Prior art keywords
pile
fiber grating
steel plate
temperature self
compensation type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710941912.2A
Other languages
Chinese (zh)
Inventor
张明义
白晓宇
牟洋洋
杨苏春
王永洪
陈小钰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao University of Technology
Original Assignee
Qingdao University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao University of Technology filed Critical Qingdao University of Technology
Priority to CN201710941912.2A priority Critical patent/CN107642112A/en
Publication of CN107642112A publication Critical patent/CN107642112A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Force Measurement Appropriate To Specific Purposes (AREA)

Abstract

The invention belongs to ground foundation engineering technical field, is related to a kind of end open type PHC pile tube end resistance test devices, and base steel plate welds together with the annular steel plate at pipe pile end;Sensor embedded hole and traction grooved are reserved on base steel plate;Temperature self-compensation type fiber grating earth pressure sensor is arranged in sensor embedded hole, the bottom surface and side of temperature self-compensation type fiber grating earth pressure sensor are closely pasted with anchoring adhesive with pile tube, armored optical cable is drilled through pile body first from the inboard wall groove of pile tube by the traction grooved on base steel plate and introduces the unit with grooves in outer wall of pile tube, and then drill to draw from the inside of pile tube through pile body second is connected with fiber grating analyzer;Its is simple in construction, install convenient, easy to operate, low cost, is hardly damaged, and measuring accuracy is high, workable, can be monitored in real time and long term monitoring, is widely used, can also be applied to other kinds of prefabricated pile.

Description

A kind of end open type PHC pile tube end resistance test devices
Technical field:
The invention belongs to ground foundation engineering technical field, is related to a kind of test equipment of prefabricated pile end resistance, especially It is a kind of end open type PHC (prestressed high strength concrete, PrestressHighConcrete) pile tube end resistance test Device.
Background technology:
Pile foundation is a kind of time-honored base form, while is also a kind of using quite varied building foundation shape Formula.With the acceleration of urbanization process, construction scope continues to increase, building structure increasingly " high, precision and frontier ", in addition soil layer feelings Condition is complicated, and the requirement to building basis is more and more harsher.End open type PHC pile tubes as a kind of pile-type in pile foundation, Pile crown need not be made, there is high capacity, steady quality, the spy such as speed of application is fast, pollution-free, noise is low, construction costs is low Point, it is well suited for using in urban district and other coastal soft clay areas conditional to noise.At present, the application amount of prefabricated pile and day are all Increase, considerably beyond its theoretical and experimental study, which increase uncertainty of the prefabricated pile in practical engineering application.Building Basis needs to meet deformation and the requirement of bearing capacity simultaneously, and the bearing capacity of stake is divided into two parts pile side friction and end resistance, For Piles for Friction Piles, the ratio that end resistance accounts for total bearing capacity is much smaller compared to pile side friction, but holds type stake for end For by chance on the contrary, for end resistance, it is the important component of pile bearing capacity, always by domestic and foreign scholars and engineering Technical staff is paid attention to.Due to construction method of the end resistance by stake, the characteristic through soil layer and supporting course, into holding force layer depth Degree, stake the factor such as size influence so that pile-end soil body interacts with stake becomes sufficiently complex, although being used for end resistance The method of determination has a lot, but due in end resistance problem there is too many uncertainty, to the field no matter from reason Still need to do extensive work by upper still put into practice in accumulation and experimental study of research.Sometimes, when larger sedimentation occurs for basis, stake end Resistance just gives full play to, but this has not met requirement of the building to sedimentation.Therefore, it is necessary to take a kind of new scene survey Method for testing rapidly and accurately determines end resistance, on the one hand can make up the deficiency of existing measuring technology, Chinese patent 201310500315.8 disclosing a kind of prestressed high-strength concrete pile end resistance test device, belong to resistance measurement equipment skill Art field, experimental rig strengthen steel plate, steel pile casting, axle power meter, ribbed stiffener, bolt, shielded conductor and type vibration wire frequency by three Readout instrument form, the experimental rig can realize to using static pressure construction pile for prestressed pipe test end resistance, solve due to The difficulty of end resistance is determined caused by pile-soil interaction is sufficiently complex.But existing test device fails to reflect that pile tube is true Construction effect, soil plug effect and the end resistance that is provided of wall thickness are merged, and institute's peg end resistance is more than actual value;It is another Aspect also can be that correlative study is accumulated experience and laid the foundation.
The content of the invention:
Present invention aims to overcome that the shortcomings that prior art is present, is retaining original opening concrete pipe pile construction effect On the premise of, optimization and raising end resistance measuring accuracy, there is provided a kind of open using the end of static pressure method or hammer-impact construction Type PHC pile tube end resistance test devices, temperature self-compensation type fiber grating earth pressure sensor is installed at stake end, utilizes optical fiber Grating demodulation instrument measures fiber bragg grating center wavelength variable quantity, and end resistance is then calculated.
To achieve these goals, the body junction of end open type PHC pile tube end resistance test devices of the present invention Structure include pile tube, base steel plate, temperature self-compensation type fiber grating earth pressure sensor, armored optical cable, fiber grating analyzer, Traction grooved, inboard wall groove, pile body first drills, unit with grooves in outer wall, pile body second drills, bump joint, pile extension weld seam and sensor Embedded hole, pile tube are end open type PHC pile tubes;In cirque structure, the base steel plate inner and outer diameter and pile tube that thickness is 3cm Overall diameter is identical, and base steel plate welds together with the annular steel plate carried at pipe pile end;Two are reserved on base steel plate The sensor embedded hole being arranged symmetrically, the diameter of sensor embedded hole are more than temperature self-compensation type optical fiber grating soil pressure sensing Device, be reserved with base steel plate be connected with sensor embedded hole, the traction grooved that width is 5mm;Temperature self-compensation type fiber grating Soil pressure sensor is arranged in the sensor embedded hole reserved on base steel plate, and temperature self-compensation type optical fiber grating soil pressure passes The bottom surface and side of sensor are closely pasted with anchoring adhesive with pile tube, ensure that temperature self-compensation type fiber grating earth pressure sensor is convex Go out base steel plate so that temperature self-compensation type fiber grating earth pressure sensor and pile tube, base steel plate are into being integral;Temperature The lead of self-compensation type fiber grating earth pressure sensor is protected with armored optical cable;It is recessed that inwall is had on the inside and outside wall of pile tube Groove and unit with grooves in outer wall, the stake end of pile tube are provided with pile body first and drilled, and stake top is provided with pile body second and drilled, and armored optical cable passes through base Traction grooved on steel plate drills from the inboard wall groove of pile tube through pile body first introduces the unit with grooves in outer wall of pile tube, then through pile body second Drill to draw from the inside of pile tube and be connected with fiber grating analyzer, traction grooved, inboard wall groove, pile body first drills, outer wall is recessed Armored optical cable in groove, the drilling of pile body second is encapsulated using structure glue;Base steel plate prevent pile tube in work progress temperature from Compensation fiber grating earth pressure sensor comes off or is damaged, and ensures that temperature self-compensation type fiber grating earth pressure sensor is uniform Stress, temperature self-compensation type fiber grating earth pressure sensor can influence of the automatic rejection temperature change to test result, because This, without the concern for temperature-compensating when this experimental rig is tested;When the length of one root canal pile is inadequate, drilled from pile body first In pass the armored optical cable with bump joint, drawn during the pile body second of armored optical cable and another root canal pile is drilled same Armored optical cable connection with bump joint, and two root canal piles are formed into pile extension weld seam along the welding alignment of tubular pile hoop plate periphery.
The present invention realizes the detailed process of end open type PHC pile tubes end resistance test:
(1) the base steel plate processed and the annular end plate at pipe pile end are welded together, its center base steel plate At stake end nearly inside edge reserve sensor embedded hole (diameter is slightly larger than temperature self-compensation type fiber grating earth pressure sensor, Depth is slightly less than the thickness of temperature self-compensation type fiber grating earth pressure sensor) and width 5mm traction grooved;Along stake outer wall side The pre-embossed width 5mm in surface unit with grooves in outer wall, drilled with electric drill to form pile body second and drill and pile body in the stake top of pile tube and stake end First drilling, and reserve width 5mm inboard wall groove in stake end inwall;
(2) temperature self-compensation type fiber grating earth pressure sensor is put into sensor embedded hole, armored optical cable edge is led Approaching channel and inboard wall groove are passed again inside pile tube along pile body groove fair line, are finally drawn from the drilling of pile body second and whole process is faced When fix, then inboard wall groove, unit with grooves in outer wall, pile body second drill and pile body first drill in pour into anchoring adhesive encapsulation, now Ensure that temperature self-compensation type fiber grating earth pressure sensor is flushed with pipe pile end soil contact face to reflect stake end and ground Interaction;
(3) after bar planting adhesive curing 2 hours, the armored optical cable that pile tube is drawn is connected with fiber grating analyzer, a side Face checks whether test device connection intact, on the other hand check temperature self-compensation type fiber grating earth pressure sensor whether by Damage;The temperature self-compensation type optical fiber grating soil pressure that the positioning of measurement installation in time is completed before using static pressure or hammering construction The initial value of sensor, then basis《Technical code for building pile foundation》(JGJ94-2008) specific requirement is constructed, construction During perform construction note and data storage, and protect tester in use;
