CN107642684A - A kind of intelligence visits leakage device - Google Patents

A kind of intelligence visits leakage device Download PDF

Info

Publication number
CN107642684A
CN107642684A CN201710847666.4A CN201710847666A CN107642684A CN 107642684 A CN107642684 A CN 107642684A CN 201710847666 A CN201710847666 A CN 201710847666A CN 107642684 A CN107642684 A CN 107642684A
Authority
CN
China
Prior art keywords
convex edge
deck
sleeve
base
leakage device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710847666.4A
Other languages
Chinese (zh)
Other versions
CN107642684B (en
Inventor
李新宏
姚荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou Changgong Electronic Technology Co Ltd
Original Assignee
Changzhou Changgong Electronic Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhou Changgong Electronic Technology Co Ltd filed Critical Changzhou Changgong Electronic Technology Co Ltd
Priority to CN201710847666.4A priority Critical patent/CN107642684B/en
Publication of CN107642684A publication Critical patent/CN107642684A/en
Application granted granted Critical
Publication of CN107642684B publication Critical patent/CN107642684B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention provides a kind of intelligence and visits leakage device, including housing unit, power supply, signal processing module and sensor;Power supply, signal processing module and sensor are both secured to inside housing unit;Housing unit is disposed with independent sensor cavities, signal processing module chamber and power supply chamber from bottom to top, and housing unit includes base, sleeve, upper lid, deck and baffle plate;Base and upper cover are fixedly installed in the upper and lower part of sleeve respectively, and deck and baffle plate setting are in base, sleeve and the formed confined space of upper lid, and the two circumferential outer surface is bonded with the confined space surface;Sensor cavities are arranged in base, and deck is arranged at the top of sensor cavities, and signal processing module chamber is arranged in deck, and baffle plate setting forms power supply chamber at the top of deck between upper lid.Pass through the technical scheme in the present invention so that visit each parts in leakage device and the more orderly and effective spoilage and maintenance cost for avoiding interference and collision, reducing product is installed.

Description

A kind of intelligence visits leakage device
Technical field
The present invention relates to supply channel detection field, more particularly to a kind of intelligence visits leakage device.
Background technology
At present, it is estimated that, China's city public water supply system(Running water)Pipe network model rate average out to 21.5%, it is adjoint The loss of these pipe network waters, caused problem is not only the downslide of economic benefit, while also easily causes underground native The loss of layer, the disaster that may trigger therefrom cause safely great threat to the people's lives and property.
China is monitored using spy leakage sensor to water-supply systems at present, and its principle is to use acoustic detection skill Art, by way of being bonded with pipeline, to judge whether pipeline has leakage loss phenomenon.Existing leakage sensor of visiting includes being used to power Power supply, the sensor for gathering signal, and the signal transacting list for the signal gathered to be handled and transmitted Member, while also include the housing for being supported and fixing to above-mentioned parts, but during use, because of interiors of products knot Structure is complex, and internal parts are easily damaged because of interference and collision during transport and installation, and visit leakage and pass The working environment of sensor is more severe, and the equal difficulty of its inspection and maintenance is larger, therefore virtually adds labour cost.
In view of above-mentioned existing visit leaks the defects of sensor is present, the present inventor is more based on such product engineering application is engaged in The practical experience and professional knowledge that year enriches, and coordinate the utilization of scientific principle, actively it is subject to research and innovation, to found a kind of intelligence Leakage device is visited, it is had more practicality.
The content of the invention
In order to solve the above technical problems, the present invention, which provides a kind of intelligence, visits leakage device, by set three it is separate Chamber so that visit each parts in leakage device and install more orderly and effectively avoid interference and collision, reduce product Spoilage and maintenance cost.
The invention provides a kind of intelligence to visit leakage device, for detecting the leakage point of supply channel, including housing unit, electricity Source, signal processing module and sensor;Power supply, signal processing module and sensor are both secured to inside housing unit;
Housing unit is disposed with independent sensor cavities, signal processing module chamber and power supply chamber, shell from bottom to top Body component includes base, sleeve, upper lid, deck and baffle plate;Base and upper lid are fixedly installed in the upper and lower part of sleeve respectively, Deck and baffle plate setting in base, sleeve and the formed confined space of upper lid, and the two circumferential outer surface with it is described close Close spatial surface fitting;Sensor cavities are arranged in base, and deck is arranged at the top of sensor cavities, and signal processing module Chamber is arranged in deck, and baffle plate setting forms power supply chamber at the top of deck between upper lid.
Further, deck is arranged at the intersection of base and sleeve.
Further, be provided with convex edge at the top of baffle plate, for be positioned over the power supply at the top of baffle plate carry out it is spacing.
Further, base top is provided with two-stage step face, and the step surface of bottom is bonded with deck bottom, the platform of higher level Terrace is bonded with sleeve bottom, and the facade between sleeve interior surface and two-stage step face overlaps.
Further, sleeve inner is evenly arranged with least two guide protrusions, deck and baffle plate outer wall along its length On be provided with and guide protrusions profile identical first be oriented to groove and second be oriented to groove.
Further, be provided through through hole in guide protrusions along its length, and upper lid and bottom seat be provided with Through the one-to-one through hole of through hole.
Further, base and sleeve, and, the junction of sleeve and upper lid is provided with elastic sealing ring.
Further, elastic sealing ring includes connector, the first U-shaped convex edge, the second U-shaped convex edge, upper convex edge and lower convex edge;
Connector is annular, and the first U-shaped convex edge, one side of the second U-shaped convex edge are connected with the outer edge of connector respectively, and The U-shaped opening end of the two towards a plane of connector, upper convex edge be similarly provided in plane and positioned at the first U-shaped convex edge, Between second U-shaped convex edge, and height is less than the height of two U-shaped convex edges;
Wherein, the first U-shaped convex edge, the second U-shaped convex edge are respectively arranged with the first projection and the second projection in convex edge side upwardly, First projection and the second projection are respectively smaller than the U-shaped opening of the first U-shaped convex edge, the second U-shaped convex edge to the horizontal range of upper convex edge Width;Lower convex edge is arranged on the opposite of plane, and is arranged at convex edge bottom.
Further, its circumferential direction is provided with least two annular projections on upper convex edge.
By the technical scheme in the present invention, the present invention has following technique effect:
By setting three separate chambers so that visit each parts in leakage device and install more orderly and effectively keep away Exempt to interfere and collided, reduced the spoilage and maintenance cost of product;
Described above is only the general introduction of technical solution of the present invention, in order to better understand the technological means of the present invention, and can Content according to specification is practiced, below with presently preferred embodiments of the present invention and coordinate accompanying drawing describe in detail as after.
Brief description of the drawings
Fig. 1 is the decomposing schematic representation that leakage device is intelligently visited in the present invention;
Fig. 2 is the sectional view that leakage device is intelligently visited in the present invention;
Fig. 3 is the structural representation of power supply;
Fig. 4 is the structural representation of sensor;
Fig. 5 is the structural representation of base;
Fig. 6 is the structural representation of sleeve;
Fig. 7 is the structural representation of upper lid;
Fig. 8 is the structural representation of deck;
Fig. 9 is the structural representation of baffle plate;
Figure 10 is the structural representation of elastic sealing ring;
Figure 11 is the sectional view of elastic sealing ring;
Description of reference numerals:Power supply 1, sensor 2, base 3, sleeve 4, guide protrusions 41, through through hole 42, upper lid 5, deck 6, First is oriented to groove 61, baffle plate 7, the guiding groove 72 of convex edge 71, second, elastic sealing ring 8, connector 81, plane 81a, opposite 81b, the first U-shaped convex edge 82, the first projection 82a, the second U-shaped convex edge 83, the second projection 83a, upper convex edge 84, annular projection 84a, Lower convex edge 85.
Embodiment
With reference to the accompanying drawings and examples, the embodiment of the present invention is described in further detail.Implement below Example is used to illustrate the present invention, but is not limited to the scope of the present invention.
Referring to shown in Fig. 1 ~ 11, a kind of intelligence visits leakage device, for detecting the leakage point of supply channel, including housing group Part, power supply 1, signal processing module and sensor 2;Power supply 1, signal processing module and sensor 2 are both secured in housing unit Portion;Housing unit is disposed with independent sensor cavities, signal processing module chamber and power supply chamber, housing from bottom to top Component includes base 3, sleeve 4, upper lid 5, deck 6 and baffle plate 7;Base 3 and upper lid 5 are fixedly installed in the top of sleeve 4 respectively And bottom, deck 6 and baffle plate 7 are arranged in the confined space that base 3, sleeve 4 and upper lid 5 are formed, and the two circumferential foreign steamer Profile surface is bonded with confined space surface;Sensor cavities are arranged in base 3, and deck 6 is arranged at the top of sensor cavities, and are believed Number processing module chamber is arranged in deck 6, and baffle plate 7 is arranged at the top of deck 6, and the power supply chamber is formed between upper lid 5; By setting three separate chambers so that each parts installation visited in leakage device is more orderly, and effectively avoids Interference and collision, either in Product transport or during product is installed, reduce because of inner body collision and The damage of product problem brought, reduce the spoilage and maintenance cost of product.
For the ease of in base 3 and the separation of sleeve 4, can conveniently installed cassette 6, deck 6 is arranged at bottom Seat 3 and sleeve 4 intersection, it is such design when deck 6 is removed, also can be easily realize sensor 2 installation and Dismounting.
The top of baffle plate 7 is provided with convex edge 71, spacing for being carried out to the power supply 1 for being positioned over the top of baffle plate 7, passes through convex edge 71 Setting so that the position of power supply 1 in radial directions is controlled, while under the stop of upper lid 5 so that power supply does not have to more Remaining fastener is the determination that position can be achieved, and reduces installation difficulty.After radial position determines, in order to realize axial location Fixed, the top of base 3 is provided with two-stage step face, and the step surface of bottom is bonded with the bottom of deck 6, the step surface and sleeve of higher level 4 bottoms are bonded, and the facade between the inner surface of sleeve 4 and two-stage step face overlaps, by between the inner surface of sleeve 4 and two-stage step face The coincidence plane of facade can be easy to the positioning of sleeve 4, i.e. first pacify deck 6 while axial restraint is realized to deck 6 The periphery of deck 6 is sheathed on loaded on base 3, then by sleeve 4;Branch by second level step surface to the bottom of deck 6 simultaneously Support, top power supply 1 is coordinated to pass through extruding of the baffle plate 7 to deck 6, you can the convenient fixation for realizing deck 6 and baffle plate 7, wherein, Wire hole is provided with baffle plate 7, for being passed through for the wire of connection power supply 1 and signal processing module.
In order to prevent during use each parts to rotate phenomenon, uniformly set along its length inside sleeve 4 3 guide protrusions 41 are equipped with, is provided with deck 6 and the outer wall of baffle plate 7 and is oriented to groove with the profile identical first of guide protrusions 41 61 and second are oriented to groove 72, raised and groove during installation to be used cooperatively, and may be such that positioning is more accurate.It is oriented to Through hole 42 is provided through in projection 41 along its length, and upper lid 5 and base 3 are provided with and run through through hole 42 1 a pair The through hole answered, the setting of each through hole so that the connection of upper lid 5, sleeve 4 and the three of base 3 is more prone to, and is met using length The bolt of satisfaction can once realize the fixation of three, effectively reduce installation cost.
Base 3 and sleeve 4, and, the junction of sleeve 4 and upper lid 5 is provided with elastic sealing ring 8, because visiting leakage device It is arranged on supply channel, therefore working environment is more moist and easily has water leakage and influences performance, and it is elastic The setting of sealing ring 8 effectively reduces the fault rate for visiting leakage device, reduces the cost changed and repaired, elastic sealing ring 8 Including connector 81, the first U-shaped convex edge 82, the second U-shaped convex edge 83, upper convex edge 84 and lower convex edge 85;Connector 81 is annular, The outer edge of first U-shaped convex edge 82, one side of the second U-shaped convex edge 83 respectively with connector 81 is connected, and the U-shaped opening of the two Towards a plane 81a of connector 81, upper convex edge 84 is similarly provided at plane 81a on and is located at the first U-shaped convex edge 82, the at end Between two U-shaped convex edges 83, and height is less than the height of two U-shaped convex edges;Wherein, the first U-shaped convex edge 82, the second U-shaped convex edge 83 exist The side of convex edge 84 is respectively arranged with the first projection 82a upwardly and the second projection 83a, the first projection 82a and the second projection 83a is arrived The horizontal range of upper convex edge 84 be respectively smaller than the first U-shaped convex edge 82, the second U-shaped convex edge 83 U-shaped opening width;Lower convex edge 85 It is arranged on plane 81a opposite 81b, and is arranged at the bottom of convex edge 84.
When elastic sealing ring 8 is when being under pressure, because the height of upper convex edge 84 is less than the height of two U-shaped convex edges, therefore the One U-shaped 82 and second U-shaped convex edge 83 of convex edge be first subjected to extruding and deform upon, during deformation, the first projection 82a and Second projection 83a is extruded the both sides of upper convex edge 84 respectively, during extruding, because material volume does not change, And upper convex edge 84 is elastomer, therefore its height can raise because being squeezed, until height and the two U-shaped convex edges of upper convex edge 84 Height it is identical when, be respectively formed closed cavity inside two U-shaped convex edges, and at least 3 structures, chamber are formd with upper convex edge 84 The formation of body is in addition to sealing function is played, moreover it is possible to play a part of buffering, lower convex edge 85 is arranged on plane 81a opposite 81b, And the bottom of convex edge 84 is arranged at, the processing of lower convex edge 85 is relatively easy to, when the first U-shaped 82 and second U-shaped convex edge 83 of convex edge is sent out During raw deformation, the inside and outside two sealed structures between the parts of bottom are equally formd in its both sides, and top is because by upper The extruding force of convex edge 84, lower convex edge 85 also can form three seal structures between the parts of bottom, in order to increase sealing effectiveness, Its circumferential direction is provided with least two annular projection 84a on upper convex edge 84, so can be in top seal and lower seal face On form multiple-sealed structure because concentrating stress.
Described above is only the preferred embodiment of the present invention, is not intended to limit the invention, it is noted that for this skill For the those of ordinary skill in art field, without departing from the technical principles of the invention, can also make it is some improvement and Modification, these improvement and modification also should be regarded as protection scope of the present invention.

Claims (9)

1. a kind of intelligence visits leakage device, for detecting the leakage point of supply channel, including housing unit, power supply(1), signal transacting Module and sensor(2);The power supply(1), signal processing module and sensor(2)It is both secured to inside the housing unit;
Characterized in that, the housing unit is disposed with independent sensor cavities, signal processing module chamber from bottom to top Room and power supply chamber, the housing unit include base(3), sleeve(4), upper lid(5), deck(6)And baffle plate(7);The bottom Seat(3)With upper lid(5)The sleeve is fixedly installed in respectively(4)Upper and lower part, the deck(6)And baffle plate(7)Set In the base(3), sleeve(4)With upper lid(5)In the confined space formed, and the two circumferential outer surface with it is described closed Spatial surface is bonded;The sensor cavities are arranged at the base(3)It is interior, the deck(6)It is arranged at the sensor cavity Ceiling portion, and the signal processing module chamber is arranged at the deck(6)It is interior, the baffle plate(7)It is arranged at the deck(6) Top, and with the upper lid(5)Between form the power supply chamber.
2. intelligence according to claim 1 visits leakage device, it is characterised in that the deck(6)It is arranged at the base(3) And sleeve(4)Intersection.
3. intelligence according to claim 1 visits leakage device, it is characterised in that the baffle plate(7)Top is provided with convex edge (71), for being positioned over the baffle plate(7)The power supply at top(1)Carry out spacing.
4. intelligence according to claim 2 visits leakage device, it is characterised in that the base(3)Top is provided with two-stage platform Terrace, the step surface of bottom and the deck(6)Bottom is bonded, the step surface of higher level and the sleeve(4)Bottom is bonded, and institute State sleeve(4)Facade between inner surface and the two-stage step face overlaps.
5. intelligence according to claim 1 visits leakage device, it is characterised in that the sleeve(4)It is internal equal along its length It is even to be provided with least two guide protrusions(41), the deck(6)And baffle plate(7)It is provided with outer wall and the guide protrusions (41)Profile identical first is oriented to groove(61)Groove is oriented to second(72).
6. intelligence according to claim 5 visits leakage device, it is characterised in that the guide protrusions(41)It is inside square along its length To being provided through through hole(42), and the upper lid(5)And base(3)It is provided with and runs through through hole with described(42)Correspond Through hole.
7. intelligence according to claim 1 visits leakage device, it is characterised in that the base(3)With sleeve(4), and, institute State sleeve(4)With upper lid(5)Junction be provided with elastic sealing ring(8).
8. intelligence according to claim 7 visits leakage device, it is characterised in that the elastic sealing ring(8)Including connector (81), the first U-shaped convex edge(82), the second U-shaped convex edge(83), upper convex edge(84)With lower convex edge(85);
The connector(81)For annular, the first U-shaped convex edge(82), the second U-shaped convex edge(83)One side respectively with institute State connector(81)Outer edge connection, and the U-shaped opening end of the two is towards the connector(81)A plane (81a), the upper convex edge(84)It is similarly provided at the plane(81a)Go up and be located at the described first U-shaped convex edge(82), the 2nd U Type convex edge(83)Between, and height is less than the height of two U-shaped convex edges;
Wherein, the described first U-shaped convex edge(82), the second U-shaped convex edge(83)Towards convex edge on described(84)Side is set respectively There is the first projection(82a)With the second projection(83a), first projection(82a)With the second projection(83a)To the upper convex edge (84)Horizontal range be respectively smaller than the described first U-shaped convex edge(82), the second U-shaped convex edge(83)U-shaped opening width;It is described Lower convex edge(85)It is arranged at the plane(81a)Opposite(81b)On, and it is arranged at the upper convex edge(84)Bottom.
9. intelligence according to claim 8 visits leakage device, it is characterised in that the upper convex edge(84)On along its circumferential direction It is provided with least two annular projections(84a).
CN201710847666.4A 2017-09-19 2017-09-19 A kind of intelligence spy leakage device Active CN107642684B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710847666.4A CN107642684B (en) 2017-09-19 2017-09-19 A kind of intelligence spy leakage device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710847666.4A CN107642684B (en) 2017-09-19 2017-09-19 A kind of intelligence spy leakage device

Publications (2)

Publication Number Publication Date
CN107642684A true CN107642684A (en) 2018-01-30
CN107642684B CN107642684B (en) 2019-10-15

Family

ID=61111800

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710847666.4A Active CN107642684B (en) 2017-09-19 2017-09-19 A kind of intelligence spy leakage device

Country Status (1)

Country Link
CN (1) CN107642684B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2699066Y (en) * 2004-04-19 2005-05-11 青岛基珀密封工业有限公司 End face inverse flow sealing strand oil seal
CN201152359Y (en) * 2008-01-11 2008-11-19 上海人本集团有限公司 Bearing seal structure
CN201487207U (en) * 2009-06-15 2010-05-26 宁国市顺达密封件制造有限公司 Axle sealing element
CN201539563U (en) * 2009-10-20 2010-08-04 青岛开世密封工业有限公司 Improved piston rod seal U-shaped ring
CN103575448A (en) * 2013-10-28 2014-02-12 宁波南车时代传感技术有限公司 Pressure transmitter for locomotive brake system
WO2014089115A1 (en) * 2012-12-03 2014-06-12 Battelle Memorial Institute Immersible methane sensors
CN103995184A (en) * 2014-05-29 2014-08-20 国家电网公司 Ultrasonic transducer and system and operation method for capacitance stability online detection
CN205780873U (en) * 2016-05-20 2016-12-07 上海唯万密封科技有限公司 A kind of mining high-pressure-resistant sealed part
EP3135090A1 (en) * 2015-08-24 2017-03-01 Digitroll Kft. Seed sensor and method for detecting blockage of a seeding channel

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2699066Y (en) * 2004-04-19 2005-05-11 青岛基珀密封工业有限公司 End face inverse flow sealing strand oil seal
CN201152359Y (en) * 2008-01-11 2008-11-19 上海人本集团有限公司 Bearing seal structure
CN201487207U (en) * 2009-06-15 2010-05-26 宁国市顺达密封件制造有限公司 Axle sealing element
CN201539563U (en) * 2009-10-20 2010-08-04 青岛开世密封工业有限公司 Improved piston rod seal U-shaped ring
WO2014089115A1 (en) * 2012-12-03 2014-06-12 Battelle Memorial Institute Immersible methane sensors
CN103575448A (en) * 2013-10-28 2014-02-12 宁波南车时代传感技术有限公司 Pressure transmitter for locomotive brake system
CN103995184A (en) * 2014-05-29 2014-08-20 国家电网公司 Ultrasonic transducer and system and operation method for capacitance stability online detection
EP3135090A1 (en) * 2015-08-24 2017-03-01 Digitroll Kft. Seed sensor and method for detecting blockage of a seeding channel
CN205780873U (en) * 2016-05-20 2016-12-07 上海唯万密封科技有限公司 A kind of mining high-pressure-resistant sealed part

Also Published As

Publication number Publication date
CN107642684B (en) 2019-10-15

Similar Documents

Publication Publication Date Title
CN104799756B (en) Exterior wall cleaning and maintaining robot
US9688326B2 (en) Robotic device for navigating inclined surfaces
CN207566817U (en) The anti-beam wind hanging basket in high-altitude
CN107642684A (en) A kind of intelligence visits leakage device
KR200462527Y1 (en) Dop hepa filter box
CN205981541U (en) Intelligent pressure transmitter
CN203431188U (en) Fire-fighting alarm valve and water pressure monitoring system
CN214662770U (en) High-pressure hose connector
KR101301621B1 (en) A fluidized-bed dryer in use with filter bracket
CN205806605U (en) A kind of solid preparation fluid bed air inlet air-flow unidirectional flame proof valve
CN107489169A (en) Water-bag type regulator and pressure regulation method
CN208778791U (en) Flame proof flap valve
CN205642767U (en) Double -barrelled block structure
CN207217110U (en) Sound insulation and noise reduction sheath
CN205898201U (en) Change angular window no. 3 nature detection device
CN205730090U (en) A kind of cylinder body of fire extinguisher factory testing equipment
CN205262692U (en) Leakage detector is put to rail vehicle vacuum collection civilian dress
CN203684371U (en) Toilet drainage pipe with adjustable length
CN206056623U (en) Combined test stand
CN106197547A (en) A kind of corner window three property detection device
CN217901110U (en) Air leakage detection device
CN203928310U (en) A kind of three sections of sealing thermal insulation high efficiency air mouth structures
CN106513361A (en) Plate washing machine with higher tightness
CN220249076U (en) Air valve mounting and sealing structure
RU140762U1 (en) THERMOCONSTANT, "CLEAN" MOBILE BOXING

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Li Xinhong

Inventor after: Gao Yan

Inventor after: Yao Rong

Inventor after: Ma Yifan

Inventor before: Li Xinhong

Inventor before: Yao Rong

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant