CN107608780A - A kind of resource tree loading method, device and transmission network management - Google Patents

A kind of resource tree loading method, device and transmission network management Download PDF

Info

Publication number
CN107608780A
CN107608780A CN201610538926.5A CN201610538926A CN107608780A CN 107608780 A CN107608780 A CN 107608780A CN 201610538926 A CN201610538926 A CN 201610538926A CN 107608780 A CN107608780 A CN 107608780A
Authority
CN
China
Prior art keywords
resource
loading
tree
loaded
child
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201610538926.5A
Other languages
Chinese (zh)
Inventor
孟彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201610538926.5A priority Critical patent/CN107608780A/en
Publication of CN107608780A publication Critical patent/CN107608780A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Information Transfer Between Computers (AREA)

Abstract

The invention discloses a kind of resource tree loading method, device and transmission network management, it is related to communication field, methods described includes:For show transmission network management management tree structure resource resource tree control receive loading resource instruction when, search predetermined resource load mode;The resource tree control loads a part of resource in tree structure resource according to the resource tree load mode searched;After a part of resource of resource tree control loading tree structure resource, when receiving the loading instruction of the further related resource that loading is relevant with the resource loaded, the related resource is loaded.The embodiment of the present invention is by demand or dynamic load resource, improving resource tree loading efficiency and reducing the EMS memory occupation of resource tree.

Description

A kind of resource tree loading method, device and transmission network management
Technical field
The present invention relates to communication field, more particularly to a kind of resource tree loading method, device and transmission network management.
Background technology
Resource tree is to be showed the resource of transmission network management management according to tree structure according to network topology level structure A kind of control, the resource of management includes:Packet, network element, veneer, port etc., such as Fig. 1.Resource tree provides the user with resource and led The function such as boat or resource selection, many functions need to use resource tree in webmaster.
All resources can be disposably loaded according to traditional processing mode, during resource tree initialization.This processing mode Benefit is simple, but deficiency is also evident from, and specifically, user only can be concerned about a part of resource under normal circumstances, not be institute Some resources all can use arrive, disposably load all resources will certainly cause efficiency lowly and internal memory waste.When webmaster management In the case of ample resources, above mentioned problem is particularly evident and may cause serious consequence, such as disposably loads all resources Longer time can be expended, causes network management function to initialize slow phenomenon, the Consumer's Experience bad to user.Further, Each resource tree can take substantial amounts of internal memory, if opening multiple functions of including resource tree simultaneously, it would be possible to cause internal memory Overflow, cause webmaster to collapse.Therefore, it is necessary to make resource tree not be disposably to load all resources in initialization, but only Load the resource that user is concerned about.
The content of the invention
The technical problem that the technical scheme provided according to embodiments of the present invention solves is how to make resource tree on demand or move State loads resource.
A kind of resource tree loading method provided according to embodiments of the present invention, including:
For show transmission network management management tree structure resource resource tree control receive loading resource instruction when, look into Look for predetermined resource load mode;
The resource tree control loads the part money in tree structure resource according to the resource tree load mode searched Source;
After a part of resource of resource tree control loading tree structure resource, the money further loaded with having loaded is received During the loading instruction of the relevant related resource in source, the related resource is loaded.
Preferably, described resource load mode includes:Original upload is carried out in an initial condition, is carrying out original upload Subsequent dynamic loading is carried out afterwards.
Preferably, it is described loading tree structure resource in a part of resource the step of include:
The resource tree control is according to the resource tree load mode searched, in an initial condition, loading tree structure money Child's resource of Element management system (Element Management System, EMS) root node in source.
Preferably, the step of loading related resource includes:
The resource tree control instructs according to the loading of the further loading related resource relevant with the resource loaded, moves Child's resource of the resource loaded in state loading tree structure resource.
The storage medium provided according to embodiments of the present invention, it stores the journey for realizing above-mentioned resource tree loading method Sequence.
A kind of resource tree loading device provided according to embodiments of the present invention, described device are arranged on for showing transmission network In the resource tree control of the tree structure resource of pipe management, including:
Searching modul, for when receiving loading resource instruction, searching predetermined resource load mode;
Original upload module, for according to the resource tree load mode searched, loading one in tree structure resource Divide resource;
Dlm (dynamic loading module), for loading tree structure resource a part of resource after, receive further loading with During the loading instruction of the relevant related resource of the resource of loading, the related resource is loaded.
Preferably, described resource load mode includes:Original upload is carried out in an initial condition, is carrying out original upload Subsequent dynamic loading is carried out afterwards.
Preferably, the original upload module is according to the resource tree load mode searched, in an initial condition, loading tree Child's resource of EMS root nodes in shape infrastructure resource.
Preferably, the dlm (dynamic loading module) adding according to the further loading related resource relevant with the resource loaded Carry and instruct, child's resource of the resource loaded in the tree-like infrastructure resource of dynamic load.
A kind of transmission network management provided according to embodiments of the present invention, it includes above-mentioned resource tree loading device.
Technical scheme provided in an embodiment of the present invention has the advantages that:
The embodiment of the present invention is improved the efficiency of resource tree initialization, reduced by dynamic loading resource on demand The internal memory that resource tree expends, the Consumer's Experience of webmastering software can be effectively improved, reduce the internal memory that webmastering software expends.
Brief description of the drawings
Fig. 1 is the resource tree schematic diagram that prior art provides;
Fig. 2 is resource tree loading method block diagram provided in an embodiment of the present invention;
Fig. 3 is resource tree loading device block diagram provided in an embodiment of the present invention;
Fig. 4 is resource tree loading flow chart provided in an embodiment of the present invention;
Fig. 5 is the topology resource hierarchical chart of network provided in an embodiment of the present invention;
Fig. 6 is first resource schematic diagram provided in an embodiment of the present invention;
Fig. 7 is Secondary resource schematic diagram provided in an embodiment of the present invention;
Fig. 8 is information resources schematic diagram provided in an embodiment of the present invention;
Fig. 9 is the 4th resource schematic diagram provided in an embodiment of the present invention;
Figure 10 is the 5th resource schematic diagram provided in an embodiment of the present invention.
Embodiment
Below in conjunction with accompanying drawing to a preferred embodiment of the present invention will be described in detail, it will be appreciated that described below is excellent Select embodiment to be merely to illustrate and explain the present invention, be not intended to limit the present invention.
Fig. 2 is resource tree loading method block diagram provided in an embodiment of the present invention, as shown in Fig. 2 step includes:
Step S101:The resource tree control of tree structure resource for showing transmission network management management is receiving loading resource During instruction, predetermined resource load mode is searched.
The resource load mode includes disposable load mode and dynamic load mode (i.e. repeated loading mode or on demand Load mode).
The dynamic load mode refers to carries out original upload in an initial condition, is subsequently moved after original upload is carried out State loads.
Step S102:The resource tree control is loaded in tree structure resource according to the resource tree load mode searched A part of resource.
When the resource tree load mode searched is dynamic load mode, the resource tree control is according to the money searched Source tree dynamic load mode, in an initial condition, load child's resource of the EMS root nodes in tree structure resource.
As another embodiment, the resource tree control can also be in the EMS root nodes in loading tree structure resource Child's resource while, using crucial child's resource in the child's resource loaded as father node, load the father node Whole resources of child's resource or the loading father node.
Step S103:When resource tree control loading tree structure resource a part of resource after, receive further loading with During the loading instruction of the relevant related resource of the resource that has loaded, the related resource is loaded.
The resource tree control instructs according to the loading of the further loading related resource relevant with the resource loaded, moves Child's resource of the resource loaded in state loading tree structure resource.
The present embodiment can allow resource tree on demand or dynamic load resource, so as to improve resource tree loading efficiency and Reduce the EMS memory occupation of resource tree.
Can be with it will appreciated by the skilled person that realizing that all or part of step in above-described embodiment method is The hardware of correlation is instructed to complete by program, described program can be stored in computer read/write memory medium, should Program upon execution, including step S101 to step S103.Wherein, described storage medium can be ROM/RAM, magnetic disc, light Disk etc..
Fig. 3 is resource tree loading device block diagram provided in an embodiment of the present invention, as shown in figure 3, including:
Searching modul 10, for when receiving loading resource instruction, searching predetermined resource load mode.The resource adds Load mode includes dynamic load mode (i.e. repeated loading mode or on-demand loading mode), i.e., carries out initially adding in an initial condition Carry, subsequent dynamic loading is carried out after original upload is carried out.
Original upload module 20, for according to the resource tree load mode searched, loading one in tree structure resource Part resource.The original upload module 20 in an initial condition, loads tree-like knot according to the resource tree load mode searched Child's resource of EMS root nodes in structure resource.As another embodiment, the original upload module 20 can also load While child's resource of EMS root nodes in tree structure resource, with crucial child's resource in child's resource for having loaded For father node, child's resource of the father node or whole resources of the loading father node are loaded.
Dlm (dynamic loading module) 30, for loading tree structure resource a part of resource after, receive further loading with During the loading instruction of the relevant related resource of the resource that has loaded, the related resource is loaded.The dlm (dynamic loading module) according to Further the loading of the loading related resource relevant with the resource loaded instructs, described in the tree-like infrastructure resource of dynamic load Child's resource of the resource loaded.
The resource tree loading device is arranged on the resource tree control of the tree structure resource for showing transmission network management management In part.
The present embodiment can improve resource tree loading efficiency, reduce the EMS memory occupation of resource tree, allow resource tree on demand Or dynamic load resource.
The embodiment of the present invention additionally provides a kind of transmission network management, which is provided with above-mentioned resource tree loading device.
Fig. 4 is resource tree loading flow chart provided in an embodiment of the present invention, as shown in figure 4, the present embodiment makes resource tree can With on demand or dynamic load resource, so as to improve resource tree loading efficiency and reduce the EMS memory occupation of resource tree, implementation steps It is as follows:
Step S201:Child's resource of EMS root nodes is loaded under resource tree original state.
Step S202:If user needs to check child's resource of some resource, child's resource of the resource is loaded.
Step S203:Other resources beyond child's resource of EMS root nodes are all according to step S202 processing.
The present embodiment makes resource tree not be disposably to load all resources in initialization, but only loads user and be concerned about Resource, or perhaps dynamic loading resource on demand, so as to improve the efficiency of resource tree initialization and reduce resource tree The internal memory of consuming, the effective Consumer's Experience for improving webmastering software and the internal memory for reducing webmastering software consuming.
With reference to Fig. 5 to Fig. 8 instantiation, the present invention is further described.
Fig. 5 is the topology resource hierarchical chart of network provided in an embodiment of the present invention, as shown in Figure 5.
EMS root nodes have child's resource:It is grouped A, packet B, network element 1, network element 2;
Packet A has child's resource:Network element A1, network element A2;
Packet B has child's resource:Network element B1;
Network element 1 has child's resource:Veneer 1a;
Network element 2 has child's resource:Veneer 2a, veneer 2b;
Network element A2 has child's resource:Veneer A 2a.
Resource tree init state loads child's resource of EMS root nodes:A, packet B, network element 1, network element 2 are grouped, such as Fig. 6 Shown first resource schematic diagram.
When user needs to check packet A child's resource, expansion packet A, loading packet A child's resource:Network element A1, net First A2, Secondary resource schematic diagram as shown in Figure 7.
User needs to check child's resource of network element 2, deploys network element 2, loads child's resource of network element 2:Veneer 2a, veneer 2b, information resources schematic diagram as shown in Figure 8.
That is, when receiving loading resource instruction, predetermined resource load mode is searched, when resource load mode is During dynamic load mode, according to dynamic load mode, child's resource packet A of original upload EMS root nodes, packet B, network element 1, Network element 2, first resource schematic diagram as shown in Figure 6.After original upload terminates, the resource further loaded with having loaded is received During the loading instruction of (being grouped A, packet B, network element 1, network element 2) relevant related resource, for example, receive further loading with During the loading instruction of the packet of loading related resource relevant A, loading packet A child resource network element A1 and network element A2, such as Fig. 7 Secondary resource schematic diagram in trival matters.After loading packet A child resource network element A1 and network element A2, further loading is received With resource (being grouped A child resource network element A1 and network element A2, and packet B, network element 1, network element 2) the relevant phase loaded When closing the loading instruction of resource, such as receive the loading instruction of the further related resource that loading is relevant with the network element 2 loaded When, the child resource veneer 2a and veneer 2b of loading network element 2, information resources schematic diagram as shown in Figure 8.
As another embodiment, it can also preset which child's resource in child's resource of EMS root nodes belongs to User's keystone resources interested, such as packet A in Fig. 5 is set as user's keystone resources interested.Receiving loading money During sourse instruction, predetermined resource load mode is searched, when resource load mode is dynamic load mode, according to dynamic load side Formula, child's resource packet A, packet B, network element 1, the network element 2 of original upload EMS root nodes, while load packet A child's resource Network element A1, network element A2, Secondary resource schematic diagram as shown in Figure 7.After original upload terminates, further loading is received with adding Resource (being grouped A child resource network element A1 and network element A2, and packet B, network element 1, network element 2) relevant related resource of load Loading instruction when, such as when receiving the loading instruction of the further loading related resource relevant with the network element 2 loaded, load The child resource veneer 2a and veneer 2b of network element 2, information resources schematic diagram as shown in Figure 8.
As another embodiment, equally preset which child's resource in child's resource of EMS root nodes belongs to user Keystone resources interested, such as packet A in Fig. 5 is set as user's keystone resources interested.Refer to receiving loading resource When making, predetermined resource load mode is searched, when resource load mode is dynamic load mode, according to dynamic load mode, Child's resource packet A, packet B, network element 1, the network element 2 of original upload EMS root nodes, while load packet A whole children money Source network element A1 and network element A2, network element A2 child resource veneer A 2a, the 4th resource schematic diagram as shown in Figure 9.Work as original upload After end, when receiving the loading instruction of the further related resource that loading is relevant with the resource loaded, such as receive further During the loading instruction of the loading related resource relevant with the network element 2 loaded, the child resource veneer 2a and veneer of network element 2 are loaded 2b, the 5th resource schematic diagram as shown in Figure 10.
In summary, embodiments of the invention have following technique effect:
The embodiment of the present invention can make resource tree on demand or dynamic load resource, so as to improve resource tree loading efficiency and Reduce the EMS memory occupation of resource tree.
Although the present invention is described in detail above, the invention is not restricted to this, those skilled in the art of the present technique Various modifications can be carried out according to the principle of the present invention.Therefore, all modifications made according to the principle of the invention, all should be understood to Fall into protection scope of the present invention.

Claims (9)

1. a kind of resource tree loading method, including:
For show transmission network management management tree structure resource resource tree control when receiving loading resource instruction, search pre- Fixed resource load mode;
The resource tree control loads a part of resource in tree structure resource according to the resource tree load mode searched;
After a part of resource of resource tree control loading tree structure resource, receive further loading has with the resource loaded During the loading instruction of the related resource of pass, the related resource is loaded.
2. according to the method for claim 1, described resource load mode includes:Carry out initially adding in an initial condition Carry, subsequent dynamic loading is carried out after original upload is carried out.
3. according to the method for claim 2, it is described loading tree structure resource in a part of resource the step of include:
The resource tree control in an initial condition, is loaded in tree structure resource according to the resource tree load mode searched Element management system EMS root nodes child's resource.
4. according to the method described in claim 1-3 any one, described the step of loading the related resource, includes:
The resource tree control instructs according to the loading of the further loading related resource relevant with the resource loaded, and dynamic adds Carry child's resource of the resource loaded in tree structure resource.
5. a kind of resource tree loading device, described device is arranged on the money of the tree structure resource for showing transmission network management management In the tree control of source, including:
Searching modul, for when receiving loading resource instruction, searching predetermined resource load mode;
Original upload module, for according to the resource tree load mode searched, loading the part money in tree structure resource Source;
Dlm (dynamic loading module), for after a part of resource of loading tree structure resource, receiving further loading with having loaded The relevant related resource of resource loading instruction when, load the related resource.
6. device according to claim 5, described resource load mode includes:Carry out initially adding in an initial condition Carry, subsequent dynamic loading is carried out after original upload is carried out.
7. device according to claim 6, the original upload module is according to the resource tree load mode searched, first Under beginning state, child's resource of the Element management system EMS root nodes in tree structure resource is loaded.
8. according to the device described in claim 5-7 any one, the dlm (dynamic loading module) is according to further loading with adding The loading instruction of the relevant related resource of the resource of load, the child of the resource loaded in the tree-like infrastructure resource of dynamic load Child resource.
9. a kind of transmission network management, it includes resource tree loading device described in the claims 5-8 any one.
CN201610538926.5A 2016-07-11 2016-07-11 A kind of resource tree loading method, device and transmission network management Withdrawn CN107608780A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610538926.5A CN107608780A (en) 2016-07-11 2016-07-11 A kind of resource tree loading method, device and transmission network management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610538926.5A CN107608780A (en) 2016-07-11 2016-07-11 A kind of resource tree loading method, device and transmission network management

Publications (1)

Publication Number Publication Date
CN107608780A true CN107608780A (en) 2018-01-19

Family

ID=61055073

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610538926.5A Withdrawn CN107608780A (en) 2016-07-11 2016-07-11 A kind of resource tree loading method, device and transmission network management

Country Status (1)

Country Link
CN (1) CN107608780A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110620902A (en) * 2019-07-05 2019-12-27 中电科新型智慧城市研究院有限公司 Local visualization and management method for mobile law enforcement recorder
CN113179391A (en) * 2021-04-23 2021-07-27 深圳市安软慧视科技有限公司 Method for fast loading equipment, related system, related equipment and storage medium

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110620902A (en) * 2019-07-05 2019-12-27 中电科新型智慧城市研究院有限公司 Local visualization and management method for mobile law enforcement recorder
CN113179391A (en) * 2021-04-23 2021-07-27 深圳市安软慧视科技有限公司 Method for fast loading equipment, related system, related equipment and storage medium

Similar Documents

Publication Publication Date Title
US10496627B2 (en) Consistent ring namespaces facilitating data storage and organization in network infrastructures
CN104657140A (en) Code generating method and device
CN103259718B (en) A kind of stream table conversion method and device
Patt-Shamir et al. The round complexity of distributed sorting
CN108243245A (en) The Radio Access Network and its resource allocation method calculated based on mixing fog
CN104598107A (en) Generating method and system of interface control
CN102819766A (en) Method, device and enterprise system for checking forms
CN103716403A (en) SAAS application deployment method and system for PAAS platform under cloud computing environment
CN104613976A (en) Path determination method and device
CN104754053A (en) Distributed software-defined network and method of dynamically controlling controllers therein
CN104199912A (en) Task processing method and device
CN114970814A (en) Processing method and processing device of neural network computation graph
CN105553882A (en) Method for scheduling SDN data plane resources
CN107608780A (en) A kind of resource tree loading method, device and transmission network management
CN103023936A (en) Multi-hierarchy network system and task executing method based on same
CN102082832A (en) Data storage method and device in distributed file system
CN111414228B (en) Method and related device for managing storage space based on Kubernetes
CN102970349B (en) A kind of memory load equalization methods of DHT network
Clemente-Castelló et al. Evaluation of data locality strategies for hybrid cloud bursting of iterative MapReduce
CN103197947A (en) Script processing method and device
CN108365976B (en) Network service optimization method and device
CN112667593A (en) Method and device for ETL (extract transform and load) flow to execute hbase fast loading
CN106681795A (en) Virtual network mapping method utilizing local topological attributes of nodes and available resource capacity values
CN101986625A (en) Path calculation method and device
CN114115911A (en) System construction strategy generation method based on directed acyclic graph

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20180119

WW01 Invention patent application withdrawn after publication