CN107630700B - 一种超高巷道“先挑后掘”成巷法 - Google Patents
一种超高巷道“先挑后掘”成巷法 Download PDFInfo
- Publication number
- CN107630700B CN107630700B CN201711008643.0A CN201711008643A CN107630700B CN 107630700 B CN107630700 B CN 107630700B CN 201711008643 A CN201711008643 A CN 201711008643A CN 107630700 B CN107630700 B CN 107630700B
- Authority
- CN
- China
- Prior art keywords
- tunnel
- coal
- rock stratum
- coal seam
- meters
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
- Road Paving Structures (AREA)
Abstract
本发明涉及煤矿巷道施工技术,具体为一种超高巷道“先挑后掘”成巷法,解决超高巷道施工效率低的问题。一种超高巷道“先挑后掘”成巷法,设计的巷道开口处,对岩层打向上的斜炮眼,放炮将岩层和煤层上部分煤体炸酥,随后掘进机正常割煤掘进,然后在掘进面设置两排炮眼,将岩体和煤层上部分煤体炸酥,岩层被两排炮眼切割开,岩层上部分自然垮落到巷道底部,掘进机正常割煤掘进,将煤层的下半部分割掉,剩余的岩体和煤体垮落,反复直到接近巷道设计深度,本方法边掘进同时边挑顶施工,只需要进行一次顶板支护作业,减少了工作量和使用支护材料的数量,极大降低了开采成本。从而达到一次安全快速成巷的目的。
Description
技术领域
本发明涉及煤矿巷道施工技术,具体为一种超高巷道“先挑后掘”成巷法。
背景技术
煤矿作业过程中,都是在煤层中掘进巷道,普通的煤矿巷道一般高度都不超2.5米,在正常情况下,常规高度的巷道完全可以满足施工要求。但是在特殊的施工条件下或者需要运输大型设备的情况下,常常遇到煤巷高度不够、需要进行挑顶以增加巷道高度的情况出现。目前普遍的作业过程,是先将普通高度的巷道打出(2.5米左右),随后进行放炮挑顶作业,增加巷道高度达到3.8米以上。这种方法需要将顶板支护两次(将巷道掘进之后一次、放炮挑顶工作后一次),增大了工作强度和支护材料的数量。
发明内容
本发明为了解决超高巷道施工效率低的问题,提供了一种超高巷道“先挑后掘”成巷法。
本发明的技术方案是,一种超高巷道“先挑后掘”成巷法,包括以下步骤,
步骤一、在设计的巷道开口处,对岩层打向上的斜炮眼,然后装药,放炮,将岩层和煤层上部分煤体炸酥,随后掘进机 正常割煤掘进,将煤层的下半部分割掉,岩层和煤体自然垮落,形成高度达到3.8米,进深为1.5米左右的巷道,完成第一阶段掘进,
步骤二、然后在巷道的工作面上进行第二阶段掘进,在掘进面设置两排炮眼, 两排炮眼放炮后,将岩层和煤层上部分煤体炸酥,岩层被两排炮眼切割开,岩层上部分自然垮落到巷道底部,清理掉落石后,掘进机正常割煤掘进,将煤层的下半部分割掉,剩余的岩体和煤体自然垮落,然后对巷道顶部进行支护施工,如此循环往复步骤二,直到接近巷道设计深度,
步骤三、最后一次掘进施工之前,在距离巷道底面3.0米处对岩层打向下的斜炮眼,然后装药,放炮,将岩层和煤层上部分煤体炸酥,随后掘进机正常割煤掘进,将煤体的下半部分割掉,岩层和煤体自然垮落,达到设计距离后完成超高巷道的施工工作。
与现有施工技术相比,本方法边掘进同时边挑顶施工,只需要进行一次顶板支护作业,减少了工作量和使用支护材料的数量,极大降低了开采成本。从而达到一次安全快速成巷,节省了锚杆数量,减少了人力出矸量的目的。
附图说明
图1为本发明所述的超高巷道“先挑后掘”成巷法构造示意图;
图2为开口处炮眼施工位置示意图;
图3为施工第一步的炮眼施工图;
图4为第一步炮眼平面布置图;
图5为第二步炮眼布置示意图;
图6为第二步炮眼的炮眼施工图;
图7为第二步炮眼的水平分布图。
具体实施方式
如图1所示,正常巷道高度,一般为煤层4厚度,约为2.5-2.6米左右,煤层4上方为岩层3,如果设计巷道宽5.4米,高3.8米。那么需要将该煤层上部岩石层3部分挑顶,以此增加整体巷道高度。
具体施工方法为:
步骤一、如图2、3、4所示意,在设计的巷道开口处2,对岩层3打向上的斜炮眼,然后装药,放炮,将岩层和煤层4上部分煤体炸酥,随后掘进机1正常割煤掘进,将煤层的下半部分割掉,岩层和煤体自然垮落,形成高度达到3.8米,进深为1.5米左右的巷道,完成第一阶段掘进。
打眼参数,距离巷道底面3.0米处高度,与巷道底面平行布置若干炮眼(本处为9个炮眼,编号为P1-P9),炮眼间距750-550mm,与巷道地平面为30°倾斜设置,打眼深度1600mm,每眼装药0.4公斤,封泥长度500mm,
使用雷管型号:毫秒延期电雷管,雷管装药方式:正向装药,雷管连线方式:串联;
步骤二、如图5、6、所示意,然后在巷道的工作面上进行第二阶段掘进,在距离巷道底面3.0米和3.4米的两个水平高度,设置两排炮眼,上排7个,下排9个(编号P1-P16),下排炮眼中间的7个炮眼分别与上排炮眼处于同一垂线上。
3.0米水平高度的炮眼与巷道底面水平设置,打眼深度1600mm,间距550-750mm,装药量每眼0.4公斤,封泥长度500mm,
3.4米水平高度的炮眼与巷道底面呈9°倾斜设置,打眼深度1500mm,间距550-750mm,装药量每眼0.4公斤,封泥长度500mm,
使用雷管型号:毫秒延期电雷管,雷管装药方式:正向装药,雷管连线方式:串联,
两排炮眼放炮后,将岩层和煤层上部分煤体炸酥,岩层3被两排炮眼切割开,岩层3上部分自然垮落到巷道底部,清理掉落石后,掘进机正常割煤掘进,将煤层的下半部分割掉,剩余的岩体和煤体自然垮落,然后对巷道顶部进行支护施工。
如此循环往复步骤二,直到接近设计深度。
步骤三、最后一次掘进施工之前,在距离巷道底面3.0米处对岩层3打向下的斜炮眼,然后装药,放炮,将岩层和煤层上部分煤体炸酥,随后掘进机1正常割煤掘进,将煤层的下半部分割掉,岩层和煤体自然垮落,达到设计距离后完成超高巷道的施工工作。
使用雷管型号:毫秒延期电雷管,雷管装药方式:正向装药,雷管连线方式:串联。
Claims (1)
1.一种超高巷道“先挑后掘”成巷法,其特征在于:包括以下步骤,
步骤一、在设计的巷道开口处,对岩层打向上的斜炮眼,然后装药,放炮,将岩层和煤层上部分煤体炸酥,随后掘进机正常割煤掘进,将煤层的下半部分割掉,岩层和煤层自然垮落,形成高度达到3 .8米,进深为1 .5米左右的巷道,完成第一阶段掘进,在步骤一中,打眼参数,距离巷道底面3 .0米处高度,与巷道底面平行布置若干炮眼,炮眼间距750- 550mm,与巷道地平面为30°倾斜设置,打眼深度1600mm,每眼装药0 .4公斤,封泥长度500mm,
步骤二、然后在巷道的工作面上进行第二阶段掘进,掘进面设置两排炮眼,两排炮眼放炮后,将岩体和煤层上部分煤体炸酥,岩层被两排炮眼切割开,岩层上部分自然垮落到巷道底部,清理掉落石后,掘进机正常割煤掘进,将煤层的下半部分割掉,剩余的岩体和煤体自然垮落,然后对巷道顶部进行支护施工,如此循环往复步骤二,直到接近巷道设计深度,在步骤二中,打眼参数为,在距离巷道底面3 .0米和3 .4米的两个水平高度,设置两排炮眼,3 .0米水平高度的炮眼与巷道底面水平设置,3 .4米水平高度的炮眼与巷道底面呈9°倾斜设置,炮眼间距550-750mm,装药量每眼0 .4公斤,封泥长度500mm,
步骤三、最后一次掘进施工之前,在距离巷道底面3 .0米处对岩层(3) 打向下的斜炮眼,然后装药,放炮,将岩层和煤层上部分煤体炸酥,随后掘进机正常割煤掘进,将煤层的下半部分割掉,岩层和煤体自然垮落,达到设计距离后完成超高巷道的施工工作,
放炮使用雷管型号:毫秒延期电雷管;雷管装药方式,正向装药;雷管连线方式,串联。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711008643.0A CN107630700B (zh) | 2017-10-25 | 2017-10-25 | 一种超高巷道“先挑后掘”成巷法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711008643.0A CN107630700B (zh) | 2017-10-25 | 2017-10-25 | 一种超高巷道“先挑后掘”成巷法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107630700A CN107630700A (zh) | 2018-01-26 |
CN107630700B true CN107630700B (zh) | 2019-07-30 |
Family
ID=61106295
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711008643.0A Active CN107630700B (zh) | 2017-10-25 | 2017-10-25 | 一种超高巷道“先挑后掘”成巷法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107630700B (zh) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102003186A (zh) * | 2010-09-13 | 2011-04-06 | 山西晋城无烟煤矿业集团有限责任公司 | 双巷掘进施工工艺 |
CN105019905A (zh) * | 2015-07-02 | 2015-11-04 | 中煤盘江重工有限公司 | 针对西南地区复杂地质条件的机炮混采方法 |
CN107165664A (zh) * | 2017-07-11 | 2017-09-15 | 河南理工大学 | 一种倾斜厚煤层沿顶掘进超高回采巷道切顶留巷方法 |
-
2017
- 2017-10-25 CN CN201711008643.0A patent/CN107630700B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102003186A (zh) * | 2010-09-13 | 2011-04-06 | 山西晋城无烟煤矿业集团有限责任公司 | 双巷掘进施工工艺 |
CN105019905A (zh) * | 2015-07-02 | 2015-11-04 | 中煤盘江重工有限公司 | 针对西南地区复杂地质条件的机炮混采方法 |
CN107165664A (zh) * | 2017-07-11 | 2017-09-15 | 河南理工大学 | 一种倾斜厚煤层沿顶掘进超高回采巷道切顶留巷方法 |
Non-Patent Citations (2)
Title |
---|
岩巷特殊超高硐室施工工艺探究;杨春华;《能源技术与管理》;20081230(第4期);72-74 |
煤矿复杂条件下超高巷道开口掘进工艺;杨晋波;《现代矿业》;20160630(第6期);33-34 |
Also Published As
Publication number | Publication date |
---|---|
CN107630700A (zh) | 2018-01-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108661646A (zh) | 一种假顶房柱式留矿嗣后充填采矿法 | |
CN105041314B (zh) | 一种深部嗣后回采矿房—分层回采矿柱的联合采矿法 | |
CN102844522B (zh) | 地下采矿 | |
CN101328809B (zh) | 无底柱深孔后退式采矿方法 | |
CN104405395B (zh) | 地下矿体从空场采矿法向崩落采矿法过渡的采矿方法 | |
CN103123247A (zh) | 用于陡倾小交角层状围岩小净距隧道开挖的减震爆破方法 | |
CN104632221B (zh) | 一种采用液态二氧化碳爆破诱导崩落采矿方法 | |
CN107063014A (zh) | 复杂环境下路堑浅孔台阶控制爆破削坡方法 | |
CN107165636A (zh) | 一种露天采石场开采的方法 | |
CN105649635B (zh) | 一种采空区内煤层复采巷道掘进方法 | |
CN109029168A (zh) | 一种井下悬顶的爆破处理方法 | |
CN110331978A (zh) | 一种环境再造分段中深孔嗣后充填采矿法 | |
CN111042818B (zh) | 一种围岩不稳固急倾斜薄矿脉钨矿体的开采方法 | |
CN103437766B (zh) | 一种原地碎裂采矿方法 | |
CN111594170B (zh) | 一种缓倾斜矿体顶底板残留矿体回采方法 | |
CN109812268A (zh) | 盘区机械化上向水平分层充填顶柱定向抛掷爆破采矿法 | |
CN110080774A (zh) | 基于急倾斜矿体垂直中深孔后退式落矿干式充填采矿法 | |
CN108086979A (zh) | 一种垂直深孔柱状药包落矿阶段矿房法采矿工艺 | |
CN110219650B (zh) | 一种环境再造阶段深孔嗣后充填采矿法 | |
CN105863727B (zh) | 间柱采空区处理方法 | |
CN107939402A (zh) | 一种回采矿岩中等以上稳固的急倾斜厚矿体的采矿方法 | |
CN112324439A (zh) | 一种诱导崩落巷道顶板的采矿方法 | |
CN107630700B (zh) | 一种超高巷道“先挑后掘”成巷法 | |
CN112031776A (zh) | 一种残采矿山的矿石回采方法 | |
CN113482618B (zh) | 辅助崩落的采矿方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |