CN107622344A - A kind of method of supplying power to and device - Google Patents
A kind of method of supplying power to and device Download PDFInfo
- Publication number
- CN107622344A CN107622344A CN201710786504.4A CN201710786504A CN107622344A CN 107622344 A CN107622344 A CN 107622344A CN 201710786504 A CN201710786504 A CN 201710786504A CN 107622344 A CN107622344 A CN 107622344A
- Authority
- CN
- China
- Prior art keywords
- area
- region
- power supply
- development plan
- determining
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
The present invention relates to a kind of method of supplying power to and device.This method includes the highest size of population, region property, development plan, the history power load for obtaining power supply area, and region property includes densely populated residence area, densely populated commerce area, low population zone;The electricity demand of power supply area is estimated according to the highest size of population, region property, development plan and history power load;Electricity demand according to estimating determines supply load.This method is a kind of method of supplying power to being adjusted flexibly according to power supply area historical data and development plan, because this method considers population situation, region property, historical data and the development plan of power supply area, so that the electricity demand estimated can not only meet the current demand of power supply area, the growth requirement of power supply area, the applicability for the supply load that lifting this method obtains can also be met.
Description
Technical field
The present invention relates to power domain, more particularly to a kind of method of supplying power to and device.
Background technology
Power system is the basic industry of national economy, and with expanding economy, the scale of power system constantly expands,
People are to electric service, the requirement more and more higher of computer quality.For this, China proposes the overall goal for building intelligent grid,
Intelligent grid is made up of intelligent power transmission network and intelligent distribution network, intelligent distribution network is proposed safe and reliable, high-quality and efficient, clever
Interactive one of three big targets, its core content living are that power distribution network has higher power supply reliability.
Therefore, method of supplying power to is particularly significant.
The content of the invention
(1) technical problems to be solved
In order to provide a kind of method of supplying power to being adjusted flexibly according to power supply area historical data and development plan, the present invention
There is provided a kind of method of supplying power to and device, this method obtains the highest size of population of power supply area, region property, development plan, gone through
History power load, region property include densely populated residence area, densely populated commerce area, low population zone;Root
The electricity demand of power supply area is estimated according to the highest size of population, region property, development plan and history power load;According to
The electricity demand estimated determines supply load.
(2) technical scheme
In order to achieve the above object, the main technical schemes that the present invention uses include:
A kind of method of supplying power to, methods described include:
101, the highest size of population of power supply area, region property, development plan, history power load a are obtained, it is described
Region property includes densely populated residence area, densely populated commerce area, low population zone;
102, the power demand of the power supply area is estimated according to the highest size of population, region property, development plan and a
Amount;
103, supply load is determined according to the electricity demand estimated.
Alternatively, the intensive residence area of the region property behaviour mouth, step 102 specifically include:
When determining that the region future is densely populated residence area according to development plan, then
When determining that the region future is densely populated commerce area according to development plan, then
Wherein, d is to estimate the time limit;
When determining that the region future is low population zone according to development plan, then
Alternatively, the intensive commerce area of the region property behaviour mouth, step 102 specifically include:
When determining that the region future is densely populated residence area according to development plan, then
Wherein, d is to estimate the time limit;
When determining that the region future is densely populated commerce area according to development plan, then the service area is estimated
Electricity demand=the 1.69a in domain;
When determining that the region future is low population zone according to development plan, then
Alternatively, the region property behaviour mouth sparse region, step 102 specifically include:
When determining that the region future is densely populated residence area according to development plan, then the service area is estimated
Electricity demand=the 3a in domain;
When determining that the region future is densely populated commerce area according to development plan, then
Wherein, d is to estimate the time limit;
When determining that the region future is low population zone according to development plan, then the use of the power supply area is estimated
Electric demand=a.
Alternatively, step 103 specifically includes:
Supply load is electricity demand/(1-c) estimated;
Wherein, c is current supply loss rate.
In addition, in order to achieve the above object, the main technical schemes that the present invention uses also include:
A kind of electric supply installation, described device include:
Acquisition module, for obtaining the highest size of population of power supply area, region property, development plan, history electricity consumption are born
Lotus a, the region property include densely populated residence area, densely populated commerce area, low population zone;
Module is estimated, for estimating the power supply area according to the highest size of population, region property, development plan and a
Electricity demand;
Determining module, for determining supply load according to the electricity demand estimated.
Alternatively, the intensive residence area of the region property behaviour mouth, it is described to estimate module, for when according to development
Planning determines that the region future is densely populated residence area, then When determining that the region is following to be densely populated according to development plan
Commerce area, then
Wherein, d is to estimate the time limit;When determining that the region future is low population zone according to development plan, then
Alternatively, the intensive commerce area of the region property behaviour mouth, it is described to estimate module, for when according to development
Planning determines that the region future is densely populated residence area, then Wherein, d is to estimate the time limit;Advised when according to development
Draw and determine that region future is densely populated commerce area, then estimate the electricity demand of the power supply area=
1.69a;When determining that the region future is low population zone according to development plan, then
Alternatively, the region property behaviour mouth sparse region, it is described to estimate module, for when true according to development plan
The fixed region future is densely populated residence area, then estimates electricity demand=3a of the power supply area;Work as basis
Development plan determines that the region future is densely populated commerce area, thenWherein, d is to estimate the time limit;
When determining that the region future is low population zone according to development plan, then the electricity demand of the power supply area is estimated
=a.
Alternatively, the determining module, for determining supply load according to equation below:
Supply load is electricity demand/(1-c) estimated;
Wherein, c is current supply loss rate.
(3) beneficial effect
The beneficial effects of the invention are as follows:Obtain the highest size of population, region property, development plan, the history of power supply area
Power load, region property include densely populated residence area, densely populated commerce area, low population zone;According to
The highest size of population, region property, development plan and history power load estimate the electricity demand of power supply area;According to pre-
The electricity demand estimated determines supply load, and then provides one kind and flexibly adjusted according to power supply area historical data and development plan
Whole method of supplying power to, because the present invention considers population situation, region property, historical data and the development of power supply area
Planning so that the electricity demand estimated can not only meet the current demand of power supply area, moreover it is possible to meet the hair of power supply area
Exhibition demand, the applicability for the supply load that lifting this method obtains.
Brief description of the drawings
Fig. 1 is a kind of flow chart for method of supplying power to that one embodiment of the invention provides;
Fig. 2 is a kind of structural representation for electric supply installation that one embodiment of the invention provides.
Embodiment
In order to preferably explain the present invention, in order to understand, below in conjunction with the accompanying drawings, by embodiment, to this hair
It is bright to be described in detail.
Power system is the basic industry of national economy, and with expanding economy, the scale of power system constantly expands,
People are to electric service, the requirement more and more higher of computer quality.For this, China proposes the overall goal for building intelligent grid,
Intelligent grid is made up of intelligent power transmission network and intelligent distribution network, intelligent distribution network is proposed safe and reliable, high-quality and efficient, clever
Interactive one of three big targets, its core content living are that power distribution network has higher power supply reliability.Therefore, method of supplying power to ten
Divide important.This method obtains the highest size of population, region property, development plan, the history power load of power supply area, region
Property includes densely populated residence area, densely populated commerce area, low population zone;According to the highest size of population,
Region property, development plan and history power load estimate the electricity demand of power supply area;According to the electricity demand estimated
Supply load is determined, and then a kind of method of supplying power to being adjusted flexibly according to power supply area historical data and development plan is provided,
Because this method considers population situation, region property, historical data and the development plan of power supply area so that estimate
Electricity demand can not only meet the current demand of power supply area, moreover it is possible to meet the growth requirement of power supply area, lifting this
The applicability for the supply load that method obtains.
Referring to Fig. 1, a kind of method of supplying power to of the present embodiment offer, including:
101, obtain the highest size of population of power supply area, region property, development plan, history power load a.
Wherein, region property includes densely populated residence area, densely populated commerce area, low population zone.
102, the electricity demand of power supply area is estimated according to the highest size of population, region property, development plan and a.
Specifically,
If 1) the intensive residence area of region property behaviour mouth,:
When according to development plan, to determine region future be densely populated residence area, in advance
When according to development plan, to determine region future be densely populated commerce area, in advance
Wherein, d is to estimate the time limit.
When according to development plan, to determine region future be low population zone, in advance
If 2) the intensive commerce area of region property behaviour mouth,:
When according to development plan, to determine region future be densely populated residence area, in advance
Wherein, d is to estimate the time limit.
When to determine region future be densely populated commerce area according to development plan, the electricity consumption of power supply area is estimated
Demand=1.69a.
When according to development plan, to determine region future be low population zone, in advance
3) region property behaviour mouth sparse region, then:
When to determine region future be densely populated residence area according to development plan, the electricity consumption of power supply area is estimated
Demand=3a.
When according to development plan, to determine region future be densely populated commerce area, in advance
Wherein, d is to estimate the time limit.
When to determine region future be low population zone according to development plan, the electricity demand of power supply area is estimated
=a.
In this step, power demands amount be consider the population situation, region property, historical data of power supply area with
And development plan obtains, therefore, the power demands amount can not only meet the current demand of power supply area, moreover it is possible to meet to supply
The growth requirement in electric region, improve the adaptability of the power demands amount.
103, supply load is determined according to the electricity demand estimated.
Preferably, supply load is calculated by equation below:
Electricity demand/(1-c) for supply load=estimate;
Wherein, c is current supply loss rate.
The present embodiment is true by the highest size of population of power supply area, region property, development plan, history power load
Determine supply load.
The method that the present embodiment provides obtains the highest size of population, region property, development plan, the history of power supply area
Power load, region property include densely populated residence area, densely populated commerce area, low population zone;According to
The highest size of population, region property, development plan and history power load estimate the electricity demand of power supply area;According to pre-
The electricity demand estimated determines supply load, and then provides one kind and flexibly adjusted according to power supply area historical data and development plan
Whole method of supplying power to, because this method considers population situation, region property, historical data and the development of power supply area
Planning so that the electricity demand estimated can not only meet the current demand of power supply area, moreover it is possible to meet the hair of power supply area
Exhibition demand, the applicability for the supply load that lifting this method obtains.
Based on same inventive concept, the present invention also provides a kind of electric supply installation, and the device solves principle and the power supply of problem
Method is similar, therefore the implementation of the system may refer to a kind of implementation of method of supplying power to, repeats part and repeats no more.
Referring to Fig. 2, the electric supply installation includes:
Acquisition module 201, the highest size of population, region property, development plan, history for obtaining power supply area are used
Electric load a, region property include densely populated residence area, densely populated commerce area, low population zone;
Module 202 is estimated, for estimating power supply area according to the highest size of population, region property, development plan and a
Electricity demand;
Determining module 203, for determining supply load according to the electricity demand estimated.
Alternatively, the intensive residence area of region property behaviour mouth, estimates module 202, for when true according to development plan
It is densely populated residence area to determine region future, then Advised when according to development
Draw and determine that region future is densely populated commerce area, then
Wherein, d is to estimate the time limit;When determining that region future is low population zone according to development plan, then
Alternatively, the intensive commerce area of region property behaviour mouth, estimates module 202, for when true according to development plan
It is densely populated residence area to determine region future, then Its
In, d is to estimate the time limit;When determining that region future is densely populated commerce area according to development plan, then power supply area is estimated
Electricity demand=1.69a;When determining that region future is low population zone according to development plan, then
Alternatively, region property behaviour mouth sparse region, module 202 is estimated, region is determined according to development plan for working as
Future is densely populated residence area, then estimates electricity demand=3a of power supply area;When determining area according to development plan
Domain future is densely populated commerce area, then
Wherein, d is to estimate the time limit;When determining that region future is low population zone according to development plan, then the use of power supply area is estimated
Electric demand=a.
Optionally it is determined that module 203, for determining supply load according to equation below:
Supply load is electricity demand/(1-c) estimated;
Wherein, c is current supply loss rate.
The device that the present embodiment provides obtains the highest size of population, region property, development plan, the history of power supply area
Power load, region property include densely populated residence area, densely populated commerce area, low population zone;According to
The highest size of population, region property, development plan and history power load estimate the electricity demand of power supply area;According to pre-
The electricity demand estimated determines supply load, and then provides one kind and flexibly adjusted according to power supply area historical data and development plan
Whole method of supplying power to, because the present apparatus considers population situation, region property, historical data and the development of power supply area
Planning so that the electricity demand estimated can not only meet the current demand of power supply area, moreover it is possible to meet the hair of power supply area
Exhibition demand, the applicability for the supply load that lifting this method obtains.
Claims (10)
1. a kind of method of supplying power to, it is characterised in that methods described includes:
101, obtain the highest size of population of power supply area, region property, development plan, history power load a, the regionality
Matter includes densely populated residence area, densely populated commerce area, low population zone;
102, the electricity demand of the power supply area is estimated according to the highest size of population, region property, development plan and a;
103, supply load is determined according to the electricity demand estimated.
2. according to the method for claim 1, it is characterised in that the intensive residence area of the region property behaviour mouth, step
Rapid 102 specifically include:
When determining that the region future is densely populated residence area according to development plan, then the power supply area is estimated
When determining that the region future is densely populated commerce area according to development plan, then the power supply area is estimated
Wherein, d is to estimate the time limit;
When determining that the region future is low population zone according to development plan, then the power supply area is estimated
3. according to the method for claim 1, it is characterised in that the intensive commerce area of the region property behaviour mouth, step
Rapid 102 specifically include:
When determining that the region future is densely populated residence area according to development plan, then the power supply area is estimated
Wherein, d is to estimate the time limit;
When determining that the region future is densely populated commerce area according to development plan, then the use of the power supply area is estimated
Electric demand=1.69a;
When determining that the region future is low population zone according to development plan, then the power supply area is estimated
4. according to the method for claim 1, it is characterised in that the region property behaviour mouth sparse region, step 102 have
Body includes:
When determining that the region future is densely populated residence area according to development plan, then the use of the power supply area is estimated
Electric demand=3a;
When determining that the region future is densely populated commerce area according to development plan, then the power supply area is estimated
Wherein, d is to estimate the time limit;
When determining that the region future is low population zone according to development plan, then the power demand of the power supply area is estimated
Amount=a.
5. according to the method for claim 1, it is characterised in that step 103 specifically includes:
Supply load is electricity demand/(1-c) estimated;
Wherein, c is current supply loss rate.
6. a kind of electric supply installation, it is characterised in that described device includes:
Acquisition module, for obtaining the highest size of population of power supply area, region property, development plan, history power load a,
The region property includes densely populated residence area, densely populated commerce area, low population zone;
Module is estimated, for estimating the electricity consumption of the power supply area according to the highest size of population, region property, development plan and a
Demand;
Determining module, for determining supply load according to the electricity demand estimated.
7. device according to claim 6, it is characterised in that the intensive residence area of the region property behaviour mouth, institute
State and estimate module, for when determining that the region future is densely populated residence area according to development plan, then estimating described
Power supply areaWhen determining that the region future is densely populated shopping centre according to development plan
Domain, then estimate the power supply areaWherein, d is to estimate the time limit;
When determining that the region future is low population zone according to development plan, then the power supply area is estimated
8. device according to claim 6, it is characterised in that the intensive commerce area of the region property behaviour mouth, institute
State and estimate module, for when determining that the region future is densely populated residence area according to development plan, then estimating described
Power supply area Wherein, d is to estimate the time limit;Determined when according to development plan
The region future is densely populated commerce area, then estimates electricity demand=1.69a of the power supply area;Work as basis
Development plan determines that the region future is low population zone, then estimates the power supply area
9. device according to claim 6, it is characterised in that the region property behaviour mouth sparse region, it is described to estimate
Module, for when determining that the region future is densely populated residence area according to development plan, then estimating the service area
Electricity demand=the 3a in domain;When determining that the region future is densely populated commerce area according to development plan, then estimate
The power supply areaWherein, d is to estimate the time limit;When according to development
Planning determines that the region future is low population zone, then estimates electricity demand=a of the power supply area.
10. device according to claim 6, it is characterised in that the determining module, for determining to supply according to equation below
Electric load:
Supply load is electricity demand/(1-c) estimated;
Wherein, c is current supply loss rate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710786504.4A CN107622344A (en) | 2017-09-04 | 2017-09-04 | A kind of method of supplying power to and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710786504.4A CN107622344A (en) | 2017-09-04 | 2017-09-04 | A kind of method of supplying power to and device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107622344A true CN107622344A (en) | 2018-01-23 |
Family
ID=61089281
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710786504.4A Pending CN107622344A (en) | 2017-09-04 | 2017-09-04 | A kind of method of supplying power to and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107622344A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110009263A (en) * | 2019-04-28 | 2019-07-12 | 河北建投能源投资股份有限公司 | Monitoring method based on power generation data |
CN110458437A (en) * | 2019-08-05 | 2019-11-15 | 安徽赛迪信息技术有限公司 | A kind of regional industrial planning application system |
CN112036777A (en) * | 2020-11-05 | 2020-12-04 | 江苏智臻能源科技有限公司 | Determination method for measuring and calculating user types based on power consumption of air conditioner and water heater |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102402726A (en) * | 2011-11-04 | 2012-04-04 | 中国电力科学研究院 | Large-scale power distribution network electric quantity prediction method based on regional load analysis |
CN102982387A (en) * | 2012-10-18 | 2013-03-20 | 安徽工程大学 | Method for predicting short-term power load |
CN103617564A (en) * | 2013-12-04 | 2014-03-05 | 国家电网公司 | Whole-network load prediction method based on local load predicted value comprehensive evaluation |
CN104134102A (en) * | 2014-07-30 | 2014-11-05 | 国家电网公司 | LEAP-model-based method for predicating medium-and-long-term electricity demand distribution of power grid |
CN105894137A (en) * | 2016-05-30 | 2016-08-24 | 中国南方电网有限责任公司电网技术研究中心 | Residential electricity demand prediction method and system |
CN106600063A (en) * | 2016-12-16 | 2017-04-26 | 东北电力大学 | Space load prediction method based on fuzzy-rough set theory and spatio-temporal information |
-
2017
- 2017-09-04 CN CN201710786504.4A patent/CN107622344A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102402726A (en) * | 2011-11-04 | 2012-04-04 | 中国电力科学研究院 | Large-scale power distribution network electric quantity prediction method based on regional load analysis |
CN102982387A (en) * | 2012-10-18 | 2013-03-20 | 安徽工程大学 | Method for predicting short-term power load |
CN103617564A (en) * | 2013-12-04 | 2014-03-05 | 国家电网公司 | Whole-network load prediction method based on local load predicted value comprehensive evaluation |
CN104134102A (en) * | 2014-07-30 | 2014-11-05 | 国家电网公司 | LEAP-model-based method for predicating medium-and-long-term electricity demand distribution of power grid |
CN105894137A (en) * | 2016-05-30 | 2016-08-24 | 中国南方电网有限责任公司电网技术研究中心 | Residential electricity demand prediction method and system |
CN106600063A (en) * | 2016-12-16 | 2017-04-26 | 东北电力大学 | Space load prediction method based on fuzzy-rough set theory and spatio-temporal information |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110009263A (en) * | 2019-04-28 | 2019-07-12 | 河北建投能源投资股份有限公司 | Monitoring method based on power generation data |
CN110458437A (en) * | 2019-08-05 | 2019-11-15 | 安徽赛迪信息技术有限公司 | A kind of regional industrial planning application system |
CN112036777A (en) * | 2020-11-05 | 2020-12-04 | 江苏智臻能源科技有限公司 | Determination method for measuring and calculating user types based on power consumption of air conditioner and water heater |
CN112036777B (en) * | 2020-11-05 | 2021-03-16 | 江苏智臻能源科技有限公司 | Determination method for measuring and calculating user types based on power consumption of air conditioner and water heater |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107622344A (en) | A kind of method of supplying power to and device | |
MY152237A (en) | Method and system for managing a power grid | |
CN105373852A (en) | BIM-based personnel evacuation prompting system and method | |
EP2458703A3 (en) | System and method for estimating demand response in electric power systems | |
WO2008141246A3 (en) | Method and system for scheduling the discharge of distributed power storage devices and for levelizing dispatch participation | |
EP2466714A3 (en) | System and Method for Managing Cold Load Pickup Using Demand Response | |
CN103971173A (en) | Method and system for controlling capacity of transformer substations of initiative power distribution network | |
CN106779468A (en) | A kind of user power utilization demand response dynamic modeling and the uncertain appraisal procedure of response | |
CN107016497A (en) | Water power generation schedule optimization method | |
CN106447118A (en) | Power optimization planning method and system | |
KR101316026B1 (en) | System and method for controling pump adapted power | |
CN106529744A (en) | Internet integrated scheduling system of schedulable load | |
CN207752514U (en) | A kind of electronic tag circuit structure based on Internet of Things | |
CN105355204A (en) | System and method for voice recognition based on cloud computation | |
MY174440A (en) | System and method for performance optimization in usb operations | |
CN206961312U (en) | Double concentrator harvesters of multiple-in-one | |
CN109861272A (en) | Consider the multi-voltage grade power grid distributed generation resource Optimal Configuration Method that electricity is sent outside | |
CN106292408A (en) | A kind of multiple-energy-sources based on RSMC's data comprehensive utilization control system | |
CN104751248A (en) | Power utilization potential analysis method and system for power demand side management | |
CN204597230U (en) | One is high voltage distribution installation line framework arrangement within doors | |
CN203301531U (en) | Water conservancy internet of things management system | |
CN108039717A (en) | The capacity collocation method and device of current conversion station in a kind of multiterminal flexible direct current power grid | |
SHENG et al. | Value estimation of conserving water and soil of ecosystem in China | |
WO2011127514A3 (en) | Apparatus for monitoring and/or controlling energy and water management | |
CN104916105B (en) | The wireless communication and control method of intelligent electric energy meter |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180123 |