The content of the invention
The present invention provides a kind of charge protection method based on smart jack, smart jack, to solve in the prior art
Equipment overcharges caused by not pulled out in time in the case that charging is full of, is easily damaged the problem of battery.
The invention discloses a kind of charge protection method based on smart jack, including:
For S100 when charging equipment is being charged on smart jack, collection smart jack is supplied to described to be charged set
Standby charging current;
S200 by the charging current of the charging equipment of collection with storage the charging equipment charging current
Memory curve is compared, judge the charging equipment whether charging complete, if so, into step S300;
S300 disconnects the electrical connection of smart jack and the charging equipment.
Further, also include before the step S100:
S010 records described to be charged set by once being charged to the charging equipment on the smart jack
In each stage of standby charging, obtain the charging current memory curve of the charging equipment;
S020 stores the charging current memory curve of the charging equipment.
Further, the step S200 includes:
S210 judges that the charging equipment is current according to the charging current memory curve of the charging equipment of storage
Charging stage;
S220 continues to charge when the charging equipment is in trickle charge stage or constant-current charging phase, and pre-
If the second time after return to step S100 gather the charging current of the charging equipment again;
S230 judges whether the charging current of the collection is less than when the charging equipment is in constant voltage charging phase
Or the minimum current value equal to constant voltage charging phase in the charging current memory curve, if so, into step S240, otherwise exist
After default 3rd time, into step S240;It is bent that default 3rd time is more than or equal to charging current memory
The time of constant-voltage phase in line;
S240 judges the charging equipment charging complete, into step S300.
Further, the step S210 includes:
S211 obtains the charging equipment and is according to the charging current memory curve of the charging equipment of storage
First reference current value in trickle stage;The charging equipment is in the second reference current value of constant-current phase, described to wait to fill
Electric equipment is in the minimum current value of constant-voltage phase;
S212 judges whether the charging current of collection is consistent with second reference current, if so, then entering step
S213, otherwise into step S214;
S213 judges that the charging equipment is in constant-current charging phase, into step S220;
S214 judges whether the charging current of collection is consistent with first reference current, if so, into step
S216, otherwise into step S215;
S215 judges that the charging equipment is in constant voltage charging phase, into step S230;
S216 gathers the charging current of the charging equipment after the default very first time, judge freshly harvested charging current
It is whether consistent with the preceding charging current once gathered, if so, into step S240, otherwise into step S213;It is described pre-
If the very first time be more than or equal to time in trickle stage in the charging current memory curve, and be less than the charging current
The time of constant-current phase in memory curve.
Further, in addition to:S400 reminds user's charging complete by light or voice.
In addition, the invention also discloses a kind of smart jack, including:Collecting unit, for gathering charging equipment charging
When charging current;Memory cell, for storing the charging current memory curve of the charging equipment;Operating unit, it is used for
Disconnect the electrical connection with the charging equipment;Control unit, for the charging current that gathers the collecting unit with
The charging current memory curve of the charging equipment of the memory cell storage is compared, and judges the charging equipment
Whether charging complete, disconnected and the electrical connection of the charging equipment if so, then passing through the operating unit.
Progressive ground, the smart jack also include:Mnemon, for by once being filled to the charging equipment
Electricity, each stage of the charging equipment charging is recorded, obtains the charging current memory curve of the charging equipment, and lead to
The memory cell is crossed to be stored.
Further, described control unit includes:Judge module, for waiting to fill according to memory module storage
The charging current memory curve of electric equipment, judge the charging equipment current charging stage;Processing module, for when described
When charging equipment is in trickle charge stage or constant-current charging phase, pass through the collecting unit after default second time
The charging current of the charging equipment is gathered again;When the charging equipment is in constant voltage charging phase, described in judgement
Whether the charging current of collection is less than or equal to the minimum current value of constant voltage charging phase in the charging current memory curve, if
It is the electrical connection for then controlling the operating unit to disconnect the smart jack and the charging equipment, otherwise, opening timing,
The operating unit is controlled to disconnect the electrical connection of the intelligent operation and the charging equipment, institute after default 3rd time
State time of the 3rd time more than or equal to constant-voltage phase in the charging current memory curve.
Further, the judge module includes:Acquisition submodule, for the charging current according to the charging equipment
Memory curve, obtain the charging equipment and be in first reference current value in trickle stage, the charging equipment in perseverance
Second reference current value and the charging equipment in stream stage are in the minimum current value of constant-voltage phase;First judges submodule
Block, for judging whether the charging current of the collecting unit collection is consistent with second reference current, if so, then judging institute
State charging equipment and be in constant-current charging phase, otherwise the second judging submodule determines whether;Second judging submodule,
For judging whether the charging current of collecting unit collection is consistent with first reference current, if so, then the 3rd
Judging submodule determines whether, otherwise, judges that the charging equipment is in constant voltage charging phase;Described 3rd judges submodule
Block, for controlling the collecting unit to gather the charging current of the charging equipment after the default very first time, judge new
Whether the charging current of collection is consistent with the preceding charging current once gathered, if so, judging charging complete;Otherwise, judge
The charging equipment is in constant-current charging phase;It is bent that the default very first time is more than or equal to charging current memory
The time in trickle stage in line, and less than the time of constant-current phase in the charging current memory curve.
Further, the smart jack also includes:Reminding unit, it is described to remind list for reminding user's charging complete
Member comprises at least one be used in light prompting module or voice reminder module by light prompting user's charging complete.
The present invention carries out sample detecting by a kind of charging current that equipment is supplied to smart jack, with reference to the equipment
Charging current memory curve, the charged state of equipment is judged, battery is disconnected socket automatically in the case of fully charged
With the electrical connection of equipment, reach and both meet charging requirement, protect the purpose of battery again.In addition, the present invention Intelligent socket, be
Charge control is carried out to it outside charging equipment, it is less demanding to charging equipment, it can so be filled with simple and effective control
Electricity.The present invention can also avoid charging equipment internal control module from causing the risk that charges after failing.The smart jack of the present invention
Curve memory can be done simultaneously to multiple charging equipments by multiple jacks, it is possible to achieve subsequently multiple equipment is filled
Electric protection and control.
Embodiment
In order that the object, technical solutions and advantages of the present invention are clearer, the present invention is made below in conjunction with accompanying drawing into
One step it is described in detail, it is clear that the described embodiment only a part of embodiment of the present invention, rather than whole implementation
Example.Based on the embodiment in the present invention, what those of ordinary skill in the art were obtained under the premise of creative work is not made
All other embodiment, belongs to the scope of protection of the invention.
The invention discloses a kind of charge protection method based on smart jack, embodiment as shown in figure 1, including:
For S100 when charging equipment is being charged on smart jack, collection smart jack is supplied to described to be charged set
Standby charging current;
S200 by the charging current of the charging equipment of collection with storage the charging equipment charging current
Memory curve is compared, judge the charging equipment whether charging complete, if so, into step S300;
S300 disconnects the electrical connection of smart jack and the charging equipment.
In the present embodiment, charging equipment, which is inserted on smart jack, to be charged, and to be charged set directly is supplied to smart jack
Standby electric current is sampled, and sampling here can be the current sample of a bit of time or adopting at certain time point
Sample, then the charging current memory curve of the charging equipment of the sample rate current with storing is contrasted, judge that this is to be charged
Equipment whether charging complete, if charging complete, then the electrical connection of socket and charging equipment is disconnected, so as to prevent from waiting filling
Electric equipment overcharges, and influences the battery life of charging equipment.
The charging process of general electronic/electrical gas equipment includes:Trickle charge (low pressure preliminary filling), constant-current charge, constant-voltage charge
And charging termination, but because voltage change can not detect in socket end the change of voltage, so the present invention only detects electricity
Rheology.
The charging process of general battery is divided into three phases.First stage is trickle charge, and battery starts in charging
Period electric current is bigger, now belongs to deep discharge, is particularly easy to produce heat energy, too high temperature directly influences battery
The quality of charging, so now passing through the charging of stable low current trickle fast and stable.The second is constant-current charge, that is, soon
Fast charging current, electric current are maintained at the invariable carry out large current charge of higher value, and voltage ramps, and reaches a magnitude of voltage
When, charging process-constant voltage charging phase of three phases is put into, this is that have a stable voltage, and it can make
Battery capacity gradually returns to state at the beginning, and now electric current slowly reduces, and when dropping to certain value and obtaining, maintains smaller
Electric current continues to charge to battery, in fact, now charges and has completed, and maintains smaller current to be overcharged to battery, for a long time
If influence whether the performance of battery.
According to this charge characteristic of battery, therefore the charging current memory curve of charging equipment can be obtained.Preferably
, can be by being carried out on the smart jack to the charging equipment before charging judgement is carried out to charging equipment
Once complete charging, each stage of the charging equipment charging is recorded, obtains and stores filling for the charging equipment
Electric current memory curve.
We are complete firstly the need of being carried out once on smart jack in certain electronic equipment with lithium battery by taking lithium battery as an example
Whole charging behavior, the electronic equipment can constantly gather the electric current that smart jack is supplied to the electronic equipment in charging process
Information.Current sample can be sampled according to curent change or time change samples, and the condition of curent change sampling is that electric current becomes
Change more than 5%;Time change refers to timing sampling, i.e., carries out current sample at regular intervals;Or take into account the two conditions
Sampled, can so meet both miss curent change, will not make sampled data excessive again.It is one as shown in Figure 2
The typical charging current memory curve of lithium battery.The charging current memory curve can be to be used as follow-up electronic equipment charging
Criterion.
Another embodiment of the present invention, as shown in figure 3, including:
For S100 when charging equipment is being charged on smart jack, collection smart jack is supplied to described to be charged set
Standby charging current;
S210 judges that the charging equipment is current according to the charging current memory curve of the charging equipment of storage
Charging stage;
S220 continues to charge when the charging equipment is in trickle charge stage or constant-current charging phase, and pre-
If the second time after return to step S100 gather the charging current of the charging equipment again;
S230 judges whether the charging current of the collection is less than when the charging equipment is in constant voltage charging phase
Or the minimum current value equal to constant voltage charging phase in the charging current memory curve, if so, into step S240, otherwise exist
After default 3rd time, into step S240;It is bent that default 3rd time is more than or equal to charging current memory
The time of constant-voltage phase in line;
S240 judges the charging equipment charging complete, into step S300.
S300 disconnects the electrical connection of smart jack and the charging equipment.
In the present embodiment, charging equipment can be supplied to the electric current of charging equipment in charging process to smart jack
Sampled, then the charging current memory curve of the charging equipment of the electric current of sampling with storing is compared, so as to
Know which charging stage the charging equipment is now arranged in, if in trickle or constant-current charging phase, then just
Continue to charge, returning again to step S100 after default second time continues to sample, and takes another look at its new progress stage.Compared with
Good, default second time here is (false more than or equal to the time of constant-current phase in the charging current memory curve
If the constant-current phase time is t2), because charging equipment is also in trickle or constant-current charging phase, then as t2 is latter yet
The situation of charging complete, the at most stage also in constant-voltage charge are not reaching to, in this way, the number of sampling can be so reduced,
But the judgement to charging equipment in time is not influenceed.And if charging equipment is in constant voltage charging phase, then just need
The charging equipment is determined whether either with or without being filled with, whether the electric current for seeing collection is minimum in charging current memory curve
Current value, if it does, then illustrating that charging has been completed, the electrical connection of socket and charging equipment can be disconnected, such as
Fruit no words, then at least in the charging current memory curve constant-voltage phase time (if the constant-voltage phase time is t3) it
Disconnect charging connection (now charge and completed) again afterwards.
Preferably, another embodiment of the present invention on the basis of above-described embodiment, is elaborated on how to be charged
What charging stage of equipment judged, specifically, as shown in figure 4, including:
For S100 when charging equipment is being charged on smart jack, collection smart jack is supplied to described to be charged set
Standby charging current;
S211 obtains the charging equipment and is according to the charging current memory curve of the charging equipment of storage
First reference current value in trickle stage;The charging equipment is in the second reference current value of constant-current phase, described to wait to fill
Electric equipment is in the minimum current value of constant-voltage phase;
S212 judges whether the charging current of collection is consistent with second reference current, if so, then entering step
S213, otherwise into step S214;
S213 judges that the charging equipment is in constant-current charging phase, into step S220;
S214 judges whether the charging current of collection is consistent with first reference current, if so, into step
S216, otherwise into step S215;
S215 judges that the charging equipment is in constant voltage charging phase, into step S230;
S216 gathers the charging current of the charging equipment after the default very first time, judge freshly harvested charging current
It is whether consistent with the preceding charging current once gathered, if so, into step S240, otherwise into step S213;It is described pre-
If the very first time be more than or equal to time in trickle stage in the charging current memory curve, and be less than the charging current
The time of constant-current phase in memory curve.
S220 continues to charge when the charging equipment is in trickle charge stage or constant-current charging phase, and pre-
If the second time after return to step S100 gather the charging current of the charging equipment again;
S230 judges whether the charging current of the collection is less than when the charging equipment is in constant voltage charging phase
Or the minimum current value equal to constant voltage charging phase in the charging current memory curve, if so, into step S240, otherwise exist
After default 3rd time, into step S240;It is bent that default 3rd time is more than or equal to charging current memory
The time of constant-voltage phase in line;
S240 judges the charging equipment charging complete, into step S300;
S300 disconnects the electrical connection of smart jack and the charging equipment.
In the present embodiment, according to charging current memory curve, the current reference value in each stage of charging can be obtained, then will
The electric current of collection is compared with each stage current reference value, so as to judge charging stage that charging equipment is presently in.From
As can be seen that constant-current charging phase, electric current is maximum and keeps constant, and the trickle charge stage protects substantially in charging current memory curve
Hold and charged in smaller current, constant voltage charging phase electric current slowly reduces, and smaller current charging is finally maintained at, therefore, if adopted
The size of current of collection substantially with the second reference current value of constant-current phase it is similar if (can be set a small error model
Enclose, can be considered consistent with the second reference current value in this error range), it can determine whether that the charging equipment fills in constant current
The electric stage, then charging has not been completed, it is also necessary to continue to charge, and electric current ratio can be gathered again after default second time
Compared with;If collection electric current it is both inconsistent with the first reference current, also with the second reference current it is inconsistent if, then substantially may be used
To judge that the charging equipment is in constant voltage charging phase, then now can be further by the sampled current value and constant-voltage phase
Minimum current value carry out referring to comparison.So as to judge whether charging complete, or after the time (t3) of constant-voltage phase again
Disconnect charging connection (now charge and completed).(the error if the size of the electric current gathered is consistent with the first reference current
In the range of), then two kinds of possibility are there is now, and it is probably that also kind is probably in constant pressure in the trickle stage that one kind, which is,
Stage, then now just need further to acquire, because trickle stage current is basically unchanged, and last electric current in constant-voltage phase
Also maintain smaller current constant substantially, therefore, electric current can be gathered again after the default very first time and judged, here first
Time is at least greater than or the time (trickle phases-time is t1) equal to the trickle charge stage, here default first when
Between meet:t2>The default very first time>t1;Like this, if charging equipment is in the trickle stage at that time, then during t1
Between after, it should arrived constant-current phase, then the electric current of second collection certainly and collection for the first time electric current it is inconsistent, change width
Degree also can be bigger, therefore can combine second of size of current gathered to judge the charging equipment current charging stage
If the electric current of second collection is larger, reached the second reference current value, then illustrate be before in the trickle stage, but
Constant-current phase is reached after the default very first time, if the electric current and the preceding electric current once gathered of second of collection are basic
Almost, if having no change, then illustrate that charging equipment has been in the last low current part of constant voltage charging phase,
It is substantially in the state overcharged, then it may determine that the charging equipment charging complete, can disconnect charging connection.
Another embodiment of the present invention, on the basis of any of the above-described embodiment, judging charging complete or be disconnected to fill
After electrical connection, in addition to:S400 reminds user's charging complete by light or voice.Pass through light or voice reminder user
Charging has been completed, and user can be allowed to know the completed message of charging in time, so as to which user can take away in time.
Based on identical technical concept, the invention also discloses a kind of smart jack, the smart jack can use this hair
Bright charge protection method, specifically, as shown in figure 5, including:Collecting unit 100, for gathering when charging equipment charges
Charging current;Memory cell 200, for storing the charging current memory curve of the charging equipment;Operating unit 300, use
In disconnection and the electrical connection of the charging equipment;Control unit 400, for filling described in the collecting unit 100 is gathered
The charging current memory curve for the charging equipment that electric current stores with the memory cell 200 is compared, and judges institute
State charging equipment whether charging complete, be electrically connected if so, then being disconnected by the operating unit 300 with the charging equipment
Connect.
The smart jack of the present invention includes fixing type socket (such as family's wall jack), mobile jack (such as insert row)
Deng socket type is unrestricted.The present invention is to carry out charge control to it outside charging equipment, by smart jack end
Charging current is detected, making battery, insert row automatically powers off in the case of fully charged, reaches and both meets charging requirement, again
Protect the purpose of battery.
Another embodiment of the present invention, on the basis of said apparatus embodiment, as shown in fig. 6, the smart jack is also
Including:Mnemon 500, for by once being charged to the charging equipment, recording the charging equipment charging
Each stage, obtain the charging current memory curve of the charging equipment, and deposited by the memory cell 200
Storage.
Another embodiment of the present invention, on the basis of any of the above-described embodiment, described control unit 400 includes:Judge
Module 410, for the charging current memory curve of the charging equipment stored according to the memory module, treated described in judgement
The charging equipment current charging stage;Processing module 420, for being in trickle charge stage or constant current when the charging equipment
During the charging stage, the charging of the charging equipment is gathered again by the collecting unit 100 after default second time
Electric current;When the charging equipment is in constant voltage charging phase, judge whether the charging current of the collection is less than or equal to
The minimum current value of constant voltage charging phase in the charging current memory curve, if so, then controlling the operating unit 300 to disconnect
The electrical connection of the smart jack and the charging equipment, otherwise, opening timing, after default 3rd time described in control
Operating unit 300 disconnects the electrical connection of the intelligent operation and the charging equipment, and the 3rd time is more than or equal to institute
State the time of constant-voltage phase in charging current memory curve.
Preferably, default second time be more than or equal to the charging current memory curve in constant-current phase when
Between.
On the basis of above-described embodiment, as shown in fig. 7, the judge module 410 includes:Acquisition submodule 411, is used for
According to the charging current memory curve of the charging equipment, the first reference that the charging equipment is in the trickle stage is obtained
Current value, the charging equipment are in the second reference current value of constant-current phase and the charging equipment is in constant pressure rank
The minimum current value of section;First judging submodule 412, for judge charging current that the collecting unit 100 gathers whether with
Second reference current is consistent, if so, then judging that the charging equipment is in constant-current charging phase, otherwise second judges son
Module 413 determines whether;Second judging submodule 413, the charging gathered for judging the collecting unit 100
Whether electric current is consistent with first reference current, if so, then the 3rd judging submodule 414 determines whether, otherwise, judges institute
State charging equipment and be in constant voltage charging phase;3rd judging submodule 414, for being controlled after the default very first time
The collecting unit 100 gathers the charging current of the charging equipment, judge freshly harvested charging current whether with it is preceding once
The charging current of collection is consistent, if so, judging charging complete;Otherwise, judge that the charging equipment is in constant-current charge
Stage;The default very first time is more than or equal to the time in trickle stage in the charging current memory curve, and is less than
The time of constant-current phase in the charging current memory curve.
Preferably, on the basis of any of the above-described device embodiment, the smart jack also includes:Reminding unit 600, use
In reminding user's charging complete, the reminding unit 600 comprises at least the light being used for by light prompting user's charging complete
One in prompting module or voice reminder module.
The smart jack embodiment of the present invention is corresponding with the embodiment of the method for the present invention, the technology of the inventive method embodiment
Details is equally applicable to the smart jack embodiment of the present invention, is repeated to reduce, no longer superfluous to chat.
The smart jack of the present invention has two mode of operations, and one is charge protection pattern, and one is common Working mould
Formula, smart jack can carry out charge control and protection under charge protection pattern to the equipment to be charged.Commonly working
Under pattern as common socket, the equipment to insertion is powered.Long-press button can be set to enter charge protection pattern, in addition,
The smart jack of the present invention can also control multiple equipment to charge, and each jack controls a equipment charge.
Another embodiment of smart jack of the present invention, the smart jack are an insert row, and the insert row has multiple jacks, each to insert
Hole has different buttons to be controlled, and this button can enter the curve memory pattern of jack, schematic diagram such as Fig. 8 by long-press
It is shown.
The charging process of general charging equipment includes:Trickle charge (low pressure preliminary filling), constant-current charge, constant-voltage charge and fill
Electricity terminates, but because voltage change insert row can not detect, so the present embodiment only detects curent change.The present embodiment
Intelligent socket is by first remembering charging current curve, comparing charging curve afterwards, realize the insert row of intelligent power down function.
Completely charging behavior is carried out once firstly the need of charging equipment, allows sub- jack to carry out the memory of charging curve;It is long
Flashed by sub- jack button to sub- jack press key lamp, then into the curve memory pattern of sub- jack, at this moment plug to have already passed through and fill
The charging equipment of electric discharge is divided to be charged, curve memory module start recording charging curve;After the completion of to be charged, user press by
Key exits memory pattern, then completes curve memory;During the follow-up equipment charge, meeting is according to the charging curve recorded and in real time
Charging current curve contrasts, to confirm at present in what stage of charging, so can also memory based curve, exclude one
A little abnormal charging behaviors, such as electric current are excessive.
Specifically, the Intelligent socket includes charging curve memory module (equivalent to mnemon), charging curve compares
Module (equivalent to control unit), its role are as follows:
(1) charging current curve memory module
Curve memory pattern is entered by the sub- jack button of long-press, and into after this pattern, insert row can be according to electric current
Change and time change sample, and the condition that curent change samples is curent change more than 5%;Time change refers to that timing is adopted
Sample, i.e., carry out current sample at regular intervals, and two such condition can meet both miss curent change, will not make again
Sampled data is excessive;Charging current memory curve is as shown in Figure 2.
(2) charging curve comparing module
From charging curve above, it can be appreciated that the minimum current and maximum current of charging be it is how many, so we
Can does the sampling of a period of time to current flow, to confirm whether charging is completed
If electric current is the high current stage, charging unfinished, continue to charge;
If electric current is currently minimum current, it is likely that is trickle charge, it is also possible to is charging complete, then we are logical
Cross element of time to go to detect, if after the time more than trickle charge, electric current is still unchanged, then judges charging complete, to this
Jack powers off;If within the time of trickle charge, electric current has big change, has reached the standard of constant-current charge, has then continued waiting for
Charging
Charging current curve is remembered, and applied in subsequent charge.Current charge control is all to be made in charging
Device interior, the present invention are to be made in feeder ear, can so be charged with simple and effective control, avoid charging equipment internal control mould
The risk that charges is caused after block failure.The present invention can do curve memory simultaneously to multiple charging equipments, and multiple equipment can be done
Charge control.
Although preferred embodiments of the present invention have been described, but those skilled in the art once know basic creation
Property concept, then can make other change and modification to these embodiments.So appended claims be intended to be construed to include it is excellent
Select embodiment and fall into having altered and changing for the scope of the invention.
Obviously, those skilled in the art can carry out the essence of various changes and modification without departing from the present invention to the present invention
God and scope.So, if these modifications and variations of the present invention belong to the scope of the claims in the present invention and its equivalent technologies
Within, then the present invention is also intended to comprising including these changes and modification.