(4) if the length of a root canal pile does not reach the depth of design code, pile extension processing is carried out, now upper section stake needs Armored optical cable is finished along pile body encapsulation in advance, and the armored optical cable with bump joint is passed from the drilling of pile body first, will It is connected with the armored optical cable again with bump joint drawn from the drilling of jacked pile pile body second, it is ensured that upper lower flange Connect well, upper and lower two section stakes are welded along tubular pile hoop version periphery and alignd, ensures welding quality, is utilized after the completion of above-mentioned work Static pressure or the construction method of hammering continue injection until reaching the pile sinking control condition of design requirement.
The present invention to temperature self-compensation type optical fiber grating soil pressure sensing before use, demarcate, in use, temperature is self-complementary The exterior normal for repaying formula fiber grating earth pressure sensor pressure-bearing surface is conllinear with ground contact surface exterior normal, it is ensured that the stress shape of pile tube State is normally delivered to an end rock-soil layer by temperature self-compensation type fiber grating earth pressure sensor, after device installation in time Measure initial value;In the work progress of pile tube, using fiber grating analyzer read data, according to the parameter index of device, Data and formula (1) Δ λ of readingB=KεΔεx, formula (2) Qpk=E Δs εxΑpEnd resistance is calculated, wherein, Δ λBFor Center wavelength variation amount, unit nm;KεFor strain transducer sensitivity coefficient;ΔεxFor axial strain variable quantity;QpkFor end bearing Power, unit kN;E is pile tube modulus of elasticity, units MPa;ΑpFor pipe pile end area, unit mm2
Compared with prior art, its is simple in construction, install convenient, easy to operate, low cost, is hardly damaged by the present invention, surveys It is high to try precision, it is workable, it can in real time be monitored and long term monitoring, be widely used, can also be applied to other kinds of Prefabricated pile.
Brief description of the drawings:
Fig. 1 is the agent structure principle schematic of end open type PHC pile tube end resistance test devices of the present invention.
Fig. 2 is tubular pile splicing principle schematic of the present invention.
Fig. 3 is pipe pile end structure principle schematic of the present invention.
Fig. 4 is the test result of wherein one test pile described in the embodiment of the present invention.
Fig. 5 is the test result of an other test pile described in the embodiment of the present invention.
Embodiment:
The invention will be further described by way of example and in conjunction with the accompanying drawings.
Embodiment:
The agent structure of end open type PHC pile tube end resistance test devices described in the present embodiment includes pile tube 1, base It is steel plate 2, temperature self-compensation type fiber grating earth pressure sensor 3, armored optical cable 4, fiber grating analyzer 5, traction grooved 6, interior Wall groove 7, the drilling of pile body first 8, unit with grooves in outer wall 9, the drilling of pile body second 10, bump joint 11, pile extension weld seam 12 and sensor Embedded hole 13, pile tube 1 are end open type PHC pile tubes;Cirque structure, the inner and outer diameter of base steel plate 2 that thickness is 3cm and pipe 1 inner and outer diameter of stake is identical, and the annular steel plate carried at 1 end of base steel plate 2 and pile tube welds together;On base steel plate 2 Two sensor embedded holes 13 being arranged symmetrically are reserved, the diameter of sensor embedded hole 13 is slightly larger than temperature self-compensation type optical fiber light Grid soil pressure sensor 3, be reserved with base steel plate 2 be connected with sensor embedded hole 13, the traction grooved 6 that width is 5mm;Temperature Self-compensation type fiber grating earth pressure sensor 3 is arranged in the sensor embedded hole 13 reserved on base steel plate 2, and temperature is self-complementary The bottom surface and side for repaying formula fiber grating earth pressure sensor 3 are closely pasted with anchoring adhesive and pile tube 1, ensure temperature self-compensation type The dimpling of fiber grating earth pressure sensor 3 goes out base steel plate 2 so that temperature self-compensation type fiber grating earth pressure sensor 3 with Pile tube 1, base steel plate 2 are into being integral;The lead of temperature self-compensation type fiber grating earth pressure sensor 3 armored optical cable 4 Protection;Inboard wall groove 7 and unit with grooves in outer wall 9 are had on the inside and outside wall of pile tube 1, the stake end of pile tube 1 is provided with pile body first and drilled 8, stake top is provided with the drilling of pile body second 10, inboard wall groove 