CN107634987B - 基于资源优化配置的智能化跨省委托检定系统及方法 - Google Patents
基于资源优化配置的智能化跨省委托检定系统及方法 Download PDFInfo
- Publication number
- CN107634987B CN107634987B CN201710728961.8A CN201710728961A CN107634987B CN 107634987 B CN107634987 B CN 107634987B CN 201710728961 A CN201710728961 A CN 201710728961A CN 107634987 B CN107634987 B CN 107634987B
- Authority
- CN
- China
- Prior art keywords
- data
- company
- verification
- provincial
- local
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710728961.8A CN107634987B (zh) | 2017-08-23 | 2017-08-23 | 基于资源优化配置的智能化跨省委托检定系统及方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710728961.8A CN107634987B (zh) | 2017-08-23 | 2017-08-23 | 基于资源优化配置的智能化跨省委托检定系统及方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107634987A CN107634987A (zh) | 2018-01-26 |
CN107634987B true CN107634987B (zh) | 2020-07-24 |
Family
ID=61099656
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710728961.8A Active CN107634987B (zh) | 2017-08-23 | 2017-08-23 | 基于资源优化配置的智能化跨省委托检定系统及方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107634987B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108896139B (zh) * | 2018-06-15 | 2021-07-02 | 南京翌天能源科技有限公司 | 一种天然气流量计的检定流转系统及方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104408552A (zh) * | 2014-11-13 | 2015-03-11 | 华为技术有限公司 | 任务协作处理方法、装置和系统 |
CN105590170A (zh) * | 2015-12-23 | 2016-05-18 | 国家电网公司 | 基于个性化服务的电力调控资料管理系统及方法 |
CN106202402A (zh) * | 2016-07-11 | 2016-12-07 | 国网重庆市电力公司 | 一种电能表计量生产调度平台系统 |
CN106548276A (zh) * | 2016-11-01 | 2017-03-29 | 上海艾卡自动化科技有限公司 | 一种基于物联网技术的仪器设备管理及资源共享云平台 |
CN106600098A (zh) * | 2016-10-29 | 2017-04-26 | 上海救要救信息科技有限公司 | 用于实现救援保障资源动态调配的方法及设备 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10339478B2 (en) * | 2014-03-26 | 2019-07-02 | Ion Geophysical Corporation | Simultaneous operations coordination and planning system |
-
2017
- 2017-08-23 CN CN201710728961.8A patent/CN107634987B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104408552A (zh) * | 2014-11-13 | 2015-03-11 | 华为技术有限公司 | 任务协作处理方法、装置和系统 |
CN105590170A (zh) * | 2015-12-23 | 2016-05-18 | 国家电网公司 | 基于个性化服务的电力调控资料管理系统及方法 |
CN106202402A (zh) * | 2016-07-11 | 2016-12-07 | 国网重庆市电力公司 | 一种电能表计量生产调度平台系统 |
CN106600098A (zh) * | 2016-10-29 | 2017-04-26 | 上海救要救信息科技有限公司 | 用于实现救援保障资源动态调配的方法及设备 |
CN106548276A (zh) * | 2016-11-01 | 2017-03-29 | 上海艾卡自动化科技有限公司 | 一种基于物联网技术的仪器设备管理及资源共享云平台 |
Non-Patent Citations (1)
Title |
---|
区域计量中心智能生产系统标准化建设;肖涛;《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》;20140115(第01期);全文 * |
Also Published As
Publication number | Publication date |
---|---|
CN107634987A (zh) | 2018-01-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111600296B (zh) | 基于边缘计算的电力负荷预测系统及其预测方法 | |
CN104361452A (zh) | 一种多网融合的大用户用电异常预警系统 | |
CN102855525B (zh) | 一种居民用户负荷预测分析系统和方法 | |
CN111131417B (zh) | 一种变电站计量监测分析系统及方法 | |
Wang et al. | Research on the remote maintenance system architecture for the rapid development of smart substation in China | |
CN103617561A (zh) | 一种电网智能变电站二次设备状态评估系统和方法 | |
CN103606022A (zh) | 一种短期负荷预测方法 | |
CN102968696A (zh) | 一种营配调业务系统信息融合应用方法 | |
CN102419834B (zh) | 企业能源结算系统 | |
CN103903094A (zh) | 一种电网企业承载力评估系统及方法 | |
CN204990657U (zh) | 远程抄表系统 | |
CN103617447B (zh) | 智能变电站的评价系统及评价方法 | |
Eladl et al. | Communication technologies requirement for energy hubs: a survey | |
CN107634987B (zh) | 基于资源优化配置的智能化跨省委托检定系统及方法 | |
CN203606686U (zh) | 基于云平台的桥梁预制梁养生远程监控系统 | |
Shang et al. | A centralized vehicle‐to‐grid scheme with distributed computing capacity engaging internet of smart charging points: case study | |
Huang et al. | Using Improved Entropy‐Cloud Model to Select High‐Speed Railway Express Freight Train Service Sites | |
Wang et al. | Research on integrated energy management and control system architecture based on local energy internet | |
Zhou et al. | Active network management considering wind and load forecasting error | |
Carere et al. | Flexibility-enabling technologies using electric vehicles | |
Li et al. | Overview and prospect of information and communication technology development in virtual power plants | |
Li et al. | A review on the blockchain technique applied in cloud energy storage power system | |
CN202677481U (zh) | 仪表智能巡检系统 | |
CN202068233U (zh) | 基于嵌入式cpu的智能电网监控装置 | |
CN115310538A (zh) | 微电网绿电标记溯源方法及设备 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: No.17, South Sala Road, Lhasa, Tibet Autonomous Region, 850000 Patentee after: ELECTRIC POWER SCIENCES RESEARCH INSTITUTE OF STATE GRID TIBET ELECTRIC POWER CO.,LTD. Patentee after: JILIN PROVINCE ELECTRIC POWER RESEARCH INSTITUTE OF JILIN ELECTRIC POWER Co.,Ltd. Patentee after: STATE GRID CORPORATION OF CHINA Address before: No.17, South Sala Road, Lhasa, Tibet Autonomous Region, 850000 Patentee before: ELECTRIC POWER SCIENCES RESEARCH INSTITUTE OF STATE GRID TIBET ELECTRIC POWER CO.,LTD. Patentee before: JILIN PROVINCE ELECTRIC POWER RESEARCH INSTITUTE OF JILIN ELECTRIC POWER Co.,Ltd. Patentee before: State Grid Corporation of China |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230529 Address after: 38 dangre West Road, Chengguan District, Lhasa City, Tibet Autonomous Region Patentee after: State Grid Tibet Electric Power Co.,Ltd. Marketing Service Center Patentee after: Marketing service center of State Grid Jilin Electric Power Co.,Ltd. Patentee after: STATE GRID CORPORATION OF CHINA Address before: No.17, South Sala Road, Lhasa, Tibet Autonomous Region, 850000 Patentee before: ELECTRIC POWER SCIENCES RESEARCH INSTITUTE OF STATE GRID TIBET ELECTRIC POWER CO.,LTD. Patentee before: JILIN PROVINCE ELECTRIC POWER RESEARCH INSTITUTE OF JILIN ELECTRIC POWER Co.,Ltd. Patentee before: STATE GRID CORPORATION OF CHINA |