CN107609752A - Business-electronic management system - Google Patents
Business-electronic management system Download PDFInfo
- Publication number
- CN107609752A CN107609752A CN201710728357.5A CN201710728357A CN107609752A CN 107609752 A CN107609752 A CN 107609752A CN 201710728357 A CN201710728357 A CN 201710728357A CN 107609752 A CN107609752 A CN 107609752A
- Authority
- CN
- China
- Prior art keywords
- application node
- management
- branch
- general headquarters
- management application
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of business-electronic management system.The system includes:General headquarters manage application node, for enterprise headquarters' transaction management;The branch management application node of application node communication connection is managed with the general headquarters, for being managed to branch's affairs;The branch management application node manages application node by external communication interface and the general headquarters and communicated to connect;And general headquarters management application node and the branch management application node be can be with the electronic management unit of independent operating.It refers to enterprise's framework in structure setting, in addition to general headquarters manage application node, builds branch management application node corresponding to branch, each application can be set oneself independent keeper it is corresponding in user be managed, realize differentiated control.When the pattern of enterprises changes, dynamic resolution, merger and reorganization can be carried out to application node, rather than overthrow reconstruction, implemented simply, quickly, and available data and system operating are hardly had any impact.
Description
Technical field
The present invention relates to field of computer technology, more particularly to a kind of business-electronic management system.
Background technology
In Modern Enterprise Administration, every affairs of enterprises are managed using electronic management system, including enterprise
Industry official document management, enterprise's communication management, internal memo management, leader's schedule management and management etc. of going abroad.The pipe of electronization
Reason is easy to statistical summaries, and especially for the enterprise of grouping of the world economy, electronic management system is easy to branch company to be reported to parent company,
Or parent company is directly collected by electronic management system to the situation of each branch company.But in modern society, enterprise's hair
Exhibition speed is very fast, and the scale of enterprise can constantly expand, and in order to adapt to the development in market, the structure of enterprise can be adjusted constantly
It is whole.In conventional method, each variation of enterprise is required for building the electronic management system to match with current enterprise structure again,
Namely need to re-start IT frame designs, so that electronic management system matches with new firms structure.Electronic management system
Build again and expend substantial amounts of human and material resources and financial resources, it is slow to build speed, causes the supporting hysteresis of management system.
The content of the invention
Based on this, it is necessary in view of the above-mentioned problems, providing one kind can be easy to carry out splitting and reorganizing to enterprise's application frame
Business-electronic management system.
To realize a kind of business-electronic management system of the object of the invention offer, including:
General headquarters manage application node, for enterprise headquarters' transaction management;
The branch management application node of application node communication connection is managed with the general headquarters, for entering to branch's affairs
Row management;
The branch management application node manages application node by external communication interface and the general headquarters and communicated to connect;And
General headquarters' management application node and the branch management application node are can be with the e-management of independent operating
Unit.
In the business-electronic management system of one of embodiment, the branch management application node is two or more, and
The system also includes center and exchanges application node;
The center exchanges application node and connects general headquarters' management application node and the branch management application node.
In the business-electronic management system of one of embodiment, general headquarters' management application node and/or the branch
Management application node includes finger management module, the corresponding application of keeper's parameter setting of the finger management module
Keeper's parameter setting of node is identical;
Keeper's parameter setting of the branch management application node and the keeper of general headquarters management application node join
Number sets different;
Keeper's parameter setting between each branch management application node is also different.
In the business-electronic management system of one of embodiment, according to demand or when the finger management module is corresponding
Branch when reaching preparatory condition, the finger management module person of the being managed parameter is reset, by the branch
Management module is integrally peeled off from its corresponding application node, branch management application node corresponding to generation.
In the business-electronic management system of one of embodiment, general headquarters' management application node and the branch management
Application node is arranged on same server or is arranged on different server.
In the business-electronic management system of one of embodiment, when including server described in two or more in the system
When, the general headquarters manage application node and the branch management application node according to server use demand size in each server
Upper distribution.
In the business-electronic management system of one of embodiment, the general headquarters manage application node by two or more service
Device provides service.
In the business-electronic management system of one of embodiment, general headquarters' management application node and the branch management
Application node includes enterprise's common base data, and when being modified to the common base data, general headquarters' management
Basic data synchronous vacations renewal in application node and the branch management application node.
A kind of business-electronic management system, including general headquarters' management application node, for enterprise headquarters' transaction management;It is and described
General headquarters' management application node includes finger management module, for being managed to branch's affairs of enterprise;And
When branch corresponding to the finger management module reaches preparatory condition, the finger management module is carried out
Keeper's parameter is reset, and overall managed from the general headquarters in application node of the finger management module is integrally peeled off, raw
Node ought to be used into branched pipe, and the branch management application node and general headquarters management application node were communicated to connect.
The business-electronic management system of one of embodiment, in addition to being managed with the general headquarters for direct construction are applied
The branch management application node of node communication connection;Keeper's parameter setting of the branch management application node and the general headquarters
The keeper's parameter setting for managing application node is different.
The business-electronic management system of one of embodiment, the branch management application node include branch management
Module.
The business-electronic management system of one of embodiment, general headquarters' management application node and the branch management
Node includes enterprise's common base data, and when being modified to the common base data, general headquarters' management application
Basic data synchronous vacations renewal in node and the branch management application node.
Beneficial effects of the present invention include:A kind of business-electronic management system provided by the invention, it is in structure setting
With reference to enterprise's framework it is corresponding build management system structure.In addition to general headquarters manage application node, branch pair is built
Oneself independent keeper can be set in the branch management application node answered, each application, and the user being responsible in corresponding carries out pipe
Reason, realizes differentiated control.Logical separation between application node, but Various types of data exchange can be carried out by communication connection.Each application section
Point can be according to the continuous expanded application function of self-growth demand, without the realization of other application nodal function in influence system.And
And because the relatively independent operation of each application node, can be directly to the branch of phase factor when a certain branch disappears because of restructuring
Management application node is deleted, the operation without influenceing other functions in business-electronic management system.
Brief description of the drawings
Fig. 1 is a kind of system structure diagram of a specific embodiment of business-electronic management system of the present invention;
Fig. 2 is a kind of system structure diagram of the another specific embodiment of business-electronic management system of the present invention;
Fig. 3 manages application node and formed for general headquarters in an a kind of specific embodiment of business-electronic management system of the present invention to be shown
It is intended to;
Fig. 4 is that a kind of server of a specific embodiment of business-electronic management system of the present invention supports schematic diagram;
Fig. 5 is to include data inside application node in an a kind of specific embodiment of business-electronic management system of the present invention
Schematic diagram.
Embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, the present invention is looked forward to below in conjunction with accompanying drawing
The embodiment of industry electronic management system illustrates.It should be appreciated that specific embodiment described herein only to
The present invention is explained, is not intended to limit the present invention.
Referring to the business-electronic management system of Fig. 1 one embodiment of the invention, including general headquarters' management application node 100 and branch
Manage application node 200.Wherein, the quantity of the branch management application node 200 can be multiple.
It should be noted that current enterprise can be divided into Business group and monomer enterprise from institutional framework, for list
An electronic management system is built by body enterprise, and the IT system of a set of stabilization of enterprise's overall operation carries out business administration.But
Business group has many features different with monomer enterprise, and as branch is numerous, distributional region is wide, and management level is more,
And conglomerate (such as merging and reorganization, is split) in fast development, it is necessary to which IT system is according to the characteristics of enterprise's different stages of development
Flexible adaptation is tackled, and to be built new framework in time, be formed new management structure.
The present invention is exactly using modular design, it is proposed that the concept of application node under grouping of the world economy framework, IT is disposed
Framework is associated with each branch under Business group and is mapped.Each branch management system in business-electronic management system
A branch in the corresponding group of system.Multiple branch managements application section can be included in one business-electronic management system
Point.
Wherein, general headquarters' management application node, for enterprise headquarters' transaction management;With general headquarters' management application node communication connection
Branch management application node, for being managed to branch's affairs.General headquarters manage application node and branch management application
Node is can be with the electronic management unit of independent operating, and the related program of each application node be encapsulated as a module, can be with
Entirety is migrated and recombinated.
It is real but each branch management application node manages application node by external communication interface and general headquarters to be communicated to connect
Information mutual communication between existing general headquarters' management application node and branch management application node.
In the business-electronic management system of the present embodiment, corresponding with enterprise framework builds management system structure.Except
Outside general headquarters' management application node, branch management application node corresponding to branch is built, oneself can be set in each application
Independent keeper, the user being responsible in corresponding are managed, and realize differentiated control.Logical separation between application node, but pass through
Communication connection can carry out Various types of data exchange.Each application node can according to the continuous expanded application function of self-growth demand, without
The realization of other application nodal function in influence system.And because the relatively independent operation of each application node, when a certain branch
When mechanism is because of restructuring disappearance, directly the branch management application node of phase factor can be deleted, without influenceing business-electronic management
The operation of other functions in system.
Referring to Fig. 2, in logical construction, except managing application node 100 and the branch management node 200 comprising general headquarters
In addition, in addition to play middle connection function center exchange application node 300.As shown in Fig. 2 the business-electronic of the present embodiment
In management system, in addition to general headquarters manage application node 100, including multiple branch management application nodes, it is corresponding and group company
Multiple parts of companies, specifically include:Equipment company corresponding with equipment company in group company manages application node 201, with group
Real estate company corresponding to real estate company manages application node 202 in company, and science and technology corresponding with scientific & technical corporation in group company is public
Department's management application node 203, and logistics company corresponding with logistics company in group company management application node 204.Each son
Application node corresponding to company is all connected to center and exchanged on application node, by the center exchange application node with it is described total
Portion's application node carries out data interaction.The setting of application node is exchanged by center, reduces general headquarters' application node IT management services
Difficulty, by more data summarizations, diverging function using the center exchange application node complete, simplify general headquarters management application section
Point function, it is easy to carry out module, the increase of application node, deletion and restructuring on original general headquarters' application node.
In addition, manage application system and branch management application system, the keeper of branch management application node for general headquarters
Parameter setting is different from keeper's parameter setting of general headquarters' management application node, i.e., each application node can be formulated accordingly
IT keepers are safeguarded.This scale to branched structure also just proposes certain requirement.In order to solve this problem, this hair
It is not that very big branch is not provided with application node for scale in the business-electronic management system of bright embodiment, but
General headquarters management application node in set a corresponding finger management module, keeper's parameter setting of finger management module and its
Keeper's parameter setting of corresponding application node is identical, and user corresponding to comprising finger management module is existed as same keeper
Interior all users are managed.It should be understood that finger management module slave module itself structure and operation angle
Degree sees that finger management module is also relatively independent, is packaged in the management module that function is more perfect together, when necessary
Wait, directly can remove module from the application node of institute's subordinate, build a new application node.
Referring to Fig. 3, when including finger management module in an application node, main group can will be corresponded in application node
The basic management function of mechanism is integrated in a finger management module arranged side by side, is easy to the management of application node.In Fig. 3, always
In portion's management application node, general headquarters' module 101 and other seven finger management modules, respectively finger management module 1 are contained
(102), finger management module 2 (103), finger management module 3 (104), finger management module 4 (105), finger management module 5
(106), finger management module 6 (107), finger management module 7 (108), structure is neat, and each branch module has more complete
The function being managed to corresponding department.Certainly, in other embodiments, may also be included in general headquarters' management application node less
Quantity or greater number of finger management module, it is relevant with the quantity of branch in enterprise group.
When branch reaches preparatory condition corresponding to finger management module, to the finger management module in application node
The person's of being managed parameter is reset, and finger management module entirety is peeled off from its corresponding application node, corresponding to generation
Branch management application node.Wherein described preparatory condition can be set according to development of company situation memory, such as settable branch's machine
Structure branch management application node is just corresponded to when structure total number of persons exceedes certain limit or preset value.Certainly, if it is considered to have must
, can also directly by branch, corresponding finger management module be overall originally when establishing application node to some branch
It is proposed, and carry out keeper's parameter setting, form a new branch management application node.Branch management application node builds it
Afterwards, corresponding branch's can requires structure IT system according to self-growth, and the maintenance of system is responsible for by itself.This is dividing
Management adjustment is significant after associate and scale are expanded rapidly.
For example, after using the business-electronic management system of the embodiment of the present invention, when enterprise group to split an a company or
When person recombinates a business department, internal adjustment capability and IT architecture ability will be more powerful, can carry out flexibly
Adjustment, what IP cans were very fast so when conglomerate business reorganization keeps up with enterprise institution's adjustment.In simple terms, adopt
With the method for the embodiment of the present invention, when organizational structure is carried out and IT architecture (business-electronic management system) changes, it is necessary to
The movement of a branch is carried out, rather than moves a root node and is rebuild.
In addition, also have the advantage to be exactly using the method for the embodiment of the present invention, when a new parent company is built,
I, which can reserve its root node, comes.Namely reserve the node of a general headquarters.Then other business modules are done again
Division.Perhaps after this subsidiary, developed and to not having to uproop again when parent company, built a root section again
Point (parent company's node), I only needs the root node blank reserved before to use can, so also has and compare
Big, flexible and convenience.
The IT system of the present invention be unable to do without the support of server, but the selection to server is that comparison is clever with set-up mode
It is living.Specifically, general headquarters' management application node can be arranged on same server with branch management application node, can also set
Onto different servers.Specifically, general headquarters' management application node can be separately positioned on difference with branch management application node
Server on, such as each application node is set on one server, but can so cause certain wasting of resources.Also may be used
Set on one server with multiple application nodes, as general headquarters' management application node can be with any more than one or two
Branch management node is set on one server.Certainly, multiple branches can be arranged on one according to the size of data volume
On individual server.
In actual design process, can judge whether also be placed on one according to the quantity for the service user that each car is included
On platform server.Such as shown in figure 4, general headquarters' management application node 100, real estate company's management application node 202, equipment company
Management application node 201 and scientific & technical corporation's management 203 4 application nodes of application node are arranged on server I BM3850,
The user that server is serviced adds up to 3000;And logistics company management application node 204 possesses more user, individually set
Put on server DELL720, client's amount of service adds up to 3500.
Specifically, when including two or more server in system, general headquarters' management application node and branch management application section
Point can distribute according to server use demand size on each server, each server service preferably after task is distributed
Number of users size is of substantially equal.Certainly, can be according to the service energy of each server if each server service ability has difference
Power carries out the division of service range.And this division is nor unalterable, because each point in group company and group
Company all in developing always, when developing the service ability caused more than server rapidly because of a certain branch on server
When, then can be by an application node from current server bulk migration to other servers.Because each drop applications section
The independence of point, this migration hardly produce any influence to the operation of business-electronic management system, and structural adjustment is extremely simple
Just.
Different application nodes can be set on one server, and an application node can also be across multiple server portions
Administration, namely general headquarters' management application node or branch management application node are by two or more server providing services.When one
When platform server can not bear to access pressure, it can be shared in the functional module difference of an application node to multiple wind service
The pressure of server.
In addition, when enterprise group includes the larger nonlocal branch of development scale, also branched pipe can be established in other places
Application node is managed, and the server of application node can also be arranged on other places, for precious boat system service efficiency, reduce network
Cost, off-site server are disposed with home server by the way of physical distribution, pass through VPN traffic between internal system
Connection.
In addition, general headquarters' management application node is responsible in operation maintenance by general headquarters keeper, branch management application node, such as
Real estate company, maintenance management is responsible for by branch company keeper, namely real estate company keeper, carries out branch management application node
The branch of setting is usually to develop the branch for reaching certain scale, itself possesses stronger IT strength.General headquarters manage
Application node includes enterprise's common base data with branch management application node, and this part is the uniform requirement of group company,
Each application node in business-electronic management system includes, referring to Fig. 5, so that real estate company manages application node 202 as an example, ground
Include official document management, public address list and work in production company management application node 202 and general headquarters' management application node 100
Contact is single.Certainly, other basic datas are may also contain in its other embodiment, system of such as asking for leave.The enterprise of the present invention
In electronic management system, when being modified to common base data, general headquarters' management application node and branch management application node
Between can carry out data exchange, the modification renewal of optimized integration data syn-chronization.
Turning also now to Fig. 5, in each application node in addition to basic data, each application node personalization of itself will also include
Demand.As general headquarters are managed in application node comprising leader's schedule, management of social insurance, go abroad management and the party and the masses' management;Real estate company
Manage in application node and examine comprising commercial real estate project management, real estate projects examination & approval, sales contract and examined with print.Such as
This, builds the application node of each branch, and each application node and application are saved at any time according to group company's development respectively
Management module inside point is split, recombinated.Business group development characteristic is adapted to, Mobile state can be entered to application node and torn open
Divide, merger and reorganization, rather than overthrow reconstruction.Implement simple, quick, the saving time, and to available data and system operating almost
Do not have any impact.
It is theoretical based on identical built modular, a kind of business-electronic management system is also provided, it includes general headquarters' management should
With node, for enterprise headquarters' transaction management;And general headquarters' management application node includes finger management module, for enterprise
Branch's affairs are managed;And when branch reaches preparatory condition corresponding to finger management module, to branch management
The module person's of being managed parameter is reset, and overall managed from general headquarters in application node of finger management module is integrally peeled off, raw
Node ought to be used into branched pipe, and branch management application node and general headquarters' management application node were communicated to connect.
The business-electronic management system of the embodiment of the present invention is different from the business-electronic management system of foregoing embodiments
Place is that can initially not have branch management application node in the present embodiment, and only manages application node comprising a general headquarters, and
Multiple finger management modules that can independently split operation are included in general headquarters' management application node.The work(of each module of other in system
Energy, and the relation between each several part are identical with previous embodiment.According to the change of Company Organization to business-electronic pipe
When reason system is adjusted, it can be realized by module, the fractionation of application node, restructuring, and without carrying out weight to whole IT system
Build, it is simple efficient.
It is similar with previous embodiment, include the branched pipe that application node communication connection is managed with general headquarters of direct construction
Manage application node;Keeper's parameter setting of branch management application node manages keeper's parameter setting of application node with general headquarters
It is different.
It is preferred that finger management module can also be included in the branch management application node.Each finger management module phase
To the function comprising independent completion.
And general headquarters' management application node includes enterprise's common base data with branch management node, and when to common base
When data are modified, the basic data synchronous vacations renewal in general headquarters' management application node and branch management application node.
One of ordinary skill in the art will appreciate that realize all or part of flow in above-described embodiment system, being can be with
The hardware of correlation is instructed to complete by computer program, described program can be stored in a computer read/write memory medium
In, the program is upon execution, it may include such as the flow of the embodiment of above-mentioned each method.Wherein, described storage medium can be magnetic
Dish, CD, read-only memory (Read-Only Memory, ROM) or random access memory (Random Access
Memory, RAM) etc..
Embodiment described above only expresses the several embodiments of the present invention, and its description is more specific and detailed, but simultaneously
Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art
For, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the guarantor of the present invention
Protect scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (12)
- A kind of 1. business-electronic management system, it is characterised in that including:General headquarters manage application node, for enterprise headquarters' transaction management;The branch management application node of application node communication connection is managed with the general headquarters, for carrying out pipe to branch's affairs Reason;The branch management application node manages application node by external communication interface and the general headquarters and communicated to connect;AndGeneral headquarters' management application node and the branch management application node are can be with the electronic management unit of independent operating.
- 2. business-electronic management system according to claim 1, it is characterised in that the branch management application node is two More than individual, and the system also includes center and exchanges application node;The center exchanges application node and connects general headquarters' management application node and the branch management application node.
- 3. business-electronic management system according to claim 1, it is characterised in that general headquarters management application node and/ Or the branch management application node includes finger management module, keeper's parameter setting of the finger management module and its Keeper's parameter setting of corresponding application node is identical;Keeper's parameter setting of the branch management application node and keeper's parameter of general headquarters management application node are set Put difference;Keeper's parameter setting between each branch management application node is also different.
- 4. business-electronic management system according to claim 3, it is characterised in that according to demand or when the branched pipe When branch corresponding to reason module reaches preparatory condition, the finger management module person of the being managed parameter is reset, Finger management module entirety is peeled off from its corresponding application node, branch management application node corresponding to generation.
- 5. business-electronic management system according to claim 1 or 2, it is characterised in that the general headquarters manage application node It is arranged on same server or is arranged on different server with the branch management application node.
- 6. business-electronic management system according to claim 5, it is characterised in that when including two or more in the system During the server, general headquarters' management application node and the branch management application node are according to server use demand size Distributed on each server.
- 7. business-electronic management system according to claim 1, it is characterised in that the general headquarters manage application node by two Individual above server providing services.
- 8. business-electronic management system according to claim 1, it is characterised in that general headquarters' management application node and institute Stating branch management application node includes enterprise's common base data, and when being modified to the common base data, institute State the basic data synchronous vacations renewal in general headquarters' management application node and the branch management application node.
- 9. a kind of business-electronic management system, it is characterised in that application node is managed including general headquarters, for enterprise headquarters' affairs pipe Reason;And general headquarters' management application node includes finger management module, for being managed to branch's affairs of enterprise; AndWhen branch corresponding to the finger management module reaches preparatory condition, the finger management module is managed Member's parameter is reset, and overall managed from the general headquarters in application node of the finger management module is integrally peeled off, generation point Branch pipe manages application node, and the branch management application node and general headquarters management application node are communicated to connect.
- 10. business-electronic management system according to claim 9, it is characterised in that also including direct construction with it is described The branch management application node of general headquarters' management application node communication connection;Keeper's parameter of the branch management application node is set Put from the general headquarters management application node keeper's parameter setting it is different.
- 11. business-electronic management system according to claim 10, it is characterised in that in the branch management application node Including finger management module.
- 12. the business-electronic management system according to claim 10 or 11, it is characterised in that general headquarters' management application section Point includes enterprise's common base data with the branch management node, and when being modified to the common base data, Basic data synchronous vacations renewal in general headquarters' management application node and the branch management application node.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710728357.5A CN107609752A (en) | 2017-08-23 | 2017-08-23 | Business-electronic management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710728357.5A CN107609752A (en) | 2017-08-23 | 2017-08-23 | Business-electronic management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107609752A true CN107609752A (en) | 2018-01-19 |
Family
ID=61065768
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710728357.5A Pending CN107609752A (en) | 2017-08-23 | 2017-08-23 | Business-electronic management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107609752A (en) |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106548298A (en) * | 2016-11-27 | 2017-03-29 | 合肥汉腾信息技术有限公司 | Management information system is multiplexed, isolation is independent is cooperateed with fusion |
-
2017
- 2017-08-23 CN CN201710728357.5A patent/CN107609752A/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106548298A (en) * | 2016-11-27 | 2017-03-29 | 合肥汉腾信息技术有限公司 | Management information system is multiplexed, isolation is independent is cooperateed with fusion |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Cameron | Guest editor's note: Investigating organizational downsizing-fundamental issues | |
Son et al. | Improving the performance of time-constrained workflow processing | |
CN105518641B (en) | Point-to-Point Data clone method, equipment and system and host node switching method, equipment and system | |
CN101373474A (en) | Magnanimity data real time processing structure and real time processing platform following with necessaries for the same | |
CN106548298A (en) | Management information system is multiplexed, isolation is independent is cooperateed with fusion | |
CN106610871A (en) | Cloud operating system architecture | |
CN107273440A (en) | Computer application, date storage method, micro services and microdata storehouse | |
WO2020259086A1 (en) | Distributed architecture | |
CN109584060A (en) | Processing method, device and the computer equipment and storage medium of timing transaction task | |
CN108183931A (en) | A kind of distribution subscription matching process based on demand management tree shape model | |
CN105404826A (en) | Authority management method for dynamically generated business object | |
CN108268474A (en) | A kind of method and device of stock control | |
CN107609752A (en) | Business-electronic management system | |
CN101567943B (en) | Colorful ring back tone system with separated data management and call management and implementing method | |
CN108241751A (en) | Buying bulletin method for automatically releasing and system | |
COTTA-SCHÖNBERG | Automation and academic library structure | |
CN109670713A (en) | Cloud control platform cloud service of goods management method, device, equipment and storage medium | |
CN102521078A (en) | Educational administration resource grade backup method based on third party cloud | |
CN102929628A (en) | Service framework supporting multi-internet service center construction and operation | |
CN110069499A (en) | Data managing method, device, system and storage medium | |
KR100989490B1 (en) | Sysem and its method for load distribution between servers | |
CN109710693A (en) | A kind of Recursive Implementation Method and system that LDAP numeric field data is synchronous | |
CN100433002C (en) | Via platform database copying configurating method | |
TWI262368B (en) | System and method for fabrication backup planning | |
CN114780251B (en) | Method and system for improving computing performance by using distributed database architecture |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180119 |
|
WD01 | Invention patent application deemed withdrawn after publication |