It is applied to a variety of crowd's adjustable basketball stands in a kind of gymnasium
Technical field
The present invention relates to be applied to a variety of crowd's adjustable basketball stands in a kind of basketball stands, more particularly to a kind of gymnasium.
Background technology
Physical culture is a kind of complicated Social Culture phenomenon, and it gives birth to using body and intellection as basic means according to human body
The rules such as long development, technical ability are formed and function improves, reach promote full development, improve fitness and overall education level,
Build up health a kind of conscious, purposeful, organized with improving the quality of living with raising locomitivity, mode of making the life better
Social activities.With the expansion of international association, the scale and level of sports business development have been to weigh country, a social development
A progressive important symbol, also turn into the important means of diplomacy and cultural exchanges between country.Physical culture can be divided into sport for all, specially
The species such as industry physical culture, school physical education.Including sports culture, physical education, sports, athletic competition, sports equipment, sports group
Knit, the lot of essential factors such as sports science technology.
As attention of the Chinese government to sports, people are also more and more denseer to the interest of sports, many projects
All it is to be cultivated since children, basketball movement is also increasingly liked that basketball stands are must not in basketball movement by people
One of apparatus that can be less, but the height of existing basketball stands is all changeless, is not suitable for stature in continually changing children
Using or disadvantaged group exercise.
Therefore research and development are needed badly and a kind of are applied to a variety of crowds, adjustment height and the basket that can be counted to the basketball knocked down
Ball-collecting rack, all it is changeless to overcome the height of basketball stands in the prior art, be not suitable for stature makes in continually changing children
With or disadvantaged group exercise the shortcomings that.
The content of the invention
(1)Technical problems to be solved
The present invention is changeless to overcome the height of basketball stands in the prior art, is not suitable for stature continually changing
The shortcomings that children's use or the exercise of disadvantaged group, the technical problem to be solved in the present invention is to provide one kind to be applied to a variety of people
Group, adjustment height and the basketball stands that the basketball knocked down can be counted.
(2)Technical scheme
In order to solve the above-mentioned technical problem, the invention provides be applied to the adjustable basketball of a variety of crowds in such a gymnasium
Frame, includes base, bow, basketball rim, governor motion and elevating mechanism, and base top is connected with elevating mechanism, lift
Bow is connected with structure, governor motion is connected with bow, basketball rim is connected with governor motion.
Preferably, governor motion includes the first hook, the first link, steel wire rope, connecting rod, directive wheel, fixed plate,
One slide rail, the first sliding block, spring and contiguous block, bow bottom are connected with the first hook, and the first hook top is cased with the first extension
Ring, bow right-hand member are connected with the first slide rail, and slidingtype is connected with the first sliding block, the first sliding block and the first slide rail on the first slide rail
Coordinate, the first slide rail lower right side is connected with contiguous block, is connected on the right side of the first sliding block with basketball rim, contiguous block top and basketball rim
Between be connected with spring, the first slider top is connected with steel wire rope, on the left of the first slide rail and at the top of bow between be connected with
Extension bar, is respectively connected with directive wheel at the top of connecting rod, bow and the first slide rail, and steel wire rope bypass directive wheel, steel cord ends and
First link top connects.
Preferably, elevating mechanism includes installing frame, the second slide rail, the second sliding block, rack, motor, sector gear and liter
Bar drops, and base top is connected with installing frame, and installing frame crown center is provided with through hole, and left and right sides middle part is respectively connected with installing frame
Second slide rail, slidingtype is connected with the second sliding block on the second slide rail, and the second sliding block coordinates with the second slide rail, in the second sliding block
Side is respectively connected with rack, and rear wall is connected with motor in installing frame, is connected with sector gear in the output of motor, rack with sector
Gear engages, and is connected with elevating lever between the rack top of the left and right sides, elevating lever passes through through hole, elevating lever top and bow
Bottom connects.
Preferably, also include the first bull stick, belt pulley, flat belt, first bearing seat, runner, connecting rod, the 3rd slide rail,
3rd sliding block and illuminating lamp, are connected with first bearing seat on the left of base top, connect on the output shaft of first bearing seat and motor
The first bull stick is connected to, belt pulley is respectively connected with the first bull stick, the belt pulley on right side is located at the outer antetheca of installing frame, the left and right sides
Flat belt is wound between belt pulley, runner is connected with first bull stick in left side, runner is located on front side of the belt pulley in left side, installation
Frame left upper portion is connected with the 3rd slide rail, and slidingtype is connected with the 3rd sliding block on the 3rd slide rail, and the 3rd sliding block is matched somebody with somebody with the 3rd slide rail
Close, rotary type is connected with connecting rod between runner on rear side of the 3rd sliding block, and the 3rd slider top is connected with illuminating lamp.
Preferably, mounting blocks, second bearing seat, the second bull stick, handle, pole, cloth bag, the second hook and the are also included
Two links, the first sliding block left side are connected with mounting blocks, and mounting blocks bottom is connected with second bearing seat, is connected with second bearing seat
Second bull stick, the second bull stick left lower are connected with pole, and cloth bag is connected with pole, and the second bull stick left upper portion is connected with handle
Hand, basketball rim right-hand member rotary type are connected with the second link, and the second link is connected with cloth bag, and the second link hangs over the second link
On.
Preferably, also include fixed block and fixture block, be connected with fixed block at the top of the 3rd slide rail, be provided with fixed block recessed
Groove, groove is interior to be provided with fixture block, and fixture block coordinates with groove, and fixture block top is connected with illuminating lamp bottom.
Preferably, also include sponge block, baffle plate and rubber blanket, baffle plate is connected with the top of basketball rim, is bonded on the right side of baffle plate
There is rubber blanket, it is symmetrical above and below between baffle plate and the first slide rail to be provided with sponge block.
Operation principle:In use, user can be shot by governor motion to be finely adjusted the height of basketball rim, pass through
Elevating mechanism can significantly be adjusted the height of basketball rim, be carried out to reach the basketball stands in gymnasium suitable for different crowd
The purpose of shooting.
Because governor motion includes the first hook, the first link, steel wire rope, connecting rod, directive wheel, fixed plate, first
Slide rail, the first sliding block, spring and contiguous block, bow bottom are connected with the first hook, and the first hook top is cased with the first link,
Bow right-hand member is connected with the first slide rail, and slidingtype is connected with the first sliding block on the first slide rail, and the first sliding block is matched somebody with somebody with the first slide rail
Close, the first slide rail lower right side is connected with contiguous block, be connected on the right side of the first sliding block with basketball rim, contiguous block top and basketball rim it
Between be connected with spring, the first slider top is connected with steel wire rope, on the left of the first slide rail and at the top of bow between be connected with connection
Bar, is respectively connected with directive wheel at the top of connecting rod, bow and the first slide rail, and steel wire rope bypasses directive wheel, steel cord ends and the
One link top connects.When needing the height for being finely adjusted basketball rim to be shot, user of service first by the first link from
First hook top is removed, and then pulls the first link to move downward, and the first link then can pull the first sliding block by steel wire rope
Upward sliding, the first sliding block can then drive basketball rim to move upwards, and spring is stretched, and unclamp the first link, and steel wire rope unclasps, basket
Ball frame can then be moved downward by the first sliding block under gravity, in this way, during the height of the good basketball rim of fine adjustment, first is hung
On ring set it is corresponding first hook height on, by the way that the first link to be enclosed on to the foot of the first hook, then can finely tune to
The extreme higher position of basketball rim, by the way that the first link to be enclosed on to the topmost of the first hook, then it can finely tune minimum to basketball rim
Position, by the way that the first link to be enclosed on to the middle part of the first hook, then it can finely tune to the medium position of basketball rim.
Because elevating mechanism includes installing frame, the second slide rail, the second sliding block, rack, motor, sector gear and lifting
Bar, base top are connected with installing frame, and installing frame crown center is provided with through hole, and left and right sides middle part is respectively connected with the in installing frame
Two slide rails, slidingtype is connected with the second sliding block on the second slide rail, and the second sliding block coordinates with the second slide rail, on the inside of the second sliding block
Rack is respectively connected with, rear wall is connected with motor in installing frame, is connected with sector gear in the output of motor, and rack is and sector
Wheel is engaged, and elevating lever is connected between the rack top of the left and right sides, and elevating lever passes through through hole, elevating lever top and bow bottom
End connection.When the height for needing significantly to adjust basketball rim, carried out to reach the basketball stands in gymnasium suitable for different crowd
The purpose of shooting, is at this moment rotated by controlled motor, and motor can then drive sector gear to rotate, and sector gear can then drive right side
Rack the tooth that elevating lever drives left side can then be passed through by the second sliding block slide downward on right side, the rack slide downward on right side
Bar can also drive bow to move downward by the second sliding block slide downward in left side by elevating lever, work as sector gear
Turning to when being engaged with the rack in left side, sector gear can then drive the rack in left side by the two sliding block upward slidings in left side,
Then by elevating lever the rack on right side can be driven to be lifted therewith by the second sliding block upward sliding on right side so as to the rack in left side
Bar can also drive bow to move upwards, be rotated by controlled motor, drive bow constantly to move up and down to realize, reach
The purpose of the height of basketball rim is significantly adjusted, after regulating height, closes motor.
Because also include the first bull stick, belt pulley, flat belt, first bearing seat, runner, connecting rod, the 3rd slide rail, the 3rd
Sliding block and illuminating lamp, are connected with first bearing seat on the left of base top, are respectively connected with the output shaft of first bearing seat and motor
First bull stick, belt pulley is respectively connected with the first bull stick, and the belt pulley on right side is located at the outer antetheca of installing frame, the belt of the left and right sides
Flat belt is wound between wheel, runner is connected with first bull stick in left side, runner is located on front side of the belt pulley in left side, and installing frame is left
Upper lateral part is connected with the 3rd slide rail, and slidingtype is connected with the 3rd sliding block on the 3rd slide rail, and the 3rd sliding block and the 3rd slide rail coordinate, the
Rotary type is connected with connecting rod between runner on rear side of three sliding blocks, and the 3rd slider top is connected with illuminating lamp.The illuminating lamp of setting, energy
Enough to play illuminating effect compared with dark place, when motor rotates, motor can then drive first bull stick on right side and the belt pulley on right side
Rotate, the belt pulley on right side can then drive the pulley rotation in left side by flat belt, and the belt pulley in left side can then drive a left side
First bar rotation of side, drives runner to rotate by first bull stick in left side, and runner then can constantly be drawn by connecting rod
Dynamic or promote the 3rd sliding block to slide up and down, the 3rd sliding block then can drive illuminating lamp constantly to move up and down, according to significantly adjusting
While the height of basketball rim can also adjusting illuminating lamp height so that the height between basketball rim and illuminating lamp is constant all the time.
Because also include mounting blocks, second bearing seat, the second bull stick, handle, pole, cloth bag, the second hook and second
Link, mounting blocks are connected with the left of the first sliding block, mounting blocks bottom is connected with second bearing seat, and the is connected with second bearing seat
Two bull sticks, the second bull stick left lower are connected with pole, and cloth bag is connected with pole, and the second bull stick left upper portion is connected with handle
Hand, basketball rim right-hand member rotary type are connected with the second link, and the second link is connected with cloth bag, and the second link hangs over the second link
On.Dropped to by the ball for allowing shooting to enter in cloth bag, so, the ball count that user can be facilitated to enter oneself shooting, no
Need to allow basketball to fall to when collecting in cloth bag, then can be removed by by the second link from the second hook, hold handle, turn
Turn bar is to cloth bag is outwarded winding, and basketball hanging fascia is on cloth bag when can prevent pitching.
Because also including fixed block and fixture block, fixed block is connected with the top of the 3rd slide rail, groove is provided with fixed block, it is recessed
Fixture block is provided with groove, fixture block coordinates with groove, and fixture block top is connected with illuminating lamp bottom.By the way that fixture block is removed out of groove,
It can complete to remove the purpose that illuminating lamp is cleared up, by the way that fixture block is snapped onto in groove, you can illuminating lamp is fixed.
Because also including sponge block, baffle plate and rubber blanket, baffle plate is connected with the top of basketball rim, rubber is bonded with the right side of baffle plate
Rubber cushion, symmetrical above and below between baffle plate and the first slide rail to be provided with sponge block, the sponge block of setting plays cushioning effect, because there is rubber
The effect of pad, prevent that frictional force caused by basketball impact damages baffle plate during pitching.
(3)Beneficial effect
The present invention is by there is provided governor motion and elevating mechanism, to realize the height of fine-tuning basketball rim or significantly regulating basket
The height of ball frame, to reach the purpose that the basketball stands in gymnasium are applied to different crowd and shot, the illuminating lamp of setting, energy
It is enough to play illuminating effect compared with dark place, according to while the height for significantly adjusting basketball rim can also adjusting illuminating lamp height,
So that the height between basketball rim and illuminating lamp is constant all the time, dropped to by the ball for allowing shooting to enter in cloth bag, so, can be with
The ball count for facilitating user to enter oneself shooting.
Brief description of the drawings
Fig. 1 is the main structure diagram of the present invention.
Fig. 2 is the first main structure diagram of governor motion of the present invention.
Fig. 3 is the first main structure diagram of elevating mechanism of the present invention.
Fig. 4 is second of main structure diagram of elevating mechanism of the present invention.
Fig. 5 is second of main structure diagram of governor motion of the present invention.
Fig. 6 is the third main structure diagram of elevating mechanism of the present invention.
Fig. 7 is the third main structure diagram of governor motion of the present invention.
Mark in accompanying drawing for:1- bases, 2- bows, 3- basketball rims, 4- governor motions, 41- first are linked up with, 42-
One link, 43- steel wire ropes, 44- connecting rods, 45- directive wheels, 46- fixed plates, the slide rails of 47- first, the sliding blocks of 48- first, 49- bullets
Spring, 410- contiguous blocks, 5- elevating mechanisms, 51- installing frames, the slide rails of 52- second, the sliding blocks of 53- second, 54- racks, 55- motors,
56- sector gears, 57- elevating levers, 58- through holes, the bull sticks of 6- first, 7- belt pulleys, 8- flat belts, 9- first bearing seats, 10- turn
Wheel, 11- connecting rods, the slide rails of 12- the 3rd, the sliding blocks of 13- the 3rd, 14- illuminating lamps, 15- mounting blocks, 16- second bearing seats, 17- second
Bull stick, 18- handles, 19- poles, 20- cloth bags, 21- second are linked up with, the links of 22- second, 23- fixed blocks, 24- grooves, 25- cards
Block, 26- sponge blocks, 27- baffle plates, 28- rubber blankets.
Embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
It is applied to a variety of crowd's adjustable basketball stands in a kind of gymnasium, as shown in figs. 1-7, includes base 1, bow 2, basketball
Frame 3, governor motion 4 and elevating mechanism 5, the top of base 1 are connected with elevating mechanism 5, bow 2, arc are connected with elevating mechanism 5
Governor motion 4 is connected with shape bar 2, basketball rim 3 is connected with governor motion 4.
Embodiment 2
It is applied to a variety of crowd's adjustable basketball stands in a kind of gymnasium, as shown in figs. 1-7, includes base 1, bow 2, basketball
Frame 3, governor motion 4 and elevating mechanism 5, the top of base 1 are connected with elevating mechanism 5, bow 2, arc are connected with elevating mechanism 5
Governor motion 4 is connected with shape bar 2, basketball rim 3 is connected with governor motion 4.
Governor motion 4 includes the first hook 41, the first link 42, steel wire rope 43, connecting rod 44, directive wheel 45, fixation
Plate 46, the first slide rail 47, the first sliding block 48, spring 49 and contiguous block 410, the bottom of bow 2 are connected with the first hook 41, and first
Link up with 41 tops and be cased with the first link 42, the right-hand member of bow 2 is connected with the first slide rail 47, and slidingtype is connected with the first slide rail 47
First sliding block 48, the first sliding block 48 coordinate with the first slide rail 47, and the lower right side of the first slide rail 47 is connected with contiguous block 410, and first
The right side of sliding block 48 is connected with basketball rim 3, and spring 49, the top of the first sliding block 48 are connected between the top of contiguous block 410 and basketball rim 3
Steel wire rope 43 is connected with, connecting rod 44, connecting rod 44, bow 2 are connected between the left side of the first slide rail 47 and the top of bow 2
Directive wheel 45 is respectively connected with the top of the first slide rail 47, steel wire rope 43 bypasses directive wheel 45, the end of steel wire rope 43 and the first link
42 tops connect.
Embodiment 3
It is applied to a variety of crowd's adjustable basketball stands in a kind of gymnasium, as shown in figs. 1-7, includes base 1, bow 2, basketball
Frame 3, governor motion 4 and elevating mechanism 5, the top of base 1 are connected with elevating mechanism 5, bow 2, arc are connected with elevating mechanism 5
Governor motion 4 is connected with shape bar 2, basketball rim 3 is connected with governor motion 4.
Governor motion 4 includes the first hook 41, the first link 42, steel wire rope 43, connecting rod 44, directive wheel 45, fixation
Plate 46, the first slide rail 47, the first sliding block 48, spring 49 and contiguous block 410, the bottom of bow 2 are connected with the first hook 41, and first
Link up with 41 tops and be cased with the first link 42, the right-hand member of bow 2 is connected with the first slide rail 47, and slidingtype is connected with the first slide rail 47
First sliding block 48, the first sliding block 48 coordinate with the first slide rail 47, and the lower right side of the first slide rail 47 is connected with contiguous block 410, and first
The right side of sliding block 48 is connected with basketball rim 3, and spring 49, the top of the first sliding block 48 are connected between the top of contiguous block 410 and basketball rim 3
Steel wire rope 43 is connected with, connecting rod 44, connecting rod 44, bow 2 are connected between the left side of the first slide rail 47 and the top of bow 2
Directive wheel 45 is respectively connected with the top of the first slide rail 47, steel wire rope 43 bypasses directive wheel 45, the end of steel wire rope 43 and the first link
42 tops connect.
Elevating mechanism 5 includes installing frame 51, the second slide rail 52, the second sliding block 53, rack 54, motor 55, sector gear
56 and elevating lever 57, the top of base 1 is connected with installing frame 51, and the crown center of installing frame 51 is provided with through hole 58, left in installing frame 51
Right two middle side parts are respectively connected with the second slide rail 52, and slidingtype is connected with the second sliding block 53, the second sliding block 53 on the second slide rail 52
Coordinate with the second slide rail 52, the inner side of the second sliding block 53 is respectively connected with rack 54, and rear wall is connected with motor 55 in installing frame 51, electricity
Sector gear 56 is connected with the output of machine 55, rack 54 engages with sector gear 56, the top of rack 54 of the left and right sides it
Between be connected with elevating lever 57, elevating lever 57 passes through through hole 58, and the top of elevating lever 57 is connected with the bottom of bow 2.
Embodiment 4
It is applied to a variety of crowd's adjustable basketball stands in a kind of gymnasium, as shown in figs. 1-7, includes base 1, bow 2, basketball
Frame 3, governor motion 4 and elevating mechanism 5, the top of base 1 are connected with elevating mechanism 5, bow 2, arc are connected with elevating mechanism 5
Governor motion 4 is connected with shape bar 2, basketball rim 3 is connected with governor motion 4.
Governor motion 4 includes the first hook 41, the first link 42, steel wire rope 43, connecting rod 44, directive wheel 45, fixation
Plate 46, the first slide rail 47, the first sliding block 48, spring 49 and contiguous block 410, the bottom of bow 2 are connected with the first hook 41, and first
Link up with 41 tops and be cased with the first link 42, the right-hand member of bow 2 is connected with the first slide rail 47, and slidingtype is connected with the first slide rail 47
First sliding block 48, the first sliding block 48 coordinate with the first slide rail 47, and the lower right side of the first slide rail 47 is connected with contiguous block 410, and first
The right side of sliding block 48 is connected with basketball rim 3, and spring 49, the top of the first sliding block 48 are connected between the top of contiguous block 410 and basketball rim 3
Steel wire rope 43 is connected with, connecting rod 44, connecting rod 44, bow 2 are connected between the left side of the first slide rail 47 and the top of bow 2
Directive wheel 45 is respectively connected with the top of the first slide rail 47, steel wire rope 43 bypasses directive wheel 45, the end of steel wire rope 43 and the first link
42 tops connect.
Elevating mechanism 5 includes installing frame 51, the second slide rail 52, the second sliding block 53, rack 54, motor 55, sector gear
56 and elevating lever 57, the top of base 1 is connected with installing frame 51, and the crown center of installing frame 51 is provided with through hole 58, left in installing frame 51
Right two middle side parts are respectively connected with the second slide rail 52, and slidingtype is connected with the second sliding block 53, the second sliding block 53 on the second slide rail 52
Coordinate with the second slide rail 52, the inner side of the second sliding block 53 is respectively connected with rack 54, and rear wall is connected with motor 55 in installing frame 51, electricity
Sector gear 56 is connected with the output of machine 55, rack 54 engages with sector gear 56, the top of rack 54 of the left and right sides it
Between be connected with elevating lever 57, elevating lever 57 passes through through hole 58, and the top of elevating lever 57 is connected with the bottom of bow 2.
Also include the first bull stick 6, belt pulley 7, flat belt 8, first bearing seat 9, runner 10, connecting rod 11, the 3rd slide rail
12nd, the 3rd sliding block 13 and illuminating lamp 14, the top left side of base 1 are connected with first bearing seat 9, first bearing seat 9 and motor 55
The first bull stick 6 is respectively connected with output shaft, belt pulley 7 is respectively connected with the first bull stick 6, the belt pulley 7 on right side is located at installing frame
51 outer antethecas, flat belt 8 is wound between the belt pulley 7 of the left and right sides, runner 10, runner are connected with first bull stick 6 in left side
10 are connected with the 3rd slide rail 12 positioned at the front side of belt pulley 7 in left side, the left upper portion of installing frame 51, and slidingtype connects on the 3rd slide rail 12
The 3rd sliding block 13 is connected to, the 3rd sliding block 13 coordinates with the 3rd slide rail 12, and rotary type connects between the rear side of the 3rd sliding block 13 and runner 10
Connecting rod 11 is connected to, the top of the 3rd sliding block 13 is connected with illuminating lamp 14.
Also include mounting blocks 15, second bearing seat 16, the second bull stick 17, handle 18, pole 19, the extension of cloth bag 20, second
The link 22 of hook 21 and second, the left side of the first sliding block 48 are connected with mounting blocks 15, and the bottom of mounting blocks 15 is connected with second bearing seat 16,
The second bull stick 17 is connected with second bearing seat 16, the left lower of the second bull stick 17 is connected with pole 19, is connected with pole 19
Cloth bag 20, the left upper portion of the second bull stick 17 are connected with handle 18, and the right-hand member rotary type of basketball rim 3 is connected with the second link 22, cloth bag
The second link 22 is connected with 20, the second link 22 is hung on the second link 22.
Also include fixed block 23 and fixture block 25, the top of the 3rd slide rail 12 is connected with fixed block 23, is provided with fixed block 23
Groove 24, groove 24 is interior to be provided with fixture block 25, and fixture block 25 coordinates with groove 24, and the top of fixture block 25 is connected with the bottom of illuminating lamp 14.
Also include sponge block 26, baffle plate 27 and rubber blanket 28, the top of basketball rim 3 is connected with baffle plate 27, the right side of baffle plate 27
It is bonded with rubber blanket 28, it is symmetrical above and below between the slide rail 47 of baffle plate 27 and first to be provided with sponge block 26.
Operation principle:In use, user can be shot by governor motion 4 to be finely adjusted the height of basketball rim 3, lead to
The height of basketball rim 3 can significantly be adjusted by crossing elevating mechanism 5, be applied to different crowd to reach the basketball stands in gymnasium
The purpose shot.
Because governor motion 4 include the first hook 41, the first link 42, steel wire rope 43, connecting rod 44, directive wheel 45,
Fixed plate 46, the first slide rail 47, the first sliding block 48, spring 49 and contiguous block 410, the bottom of bow 2 are connected with the first hook 41,
First 41 tops of hook are cased with the first link 42, and the right-hand member of bow 2 is connected with the first slide rail 47, and slidingtype connects on the first slide rail 47
The first sliding block 48 is connected to, the first sliding block 48 coordinates with the first slide rail 47, and the lower right side of the first slide rail 47 is connected with contiguous block 410,
The right side of first sliding block 48 is connected with basketball rim 3, and spring 49, the first sliding block 48 are connected between the top of contiguous block 410 and basketball rim 3
Top is connected with steel wire rope 43, and connecting rod 44, connecting rod 44, arc are connected between the left side of the first slide rail 47 and the top of bow 2
The top of 2 and first slide rail of shape bar 47 is respectively connected with directive wheel 45, and steel wire rope 43 bypasses directive wheel 45, the end of steel wire rope 43 and first
The top of link 42 connects.When needing the height for being finely adjusted basketball rim 3 to be shot, user of service is first by the first link 42
Removed from the first 41 tops of hook, then pull the first link 42 to move downward, the first link 42 can then be drawn by steel wire rope 43
The dynamic upward sliding of first sliding block 48, the first sliding block 48 then can drive basketball rim 3 to move upwards, and spring 49 is stretched, and unclamp first
Link 42, steel wire rope 43 are unclasped, and basketball rim 3 can then be moved downward by the first sliding block 48 under gravity, in this way, fine adjustment
During the height of good basketball rim 3, in height that the first link 42 is put to corresponding first hook 41, by by 42 sets of the first link
In the foot of the first hook 41, then can finely tune to the extreme higher position of basketball rim 3, by the way that the first link 42 is enclosed on into the first extension
The topmost of hook 41, then it can finely tune to the extreme lower position of basketball rim 3, by the way that the first link 42 is enclosed in the first hook 41
Portion, then it can finely tune to the medium position of basketball rim 3.
Because elevating mechanism 5 includes installing frame 51, the second slide rail 52, the second sliding block 53, rack 54, motor 55, sector
Gear 56 and elevating lever 57, the top of base 1 are connected with installing frame 51, and the crown center of installing frame 51 is provided with through hole 58, installing frame 51
The second slide rail 52 is respectively connected with the middle part of the interior left and right sides, slidingtype is connected with the second sliding block 53 on the second slide rail 52, and second slides
Block 53 coordinates with the second slide rail 52, and the inner side of the second sliding block 53 is respectively connected with rack 54, and rear wall is connected with motor in installing frame 51
55, sector gear 56 is connected with the output of motor 55, and rack 54 engages with sector gear 56, and the rack 54 of the left and right sides pushes up
Elevating lever 57 is connected between end, elevating lever 57 passes through through hole 58, and the top of elevating lever 57 is connected with the bottom of bow 2.Work as needs
The height of basketball rim 3 is significantly adjusted, to reach the purpose that the basketball stands in gymnasium are applied to different crowd and shot, this
When rotated by controlled motor 55, motor 55 then can drive sector gear 56 to rotate, sector gear 56 can then drive right side tooth
Bar 54 can then pass through elevating lever 57 and drive left side by the slide downward of the second sliding block 53 on right side, the slide downward of rack 54 on right side
Rack 54 by the slide downward of the second sliding block 53 in left side, and then also bow 2 can be driven to move downward by elevating lever 57,
When sector gear 56, which turns to, to be engaged with the rack in left side 54, sector gear 56 can then drive the rack 54 in left side to pass through left side
Two sliding block upward slidings, so as to which the rack 54 in left side can then drive that the rack 54 on right side passes through right side by elevating lever 57
The upward sliding of two sliding block 53, therewith elevating lever 57 also bow 2 can be driven to move upwards, rotated, come real by controlled motor 55
Now drive bow 2 constantly to move up and down, reach the purpose for the height for significantly adjusting basketball rim 3, after regulating height,
Close motor 55.
Because also include the first bull stick 6, belt pulley 7, flat belt 8, first bearing seat 9, runner 10, connecting rod the 11, the 3rd
Slide rail 12, the 3rd sliding block 13 and illuminating lamp 14, the top left side of base 1 are connected with first bearing seat 9, first bearing seat 9 and motor
The first bull stick 6 is respectively connected with 55 output shaft, belt pulley 7 is respectively connected with the first bull stick 6, the belt pulley 7 on right side is positioned at peace
Framed up 51 outer antethecas, and flat belt 8 is wound between the belt pulley 7 of the left and right sides, runner 10 is connected with first bull stick 6 in left side,
Runner 10 is located at the front side of belt pulley 7 in left side, and the left upper portion of installing frame 51 is connected with the 3rd slide rail 12, slided on the 3rd slide rail 12
Formula is connected with the 3rd sliding block 13, and the 3rd sliding block 13 coordinates with the 3rd slide rail 12, is rotated between the rear side of the 3rd sliding block 13 and runner 10
Formula is connected with connecting rod 11, and the top of the 3rd sliding block 13 is connected with illuminating lamp 14.The illuminating lamp 14 of setting, photograph can played compared with dark place
Bright effect, when motor 55 rotates, motor 55 can then drive first bull stick 6 on right side and the belt pulley 7 on right side to rotate, right side
Belt pulley 7 then can drive the belt pulley 7 in left side to rotate by flat belt 8, and the belt pulley 7 in left side can then drive the first of left side
Bull stick 6 is rotated, and drives runner 10 to rotate by first bull stick 6 in left side, and runner 10 then can constantly be drawn by connecting rod 11
Dynamic or the 3rd sliding block 13 of promotion slides up and down, and the 3rd sliding block 13 then can drive illuminating lamp 14 constantly to move up and down, according to significantly
Degree regulation basketball rim 3 height while can also adjusting illuminating lamp 14 height so that the height between basketball rim 3 and illuminating lamp 14
Degree is constant all the time.
Because also include mounting blocks 15, second bearing seat 16, the second bull stick 17, handle 18, pole 19, cloth bag 20,
Two hooks 21 and the second link 22, the left side of the first sliding block 48 are connected with mounting blocks 15, and the bottom of mounting blocks 15 is connected with second bearing
Seat 16, the second bull stick 17 is connected with second bearing seat 16, the left lower of the second bull stick 17 is connected with pole 19, connected on pole 19
Cloth bag 20 is connected to, the left upper portion of the second bull stick 17 is connected with handle 18, and the right-hand member rotary type of basketball rim 3 is connected with the second link 22,
The second link 22 is connected with cloth bag 20, the second link 22 is hung on the second link 22.Dropped to by the ball for allowing shooting to enter
In cloth bag 20, so, the ball count that user can be facilitated to enter oneself shooting, it is not necessary to allow basketball to fall to 20 inner receipts of cloth bag
During collection, then it can be removed by by the second link 22 from the second hook 21, hold handle 18, rotate bull stick to outwarding winding cloth bag
20, basketball hanging fascia is on cloth bag 20 when can prevent pitching.
Because also including fixed block 23 and fixture block 25, the top of the 3rd slide rail 12 is connected with fixed block 23, on fixed block 23
Groove 24 is provided with, fixture block 25 is provided with groove 24, fixture block 25 coordinates with groove 24, and the top of fixture block 25 connects with the bottom of illuminating lamp 14
Connect.By the way that fixture block 25 is removed out of groove 24, you can the purpose that illuminating lamp 14 is cleared up is removed in completion, by by fixture block 25
Snap onto in groove 24, you can illuminating lamp 14 is fixed.
Because also including sponge block 26, baffle plate 27 and rubber blanket 28, the top of basketball rim 3 is connected with baffle plate 27, baffle plate 27
Right side is bonded with rubber blanket 28, symmetrical above and below between the slide rail 47 of baffle plate 27 and first to be provided with sponge block 26, the sponge block 26 of setting
Cushioning effect is played, because there is rubber blanket 28, prevents that frictional force caused by basketball impact damages baffle plate 27 during pitching.
Embodiment described above only expresses the preferred embodiment of the present invention, and its description is more specific and detailed, but simultaneously
Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art
For, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these belong to this hair
Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.