CN107600910A - Timing belt conveying device - Google Patents
Timing belt conveying device Download PDFInfo
- Publication number
- CN107600910A CN107600910A CN201710965400.XA CN201710965400A CN107600910A CN 107600910 A CN107600910 A CN 107600910A CN 201710965400 A CN201710965400 A CN 201710965400A CN 107600910 A CN107600910 A CN 107600910A
- Authority
- CN
- China
- Prior art keywords
- tensioning wheel
- fixedly installed
- frame
- installing plate
- driving shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009434 installation Methods 0.000 claims abstract description 4
- 230000008859 change Effects 0.000 abstract description 3
- 238000010276 construction Methods 0.000 abstract description 3
- 230000008901 benefit Effects 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 6
- 230000008569 process Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
Landscapes
- Escalators And Moving Walkways (AREA)
Abstract
This application discloses a kind of timing belt conveying device, including frame, installation settings has driving shaft and driven shaft respectively at the upper rack both ends, the driving shaft is driven by motor, the motor is fixedly installed in the first installing plate, first installing plate is fixedly installed in the frame, in addition to the first tensioning wheel, the second tensioning wheel, the 3rd tensioning wheel, belt.The advantage of the invention is that simple in construction firm, conveying is stable, loads larger, service life length, and if necessary to change timing belt, only need to be i.e. replaceable by the bolt release for fixing the second tensioning wheel, it is convenient and swift.
Description
Technical field
The application is related to a kind of timing belt conveying device.
Background technology
Timing belt easily conveys unstable in the prior art, and built on the sand, service life is short for structure.
The content of the invention
It is an object of the invention to provide a kind of timing belt conveying device, with overcome the deficiencies in the prior art.
To achieve the above object, the present invention provides following technical scheme.
The embodiment of the present application discloses a kind of timing belt conveying device, including frame, and the upper rack both ends are pacified respectively
Installing is equipped with driving shaft and driven shaft, and the driving shaft is driven by motor, and the motor is fixedly installed in the first installing plate, described
First installing plate is fixedly installed in the frame, in addition to the first tensioning wheel, the second tensioning wheel, the 3rd tensioning wheel, belt, described
First tensioning wheel, the second tensioning wheel, the 3rd tensioning wheel are fixedly installed in the frame, the driving shaft, driven shaft, first respectively
Tensioning wheel, the second tensioning wheel, the 3rd tensioning wheel pass sequentially through the belt connection, and second tensioning wheel is fixedly installed in described
Among frame lower, first tensioning wheel and the 3rd tensioning wheel are respectively symmetrically arranged at both sides above second tensioning wheel,
The belt keep level between the driven shaft and the first tensioning wheel, between the 3rd tensioning wheel and the driving shaft
The belt keep level, the belt keep level between the driving shaft and the driven shaft, the driving shaft and institute
State the belt between the belt between driven shaft, the driven shaft and the first tensioning wheel, the 3rd tensioning wheel with
The belt bottom between the driving shaft is disposed with multiple supporting guides respectively, and the supporting guide is fixedly installed in
The frame.
Preferably, in above-mentioned timing belt conveying device, in addition to the second installing plate, second tensioning wheel pass through spiral shell
Bolt is fixed on second installing plate, and second installing plate is fixedly installed in the frame.
Preferably, in above-mentioned timing belt conveying device, in addition to multiple 3rd installing plates, each supporting guide
The 3rd installing plate is fixedly installed in respectively, and the 3rd installing plate is fixedly installed in the frame.
Preferably, in above-mentioned timing belt conveying device, in addition to a case, the case are covered in the driving shaft
With driven shaft top, the case is fixedly installed in the frame.
Preferably, in above-mentioned timing belt conveying device, the bottom of the frame is supported in ground by support feet.
Compared with prior art, the advantage of the invention is that:Simple in construction firm, conveying is stable, and load is larger, uses the longevity
Length is ordered, and if necessary to change timing belt, only need to be i.e. replaceable by the bolt release for fixing the second tensioning wheel, it is convenient and swift.
Brief description of the drawings
, below will be to embodiment or existing in order to illustrate more clearly of the embodiment of the present application or technical scheme of the prior art
There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this
Some embodiments described in application, for those of ordinary skill in the art, on the premise of not paying creative work,
Other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 show the structural representation of timing belt conveying device in the specific embodiment of the invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, detailed retouch is carried out to the technical scheme in the embodiment of the present invention
State, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.Based on the present invention
In embodiment, the every other implementation that those of ordinary skill in the art are obtained on the premise of creative work is not made
Example, belongs to the scope of protection of the invention.
In the description of the invention, it is necessary to explanation, term " " center ", " on ", " under ", "left", "right", " vertical ",
The orientation or position relationship of the instruction such as " level ", " interior ", " outer " be based on orientation shown in the drawings or position relationship, merely to
Be easy to the description present invention and simplify description, rather than instruction or imply signified device or element must have specific orientation,
With specific azimuth configuration and operation, therefore it is not considered as limiting the invention.In addition, term " first ", " second ",
" the 3rd " is only used for describing purpose, and it is not intended that instruction or hint relative importance.
In the description of the invention, it is necessary to illustrate, unless otherwise clearly defined and limited, term " installation ", " phase
Even ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or be integrally connected;Can
To be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected by intermediary, Ke Yishi
The connection of two element internals.For the ordinary skill in the art, with concrete condition above-mentioned term can be understood at this
Concrete meaning in invention.
With reference to shown in Fig. 1, timing belt conveying device, including frame 100, installation settings has the both upper ends thereof of frame 100 respectively
Driving shaft 200 and driven shaft 300, driving shaft 200 are driven by motor 210, and motor 210 is fixedly installed in the first installing plate 220, the
One installing plate 220 is fixedly installed in frame 100, in addition to the first tensioning wheel 400, the second tensioning wheel 500, the 3rd tensioning wheel 600,
Belt 700, the first tensioning wheel 400, the second tensioning wheel 500, the 3rd tensioning wheel 600 are fixedly installed in frame 100, driving shaft respectively
200th, driven shaft 300, the first tensioning wheel 400, the second tensioning wheel 500, the 3rd tensioning wheel 600 pass sequentially through belt 700 and connected, the
Two tensioning wheels 500 are fixedly installed among the bottom of frame 100, and the first tensioning wheel 400 is respectively symmetrically set with the 3rd tensioning wheel 600
The both sides above the second tensioning wheel 500, the keep level of belt 700 between the tensioning wheel 400 of driven shaft 300 and first, the 3rd
The keep level of belt 700 between bearing up pulley 600 and driving shaft 200, the belt 700 between driving shaft 200 and driven shaft 300 are kept
Level, the belt 700 between belt 700, the tensioning wheel 400 of driven shaft 300 and first between driving shaft 200 and driven shaft 300,
The bottom of belt 700 between 3rd tensioning wheel 600 and driving shaft 200 is disposed with multiple supporting guides 800 respectively, and support is led
Rail 800 is fixedly installed in frame 100.Also include the second installing plate 510, the second tensioning wheel 500 is secured by bolts in the second peace
Loading board 510, the second installing plate 510 are fixedly installed in frame 100.
Simple in construction firm, conveying is stable, and load is larger, service life length, and if necessary to change timing belt, only needs
The bolt release for fixing the second tensioning wheel is i.e. replaceable, it is convenient and swift.
Further, in addition to multiple 3rd installing plates 810, each supporting guide 800 are fixedly installed in the 3rd peace respectively
Loading board 810, the 3rd installing plate 810 are fixedly installed in frame 100.
Further, in addition to a case 900, case 900 are covered above driving shaft 200 and driven shaft 300, case
900 are fixedly installed in frame 100.
Protect internal structure.
Further, the bottom of frame 100 is supported in ground by support feet 110.
Ensure that mechanism consolidates.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality
Body or operation make a distinction with another entity or operation, and not necessarily require or imply and deposited between these entities or operation
In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to
Nonexcludability includes, so that process, method, article or equipment including a series of elements not only will including those
Element, but also the other element including being not expressly set out, or it is this process, method, article or equipment also to include
Intrinsic key element.In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that
Other identical element also be present in process, method, article or equipment including the key element.
Described above is only the embodiment of the application, it is noted that for the ordinary skill people of the art
For member, on the premise of the application principle is not departed from, some improvements and modifications can also be made, these improvements and modifications also should
It is considered as the protection domain of the application.
Claims (5)
1. a kind of timing belt conveying device, it is characterised in that including frame, installation settings has master respectively at the upper rack both ends
Moving axis and driven shaft, the driving shaft are driven by motor, and the motor is fixedly installed in the first installing plate, first installing plate
It is fixedly installed in the frame, in addition to the first tensioning wheel, the second tensioning wheel, the 3rd tensioning wheel, belt, first tensioning
Wheel, the second tensioning wheel, the 3rd tensioning wheel are fixedly installed in the frame respectively, the driving shaft, driven shaft, the first tensioning wheel,
Second tensioning wheel, the 3rd tensioning wheel pass sequentially through the belt connection, and second tensioning wheel is fixedly installed under the frame
Among portion, first tensioning wheel and the 3rd tensioning wheel are respectively symmetrically arranged at both sides above second tensioning wheel, it is described from
The belt keep level between moving axis and the first tensioning wheel, the skin between the 3rd tensioning wheel and the driving shaft
Band keep level, the belt keep level between the driving shaft and the driven shaft, the driving shaft with it is described driven
The belt between the belt, the driven shaft and the first tensioning wheel, the 3rd tensioning wheel and the master between axle
The belt bottom between moving axis is disposed with multiple supporting guides respectively, and the supporting guide is fixedly installed in the machine
Frame.
2. timing belt conveying device according to claim 1, it is characterised in that also including the second installing plate, described second
Tensioning wheel is secured by bolts in second installing plate, and second installing plate is fixedly installed in the frame.
3. timing belt conveying device according to claim 1, it is characterised in that also including multiple 3rd installing plates, each
The supporting guide is fixedly installed in the 3rd installing plate respectively, and the 3rd installing plate is fixedly installed in the frame.
4. timing belt conveying device according to claim 1, it is characterised in that also covered including a case, the case
Above the driving shaft and driven shaft, the case is fixedly installed in the frame.
5. timing belt conveying device according to claim 1, it is characterised in that the bottom of the frame is supported by support feet
In ground.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710965400.XA CN107600910A (en) | 2017-10-17 | 2017-10-17 | Timing belt conveying device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710965400.XA CN107600910A (en) | 2017-10-17 | 2017-10-17 | Timing belt conveying device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107600910A true CN107600910A (en) | 2018-01-19 |
Family
ID=61078474
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710965400.XA Pending CN107600910A (en) | 2017-10-17 | 2017-10-17 | Timing belt conveying device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107600910A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20130025727A (en) * | 2011-09-02 | 2013-03-12 | 주식회사 포스코 | Belt conveyer for suppling raw material |
CN203372737U (en) * | 2013-07-12 | 2014-01-01 | 嘉兴乾昆工业设计有限公司 | Concrete conveyer |
CN205441747U (en) * | 2016-02-24 | 2016-08-10 | 上海古鳌电子科技股份有限公司 | Paper currency horizontal conveyor |
CN207275571U (en) * | 2017-10-17 | 2018-04-27 | 江苏港星方能超声洗净科技有限公司 | Synchronous belt conveying device |
-
2017
- 2017-10-17 CN CN201710965400.XA patent/CN107600910A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20130025727A (en) * | 2011-09-02 | 2013-03-12 | 주식회사 포스코 | Belt conveyer for suppling raw material |
CN203372737U (en) * | 2013-07-12 | 2014-01-01 | 嘉兴乾昆工业设计有限公司 | Concrete conveyer |
CN205441747U (en) * | 2016-02-24 | 2016-08-10 | 上海古鳌电子科技股份有限公司 | Paper currency horizontal conveyor |
CN207275571U (en) * | 2017-10-17 | 2018-04-27 | 江苏港星方能超声洗净科技有限公司 | Synchronous belt conveying device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101863422A (en) | Rubber-tyred gantry crane with suspension crane and construction method thereof | |
CN206690974U (en) | A kind of car transporter packaged type tire supporting arrangement | |
CN109680568A (en) | The linear adjustment equipment of track girder and method | |
CN107043070A (en) | A kind of Feeding System of Urban Rail Transit equipment installs special portal frame | |
CN103603774B (en) | A kind of wind-powered electricity generation is from hoisting system | |
CN207275571U (en) | Synchronous belt conveying device | |
CN105416360B (en) | A kind of suspension rack walk helper suitable for middle low speed magnetic suspension train | |
CN107600910A (en) | Timing belt conveying device | |
CN102734085A (en) | Framework of large wind generating set | |
CN205189465U (en) | Chain garage | |
CN204675737U (en) | One is shaken groove lifting and moving device | |
CN204455739U (en) | High-speed switch is grown up part replacement special purpose device | |
CN207956881U (en) | material delivery system in tunnel | |
CN206885955U (en) | A kind of car and stacking machine | |
CN204578308U (en) | Transport trainset | |
CN211283519U (en) | Crawler crane with self-walking base | |
CN107697804A (en) | Crane bridge structure | |
CN208329804U (en) | Anti- stereo garage hanging basket swings adjustable elastic baffle | |
CN209668631U (en) | One discharge plate cabinet portal frame in place | |
CN203113240U (en) | Police rapidly mounted removable trouble-causing motor vehicle rushing prevention barricade | |
CN208698594U (en) | Process bogie | |
CN207957536U (en) | A kind of crane | |
CN107521618B (en) | A kind of functional module mounting device | |
CN206751329U (en) | A kind of power construction operating desk of more carriers | |
CN108975184A (en) | Built-in hoisting mechanism |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |