CN107640714A - Battlebus air-drop buffer system secondary row army's equipment and its application method - Google Patents
Battlebus air-drop buffer system secondary row army's equipment and its application method Download PDFInfo
- Publication number
- CN107640714A CN107640714A CN201711026548.3A CN201711026548A CN107640714A CN 107640714 A CN107640714 A CN 107640714A CN 201711026548 A CN201711026548 A CN 201711026548A CN 107640714 A CN107640714 A CN 107640714A
- Authority
- CN
- China
- Prior art keywords
- battlebus
- buffer system
- fixed plate
- cable wire
- supporting plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/30—Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways
Landscapes
- Handcart (AREA)
- Wind Motors (AREA)
Abstract
The present invention relates to a kind of battlebus air-drop buffer system secondary row army's equipment and its application method,Including the moving cart for buffer system ground moving,Buffer system can be transferred to the transfer device of battlebus over top and the fore-stock and after-poppet that are used to support buffer system before and after battlebus top from ground,Transfer device includes the capstan winch with cable wire for being located at battlebus top side,What can be swung up and down is hinged on the supporting plate of another lateral edges at the top of battlebus,Can swing up and down it is be hinged on the supporting plate and with limit function linkage board,Can the front and rear fixed plate being located on linkage board rotated,After cable wire pulls supporting plate to be swung up in place,Fixed plate is promoted to above battlebus top edge and is limited in horizontality by linkage board,Cable wire pulls fixed plate to rotate the buffer system in fixed plate to surface at the top of battlebus.Whole equipment can under the conditions of 3 people by buffer system at the top of ground and battlebus between easily change, realize quick march.
Description
Technical field
The invention belongs to reset air-drop equipment field, and in particular to a kind of battlebus air-drop buffer system secondary row army's equipment and
Its application method.
Background technology
During air-drop, battlebus typically carries out landing buffer by buffer system, that is to say, that when having airdrop mission, buffer system
System needs to follow battlebus quickly to march together, in order to realize this requirement, it is necessary to which buffer system is arranged on into battlebus roof, and
The use of battlebus is not influenceed.And buffer system typically weighs about 250 kilograms, about 2.2 meters of battlebus roof height, battlebus entourage one
As be 3 to 5 people, in the wild fight under the conditions of, logistics support equipment deficiency, lack lifting appliance, in the situation without auxiliary equipment
Quick march can not be realized at all down, even if setting auxiliary equipment, it is also necessary to meet that light, operating personnel are few and operation is quick
It is required that.
The content of the invention
It is an object of the invention to provide a kind of battlebus air-drop buffer system secondary row army's equipment and its application method, whole dress
Standby simple in construction, light and handy convenience, can under the conditions of 3 people by buffer system at the top of ground and battlebus between easily change, it is real
Now quick march.
The technical solution adopted in the present invention is:
A kind of battlebus air-drop buffer system secondary row army equipment, including moving cart for buffer system ground moving,
Buffer system can be transferred to the transfer device of battlebus over top from ground and be used for branch before and after battlebus top
Support buffer system fore-stock and after-poppet, transfer device include be located at battlebus top side the capstan winch with cable wire, can on
Lower swing be hinged on the supporting plate of another lateral edges at the top of battlebus, can swing up and down it is be hinged on the supporting plate and with limit
The linkage board of bit function, can front and rear rotation the fixed plate being located on linkage board, before supporting plate is not pulled by cable wire, fixed plate position
Below the battlebus side, after cable wire pulls supporting plate to be swung up in place, fixed plate be promoted to above battlebus top edge and
Horizontality is limited in by linkage board, and cable wire pulls fixed plate the buffer system in fixed plate can be rotated at the top of battlebus just
Side.
Further, moving cart, fixed plate, fore-stock and after-poppet fix buffer system by restraining.
Further, the connection cable wire that fore-stock and after-poppet are tightened up is pressed abd fixed at the top of battlebus, connects cable wire
It is located at battlebus top edge with the fixing point of battlebus.
Further, transfer device is located in the middle part of battlebus, and buffer system is rotated to surface at the top of battlebus, supporting plate energy
Enough coordinate fore-stock and after-poppet support buffer system.
Further, it is equipped with the pulling eye coordinated with cable wire in supporting plate and fixed plate.
A kind of application method based on above-mentioned battlebus air-drop buffer system secondary row army equipment is incited somebody to action, it is necessary to when quickly marching
Buffer system head and the tail are separately mounted in two moving carts, promote moving cart to be fixed on buffer system to battlebus side
In fixed plate and the connection with moving cart is removed, cable wire is connected with supporting plate, pulls supporting plate to be swung up by capstan winch,
Supporting plate is swung up rear fixed plate in place and is promoted to above battlebus top edge and is limited in horizontality by linkage board, then
Cable wire is set to be connected with fixed plate, cable wire pulls fixed plate to rotate buffer system to surface at the top of battlebus, and buffer system is first
Tail is separately mounted on fore-stock and after-poppet.
The beneficial effects of the invention are as follows:
Whole equipment configuration is simple, light and handy convenient, can under the conditions of 3 people by buffer system at the top of ground and battlebus it
Between easily change, realize quick march.
Brief description of the drawings
Fig. 1 is the scheme of installation of capstan winch and battlebus in the embodiment of the present invention.
Fig. 2 is the scheme of installation of fore-stock in the embodiment of the present invention, transfer device and after-poppet and battlebus.
Fig. 3 is the scheme of installation of moving cart and buffer system in the embodiment of the present invention.
Fig. 4 is schematic diagram when moving cart of the embodiment of the present invention moves to battlebus side.
Fig. 5 is the schematic diagram of transfer device in the embodiment of the present invention.
Fig. 6 is schematic diagram when buffer system of the embodiment of the present invention is promoted to battlebus top edge top.
Fig. 7 is schematic diagram when battlebus of the embodiment of the present invention is quickly marched with buffer system.
In figure:1- battlebuses;2- capstan winches;3- cable wires;4- fore-stocks;5- connection cable wires;6- restrainings;7- supporting plates;8- joins
Dynamic plate;9- fixed plates;10- after-poppets;11- moving carts;12- buffer systems.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
As shown in Figures 1 to 7, a kind of battlebus air-drop buffer system secondary row army equipment, including for the ground of buffer system 12
The moving cart 11 of face movement, transfer device and the installation that buffer system 12 can be transferred to the over top of battlebus 1 from ground
The fore-stock 4 and after-poppet 10 that are used to support 12 systems of buffering before and after the top of battlebus 1, transfer device include being located at battlebus 1
The capstan winch 2 with cable wire 3 of top side, the supporting plate 7 for being hinged on another lateral edges in the top of battlebus 1 that can be swung up and down, can
Swing up and down being hinged in supporting plate 7 and linkage board 8 with limit function, can front and rear rotation be located on linkage board 8
Fixed plate 9, as shown in Fig. 2 before supporting plate 7 is not pulled by cable wire 3, fixed plate 9 is located at below the side of battlebus 1, such as Fig. 4, Fig. 6
Shown in Fig. 7, cable wire 3 is pulled after supporting plate 7 is swung up in place, fixed plate 9 be promoted to above the top edge of battlebus 1 and by
Linkage board 8 is limited in horizontality, and cable wire 3 pulls fixed plate 9 to rotate the buffer system 12 in fixed plate 9 to battlebus 1 and pushed up
Directly over portion.
As shown in Fig. 2 to 4, Fig. 6 and Fig. 7, in the present embodiment, moving cart 11, fixed plate 9, fore-stock 4 and after-poppet
10 fix buffer system 12 by restraining 6, and buffer system 12 is fixed using restraining 6, both light and easy to operate.
As shown in Fig. 2, Fig. 4, Fig. 6 and Fig. 7, in the present embodiment, the connection steel that fore-stock 4 and after-poppet 10 are tightened up
Rope 5 is pressed abd fixed on the top of battlebus 1, and the fixing point of connection cable wire 5 and battlebus 1 is located at the top edge of battlebus 1.Need not be in battlebus 1
Fixing point is set in top work surface, only fixing point need to be set in edge.
As shown in Fig. 2, Fig. 4, Fig. 6 and Fig. 7, in the present embodiment, transfer device is located at the middle part of battlebus 1, buffer system 12
After directly over rotation to the top of battlebus 1, supporting plate 7 can coordinate fore-stock 4 and after-poppet 10 to support buffer system 12.Supporting plate
7 serve the effect of middle bracket.
As shown in figure 5, in the present embodiment, the pulling eye coordinated with cable wire 3 is equipped with supporting plate 7 and fixed plate 9.
The application method of battlebus air-drop buffer system secondary row army equipment is, it is necessary to when quickly marching, by buffer system 12
Head and the tail be separately mounted in two moving carts 11, promote moving cart 11 to the side of battlebus 1, buffer system 12 is fixed on
In fixed plate 9 and remove with the connection of moving cart 11, cable wire 3 is connected with supporting plate 7, by the pulling supporting plate 7 of capstan winch 2 to
Upper swing, supporting plate 7 are swung up rear fixed plate 9 in place and are promoted to above the top edge of battlebus 1 and are limited in by linkage board 8
Horizontality, then cable wire 3 is connected with fixed plate 9, cable wire 3 pulls fixed plate 9 to rotate buffer system 12 to the top of battlebus 1 just
Top, the head and the tail of buffer system 12 are separately mounted on fore-stock 4 and after-poppet 10.Whole equipment configuration is simple, light and handy square
Just, buffer system 12 can easily be changed between ground and the top of battlebus 1 under the conditions of 3 people, realizes quick march.
It should be appreciated that for those of ordinary skills, can according to the above description be improved or converted,
And all these modifications and variations should all belong to the protection domain of appended claims of the present invention.
Claims (6)
- A kind of 1. battlebus air-drop buffer system secondary row army equipment, it is characterised in that:Including for buffer system ground moving Moving cart, buffer system can be transferred to the transfer device of battlebus over top and before and after battlebus top from ground Be used for support the fore-stock and after-poppet of buffer system, transfer device includes being located at the strand with cable wire of battlebus top side Disk, can swing up and down be hinged on the supporting plate of another lateral edges at the top of battlebus, can swing up and down it is be hinged on the supporting plate And linkage board with limit function, can front and rear rotation the fixed plate being located on linkage board, before supporting plate is not pulled by cable wire, Fixed plate is located at below battlebus side, and after cable wire pulls supporting plate to be swung up in place, fixed plate is promoted to battlebus top sides Horizontality is limited in above edge and by linkage board, cable wire pulls fixed plate to rotate the buffer system in fixed plate to battlebus Directly over top.
- 2. battlebus air-drop buffer system secondary row army equipment as claimed in claim 1, it is characterised in that:Moving cart, fixation Plate, fore-stock and after-poppet fix buffer system by restraining.
- 3. battlebus air-drop buffer system secondary row army equipment as claimed in claim 1, it is characterised in that:Fore-stock and after-poppet The connection cable wire being tightened up is pressed abd fixed at the top of battlebus, and the fixing point for connecting cable wire and battlebus is located at battlebus top edge.
- 4. battlebus air-drop buffer system secondary row army equipment as claimed in claim 1, it is characterised in that:Transfer device is positioned at war In the middle part of car, buffer system is rotated to surface at the top of battlebus, and supporting plate can coordinate fore-stock and after-poppet to support buffer system System.
- 5. battlebus air-drop buffer system secondary row army equipment as claimed in claim 1, it is characterised in that:Supporting plate and fixed plate On be equipped with cable wire coordinate pulling eye.
- A kind of 6. application method of battlebus air-drop buffer system secondary row army equipment, it is characterised in that:, will when needing quickly to march Buffer system head and the tail are separately mounted in two moving carts, promote moving cart to be fixed on buffer system to battlebus side In fixed plate and the connection with moving cart is removed, cable wire is connected with supporting plate, pulls supporting plate to be swung up by capstan winch, Supporting plate is swung up rear fixed plate in place and is promoted to above battlebus top edge and is limited in horizontality by linkage board, then Cable wire is set to be connected with fixed plate, cable wire pulls fixed plate to rotate buffer system to surface at the top of battlebus, and buffer system is first Tail is separately mounted on fore-stock and after-poppet.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711026548.3A CN107640714B (en) | 2017-10-27 | 2017-10-27 | Auxiliary marching equipment of air-drop buffer system of war chariot and use method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711026548.3A CN107640714B (en) | 2017-10-27 | 2017-10-27 | Auxiliary marching equipment of air-drop buffer system of war chariot and use method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107640714A true CN107640714A (en) | 2018-01-30 |
CN107640714B CN107640714B (en) | 2023-05-05 |
Family
ID=61124756
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711026548.3A Active CN107640714B (en) | 2017-10-27 | 2017-10-27 | Auxiliary marching equipment of air-drop buffer system of war chariot and use method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107640714B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109186352A (en) * | 2018-10-31 | 2019-01-11 | 航宇救生装备有限公司 | Buffer system takes dress march method |
CN114030616A (en) * | 2021-12-03 | 2022-02-11 | 航宇救生装备有限公司 | Anti-interference method and device for marching after air-drop war chariot landing |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2378373Y (en) * | 1999-04-30 | 2000-05-17 | 池正焕 | Incorporating sheaves |
CN1300266A (en) * | 1998-05-11 | 2001-06-20 | 策勒控股有限公司 | Lifting and tipping device |
JP2002362899A (en) * | 2001-04-04 | 2002-12-18 | Yoshitada Nakai | Weight balancing lifting device |
JP2003182999A (en) * | 2001-12-14 | 2003-07-03 | Aikoku Alpha Corp | Cargo transporting machine |
CN1663883A (en) * | 2004-03-02 | 2005-09-07 | 张宝霖 | Air-landing device and weight air-dropping device for manned military equipment |
CN202608627U (en) * | 2012-03-31 | 2012-12-19 | 西安天伟电子系统工程有限公司 | Vehicle-mounted platform with manual rapid foldable lifting mechanism |
CN104224465A (en) * | 2014-10-15 | 2014-12-24 | 安徽工程大学 | Wheelchair capable of climbing stairs |
CN204280173U (en) * | 2014-11-30 | 2015-04-22 | 航宇救生装备有限公司 | Air-drop is anti-turns over load bed device |
CN105853141A (en) * | 2016-03-28 | 2016-08-17 | 南京邮电大学 | Shoulder rehabilitation system with gravity compensation mechanism |
JP2016187509A (en) * | 2015-03-30 | 2016-11-04 | 日本発條株式会社 | Lifting device |
CN106829792A (en) * | 2017-04-17 | 2017-06-13 | 秦朝东 | Loading elevator structure |
CN206266167U (en) * | 2016-12-17 | 2017-06-20 | 天津博斯特膜装饰工程有限公司 | A kind of film for building is without suspension centre erecting device |
CN207434923U (en) * | 2017-10-27 | 2018-06-01 | 航宇救生装备有限公司 | Battlebus air-drop buffer system secondary row army equipment |
-
2017
- 2017-10-27 CN CN201711026548.3A patent/CN107640714B/en active Active
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1300266A (en) * | 1998-05-11 | 2001-06-20 | 策勒控股有限公司 | Lifting and tipping device |
CN2378373Y (en) * | 1999-04-30 | 2000-05-17 | 池正焕 | Incorporating sheaves |
JP2002362899A (en) * | 2001-04-04 | 2002-12-18 | Yoshitada Nakai | Weight balancing lifting device |
JP2003182999A (en) * | 2001-12-14 | 2003-07-03 | Aikoku Alpha Corp | Cargo transporting machine |
CN1663883A (en) * | 2004-03-02 | 2005-09-07 | 张宝霖 | Air-landing device and weight air-dropping device for manned military equipment |
CN202608627U (en) * | 2012-03-31 | 2012-12-19 | 西安天伟电子系统工程有限公司 | Vehicle-mounted platform with manual rapid foldable lifting mechanism |
CN104224465A (en) * | 2014-10-15 | 2014-12-24 | 安徽工程大学 | Wheelchair capable of climbing stairs |
CN204280173U (en) * | 2014-11-30 | 2015-04-22 | 航宇救生装备有限公司 | Air-drop is anti-turns over load bed device |
JP2016187509A (en) * | 2015-03-30 | 2016-11-04 | 日本発條株式会社 | Lifting device |
CN105853141A (en) * | 2016-03-28 | 2016-08-17 | 南京邮电大学 | Shoulder rehabilitation system with gravity compensation mechanism |
CN206266167U (en) * | 2016-12-17 | 2017-06-20 | 天津博斯特膜装饰工程有限公司 | A kind of film for building is without suspension centre erecting device |
CN106829792A (en) * | 2017-04-17 | 2017-06-13 | 秦朝东 | Loading elevator structure |
CN207434923U (en) * | 2017-10-27 | 2018-06-01 | 航宇救生装备有限公司 | Battlebus air-drop buffer system secondary row army equipment |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109186352A (en) * | 2018-10-31 | 2019-01-11 | 航宇救生装备有限公司 | Buffer system takes dress march method |
CN114030616A (en) * | 2021-12-03 | 2022-02-11 | 航宇救生装备有限公司 | Anti-interference method and device for marching after air-drop war chariot landing |
Also Published As
Publication number | Publication date |
---|---|
CN107640714B (en) | 2023-05-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107640714A (en) | Battlebus air-drop buffer system secondary row army's equipment and its application method | |
CN105490193A (en) | High-altitude automatic ground wire suspension device for transformer substation | |
CN207434923U (en) | Battlebus air-drop buffer system secondary row army equipment | |
CN108519393A (en) | Unmanned machine detecting device and application method suitable for three cross-line road strain clamps | |
CN203048431U (en) | Tower crane work monitoring device | |
CN205882391U (en) | On -vehicle manual telescopic lightning rod | |
CN104882828A (en) | Power cable paying-off device | |
US20130259609A1 (en) | Truss lifter and stabilizer | |
JP2019520509A (en) | Method of constructing a wind turbine and a hanging beam for mounting a rotor blade of a wind turbine | |
CN102255261A (en) | Shifting device for two-circuit hot-line work of transmission line | |
CN203959697U (en) | The equalizing bar of hoisting platform truss | |
CN204349336U (en) | Overhead-groundwire lifter | |
CN102733644B (en) | Super-altitude roof super-long antenna hoisting construction method and system | |
CN205971822U (en) | Unmanned aerial vehicle's delivery host computer | |
CN103669823B (en) | The rear support of angle rotatable | |
CN211017743U (en) | Trailer type lightning protection device for vehicle | |
CN103148912A (en) | Mounting bracket for mounting non-contact water level monitoring equipment | |
CN104030176A (en) | Balance beam for lifting platform truss and lifting method thereof | |
CN206900596U (en) | The hydrology surveys ship supporting arm device | |
CN104058069B (en) | Equipment enters cabin auxiliary device | |
CN206211476U (en) | Transmission line of electricity overhead line structures auxiliary fixing device | |
CN204859074U (en) | Portable installation and maintenance platform of photovoltaic module | |
CN104876165A (en) | Mobile mounting and maintenance platform of photovoltaic component | |
CN207792513U (en) | A kind of crane anti-swing control system automatically | |
CN105562280B (en) | A kind of cable wire safeguards lubricator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |