CN107612671A - carrier power control method and device - Google Patents
carrier power control method and device Download PDFInfo
- Publication number
- CN107612671A CN107612671A CN201710997329.3A CN201710997329A CN107612671A CN 107612671 A CN107612671 A CN 107612671A CN 201710997329 A CN201710997329 A CN 201710997329A CN 107612671 A CN107612671 A CN 107612671A
- Authority
- CN
- China
- Prior art keywords
- mobile terminal
- carrier
- carriers
- maximum number
- resource block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02D—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
- Y02D30/00—Reducing energy consumption in communication networks
- Y02D30/70—Reducing energy consumption in communication networks in wireless communication networks
Abstract
The present invention provides a kind of carrier power control method and device, applied to signal transmission apparatus, the signal transmission apparatus and communication of mobile terminal;Methods described includes:The maximum number of carriers that detection mobile terminal is currently supported;When the maximum number of carriers is 2, the resource block quantity of the mobile terminal upstream auxiliary carriers is arranged to be not more than the first predetermined number;When the maximum number of carriers is more than 2, the resource block quantity of the mobile terminal upstream auxiliary carriers is set greater than first predetermined number and is less than the second predetermined number.By the resource block quantity that upstream auxiliary carriers are controlled according to the quantity of maximum carrier wave so that the secondary carrier power can not follow main carrier linear change.In this way, under the communication scenes for carrying out needing the main carrier that there is higher-wattage, the power of the secondary carrier can be lowered relatively, effectively reduce the energy expenditure of mobile terminal.
Description
Technical field
The present invention relates to mobile communication technology field, in particular to a kind of carrier power control method and device.
Background technology
With the development of wireless communication technology, carrier aggregation technology is applied even more extensively, for example, on up-link carrier
Carrier aggregation, the bandwidth of mobile terminal uplink signal transmissions can be increased, effectively improve the speed of data upload.Carried in application
In the communication process of ripple polymerization, it is necessary to distribute the power of certain share for each carrier wave member with ensure signal on the carrier wave or
Signaling normal transmission.In practical application scene, only need to ensure to communicate for the higher power of main carrier power distribution sometimes,
But in the scheme of conventional up-link carrier Power Control, identical power distribution is carried out to each member of up-link carrier,
While needing to improve main carrier power, the power of secondary carrier is similarly improved to ratio, causes extra power consumption.
The content of the invention
In order to overcome above-mentioned deficiency of the prior art, it is an object of the invention to provide a kind of carrier power controlling party
Method, applied to signal transmission apparatus, the signal transmission apparatus and communication of mobile terminal;Methods described includes:
The maximum number of carriers that detection mobile terminal is currently supported;
When the maximum number of carriers is 2, the resource block quantity of the mobile terminal upstream auxiliary carriers is arranged to not
More than the first predetermined number;
When the maximum number of carriers is more than 2, the resource block quantity of the mobile terminal upstream auxiliary carriers is arranged to
More than first predetermined number and it is less than the second predetermined number.
Further, in the above-mentioned methods, the maximum number of carriers currently supported in the detection mobile terminal
Before step, methods described also includes:
Detect whether the mobile terminal supports multi-carrier polymerizing;
When detecting that the mobile terminal does not support multi-carrier polymerizing, network scenarios adjustment is up according to as defined in 3GPP
The power of carrier wave;
When detecting that the mobile terminal supports multi-carrier polymerizing, then perform the detection mobile terminal and currently prop up
The step of maximum number of carriers held.
Further, in the above-mentioned methods, first predetermined number is 10, and second predetermined number is 50.
Further, in the above-mentioned methods, the step for the maximum number of carriers that the detection mobile terminal is currently supported
Suddenly, including:
Using the secondary carrier quantity of the continuous up band of the maximum for meeting 3GPP supports as the maximum number of carriers, institute is detected
State the maximum number of carriers that mobile terminal is currently supported.
Further, in the above-mentioned methods, the signal transmission apparatus controls the institute of the mobile terminal upstream auxiliary carriers
Stating the mode of resource block quantity includes:
The size of the secondary carrier control channel unit is configured by way of cross-carrier scheduling on main carrier, with adjustment
The resource block quantity of the mobile terminal upstream auxiliary carriers.
It is described applied to signal transmission apparatus another object of the present invention is to provide a kind of carrier power control device
Signal transmission apparatus and communication of mobile terminal;The carrier power control device includes:
Detection module, the maximum number of carriers currently supported for detecting mobile terminal;
Control module, for when the maximum number of carriers be 2 when, by the resource block of the mobile terminal upstream auxiliary carriers
Quantity is arranged to be not more than the first predetermined number;And for when the maximum number of carriers be more than 2 when, by the mobile terminal
The resource block quantity of row secondary carrier is set greater than first predetermined number and is less than the second predetermined number.
Further, in said apparatus, the detection module includes:
Judging submodule, for detecting whether the mobile terminal supports multi-carrier polymerizing;
Implementation sub-module, for when detecting that the mobile terminal does not support multi-carrier polymerizing, according to as defined in 3GPP
Network scenarios adjusts the power of up-link carrier;
Detection sub-module, for when detecting that the mobile terminal supports multi-carrier polymerizing, then perform the detection institute
The step of stating the maximum number of carriers that mobile terminal is currently supported.
Further, in said apparatus, first predetermined number is 10, and second predetermined number is 50.
Further, in said apparatus, the detection module, will be full when detecting the step of the maximum number of carriers
The secondary carrier quantity for the continuous up band of maximum that sufficient 3GPP is supported detects the mobile terminal and worked as the maximum number of carriers
The maximum number of carriers of preceding support.
Further, in said apparatus, the control module is configured on main carrier by way of cross-carrier scheduling
The size of the secondary carrier control channel unit, to adjust the resource block quantity of the mobile terminal upstream auxiliary carriers.
In terms of existing technologies, the invention has the advantages that:
Carrier power control method and device provided by the invention, by controlling up auxiliary load according to the quantity of maximum carrier wave
The resource block quantity of ripple so that the secondary carrier power can not follow main carrier linear change.In this way, described in needed
Main carrier has under the communication scenes of higher-wattage, can lower the power of the secondary carrier relatively, effectively reduce mobile terminal
Energy expenditure.
Brief description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below by embodiment it is required use it is attached
Figure is briefly described, it will be appreciated that the following drawings illustrate only certain embodiments of the present invention, therefore be not construed as pair
The restriction of scope, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to this
A little accompanying drawings obtain other related accompanying drawings.
Fig. 1 is that signal transmission apparatus provided in an embodiment of the present invention and mobile terminal interact schematic diagram;
Fig. 2 is the schematic diagram of signal transmission apparatus provided in an embodiment of the present invention;
Fig. 3 is the flow chart of carrier power control method provided in an embodiment of the present invention;
Fig. 4 is the schematic diagram of carrier power control device provided in an embodiment of the present invention.
Icon:100- signal transmission apparatus;110- carrier power control devices;111- detection modules;112- control modules;
120- memories;130- processors;140- communication units;200- mobile terminals.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention
In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is
Part of the embodiment of the present invention, rather than whole embodiments.The present invention implementation being generally described and illustrated herein in the accompanying drawings
The component of example can be configured to arrange and design with a variety of.
Therefore, below the detailed description of the embodiments of the invention to providing in the accompanying drawings be not intended to limit it is claimed
The scope of the present invention, but be merely representative of the present invention selected embodiment.It is common based on the embodiment in the present invention, this area
The every other embodiment that technical staff is obtained under the premise of creative work is not made, belong to the model that the present invention protects
Enclose.
It should be noted that:Similar label and letter represents similar terms in following accompanying drawing, therefore, once a certain Xiang Yi
It is defined, then it further need not be defined and explained in subsequent accompanying drawing in individual accompanying drawing.
In the description of the invention, it is necessary to which explanation, term " first ", " second ", " the 3rd " etc. are only used for differentiation and retouched
State, and it is not intended that instruction or hint relative importance.
In addition, the term such as term " level ", " vertical ", " pendency " is not offered as requiring part abswolute level or pendency, and
It is to be slightly tilted.Such as " level " only refers to that its direction is more horizontal with respect to for " vertical ", is not to represent the structure
Must be fully horizontal, but can be slightly tilted.
In the description of the invention, it is also necessary to explanation, unless otherwise clearly defined and limited, term " setting ",
" installation ", " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or one
Connect body;Can be mechanical connection or electrical connection;Can be joined directly together, can also be indirect by intermediary
It is connected, can is the connection of two element internals.For the ordinary skill in the art, on being understood with concrete condition
State the concrete meaning of term in the present invention.
It refer to Fig. 1, Fig. 1 is the signal transmission apparatus 100 that provides of the present embodiment interacts signal with mobile terminal 200
Figure, wherein, the carrier wave that the signal transmission apparatus 100 uses when sending signal to the mobile terminal 200 is descending carrier, institute
The carrier wave used when mobile terminal 200 sends signal to the signal transmission apparatus 100 is stated as up-link carrier.Supporting multicarrier
In the scene of polymerization, the carrier wave of polymerization can include multiple carrier wave members, described to include a main carrier and at least one in member
Individual secondary carrier.
Fig. 2 is refer to, Fig. 2 is the schematic diagram of signal transmission apparatus 100 shown in Fig. 1, and the signal transmission apparatus 100 includes
Carrier power control device 110, memory 120, processor 130, communication unit 140.
The memory 120, processor 130 and 140 each element of communication unit are directly or indirectly electrical between each other
Connection, to realize the transmission of data or interaction.For example, these elements can pass through one or more communication bus or letter between each other
Number line, which is realized, to be electrically connected with.The carrier power control device 110 include it is at least one can be with software or firmware (firmware)
Form be stored in the memory 120 or be solidificated in the operating system (operating of the signal transmission apparatus 100
System, OS) in software function module.The processor 130 is used to perform the executable mould stored in the memory 120
Block, such as software function module included by the carrier power control device 110 and computer program etc..
Wherein, the memory 120 may be, but not limited to, random access memory (Random Access
Memory, RAM), read-only storage (Read Only Memory, ROM), programmable read only memory (Programmable
Read-Only Memory, PROM), erasable read-only memory (Erasable Programmable Read-Only
Memory, EPROM), electricallyerasable ROM (EEROM) (Electric Erasable Programmable Read-Only
Memory, EEPROM) etc..Wherein, memory 120 is used for storage program, the processor 130 after execute instruction is received,
Perform described program.
The communication unit 140 is used to realize the radio communication between the signal transmission apparatus 100 and mobile terminal 200
Connection.
The processor 130 is probably a kind of IC chip, has the disposal ability of signal.Above-mentioned processor can
To be general processor, including central processing unit (Central Processing Unit, CPU), network processing unit (Network
Processor, NP) etc.;It can also be digital signal processor (DSP), application specific integrated circuit (ASIC), field-programmable gate array
Arrange (FPGA) either other PLDs, discrete gate or transistor logic, discrete hardware components.It can realize
Or disclosed each method, step and logic diagram in the execution embodiment of the present invention.General processor can be microprocessor
Or the processor can also be any conventional processor etc..
Study and find through inventor, in the existing conventional method to up-link carrier Power Control, can only use to up
Each member of carrier wave divides equally the method for power, i.e., the power of each carrier wave member is identical.But in actual applications, in fact it could happen that only
Main carrier distribution higher-wattage is needed to ensure signalling, it is not necessary to distribute the situation of higher-wattage for secondary carrier.
Such as on PUCCH (Physical Uplink Control Channel, physical uplink control channel)
When sending CQI (Channel Quality Indicator, channel quality instruction), the mobile terminal 200 is needed only to thing
The CQI for managing media channel is sent by the power of the main carrier, to allow the signal transmission apparatus 100 accurately to the movement
Terminal 200 is transmitted the scheduling of pattern, and and do not need the secondary carrier to launch any up letter under so high power
Number (for example, synchronizing signal, control signal, data-signal).In this case, it is very big to distribute unnecessary power meeting for the secondary carrier
Waste allow the electric energy of mobile terminal 200.
Therefore in the present embodiment, the side of resource block (Resource Block, RB) quantity by controlling upstream auxiliary carriers
Formula controls the power of the secondary carrier so that can be that the secondary carrier distributes relatively described master in some communication scenes
Carrier wave lower-wattage.Wherein, a width of 180kHz of the band of a resource block, the resource block is by 12 with a width of 15kHz's
Subcarrier forms, and is a time slot (0.5ms) in time domain, so 1 resource block is actually 1 on time-frequency
0.5ms, bandwidth 180kHz carrier wave.
Specifically, Fig. 3 is refer to, Fig. 3 obtains for a kind of application message applied to the signal transmission apparatus 100 shown in Fig. 1
The flow chart of method is taken, methods described will be described in detail including each step below.
Step S110, detects whether the mobile terminal 200 supports multi-carrier polymerizing.
In the present embodiment, the signal transmission apparatus 100 detects whether the mobile terminal 200 supports multicarrier to gather
Close.
When detecting that the mobile terminal 200 does not support multi-carrier polymerizing, into step S120;
When detecting that the mobile terminal 200 supports multi-carrier polymerizing, into step S130.
Step S120, the power of network scenarios adjustment up-link carrier according to as defined in 3GPP.
In the present embodiment, the signal transmission apparatus 100 is detecting that the mobile terminal 200 do not support multicarrier to gather
During conjunction, do not start the mechanism that power adjustment is carried out to the secondary carrier, up load is adjusted according only to network scenarios as defined in 3GPP
The power of ripple.
Step S130, the maximum number of carriers that detection mobile terminal 200 is currently supported.
Because in the case of up in-band carrier wave band is discontinuous, bandwidth range is excessive, signal during practical application
For transmission equipment 100 when carrying out signal dispatching, the resource block quantity of the secondary carrier can be with network channel state or communication scenes
Adjust accordingly, it is impossible to control the resource block quantity of secondary carrier.
Therefore in the present embodiment, the mobile terminal 200 is met to the secondary carrier for the continuous up band of maximum that 3GPP is supported
Quantity detects what the mobile terminal 200 was currently supported as the maximum number of carriers, the detection of signal transmission apparatus 100
The maximum number of carriers.
Step S140, when the maximum number of carriers is 2, by the resource block of the upstream auxiliary carriers of mobile terminal 200
Quantity is arranged to be not more than the first predetermined number.
In the present embodiment, first predetermined number can be 10.
Discovery is largely analyzed and tested through inventor, when the maximum number of carriers is 2, by the up secondary carrier
Resource block quantity set 0<x<10, now the secondary carrier power can be smaller 2dB than the main carrier.
Specifically, in the present embodiment, the signal transmission apparatus 100 can pass through cross-carrier scheduling on main carrier
Mode configures the secondary carrier control channel unit (Control Channel Element, CCE) size, with described in adjustment
The resource block quantity of the upstream auxiliary carriers of mobile terminal 200.Wherein, CCE is PDCCH (Physical Downlink Control
Channel, physical downlink control channel) basic composition unit, a CCE is by 36 resource units (Resource
Element, RE), 12 RE just constitute a resource block.The size of the CCE units in the main carrier PDCCH is configured, i.e.,
It can realize and the number of the resource block of upstream auxiliary carriers is controlled.
Step S150, when the maximum number of carriers is more than 2, by the resource of the upstream auxiliary carriers of mobile terminal 200
Number of blocks is set greater than first predetermined number and is less than the second predetermined number.
Discovery is largely analyzed and tested through inventor, when the maximum number of carriers is more than 2, by the up auxiliary load
The resource block quantity of ripple sets 10<x<50, now the secondary carrier power maximum can be down to smaller 3dB than the main carrier.
The carrier power control method provided based on above-mentioned design, the present embodiment, passes through the quantity control according to maximum carrier wave
The resource block quantity of upstream auxiliary carriers processed so that the secondary carrier power can not follow main carrier linear change so that in institute
While stating the watt level of main carrier and both met system call scene, the secondary carrier is not existed with the power of equal size again
Send.
It refer to Fig. 4, Fig. 4 is the schematic diagram of the carrier power control device 110, the carrier power control device
110 include detection module 111 and control module 112.
The detection module 111, the maximum number of carriers currently supported for detecting mobile terminal 200.
In the present embodiment, the detection module 111 can be used for performing the step S110 shown in Fig. 2, on the detection mould
The specific descriptions of block 111 can join the description to the step S110.
Alternatively, in the present embodiment, the detection module 111 includes judging submodule, implementation sub-module and detection
Module.
The judging submodule, for detecting whether the mobile terminal 200 supports multi-carrier polymerizing.
The implementation sub-module, for when detecting that the mobile terminal 200 does not support multi-carrier polymerizing, according to 3GPP
The power of defined network scenarios adjustment up-link carrier.
The detection sub-module, for when detecting that the mobile terminal 200 supports multi-carrier polymerizing, then perform described
The step of detecting the maximum number of carriers that the mobile terminal 200 is currently supported.
Alternatively, in the present embodiment, the detection module 111, will when detecting the step of the maximum number of carriers
Meet that the secondary carrier quantity for the continuous up band of maximum that 3GPP is supported as the maximum number of carriers, detects the mobile terminal
200 maximum number of carriers currently supported.
The control module 112, for when the maximum number of carriers be 2 when, by the up auxiliary load of the mobile terminal 200
The resource block quantity of ripple is arranged to be not more than the first predetermined number;And for when the maximum number of carriers be more than 2 when, will described in
The resource block quantity of the upstream auxiliary carriers of mobile terminal 200 is set greater than first predetermined number and is less than the second present count
Amount.
Wherein, in the present embodiment, first predetermined number is 10, and second predetermined number is 50.
In the present embodiment, the control module 112 can be used for performing the step S120 and S130 shown in Fig. 2, on described
The specific descriptions of control module 112 can join the description to the step S120 and S130.
Alternatively, in the present embodiment, the control module 112 is configured on main carrier by way of cross-carrier scheduling
The size of the secondary carrier control channel unit, to adjust the resource block quantity of the upstream auxiliary carriers of mobile terminal 200.
In summary, carrier power control method and device provided by the invention, the quantity control according to maximum carrier wave is passed through
The resource block quantity of upstream auxiliary carriers processed so that the secondary carrier power can not follow main carrier linear change.In this way, entering
Row needs the main carrier to have under the communication scenes of higher-wattage, can lower the power of the secondary carrier relatively, effectively subtract
The energy expenditure of few mobile terminal 200.
In embodiment provided herein, it should be understood that disclosed apparatus and method, can also be by other
Mode realize.Device embodiment described above is only schematical, for example, the flow chart and block diagram in accompanying drawing are shown
According to the device, the architectural framework in the cards of method and computer program product, function of multiple embodiments of the present invention
And operation.At this point, each square frame in flow chart or block diagram can represent one of a module, program segment or code
Point, a part for the module, program segment or code includes one or more and is used to realize the executable of defined logic function
Instruction.It should also be noted that at some as in the implementation replaced, the function of being marked in square frame can also be with different from attached
The order marked in figure occurs.For example, two continuous square frames can essentially perform substantially in parallel, they also may be used sometimes
To perform in the opposite order, this is depending on involved function.It is it is also noted that each in block diagram and/or flow chart
The combination of square frame and the square frame in block diagram and/or flow chart, can use function or action as defined in performing it is special based on
The system of hardware is realized, or can be realized with the combination of specialized hardware and computer instruction.
In addition, each functional module in each embodiment of the present invention can integrate to form an independent portion
Point or modules individualism, can also two or more modules be integrated to form an independent part.
If the function is realized in the form of software function module and is used as independent production marketing or in use, can be with
It is stored in a computer read/write memory medium.Based on such understanding, technical scheme is substantially in other words
The part to be contributed to prior art or the part of the technical scheme can be embodied in the form of software product, the meter
Calculation machine software product is stored in a storage medium, including some instructions are causing a computer equipment (can be
People's computer, server, or network equipment etc.) perform all or part of step of each embodiment methods described of the present invention.
And foregoing storage medium includes:USB flash disk, mobile hard disk, read-only storage (ROM, Read-Only Memory), arbitrary access are deposited
Reservoir (RAM, Random Access Memory), magnetic disc or CD etc. are various can be with the medium of store program codes.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality
Body or operation make a distinction with another entity or operation, and not necessarily require or imply and deposited between these entities or operation
In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to
Nonexcludability includes, so that process, method, article or equipment including a series of elements not only will including those
Element, but also the other element including being not expressly set out, or it is this process, method, article or equipment also to include
Intrinsic key element.In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that
Other identical element also be present in process, method, article or equipment including the key element.
The foregoing is only a specific embodiment of the invention, but protection scope of the present invention is not limited thereto, any
Those familiar with the art the invention discloses technical scope in, change or replacement can be readily occurred in, should all be contained
Cover within protection scope of the present invention.Therefore, protection scope of the present invention described should be defined by scope of the claims.
Claims (10)
1. a kind of carrier power control method, applied to signal transmission apparatus, it is characterised in that the signal transmission apparatus is with moving
Dynamic terminal communication;Methods described includes:
The maximum number of carriers that detection mobile terminal is currently supported;
When the maximum number of carriers is 2, the resource block quantity of the mobile terminal upstream auxiliary carriers is arranged to be not more than
First predetermined number;
When the maximum number of carriers is more than 2, the resource block quantity of the mobile terminal upstream auxiliary carriers is set greater than
First predetermined number and it is less than the second predetermined number.
2. according to the method for claim 1, it is characterised in that in the maximum that the detection mobile terminal is currently supported
Before the step of number of carrier wave, methods described also includes:
Detect whether the mobile terminal supports multi-carrier polymerizing;
When detecting that the mobile terminal does not support multi-carrier polymerizing, network scenarios adjusts up-link carrier according to as defined in 3GPP
Power;
When detecting that the mobile terminal supports multi-carrier polymerizing, then perform what the detection mobile terminal was currently supported
The step of maximum number of carriers.
3. according to the method for claim 1, it is characterised in that first predetermined number is 10, second present count
Measure as 50.
4. according to the method for claim 1, it is characterised in that the maximum load that the detection mobile terminal is currently supported
The step of wave number amount, including:
Using the secondary carrier quantity of the continuous up band of the maximum for meeting 3GPP supports as the maximum number of carriers, the shifting is detected
The maximum number of carriers that dynamic terminal is currently supported.
5. according to the method for claim 1, it is characterised in that the signal transmission apparatus controls the mobile terminal up
The mode of the resource block quantity of secondary carrier includes:
The size of the secondary carrier control channel unit is configured by way of cross-carrier scheduling on main carrier, with described in adjustment
The resource block quantity of mobile terminal upstream auxiliary carriers.
6. a kind of carrier power control device, applied to signal transmission apparatus, it is characterised in that the signal transmission apparatus is with moving
Dynamic terminal communication;The carrier power control device includes:
Detection module, the maximum number of carriers currently supported for detecting mobile terminal;
Control module, for when the maximum number of carriers be 2 when, by the resource block quantity of the mobile terminal upstream auxiliary carriers
It is arranged to be not more than the first predetermined number;And for when the maximum number of carriers be more than 2 when, the mobile terminal is up auxiliary
The resource block quantity of carrier wave is set greater than first predetermined number and is less than the second predetermined number.
7. device according to claim 6, it is characterised in that the detection module includes:
Judging submodule, for detecting whether the mobile terminal supports multi-carrier polymerizing;
Implementation sub-module, for when detecting that the mobile terminal does not support multi-carrier polymerizing, the network according to as defined in 3GPP
Scene adjusts the power of up-link carrier;
Detection sub-module, for when detecting that the mobile terminal supports multi-carrier polymerizing, then perform the detection shifting
The step of maximum number of carriers that dynamic terminal is currently supported.
8. device according to claim 6, it is characterised in that first predetermined number is 10, second present count
Measure as 50.
9. device according to claim 6, it is characterised in that the detection module is detecting the maximum number of carriers
During step, using the secondary carrier quantity of the continuous up band of the maximum for meeting 3GPP supports as the maximum number of carriers, institute is detected
State the maximum number of carriers that mobile terminal is currently supported.
10. device according to claim 6, it is characterised in that the control module passes through cross-carrier tune on main carrier
The mode of degree configures the size of the secondary carrier control channel unit, to adjust the resource block of the mobile terminal upstream auxiliary carriers
Quantity.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710997329.3A CN107612671A (en) | 2017-10-24 | 2017-10-24 | carrier power control method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710997329.3A CN107612671A (en) | 2017-10-24 | 2017-10-24 | carrier power control method and device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107612671A true CN107612671A (en) | 2018-01-19 |
Family
ID=61080526
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710997329.3A Pending CN107612671A (en) | 2017-10-24 | 2017-10-24 | carrier power control method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107612671A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104135456A (en) * | 2014-08-21 | 2014-11-05 | 武汉邮电科学研究院 | Carrier aggregation method for LTE system |
CN105450376A (en) * | 2014-08-28 | 2016-03-30 | 成都鼎桥通信技术有限公司 | Control method and apparatus for secondary carrier in asymmetric uplink carrier aggregation |
CN106549742A (en) * | 2015-09-23 | 2017-03-29 | 索尼公司 | Apparatus and method in wireless communication system |
US20170264402A1 (en) * | 2016-03-14 | 2017-09-14 | Samsung Electronics Co., Ltd | Transmission of sounding reference signals in communication systems with carrier aggregation |
-
2017
- 2017-10-24 CN CN201710997329.3A patent/CN107612671A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104135456A (en) * | 2014-08-21 | 2014-11-05 | 武汉邮电科学研究院 | Carrier aggregation method for LTE system |
CN105450376A (en) * | 2014-08-28 | 2016-03-30 | 成都鼎桥通信技术有限公司 | Control method and apparatus for secondary carrier in asymmetric uplink carrier aggregation |
CN106549742A (en) * | 2015-09-23 | 2017-03-29 | 索尼公司 | Apparatus and method in wireless communication system |
US20170264402A1 (en) * | 2016-03-14 | 2017-09-14 | Samsung Electronics Co., Ltd | Transmission of sounding reference signals in communication systems with carrier aggregation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11116031B2 (en) | Handling of inactive parameters upon release and re-suspend | |
US11818761B2 (en) | Implicit temporal network access load distribution | |
US10009856B2 (en) | Method and apparatus for transmitting PUCCH with a lower A-MPR | |
EP3595375B1 (en) | Method, device and system for configuring transmission direction | |
EP3755074A1 (en) | Transmitter and transmission method | |
JP6900520B2 (en) | Power processing methods, equipment, and storage media | |
EP2928248A1 (en) | Device and method for configurating almost blank subframe, and heterogeneous wireless communication network | |
US20210029551A1 (en) | System and method of signaling spectrum flatness configuration | |
CN102281592B (en) | Method and device for transmitting transmission power control command | |
EP4216465A1 (en) | Modulation and coding scheme (mcs) indication information transmission method and apparatus, and communication device | |
CN108811156B (en) | Information transmission method and device | |
US10411942B2 (en) | Techniques for using a modulation and coding scheme for downlink transmissions | |
CN106817774A (en) | Scheduling of user terminals method and device | |
CN105554801A (en) | Device of Handling Clear Channel Assessment and Transmission in Unlicensed Band | |
CN110505707B (en) | Information detection, transmission, processing and receiving method, terminal and network equipment | |
CN107612671A (en) | carrier power control method and device | |
EP3091809B1 (en) | Method and device for reporting power headroom and user equipment | |
CN105636180B (en) | Power consumption control method and system for base station | |
WO2018057983A1 (en) | Method and apparatus for transmitting pucch with a lower a-mpr | |
CN105307276A (en) | Non-authoritative frequency band transmission method and device | |
CN104349349A (en) | Cell parameter determining method, system and equipment | |
CN111371537B (en) | Cell carrier aggregation parameter optimization method, device, equipment and storage medium | |
CN108076524B (en) | Resource block allocation method and device | |
CN105025573A (en) | LTE network trunking service paging method and system | |
CN103916897A (en) | Data processing method and data processing apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180119 |
|
RJ01 | Rejection of invention patent application after publication |