CN107612023A - 一种风电变流器低电压穿越程序的优化方法 - Google Patents
一种风电变流器低电压穿越程序的优化方法 Download PDFInfo
- Publication number
- CN107612023A CN107612023A CN201710799054.2A CN201710799054A CN107612023A CN 107612023 A CN107612023 A CN 107612023A CN 201710799054 A CN201710799054 A CN 201710799054A CN 107612023 A CN107612023 A CN 107612023A
- Authority
- CN
- China
- Prior art keywords
- power
- voltage
- wind turbines
- control system
- master control
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/76—Power conversion electric or electronic aspects
Landscapes
- Control Of Eletrric Generators (AREA)
Abstract
本发明公开了一种风电变流器低电压穿越程序的优化方法,当网侧电压检测模块检测到电网电压跌落至690V的20%‑90%之间时,功率比较模块中代表低穿标志位的状态字由0变为1,通过通讯线缆传送给风电机组的主控系统;当功率比较模块的下一个功率采集点的值大于或等于上一个功率采集点及检测到风电机组的并网点电压恢复至故障前电压的90%以上时,所述功率比较模块中代表低穿标志位的状态字由1变为0,通过通讯线缆传送给风电机组的主控系统,从而恢复主控系统对变流器的控制,达到风电机组的功率曲线能够完全追随主控系统发出的转矩指令的目的。本发明能有效解决能有效解决风电机组的功率曲线与主控系统发出的转矩曲线不匹配的问题,具有广泛的应用前景。
Description
技术领域
本发明涉及风电变流器低电压穿越程序的技术领域,尤其是指一种风电变流器低电压穿越程序的优化方法。
背景技术
目前,风电机组在低电压穿越过程中,风电机组的并网点电压由于出现不同程度的跌落,风电机组的主控系统的低穿标志位由0置1,风电机组的有功功率也会跌落。当风电机组的并网点电压恢复至故障前电压的90%及以上时,会使得风电机组的主控系统的低穿标志位由1置0,这时,风电机组的变流器开始接受主控系统的控制,主控系统向变流器发出不断上升的转矩指令,使得风电机组发出的有功功率也不断上升。
对于很多低电压穿越过程而言,当主控系统向变流器发出的不断上升的转矩指令时,此时风电机组的有功功率还没跌至最低值,仍在下降过程中,这使得风电机组的功率曲线与主控系统发出的转矩曲线不匹配,即功率曲线不能完全追随转矩指令。
发明内容
本发明的目的在于克服现有技术的缺点与不足,提出了一种风电变流器低电压穿越程序的优化方法,能有效解决风电机组的功率曲线与主控系统发出的转矩曲线不匹配的问题。
为实现上述目的,本发明所提供的技术方案为:一种风电变流器低电压穿越程序的优化方法,首先,需配置有一个功率比较模块,然后再利用变流器内现有的网侧电压检测模块和电流互感器来实时测量电网电压、电网电流和风电机组输出的有功功率值;当所述网侧电压检测模块检测到电网电压跌落至690V的20%-90%之间时,所述功率比较模块中代表低穿标志位的状态字由0变为1,通过通讯线缆传送给风电机组的主控系统;而当所述功率比较模块的下一个功率采集点的值大于或等于上一个功率采集点以及检测到风电机组的并网点电压恢复至故障前电压的90%以上时,所述功率比较模块中代表低穿标志位的状态字由1变为0,通过通讯线缆传送给风电机组的主控系统,从而恢复主控系统对变流器的控制,达到风电机组的功率曲线能够完全追随主控系统发出的转矩指令的目的。
本发明与现有技术相比,具有如下优点与有益效果:
在风电机组的低电压穿越过程中,当风电机组的并网点电压恢复至故障前电压的90%以上时,风电机组的功率曲线能够完全追随主控系统发出的转矩指令,具有广泛的应用前景。
附图说明
图1为本发明所述优化方法的流程图。
具体实施方式
下面结合具体实施例对本发明作进一步说明。
如图1所示,本实施例所提供的风电变流器低电压穿越程序的优化方法,其具体情况如下:
首先,需配置有一个功率比较模块,然后再利用变流器内现有的网侧电压检测模块和电流互感器来实时测量电网电压、电网电流和风电机组输出的有功功率值;当所述网侧电压检测模块检测到电网电压跌落至690V的20%-90%之间时,所述功率比较模块中代表低穿标志位的状态字由0变为1,通过通讯线缆传送给风电机组的主控系统;而当所述功率比较模块的下一个功率采集点的值大于或等于上一个功率采集点以及检测到风电机组的并网点电压恢复至故障前电压的90%及以上时,所述功率比较模块中代表低穿标志位的状态字由1变为0,通过通讯线缆传送给风电机组的主控系统,从而恢复主控系统对变流器的控制,达到风电机组的功率曲线能够完全追随主控系统发出的转矩指令的目的。
综上所述,相比现有技术,采用本发明方法能够在风电机组的低电压穿越过程中,当风电机组的并网点电压恢复至故障前电压的90%以上时,风电机组的功率曲线能够完全追随主控系统发出的转矩指令,满足使用要求,以确保风电机组的正常运行,值得推广。
以上所述之实施例子只为本发明之较佳实施例,并非以此限制本发明的实施范围,故凡依本发明之形状、原理所作的变化,均应涵盖在本发明的保护范围内。
Claims (1)
1.一种风电变流器低电压穿越程序的优化方法,其特征在于:首先,需配置有一个功率比较模块,然后再利用变流器内现有的网侧电压检测模块和电流互感器来实时测量电网电压、电网电流和风电机组输出的有功功率值;当所述网侧电压检测模块检测到电网电压跌落至690V的20%-90%之间时,所述功率比较模块中代表低穿标志位的状态字由0变为1,通过通讯线缆传送给风电机组的主控系统;而当所述功率比较模块的下一个功率采集点的值大于或等于上一个功率采集点以及检测到风电机组的并网点电压恢复至故障前电压的90%以上时,功率比较模块中代表低穿标志位的状态字由1变为0,通过通讯线缆传送给风电机组的主控系统,从而恢复主控系统对变流器的控制,达到风电机组的功率曲线能够完全追随主控系统发出的转矩指令的目的。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710799054.2A CN107612023A (zh) | 2017-09-07 | 2017-09-07 | 一种风电变流器低电压穿越程序的优化方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710799054.2A CN107612023A (zh) | 2017-09-07 | 2017-09-07 | 一种风电变流器低电压穿越程序的优化方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107612023A true CN107612023A (zh) | 2018-01-19 |
Family
ID=61062146
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710799054.2A Pending CN107612023A (zh) | 2017-09-07 | 2017-09-07 | 一种风电变流器低电压穿越程序的优化方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107612023A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116169694A (zh) * | 2023-04-19 | 2023-05-26 | 广州智光储能科技有限公司 | 一种虚拟同步发电机控制方法、装置、设备 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102769306A (zh) * | 2012-07-13 | 2012-11-07 | 兰州交通大学 | 一种永磁直驱风电系统网侧逆变器低电压穿越控制方法 |
CN102832641A (zh) * | 2012-09-11 | 2012-12-19 | 南京飓能电控自动化设备制造有限公司 | 一种具备可靠低电压穿越能力的双馈变流器 |
CN103187734A (zh) * | 2011-12-27 | 2013-07-03 | 北京能高自动化技术股份有限公司 | 全功率风电机组并网变流器低电压穿越控制方法 |
CN106786737A (zh) * | 2016-12-22 | 2017-05-31 | 国电南京自动化股份有限公司 | 一种针对集散式光伏发电系统的低电压穿越控制方法 |
-
2017
- 2017-09-07 CN CN201710799054.2A patent/CN107612023A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103187734A (zh) * | 2011-12-27 | 2013-07-03 | 北京能高自动化技术股份有限公司 | 全功率风电机组并网变流器低电压穿越控制方法 |
CN102769306A (zh) * | 2012-07-13 | 2012-11-07 | 兰州交通大学 | 一种永磁直驱风电系统网侧逆变器低电压穿越控制方法 |
CN102832641A (zh) * | 2012-09-11 | 2012-12-19 | 南京飓能电控自动化设备制造有限公司 | 一种具备可靠低电压穿越能力的双馈变流器 |
CN106786737A (zh) * | 2016-12-22 | 2017-05-31 | 国电南京自动化股份有限公司 | 一种针对集散式光伏发电系统的低电压穿越控制方法 |
Non-Patent Citations (1)
Title |
---|
李文津 等: "含动态直流泄能电阻的MMC_HVDC提高风电场低电压穿越能力研究", 《电网技术》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116169694A (zh) * | 2023-04-19 | 2023-05-26 | 广州智光储能科技有限公司 | 一种虚拟同步发电机控制方法、装置、设备 |
CN116169694B (zh) * | 2023-04-19 | 2023-08-22 | 广州智光储能科技有限公司 | 一种虚拟同步发电机控制方法、装置、设备 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106600022B (zh) | 基于多目标优化的风-光-燃气-海水抽水蓄能孤立电力系统容量优化配置方法 | |
CN103066626A (zh) | 一种多源协调日前发电计划方法 | |
CN104734165B (zh) | 一种风电机组全功率变流器低电压穿越无功功率控制方法 | |
CN103997039A (zh) | 基于概率区间预测的计及风电接纳的旋转备用区间预测方法 | |
CN112186744B (zh) | 一种适用于含分布式电源配电网的供电恢复方法及应用 | |
CN202957612U (zh) | 含风光储的智能微网及其控制系统 | |
CN205123280U (zh) | 风电场的拓扑结构、升压控制装置及系统 | |
CN103545848A (zh) | 光伏电站群有功功率协调控制方法 | |
CN205011850U (zh) | 铝电解槽热平衡控制装置 | |
CN110198030A (zh) | 考虑光伏发电功率快速调控的直流紧急协调控制方法及系统 | |
CN115411748A (zh) | 光伏发电系统频率的调节方法、调节装置和调节系统 | |
CN104901341A (zh) | 基于机组出力及变负荷速率的火力发电煤耗量计算方法 | |
CN103972921B (zh) | 一种基于功率平衡的永磁同步风电场低电压穿越协调控制方法 | |
CN107612023A (zh) | 一种风电变流器低电压穿越程序的优化方法 | |
CN105914798B (zh) | 一种基于全网同时间断面的风电场无功优化运行控制方法 | |
CN105809576A (zh) | 面向配电网的供电安全负荷分层评估方法 | |
CN102315674B (zh) | 风网蓄协同供电方法及装置 | |
CN106602591B (zh) | 一种多目标优化控制的海水抽蓄风电联合控制方法 | |
CN205139998U (zh) | 基于峰谷电价的区域电网经济调度系统 | |
CN104779622A (zh) | 基于阶梯图的中压配电网分布式电源无功差异控制方法 | |
CN105281369B (zh) | 风电场的拓扑结构、升压控制方法、装置及系统 | |
CN205017247U (zh) | 一种光储联合发电装置 | |
CN109873456A (zh) | 一种基于电极式锅炉的火电厂参与电网深度调峰方法 | |
CN204361779U (zh) | 一种风电场故障恢复系统 | |
CN204497753U (zh) | 一种综合能源的发电系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180119 |