7 of the armored optical cable 4 by the traction grooved 6 on base steel plate 2 from pile tube 1 The unit with grooves in outer wall 9 of pile tubes 1 is introduced through the drilling of pile body first 8, is then drawn from the inside of pile tube 1 through the drilling of pile body second 10 and light Fine grating analysis instrument 5 connects, traction grooved 6, inboard wall groove 7, pile body first drilling 8, unit with grooves in outer wall 9, pile body second drilling 10 in Armored optical cable 4 using structure glue encapsulate;Base steel plate 2 prevents the temperature self-compensation type fiber grating in work progress of pile tube 1 Soil pressure sensor 3 comes off or is damaged, and ensures the uniform stressed of temperature self-compensation type fiber grating earth pressure sensor 3, temperature is certainly Compensation fiber grating earth pressure sensor 3 can influence of the automatic rejection temperature change to test result, therefore, this experiment side Method is without the concern for temperature-compensating;When the length of one root canal pile 1 is inadequate, passed from the drilling of pile body first 8 with bump joint 11 armored optical cable 4, the pile body second of armored optical cable 4 and another root canal pile 1 is drilled being connect again with flange of drawing in 10 First 11 armored optical cable 4 is connected, and two root canal piles are formed into pile extension weld seam 12 along the welding alignment of tubular pile hoop plate periphery.
The present embodiment realizes the detailed process of end open type PHC pile tubes end resistance test:
(1) the annular end plate at 1 end of the base steel plate 2 processed and pile tube is welded together, its center base steel In the reserved sensor embedded hole 13 of the nearly inside edge in stake end, (diameter passes plate 2 slightly larger than temperature self-compensation type optical fiber grating soil pressure Sensor 3, depth are slightly less than the thickness of temperature self-compensation type fiber grating earth pressure sensor 3) and width 5mm traction grooved 6;Edge The stake outer wall pre-embossed width 5mm in side surface unit with grooves in outer wall 9, is drilled to form pile body second in the stake top of pile tube 1 and stake end with electric drill Drilling 10 and the drilling of pile body first 8, and reserve width 5mm inboard wall groove 7 in stake end inwall;
(2) temperature self-compensation type fiber grating earth pressure sensor 3 is put into sensor embedded hole 13, armored optical cable 4 Pass inside pile tube again along the fair line of pile body groove 9 along traction grooved 6 and inboard wall groove 7, finally draw from the drilling of pile body second 10 Go out and whole interim fixed, then poured into inboard wall groove 7, unit with grooves in outer wall 9, the drilling of pile body second 10 and the drilling of pile body first 8 Anchoring adhesive encapsulates, and now to ensure that temperature self-compensation type fiber grating earth pressure sensor 3 flushes with pipe pile end soil contact face To reflect the interaction at stake end and ground;
(3) after bar planting adhesive curing 2 hours, the armored optical cable 4 that pile tube 1 is drawn is connected with fiber grating analyzer 5, one Aspect checks whether test device connection is intact, on the other hand checks that temperature self-compensation type fiber grating earth pressure sensor 3 is It is no to be damaged;The temperature self-compensation type fiber grating soil that the positioning of measurement installation in time is completed before using static pressure or hammering construction The initial value of pressure sensor 3, then basis《Technical code for building pile foundation》(JGJ94-2008) specific requirement is constructed, Construction note and data storage are performed in work progress, and protects tester in use;
(4) if the length of a root canal pile does not reach the depth of design code, pile extension processing is carried out, now upper section stake needs Armored optical cable is finished along pile body encapsulation in advance, and the armored optical cable with bump joint 11 is passed from the drilling of pile body first 8 4, it is connected with the armored optical cable 4 again with bump joint 11 drawn in 10 that drilled from jacked pile pile body second, really Lower flange is connected good on guarantor, and upper and lower two section stakes are welded along tubular pile hoop version periphery and alignd, ensure welding quality, above-mentioned work After the completion of utilize static pressure or the construction method of hammering to continue injection until reaching the pile sinking control condition of design requirement.
The test pile of the present embodiment is PHC-AB400 types end open type prestressed concrete pipe pile, wall thickness 95mm, and stake is long 23m, tested respectively using two test piles under test site as shown in table 1, test result is respectively such as Fig. 4 and Fig. 5 institutes Show.
Table 1:Test site geological condition

Claims (3)

1. a kind of end open type PHC pile tube end resistance test devices, it is characterised in that agent structure includes pile tube, base steel Plate, temperature self-compensation type fiber grating earth pressure sensor, armored optical cable, fiber grating analyzer, traction grooved, inboard wall groove, Pile body first drills, unit with grooves in outer wall, pile body second drills, bump joint, pile extension weld seam and sensor embedded hole, pile tube are end Open type PHC pile tubes;Cirque structure, the base steel plate inner and outer diameter that thickness is 3cm are identical with pile tube inner and outer diameter, base steel Plate welds together with the annular steel plate carried at pipe pile end;It is embedding that two sensors being arranged symmetrically are reserved on base steel plate Enter hole, the diameter of sensor embedded hole is more than temperature self-compensation type fiber grating earth pressure sensor, is reserved with base steel plate It is connected with sensor embedded hole, the traction grooved that width is 5mm;Temperature self-compensation type fiber grating earth pressure sensor is arranged on bottom In the sensor embedded hole reserved on seat steel plate, the bottom surface of temperature self-compensation type fiber grating earth pressure sensor and side are planted Muscle glue is closely pasted with pile tube, ensures temperature self-compensation type fiber grating earth pressure sensor protrusion base steel plate so that temperature Self-compensation type fiber grating earth pressure sensor and pile tube, base steel plate are into being integral;Temperature self-compensation type fiber grating soil The lead of pressure sensor is protected with armored optical cable;Inboard wall groove and unit with grooves in outer wall, pile tube are had on the inside and outside wall of pile tube Stake end be provided with pile body first and drill, stake top is provided with pile body second and drilled, armored optical cable by the traction grooved on base steel plate from The inboard wall groove of pile tube drills through pile body first introduces the unit with grooves in outer wall of pile tube, is then drilled through pile body second from the inside of pile tube Extraction is connected with fiber grating analyzer, and it is interior that traction grooved, inboard wall groove, pile body first drills, unit with grooves in outer wall, pile body second drills Armored optical cable using structure glue encapsulate;Base steel plate prevents pile tube temperature self-compensation type fiber grating soil pressure in work progress Force snesor comes off or is damaged, and ensures temperature self-compensation type fiber grating earth pressure sensor uniform stressed, temperature self-compensation type Fiber grating earth pressure sensor being capable of influence of the automatic rejection temperature change to test result;The length of one root canal pile is inadequate When, the armored optical cable with bump joint is passed from the drilling of pile body first, by the pile body of armored optical cable and another root canal pile the The armored optical cable again with bump joint drawn in two drillings is connected, and two root canal piles are welded along tubular pile hoop plate periphery Alignment forms pile extension weld seam.
2. end open type PHC pile tubes end resistance test device according to claim 1, it is characterised in that the device uses Before, temperature self-compensation type optical fiber grating soil pressure sensing is demarcated, in use, temperature self-compensation type optical fiber grating soil pressure The exterior normal of sensor pressure-bearing surface is conllinear with ground contact surface exterior normal, it is ensured that the stress of pile tube passes through temperature self-compensation type Fiber grating earth pressure sensor is normally delivered to an end rock-soil layer, measures initial value after device installation in time;In pile tube Work progress in, using fiber grating analyzer read data, according to the parameter index of device, read data and formula (1)ΔλB=KεΔεx, formula (2) Qpk=E Δs εxΑpEnd resistance is calculated, wherein, Δ λBCentered on wavelength variable quantity, Unit nm;KεFor strain transducer sensitivity coefficient;ΔεxFor axial strain variable quantity;QpkFor end resistance, unit kN;E is pipe Stake modulus of elasticity, units MPa;ΑpFor pipe pile end area, unit mm2
3. end open type PHC pile tubes end resistance test device according to claim 2, it is characterised in that using the device Realize the detailed process of end open type PHC pile tubes end resistance test:
(1) the base steel plate processed and the annular end plate at pipe pile end are welded together, its center base steel plate is in stake Nearly inside edge is held to reserve sensor embedded hole and width 5mm traction grooved;Along the pre-embossed width 5mm in stake outer wall side surface outer wall Groove, drilled with electric drill to form the drilling of pile body second and pile body first drills in the stake top of pile tube and stake end, and in stake end inwall Reserved width 5mm inboard wall groove;
(2) temperature self-compensation type fiber grating earth pressure sensor is put into sensor embedded hole, armored optical cable is along traction grooved Passed again along pile body groove fair line inside pile tube with inboard wall groove, finally drawn from the drilling of pile body second and whole process is interim solid It is fixed, then anchoring adhesive encapsulation is poured into inboard wall groove, unit with grooves in outer wall, pile body second drill and pile body first drills, now to protect Card temperature self-compensation type fiber grating earth pressure sensor is flushed with pipe pile end soil contact face to reflect the phase at stake end and ground Interaction;
(3) after bar planting adhesive curing 2 hours, the armored optical cable that pile tube is drawn is connected with fiber grating analyzer, on the one hand examined Whether intact look into test device connection, on the other hand check whether temperature self-compensation type fiber grating earth pressure sensor is damaged It is bad;The temperature self-compensation type optical fiber grating soil pressure that the positioning of measurement installation in time is completed before using static pressure or hammering construction passes The initial value of sensor, then basis《Technical code for building pile foundation》(JGJ94-2008) specific requirement is constructed, and is constructed Construction note and data storage are performed in journey, and protects tester in use;
(4) if the length of a root canal pile does not reach the depth of design code, pile extension processing is carried out, now upper section stake need to shift to an earlier date By armored optical cable along pile body encapsulation finish, and from pile body first drilling in pass the armored optical cable with bump joint, by its with The armored optical cable again with bump joint drawn from the drilling of jacked pile pile body second is connected, it is ensured that upper lower flange is connected Well, upper and lower two section stakes are welded along tubular pile hoop version periphery and alignd, ensured welding quality, static pressure is utilized after the completion of above-mentioned work Or the construction method of hammering continues injection until reaching the pile sinking control condition of design requirement.
CN201710941912.2A 2017-09-30 2017-09-30 A kind of end open type PHC pile tube end resistance test devices Pending CN107642112A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710941912.2A CN107642112A (en) 2017-09-30 2017-09-30 A kind of end open type PHC pile tube end resistance test devices

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710941912.2A CN107642112A (en) 2017-09-30 2017-09-30 A kind of end open type PHC pile tube end resistance test devices

Publications (1)

Publication Number Publication Date
CN107642112A true CN107642112A (en) 2018-01-30

Family

ID=61122997

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710941912.2A Pending CN107642112A (en) 2017-09-30 2017-09-30 A kind of end open type PHC pile tube end resistance test devices

Country Status (1)

Country Link
CN (1) CN107642112A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103498488A (en) * 2013-10-22 2014-01-08 闫楠 Resistance testing device for pile end of prestress high-strength concrete pipe pile
CN103512686A (en) * 2013-10-12 2014-01-15 青岛理工大学 Pile body stress testing device of static-pressure high-strength pre-stress concrete pipe pile
JP2015017493A (en) * 2013-06-14 2015-01-29 株式会社技研製作所 Method and system for estimating end resistance of rotary press-in pile
CN105200971A (en) * 2015-10-22 2015-12-30 青岛理工大学 Device and method for testing pile-soil interface soil pressure and pore water pressure
CN207228185U (en) * 2017-09-30 2018-04-13 青岛理工大学 A kind of end open type PHC pile pile end resistance test devices

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015017493A (en) * 2013-06-14 2015-01-29 株式会社技研製作所 Method and system for estimating end resistance of rotary press-in pile
CN103512686A (en) * 2013-10-12 2014-01-15 青岛理工大学 Pile body stress testing device of static-pressure high-strength pre-stress concrete pipe pile
CN103498488A (en) * 2013-10-22 2014-01-08 闫楠 Resistance testing device for pile end of prestress high-strength concrete pipe pile
CN105200971A (en) * 2015-10-22 2015-12-30 青岛理工大学 Device and method for testing pile-soil interface soil pressure and pore water pressure
CN207228185U (en) * 2017-09-30 2018-04-13 青岛理工大学 A kind of end open type PHC pile pile end resistance test devices

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
徐津祥: "静压桩的桩身应力光纤测试方法及贯入阻力研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 *

Similar Documents

Publication Publication Date Title
CN107642111A (en) A kind of end open type PHC pile tube end resistance method of testings
CN103485373A (en) Method for testing pile shaft stress of static pressure high-strength pre-stressed concrete pipe pile
CN103512686A (en) Pile body stress testing device of static-pressure high-strength pre-stress concrete pipe pile
CN102943493B (en) Method for measuring internal force and deformation of precast pile
CN207228185U (en) A kind of end open type PHC pile pile end resistance test devices
CN105973285A (en) Multifunctional intelligent anchor pole and installation arrangement method thereof
CN106225818A (en) A kind of single-point temperature compensation multifunctional intellectual anchor pole and installation distribution method thereof
CN204730824U (en) A kind of distributed settlement measuring device
CN105019485B (en) A kind of excavation of foundation pit dead load test on pile foundation detection method
CN107643137B (en) Method for testing pile body stress of miniature steel pipe pile
CN107643138A (en) A kind of miniature steel pipe pile pile stress test device
CN105181190A (en) Device for testing mechanical characteristic of tunnel locking anchor pipe and testing method for device
CN109141271B (en) Multi-point optical fiber grating hole bottom strain gauge
CN108661091A (en) A kind of in due course test device of Deep Plate Load Test and test method
CN107402087A (en) A kind of monitoring device and monitoring system of country rock three-dimensional turbulence stress field
CN105890829A (en) Device for comparing test performance of force measuring locking anchor pipes of tunnel and test method
CN105332394A (en) Testing device for researching resistance of uplift piles on abrupt gush damage mechanism of foundation pits
Buckley et al. Optimization of impact pile driving using optical fiber Bragg-grating measurements
CN104897321B (en) Wall shearing stress method of testing in a kind of pre-formed members concrete tubular pile pile body
CN207074097U (en) A kind of monitoring device and monitoring system of country rock three-dimensional turbulence stress field
CN207215329U (en) A kind of miniature steel pipe pile pile stress test device
CN105157999A (en) Method for assessing pile integrity and lateral displacement based on distributed optical fiber sensing technology
CN203479436U (en) Pile body stress test apparatus for static-pressure prestressed high-strength concrete pile
CN207215347U (en) A kind of nonmetallic anti-float anchor rod multiple solutions shear stress joint test device
CN204988572U (en) Skin friction testing arrangement in prefabricated opening concrete pipe pile pile body

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination