CN107609246A - General optimized calculation method and the device of standing in general energy microgrid - Google Patents
General optimized calculation method and the device of standing in general energy microgrid Download PDFInfo
- Publication number
- CN107609246A CN107609246A CN201710787723.4A CN201710787723A CN107609246A CN 107609246 A CN107609246 A CN 107609246A CN 201710787723 A CN201710787723 A CN 201710787723A CN 107609246 A CN107609246 A CN 107609246A
- Authority
- CN
- China
- Prior art keywords
- general
- type
- energy
- stand
- sequential
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/40—Controlling or monitoring, e.g. of flood or hurricane; Forecasting, e.g. risk assessment or mapping
Landscapes
- Mobile Radio Communication Systems (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
The invention discloses general can stand optimized calculation method and device in a kind of general energy microgrid, wherein, method includes:Obtain the general sketch that can stand in general energy microgrid;Each general type that can be stood in the general sketch that can stand is determined according to the general sketch that can stand;Obtain each general construction sequential that can be stood;The general scale optimization result of calculation that can be stood under general energy microgrid is obtained according to each general type that can be stood and construction sequential.This method can carry out the general scale optimization that can be stood under general energy microgrid by the construction sequential of each general type that can be stood and each general energy station and calculate, realize it is general can station between provide multiple forms of energy to complement each other, the supply and scheduling of the energy are realized, the maximization of the utilization of resources is realized, increases economic efficiency.
Description
Technical field
The present invention relates to general energy microgrid Performance Optimization technique field, in more particularly to a kind of general energy microgrid, general energy station, which optimizes, counts
Calculate method and device.
Background technology
It is general can microgrid be it is general can station development and optimization design an important directions, and pass through it is general can station between multipotency
Complementation can realize the maximization of the utilization of resources, increase economic efficiency.
However, in correlation technique, lack the design to the general type that can stand in general energy microgrid, more without in general energy microgrid
The computational methods of the general scale that can stand, lack and consider general energy source dispensing direction that can be between station, build the problems such as sequential, so as to can not be real
It is existing it is general can provide multiple forms of energy to complement each other between station, the supply of the energy and scheduling can not be realized, cause utilize resource to the full extent, reduction
Economic benefit, it would be highly desirable to solve.
The content of the invention
It is contemplated that at least solves one of technical problem in correlation technique to a certain extent.
Therefore, it is an object of the present invention to propose the general optimized calculation method that can stand in a kind of general energy microgrid, this method
Can realize it is general can provide multiple forms of energy to complement each other between station, realize the supply and scheduling of the energy, realize the maximization of the utilization of resources, improve economical
Benefit.
It is another object of the present invention to propose the general optimization computing device that can stand in a kind of general energy microgrid.
To reach above-mentioned purpose, one aspect of the present invention embodiment proposes the general optimization calculating side that can stand in a kind of general energy microgrid
Method, comprise the following steps:Obtain the general sketch that can stand in general energy microgrid;Determined according to the general sketch that can stand in the general sketch that can stand
Each general type that can be stood;Obtain each general construction sequential that can be stood;According to it is described it is each it is general can the type at station and described
Build sequential and obtain the general scale optimization result of calculation that can be stood under the general energy microgrid.
The general optimized calculation method that can stand in the general energy microgrid of the embodiment of the present invention, the general energy that can pass through in general energy microgrid are stood
Sketch determines each general type that can be stood in the general sketch that can stand, so that stood according to the type at each general energy station and each general energy
Build sequential carry out it is general can under microgrid it is general can the scale optimization at station calculate, realize it is general can provide multiple forms of energy to complement each other between station, realize the energy
Supply and scheduling, realize the maximization of the utilization of resources, increase economic efficiency.
Alternatively, in one embodiment of the invention, the general type that can be stood includes the single general type that can stand, the energy exports
Type, the energy receive type, multidirectional receive output type and multidirectional receive output type.
Further, in one embodiment of the invention, if the general type that can be stood is the single general energy station
Type or energy output type, then it is micro- to obtain the general energy for the type stood according to each general energy and the construction sequential
The general scale optimization result of calculation that can be stood off the net, further comprises:If be later than the construction with sequential construction, input timing
Sequence or the input timing are earlier than the construction sequential, then local carry calculation installation.
Further, in one embodiment of the invention, if the general type that can be stood receives class for the energy
Type or it is multidirectional receive output type, then it is described according to it is described it is each it is general can station type and the construction sequential obtain the general energy
The general scale optimization result of calculation that can be stood, further comprises under microgrid:If built with sequential construction or input timing earlier than described
If sequential, then merge plot total installed capacity and the installation of upstream plot;It is local if the input timing is later than the construction sequential
Carry calculation is installed.
Further, in one embodiment of the invention, if the general type that can be stood is defeated for the multidirectional receiving
Go out type, then it is described that general energy station under the general energy microgrid is obtained according to each general type that can be stood and the construction sequential
Scale optimization result of calculation, further comprises:If with sequential construction, local carry calculation installation;If input timing is early
In the construction sequential, then merge plot total installed capacity and the installation of upstream plot;If the input timing is later than the construction
Sequence, then local carry calculation installation.
To reach above-mentioned purpose, another aspect of the present invention embodiment proposes the general optimization that can stand in a kind of general energy microgrid and calculated
Device, including:First acquisition module, for obtaining the general sketch that can stand in general energy microgrid;Judge module, for according to described general
The sketch that can stand determines each general type that can be stood in the general sketch that can stand;Second acquisition module, for obtaining each general energy station
Construction sequential;Optimization module, it is micro- for obtaining the general energy according to each general type that can be stood and the construction sequential
The general scale optimization result of calculation that can be stood off the net.
The general optimization computing device that can stand in the general energy microgrid of the embodiment of the present invention, can be stood by the general energy in general energy microgrid
Sketch determines each general type that can be stood in the general sketch that can stand, so that stood according to the type at each general energy station and each general energy
Build sequential carry out it is general can under microgrid it is general can the scale optimization at station calculate, realize it is general can provide multiple forms of energy to complement each other between station, realize the energy
Supply and scheduling, realize the maximization of the utilization of resources, increase economic efficiency.
Further, in one embodiment of the invention, it is defeated to include single general type, the energy of standing for the general type that can be stood
Go out type, the energy receives type, multidirectional receive output type and multidirectional receives output type.
Further, in one embodiment of the invention, when the general type that can be stood is the single general class that can stand
When type or energy output type, the optimization module is additionally operable to sequence construction at the same time, input timing be later than it is described construction sequential or
When the input timing is earlier than the construction sequential, local carry calculation installation.
Further, in one embodiment of the invention, when the general type that can be stood receives type for the energy
Or it is multidirectional when receiving output type, the optimization module is additionally operable to sequence construction at the same time or input timing earlier than the construction sequential
When, merge plot total installed capacity and the installation of upstream plot, and when the input timing is later than the construction sequential, local load
Calculate installation.
Further, in one embodiment of the invention, when the general type that can be stood is the multidirectional receiving output
During type, when the optimization module is additionally operable to sequence construction at the same time, local carry calculation installation, and in input timing earlier than institute
When stating construction sequential, merge plot total installed capacity and the installation of upstream plot, and be later than the construction sequential in the input timing
When, local carry calculation installation.
The additional aspect of the present invention and advantage will be set forth in part in the description, and will partly become from the following description
Obtain substantially, or recognized by the practice of the present invention.
Brief description of the drawings
Of the invention above-mentioned and/or additional aspect and advantage will become from the following description of the accompanying drawings of embodiments
Substantially and it is readily appreciated that, wherein:
Fig. 1 is the flow chart of the general optimized calculation method that can stand in the general energy microgrid according to the embodiment of the present invention;
Fig. 2 is can microgrid sketch schematic diagram according to the general of one embodiment of the invention;
Fig. 3 is the classification schematic diagram of the general type that can stand under the general energy microgrid according to one embodiment of the invention;
Fig. 4 is the general scale calculation optimization algorithm schematic diagram that can be stood in the general energy microgrid according to one embodiment of the invention;
And
Fig. 5 is that general can stand optimizes the structural representation of computing device in the general energy microgrid according to the embodiment of the present invention.
Embodiment
Embodiments of the invention are described below in detail, the example of the embodiment is shown in the drawings, wherein from beginning to end
Same or similar label represents same or similar element or the element with same or like function.Below with reference to attached
The embodiment of figure description is exemplary, it is intended to for explaining the present invention, and is not considered as limiting the invention.
Describe to propose according to embodiments of the present invention with reference to the accompanying drawings it is general can in microgrid it is general can stand optimized calculation method and
Device, describe to propose according to embodiments of the present invention first with reference to the accompanying drawings it is general can the general optimized calculation method that can stand in microgrid.
Fig. 1 be one embodiment of the invention it is general can in microgrid the general optimized calculation method that can stand flow chart.
As shown in figure 1, the general optimized calculation method that can stand comprises the following steps in the general energy microgrid:
In step S101, the general sketch that can stand in general energy microgrid is obtained.
It is understood that as shown in Fig. 2 Fig. 2 is the general sketch that can stand in general energy microgrid.Wherein, square frame represents single
General to stand, arrow represents general energy flow direction between standing, and energy flow direction has directionality.
In step s 102, each general type that can be stood in the general sketch that can stand is determined according to the general sketch that can stand.
Alternatively, in one embodiment of the invention, the general type that can be stood includes the single general type that can stand, the energy exports
Type, the energy receive type, multidirectional receive output type and multidirectional receive output type.
, can be with according to the general general sketch that can stand that can be in microgrid it is understood that after the general sketch that can stand is obtained
General can stand is classified as follows:As shown in figure 3, the single general type that can stand, i.e. type-A in figure, representing general can stand and other
Energy transmission & distribution be not present between what general energy station;B types in energy output type, i.e. figure, represent the general energy station and other or more
There is energy output between individual general energy station;The energy receives type, i.e., C types in figure, represents that general can stand receives to come from one or more
Energy conveying between individual general energy station;It is multidirectional to receive output type, i.e., D types in figure, represent that the general energy station receives and output comes from
One or more general energy conveyings that can stand, but receive the general type difference that can stand with output;It is multidirectional to receive output type, that is, scheme
Middle E types, represent that the general energy station receives and exported from the general energy conveying that can stand of one or more, but receive and export general
The type that can stand is identical.
In step s 103, each general construction sequential that can be stood is obtained.
In step S104, the general scale that can be stood under general energy microgrid is obtained according to each general type that can be stood and construction sequential
Optimize result of calculation.
Wherein, in one embodiment of the invention, if it is general can station type for it is single it is general can stand type or the energy it is defeated
Go out type, then the general scale optimization calculating knot that can be stood under general energy microgrid is obtained with sequential is built according to each general type that can be stood
Fruit, further comprise:Sequential or input timing are built earlier than sequential is built if be later than with sequential construction, input timing,
Local carry calculation installation.
It is understood that as shown in figure 4, if the general type that can be stood is single general type or the energy output class of standing
Type, that is, type-A or B types, it is necessary first to judged to sequential, if being later than with sequential construction, input timing
Sequential or input timing are built earlier than sequential is built, then local carry calculation installation.
Wherein, in one embodiment of the invention, if the general type that can be stood receives type or multidirectional receiving for the energy
Output type, then the general scale optimization calculating knot that can be stood under general energy microgrid is obtained with sequential is built according to each general type that can be stood
Fruit, further comprise:If merge plot total installed capacity and upstream plot earlier than sequential is built with sequential construction or input timing
Installation;If input timing is later than construction sequential, local carry calculation installation.
If it is understood that as shown in figure 4, it is general can the type at station receive type for the energy or multidirectional receive output class
Type, that is, C types or D types, it is necessary first to sequential is judged, if with sequential construction or input timing earlier than
Sequential is built, then merges plot total installed capacity and the installation of upstream plot;If input timing is later than construction sequential, local load gauge
Calculate installation.
Wherein, in one embodiment of the invention, if the general type that can be stood receives output type, basis to be multidirectional
Each the general type that can be stood and construction sequential obtain the general scale optimization result of calculation that can be stood under general energy microgrid, further comprise:
If with sequential construction, local carry calculation installation;If input timing merges plot total installed capacity simultaneously earlier than sequential is built
Install in upstream plot;If input timing is later than construction sequential, local carry calculation installation.
If it is understood that as shown in figure 4, it is general can station type it is multidirectional receive output type, that is, E types,
Judged firstly the need of to sequential, if with sequential construction, then local carry calculation installation;If input timing is earlier than building
If sequential, then merge plot total installed capacity and the installation of upstream plot;If input timing is later than construction sequential, local carry calculation
Installation.
The general optimized calculation method that can stand in the general energy microgrid proposed according to embodiments of the present invention, can be by general energy microgrid
The general sketch that can stand determine in the general sketch that can stand it is each it is general can station type, so as to according to it is each it is general can the type at station and each
It is general can station constructions sequential carry out it is general can under microgrid it is general can the scale optimization at station calculate, realize it is general can provide multiple forms of energy to complement each other between station, in fact
The supply and scheduling of the existing energy, realize the maximization of the utilization of resources, increase economic efficiency.
The general optimization computing device that can stand in the general energy microgrid proposed according to embodiments of the present invention referring next to accompanying drawing description.
Fig. 5 be one embodiment of the invention it is general can in microgrid it is general can station optimization computing device structural representation.
As shown in figure 5, the general optimization computing device 10 that can stand includes in the general energy microgrid:First acquisition module 100, judge mould
Block 200, the second acquisition module 300 and optimization module 400.
Wherein, the first acquisition module 100 is used to obtain the general sketch that can stand in general energy microgrid;Judge module 200 is used for root
Each general type that can be stood in the general sketch that can stand is determined according to the general sketch that can stand;Second acquisition module 300 is used to obtain each general energy
The construction sequential stood;Optimization module 400 is used for basis, and each general the type that can be stood and construction sequential obtain general energy under general energy microgrid
The scale optimization result of calculation stood.The device 10 of the embodiment of the present invention can pass through each general type that can be stood and each general energy
The construction sequential stood carry out it is general can under microgrid it is general can the scale optimization at station calculate, realize it is general can provide multiple forms of energy to complement each other between station, realize energy
The supply and scheduling in source, realize the maximization of the utilization of resources, increase economic efficiency.
Further, in one embodiment of the invention, it is defeated to include single general type, the energy of standing for the general type that can be stood
Go out type, the energy receives type, multidirectional receive output type and multidirectional receives output type.
Further, in one embodiment of the invention, when the general type that can be stood is single general type or the energy of standing
During output type, optimization module 400 is additionally operable to sequence construction at the same time, input timing is later than and builds sequential or input timing earlier than building
If during sequential, local carry calculation installation.
Further, in one embodiment of the invention, when it is general can the type at station receive type for the energy or multidirectional connect
During by output type, when optimization module 400 is additionally operable to sequence construction at the same time or input timing earlier than sequential is built, it is total to merge plot
Install and upstream plot is installed, and when input timing is later than and builds sequential, local carry calculation installation.
Further, in one embodiment of the invention, when it is general can station type for it is multidirectional receive output type when, it is excellent
When change module 400 is additionally operable to sequence construction at the same time, local carry calculation installation, and when input timing is earlier than sequential is built,
Merge plot total installed capacity and the installation of upstream plot, and when input timing is later than and builds sequential, local carry calculation installation.
It should be noted that foregoing be also suitable to the general explanation that can stand optimized calculation method embodiment in general energy microgrid
The general optimization computing device that can stand in the general energy microgrid of the embodiment, here is omitted.
The general optimization computing device that can stand in the general energy microgrid proposed according to embodiments of the present invention, can be by general energy microgrid
The general sketch that can stand determine in the general sketch that can stand it is each it is general can station type, so as to according to it is each it is general can the type at station and each
It is general can station constructions sequential carry out it is general can under microgrid it is general can the scale optimization at station calculate, realize it is general can provide multiple forms of energy to complement each other between station, in fact
The supply and scheduling of the existing energy, realize the maximization of the utilization of resources, increase economic efficiency.
In the description of the invention, it is to be understood that term " " center ", " longitudinal direction ", " transverse direction ", " length ", " width ",
" thickness ", " on ", " under ", "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom " " interior ", " outer ", " up time
The orientation or position relationship of the instruction such as pin ", " counterclockwise ", " axial direction ", " radial direction ", " circumference " be based on orientation shown in the drawings or
Position relationship, it is for only for ease of and describes the present invention and simplify description, rather than indicates or imply that signified device or element must
There must be specific orientation, with specific azimuth configuration and operation, therefore be not considered as limiting the invention.
In addition, term " first ", " second " are only used for describing purpose, and it is not intended that instruction or hint relative importance
Or the implicit quantity for indicating indicated technical characteristic.Thus, define " first ", the feature of " second " can be expressed or
Implicitly include at least one this feature.In the description of the invention, " multiple " are meant that at least two, such as two, three
It is individual etc., unless otherwise specifically defined.
In the present invention, unless otherwise clearly defined and limited, term " installation ", " connected ", " connection ", " fixation " etc.
Term should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or integrally;Can be that machinery connects
Connect or electrically connect;Can be joined directly together, can also be indirectly connected by intermediary, can be in two elements
The connection in portion or the interaction relationship of two elements, limited unless otherwise clear and definite.For one of ordinary skill in the art
For, the concrete meaning of above-mentioned term in the present invention can be understood as the case may be.
In the present invention, unless otherwise clearly defined and limited, fisrt feature can be with "above" or "below" second feature
It is that the first and second features directly contact, or the first and second features pass through intermediary mediate contact.Moreover, fisrt feature exists
Second feature " on ", " top " and " above " but fisrt feature are directly over second feature or oblique upper, or be merely representative of
Fisrt feature level height is higher than second feature.Fisrt feature second feature " under ", " lower section " and " below " can be
One feature is immediately below second feature or obliquely downward, or is merely representative of fisrt feature level height and is less than second feature.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " example ", " specifically show
The description of example " or " some examples " etc. means specific features, structure, material or the spy for combining the embodiment or example description
Point is contained at least one embodiment or example of the present invention.In this manual, to the schematic representation of above-mentioned term not
Identical embodiment or example must be directed to.Moreover, specific features, structure, material or the feature of description can be with office
Combined in an appropriate manner in one or more embodiments or example.In addition, in the case of not conflicting, the skill of this area
Art personnel can be tied the different embodiments or example and the feature of different embodiments or example described in this specification
Close and combine.
Although embodiments of the invention have been shown and described above, it is to be understood that above-described embodiment is example
Property, it is impossible to limitation of the present invention is interpreted as, one of ordinary skill in the art within the scope of the invention can be to above-mentioned
Embodiment is changed, changed, replacing and modification.
Claims (10)
1. the general optimized calculation method that can stand in a kind of general energy microgrid, it is characterised in that comprise the following steps:
Obtain the general sketch that can stand in general energy microgrid;
Each general type that can be stood in the general sketch that can stand is determined according to the general sketch that can stand;
Obtain each general construction sequential that can be stood;And
The general scale optimization that can be stood under the general energy microgrid is obtained according to the type at each general energy station and the sequential of building
Result of calculation.
2. the general optimized calculation method that can stand in general energy microgrid according to claim 1, it is characterised in that the general type that can be stood
Receive type including the single general type that can stand, energy output type, the energy, multidirectional receive output type and multidirectional receive output class
Type.
3. the general optimized calculation method that can stand in general energy microgrid according to claim 2, it is characterised in that if the general energy
The type stood is single general can stand type or the energy output type, then it is described according to it is described it is each it is general can station type and institute
State construction sequential and obtain the general scale optimization result of calculation that can be stood under the general energy microgrid, further comprise:
If being later than the construction sequential or the input timing earlier than the construction sequential with sequential construction, input timing,
Local carry calculation installation.
4. the general optimized calculation method that can stand in general energy microgrid according to claim 2, it is characterised in that if the general energy
The type stood be the energy receive type or it is multidirectional receive output type, then it is described according to it is described it is each it is general can station type and
The sequential of building obtains the general scale optimization result of calculation that can be stood under the general energy microgrid, further comprises:
If merge plot total installed capacity and the installation of upstream plot earlier than the construction sequential with sequential construction or input timing;
If the input timing is later than the construction sequential, local carry calculation installation.
5. the general optimized calculation method that can stand in general energy microgrid according to claim 2, it is characterised in that if the general energy
The type stood for it is described it is multidirectional receive output type, then it is described according to it is described it is each it is general can station type and the construction sequential obtain
The general scale optimization result of calculation that can be stood under to the general energy microgrid, further comprises:
If with sequential construction, local carry calculation installation;
If input timing merges plot total installed capacity and the installation of upstream plot earlier than the construction sequential;
If the input timing is later than the construction sequential, local carry calculation installation.
A kind of 6. general optimization computing device that can stand in general energy microgrid, it is characterised in that including:
First acquisition module, for obtaining the general sketch that can stand in general energy microgrid;
Judge module, for determining each general type that can be stood in the general sketch that can stand according to the general sketch that can stand;
Second acquisition module, for obtaining each general construction sequential that can be stood;And
Optimization module, for obtaining general energy under the general energy microgrid according to each general type that can be stood and the construction sequential
The scale optimization result of calculation stood.
7. the general optimization computing device that can stand in general energy microgrid according to claim 6, it is characterised in that the general type that can be stood
Receive type including the single general type that can stand, energy output type, the energy, multidirectional receive output type and multidirectional receive output class
Type.
8. the general optimization computing device that can stand in general energy microgrid according to claim 7, it is characterised in that when the general energy is stood
Type for it is described it is single it is general can stand type or the energy output type when, the optimization module is additionally operable to sequence construction at the same time, defeated
When entering sequential and being later than the construction sequential or the input timing earlier than the construction sequential, local carry calculation installation.
9. the general optimization computing device that can stand in general energy microgrid according to claim 7, it is characterised in that when the general energy is stood
Type for the energy receive type or it is multidirectional receive output type when, the optimization module be additionally operable to sequence construction at the same time or
When input timing is earlier than the construction sequential, merge plot total installed capacity and the installation of upstream plot, and in input timing evening
When the construction sequential, local carry calculation installation.
10. the general optimization computing device that can stand in general energy microgrid according to claim 7, it is characterised in that when the general energy
The type stood for it is described it is multidirectional receive output type when, the optimization module be additionally operable at the same time sequence construction when, local load gauge
Installation is calculated, and when input timing is earlier than the construction sequential, merges plot total installed capacity and the installation of upstream plot, and in institute
When stating input timing and being later than the construction sequential, the installation of local carry calculation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710787723.4A CN107609246B (en) | 2017-09-04 | 2017-09-04 | Method and device for optimizing and calculating universal energy station in universal energy microgrid |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710787723.4A CN107609246B (en) | 2017-09-04 | 2017-09-04 | Method and device for optimizing and calculating universal energy station in universal energy microgrid |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107609246A true CN107609246A (en) | 2018-01-19 |
CN107609246B CN107609246B (en) | 2021-09-10 |
Family
ID=61057502
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710787723.4A Active CN107609246B (en) | 2017-09-04 | 2017-09-04 | Method and device for optimizing and calculating universal energy station in universal energy microgrid |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107609246B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100791636B1 (en) * | 2006-12-20 | 2008-01-04 | 고려대학교 산학협력단 | System for beacon transmitting scheduling considering data type and method thereof |
US20110264286A1 (en) * | 2010-04-27 | 2011-10-27 | Jong Soo Park | Smart control device |
CN102426438A (en) * | 2011-01-14 | 2012-04-25 | 新奥科技发展有限公司 | Universal energy network system based on universal energy gateway and construction method thereof |
CN202837961U (en) * | 2012-04-01 | 2013-03-27 | 广东金智慧物联网科技有限公司 | Energy consumption information dynamically monitoring system based on Internet of things |
CN106410859A (en) * | 2015-07-28 | 2017-02-15 | 中国电力科学研究院 | Random production simulation-based new energy grid connection admitting ability calculation method |
-
2017
- 2017-09-04 CN CN201710787723.4A patent/CN107609246B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100791636B1 (en) * | 2006-12-20 | 2008-01-04 | 고려대학교 산학협력단 | System for beacon transmitting scheduling considering data type and method thereof |
US20110264286A1 (en) * | 2010-04-27 | 2011-10-27 | Jong Soo Park | Smart control device |
CN102426438A (en) * | 2011-01-14 | 2012-04-25 | 新奥科技发展有限公司 | Universal energy network system based on universal energy gateway and construction method thereof |
CN202837961U (en) * | 2012-04-01 | 2013-03-27 | 广东金智慧物联网科技有限公司 | Energy consumption information dynamically monitoring system based on Internet of things |
CN106410859A (en) * | 2015-07-28 | 2017-02-15 | 中国电力科学研究院 | Random production simulation-based new energy grid connection admitting ability calculation method |
Non-Patent Citations (1)
Title |
---|
陈深: "微电网优化调度模型与方法研究", 《中国优秀硕士学位论文全文数据库》 * |
Also Published As
Publication number | Publication date |
---|---|
CN107609246B (en) | 2021-09-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Taher et al. | New approach for optimal UPFC placement using hybrid immune algorithm in electric power systems | |
CN102981893B (en) | A kind of dispatching method of virtual machine and system | |
CN105138777A (en) | Pole tower model selection method and device | |
CN106208393B (en) | A kind of distribution network automated monitoring method and system | |
CN105207306B (en) | The charging current control method and device of electric automobile power battery | |
CN105140933B (en) | 110kV substation various dimensions variable element calculates reactive compensation configuration method | |
CN107748956A (en) | A kind of appraisal procedure of power distribution network typical wiring non-integer segmentation reliability | |
CN103955569A (en) | Calculation method for blanking length mathematical model of flexible lead of 500kV substation | |
CN102752395A (en) | On-line scheduling method for real-time service distribution of distributed type data center | |
CN102590685A (en) | Current matching state estimating method of power distribution network | |
CN107122523A (en) | Heat supply phase Combined Cycle Unit electric load adjustable extent on-line monitoring method | |
ATE295773T1 (en) | SYSTEM FOR FEEDING MATERIAL PARTS TO AN INJECTION MOLDING MACHINE | |
CN106969465B (en) | Central air-conditioning in office building system magnetic suspension cold water host control method and device | |
CN107612045A (en) | A kind of Power Plant generated energy intelligent dispensing system and method | |
CN104656053A (en) | State estimation method and system for electric energy metering devices | |
CN107609246A (en) | General optimized calculation method and the device of standing in general energy microgrid | |
CN102386623A (en) | Method for reducing loss of wind farm | |
FR3105516B1 (en) | Process for shedding the outputs of an electrical energy production installation | |
CN106523329A (en) | Compressed air grid-connected energy saving operation method of multi-system air compression station | |
CN107861820A (en) | A kind of resources of virtual machine distribution method and system | |
CN104834968B (en) | A kind of real-time grid economical operation assessment sub- optimization algorithm of thermoelectricity | |
CN103208804A (en) | Branch voltage stability analysis based selection method for reactive power compensation point of microgrid | |
CN107480765A (en) | The application process and device of heredity and ant colony algorithm in group volume | |
CN107563556A (en) | The sorting technique and device of the general type that can stand in general energy microgrid | |
Vasilj et al. | Wind power forecast error simulation model |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |