> <mi>H</mi> </msub> <msub> <mi>q</mi> <msub> <mi>L</mi> <mn>1</mn> </msub> </msub> <mo>)</mo> </mrow> <mo>+</mo> <mi>&amp;sigma;</mi> <mo>&amp;lsqb;</mo> <msub> <mi>p&amp;omega;</mi> <msub> <mi>H</mi> <mn>2</mn> </msub> </msub> <mo>+</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>-</mo> <mi>p</mi> <mo>)</mo> </mrow> <msub> <mi>&amp;omega;</mi> <msub> <mi>L</mi> <mn>2</mn> </msub> </msub> <mo>&amp;rsqb;</mo> </mrow> </mtd> </mtr> </mtable> <mo>,</mo> </mrow>
<mrow> <msub> <mi>&amp;omega;</mi> <msub> <mi>L</mi> <mn>1</mn> </msub> </msub> <mo>+</mo> <mi>&amp;sigma;</mi> <mo>&amp;lsqb;</mo> <msub> <mi>p&amp;omega;</mi> <msub> <mi>H</mi> <mn>2</mn> </msub> </msub> <mo>+</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>-</mo> <mi>P</mi> <mo>)</mo> </mrow> <msub> <mi>&amp;omega;</mi> <msub> <mi>L</mi> <mn>2</mn> </msub> </msub> <mo>&amp;rsqb;</mo> <mo>&amp;GreaterEqual;</mo> <msub> <mi>&amp;omega;</mi> <msub> <mi>H</mi> <mn>1</mn> </msub> </msub> <mo>+</mo> <mrow> <mo>(</mo> <msub> <mi>&amp;theta;</mi> <mi>H</mi> </msub> <msub> <mi>q</mi> <msub> <mi>H</mi> <mn>1</mn> </msub> </msub> <mo>-</mo> <msub> <mi>&amp;theta;</mi> <mi>L</mi> </msub> <msub> <mi>q</mi> <msub> <mi>H</mi> <mn>1</mn> </msub> </msub> <mo>)</mo> </mrow> <mo>+</mo> <mi>&amp;sigma;</mi> <mo>&amp;lsqb;</mo> <msub> <mi>p&amp;omega;</mi> <msub> <mi>H</mi> <mn>2</mn> </msub> </msub> <mo>+</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>-</mo> <mi>p</mi> <mo>)</mo> </mrow> <msub> <mi>&amp;omega;</mi> <msub> <mi>L</mi> <mn>2</mn> </msub> </msub> <mo>&amp;rsqb;</mo> <mo>,</mo> </mrow>
进一步地,所述两阶段能源交易的动态契约模型求解的实现过程包括:
由于θH<θL,于是在动态契约模型中有
上述不等式恒成立,于是,两阶段动态契约优化问题可以简化为:
<mfenced open = "" close = ""> <mtable> <mtr> <mtd> <mrow> <munder> <mi>max</mi> <mrow> <mo>{</mo> <msub> <mi>&amp;omega;</mi> <mi>H</mi> </msub> <mo>,</mo> <msub> <mi>&amp;omega;</mi> <mi>L</mi> </msub> <mo>,</mo> <msub> <mi>q</mi> <msub> <mi>H</mi> <mn>1</mn> </msub> </msub> <mo>,</mo> <msub> <mi>q</mi> <msub> <mi>L</mi> <mn>1</mn> </msub> </msub> <mo>,</mo> <msub> <mi>q</mi> <msub> <mi>H</mi> <mn>2</mn> </msub> </msub> <mo>,</mo> <msub> <mi>q</mi> <msub> <mi>L</mi> <mn>2</mn> </msub> </msub> <mo>}</mo> </mrow> </munder> <mi>p</mi> <mo>&amp;lsqb;</mo> <mi>V</mi> <mrow> <mo>(</mo> <msub> <mi>q</mi> <msub> <mi>H</mi> <mn>1</mn> </msub> </msub> <mo>)</mo> </mrow> <mo>-</mo> <msub> <mi>&amp;theta;</mi> <mi>H</mi> </msub> <msub> <mi>q</mi> <msub> <mi>H</mi> <mn>1</mn> </msub> </msub> <mo>+</mo> <mi>&amp;sigma;</mi> <mrow> <mo>(</mo> <mi>V</mi> <mo>(</mo> <msub> <mi>q</mi> <msub> <mi>H</mi> <mn>2</mn> </msub> </msub> <mo>)</mo> <mo>-</mo> <msub> <mi>&amp;theta;</mi> <mi>H</mi> </msub> <msub> <mi>q</mi> <msub> <mi>H</mi> <mn>2</mn> </msub> </msub> <mo>)</mo> </mrow> <mo>&amp;rsqb;</mo> <mo>+</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>-</mo> <mi>p</mi> <mo>)</mo> </mrow> <mo>&amp;lsqb;</mo> <mi>V</mi> <mrow> <mo>(</mo> <msub> <mi>q</mi> <msub> <mi>L</mi> <mn>1</mn> </msub> </msub> <mo>)</mo> </mrow> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <mo>-</mo> <msub> <mi>&amp;theta;</mi> <mi>L</mi> </msub> <msub> <mi>q</mi> <mrow> <mi>L</mi> <mo>|</mo> </mrow> </msub> <mo>+</mo> <mi>&amp;sigma;</mi> <mrow> <mo>(</mo> <mi>V</mi> <mo>(</mo> <msub> <mi>q</mi> <msub> <mi>L</mi> <mn>2</mn> </msub> </msub> <mo>)</mo> <mo>-</mo> <msub> <mi>&amp;theta;</mi> <mi>L</mi> </msub> <msub> <mi>q</mi> <msub> <mi>L</mi> <mn>2</mn> </msub> </msub> <mo>)</mo> </mrow> <mo>&amp;rsqb;</mo> <mo>-</mo> <mo>&amp;lsqb;</mo> <msub> <mi>p&amp;omega;</mi> <msub> <mi>H</mi> <mn>1</mn> </msub> </msub> <mo>+</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>-</mo> <mi>p</mi> <mo>)</mo> </mrow> <msub> <mi>&amp;omega;</mi> <msub> <mi>L</mi> <mn>1</mn> </msub> </msub> <mo>&amp;rsqb;</mo> <mo>-</mo> <mi>&amp;sigma;</mi> <mo>&amp;lsqb;</mo> <msub> <mi>p&amp;omega;</mi> <msub> <mi>H</mi> <mn>2</mn> </msub> </msub> <mo>+</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>-</mo> <mi>p</mi> <mo>)</mo> </mrow> <msub> <mi>&amp;omega;</mi> <msub> <mi>L</mi> <mn>2</mn> </msub> </msub> <mo>&amp;rsqb;</mo> <mo>,</mo> </mrow> </mtd> </mtr> </mtable> </mfenced>
<mrow> <mtable> <mtr> <mtd> <mrow> <mi>s</mi> <mo>.</mo> <mi>t</mi> <mo>.</mo> </mrow> </mtd> <mtd> <mrow> <msub> <mi>&amp;omega;</mi> <msub> <mi>H</mi> <mn>1</mn> </msub> </msub> <mo>-</mo> <msub> <mi>&amp;omega;</mi> <msub> <mi>L</mi> <mn>1</mn> </msub> </msub> <mo>&amp;GreaterEqual;</mo> <msub> <mi>&amp;theta;</mi> <mi>L</mi> </msub> <msub> <mi>q</mi> <msub> <mi>L</mi> <mn>1</mn> </msub> </msub> <mo>-</mo> <msub> <mi>&amp;theta;</mi> <mi>H</mi> </msub> <msub> <mi>q</mi> <msub> <mi>L</mi> <mn>1</mn> </msub> </msub> </mrow> </mtd> </mtr> </mtable> <mo>,</mo> </mrow>
<mrow> <msub> <mi>&amp;omega;</mi> <msub> <mi>L</mi> <mn>1</mn> </msub> </msub> <mo>-</mo> <msub> <mi>&amp;omega;</mi> <msub> <mi>H</mi> <mn>1</mn> </msub> </msub> <mo>&amp;GreaterEqual;</mo> <msub> <mi>&amp;theta;</mi> <mi>H</mi> </msub> <msub> <mi>q</mi> <msub> <mi>H</mi> <mn>1</mn> </msub> </msub> <mo>-</mo> <msub> <mi>&amp;theta;</mi> <mi>L</mi> </msub> <msub> <mi>q</mi> <msub> <mi>H</mi> <mn>1</mn> </msub> </msub> <mo>,</mo> </mrow>
针对两个阶段动态契约优化问题,可借助Kuhn-Tucker最优条件获得其最优解。
CN201710721137.XA 2017-08-17 2017-08-17 一种智能电网中能源交易的动态激励契约设计方法 Pending CN107657333A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710721137.XA CN107657333A (zh) 2017-08-17 2017-08-17 一种智能电网中能源交易的动态激励契约设计方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710721137.XA CN107657333A (zh) 2017-08-17 2017-08-17 一种智能电网中能源交易的动态激励契约设计方法

Publications (1)

Publication Number Publication Date
CN107657333A true CN107657333A (zh) 2018-02-02

Family

ID=61128527

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710721137.XA Pending CN107657333A (zh) 2017-08-17 2017-08-17 一种智能电网中能源交易的动态激励契约设计方法

Country Status (1)

Country Link
CN (1) CN107657333A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108763943A (zh) * 2018-05-23 2018-11-06 山东师范大学 一种基于契约理论的安全的数据共享激励方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108763943A (zh) * 2018-05-23 2018-11-06 山东师范大学 一种基于契约理论的安全的数据共享激励方法
CN108763943B (zh) * 2018-05-23 2020-05-08 山东师范大学 一种基于契约理论的安全的数据共享激励方法

Similar Documents

Publication Publication Date Title
Fachrizal et al. Smart charging of electric vehicles considering photovoltaic power production and electricity consumption: A review
Lu et al. Reinforcement learning-based microgrid energy trading with a reduced power plant schedule
Good et al. Flexibility in multi-energy communities with electrical and thermal storage: A stochastic, robust approach for multi-service demand response
Lin et al. Optimal charging control of energy storage and electric vehicle of an individual in the internet of energy with energy trading
Awad et al. Impact of energy storage systems on electricity market equilibrium
Zafirakis et al. The value of arbitrage for energy storage: Evidence from European electricity markets
Denholm et al. Evaluating the limits of solar photovoltaics (PV) in electric power systems utilizing energy storage and other enabling technologies
Marnay et al. Optimal technology selection and operation of commercial-building microgrids
CN104969434A (zh) 通过可再生能量的存储和输送节约能源的系统和方法
Shandurkova et al. A prosumer oriented energy market
Song et al. An improved real-time pricing algorithm based on utility maximization for smart grid
CN107609779A (zh) 一种分布式能源管理系统的综合效益评估方法
Siepermann et al. The potential of shifting residential energy consumption for the energy transition
CN107657333A (zh) 一种智能电网中能源交易的动态激励契约设计方法
CN108875999A (zh) 一种独立非对称信息下直接能源交易动态契约激励方法
CN111062773A (zh) 一种虚拟电厂交易管理系统
Tushar et al. Prioritizing consumers in smart grid: Energy management using game theory
Wang et al. Study on the economic dispatch of regional integrated energy system based on master-slave game
Das et al. Socio-economic advancement and grid-frequency control of a wind farm-PHS-solar connected EV hybrid electrical system considering imbalance prices
Desta Energy Supply and Demand Side Management in Industrial Microgrid Context
Vahid-Ghavidel et al. Opportunistic info-gap approach for optimization of electrical and heating loads in multi-energy systems in the presence of a demand response program
Ren et al. Research on customized construction of virtual power plant-based on balance control unit
Reihani et al. Game theoretic contribution of demand response in real time power provision of distribution system operator
Blansfield et al. Industry response to revenue erosion from solar PVs
CN110942339B (zh) 一种虚拟电厂交易管理方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180202