CN107597854A - The control method of reciprocal reversable mill passage load optimal - Google Patents

The control method of reciprocal reversable mill passage load optimal Download PDF

Info

Publication number
CN107597854A
CN107597854A CN201710855443.2A CN201710855443A CN107597854A CN 107597854 A CN107597854 A CN 107597854A CN 201710855443 A CN201710855443 A CN 201710855443A CN 107597854 A CN107597854 A CN 107597854A
Authority
CN
China
Prior art keywords
drafts
rolling
calculated values
passage
roll
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710855443.2A
Other languages
Chinese (zh)
Other versions
CN107597854B (en
Inventor
许磊
黄明辉
蒋婷
刘栩
李毅波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGXI LIUZHOU YINHAI ALUMINUM INDUSTRY Co Ltd
Central South University
Original Assignee
GUANGXI LIUZHOU YINHAI ALUMINUM INDUSTRY Co Ltd
Central South University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGXI LIUZHOU YINHAI ALUMINUM INDUSTRY Co Ltd, Central South University filed Critical GUANGXI LIUZHOU YINHAI ALUMINUM INDUSTRY Co Ltd
Priority to CN201710855443.2A priority Critical patent/CN107597854B/en
Publication of CN107597854A publication Critical patent/CN107597854A/en
Application granted granted Critical
Publication of CN107597854B publication Critical patent/CN107597854B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of control method of reciprocal reversable mill passage load optimal, it is related to metal-pressed machine technical field, this method comprises the following steps:Process control model systems inspection, which goes out to exist, to be bitten failure and successful passage is bitten after it have adjusted drafts, records the drafts adjusted value of these passages, the drafts pre-calculated values as next piece of same specification rolled piece rolling;The rolling load situation of all rolling passes is checked, rolling force model and current model are modified according to mill capacity, or increase drafts pre-calculated values, rolling force model is substituted into again and is calculated, to reach desired value;Drafts is redistributed, the drafts pre-calculated values after being optimized;Total rolling pass number and subsequent treatment whether are reduced after checking adjusted some reduction in pass pre-calculated values.The present invention solves the problem of existing reciprocal reversable mill drafts adjustment workload is big, and easily appearance is largely omitted and be wrong.

Description

The control method of reciprocal reversable mill passage load optimal
Technical field
The present invention relates to metal-pressed machine technical field, especially a kind of control of reciprocal reversable mill passage load optimal Method processed.
Background technology
At present, relatively advanced reciprocal reversable mill is generally fitted provided with process control model system.Process control model The main function of system is exactly to set rolling procedure table, wherein, the reduction settings of each rolling pass are most crucial parts.Pressure Lower amount setting is excessive, it is possible that biting the problems such as difficult, roll-force is excessive and rolling torsion is excessive, roll-force crosses conference hair Raw hydraulic cylinder drain charge, and rolling torsion is excessive, causes main driving motor to trip.Reduction settings are too small, then it is unnecessary to increase Rolling pass number, cause energy consumption to increase.Existing process control model system does not possess also to have to be carried out certainly for drafts The control device of dynamic optimization, all manually adjusts some its by technologist and thinks the drafts of irrational passage, but be based on At present many factories receive orders be the more specifications of small lot present situation, the rolling procedure table of different product is different, each The road number of rolling procedure table is several to dozens of again.Therefore, the workload of technologist's regulation drafts is very big, difficult Exempt from substantial amounts of omission and mistake occur, huge loss is brought to factory.
The content of the invention
It is an object of the invention to provide a kind of control method of reciprocal reversable mill passage load optimal, this method can be with It is big to solve existing reciprocal reversable mill drafts adjustment workload, substantial amounts of the problem of omitting and be wrong easily occurs.
In order to solve the above problems, the technical solution adopted by the present invention is:This reciprocal reversable mill passage load optimal Control method comprise the following steps:
A, drafts pre-calculated values are adjusted:When the rolling of one piece of rolled piece of completion, process control model systems inspection, which goes out to exist, stings Enter failure and successful passage is bitten after it have adjusted drafts, the drafts adjusted value of these passages is recorded, to next piece Before same specification rolled piece is rolled, the initial depression amount pre-calculated values of these passages are adjusted to the drafts adjusted value, and count The difference of drafts adjusted value and initial depression amount pre-calculated values is calculated, obtains the offset for optimization;
B, according to mill capacity, drafts pre-calculated values are optimized:The rolling of all rolling passes of the rolled piece of rolling is checked Load condition, rolling load include roll-force and main transmission electric current;The passage of desired value is not up to actual rolling load, is judged Whether it is due to that model calculating deviation and not up to desired value occurs, if it is, entering to rolling force model and current model Row amendment, without being adjusted to the drafts pre-calculated values of these passages;If it is not, then determine whether actually to roll Whether load processed is due to that the setting of drafts pre-calculated values is too small and not up to desired value, if it is, increasing the passage Drafts pre-calculated values, rolling force model is substituted into again and is calculated, constantly increases drafts pre-calculated values, then roll-force and electric current Pre-calculated values also increase, until when precomputation roll-force or precomputation electric current reach desired value, it is estimated to stop increase drafts Calculation value;The drafts adjusted value of the passage of increase drafts pre-calculated values is calculated, is calculated according to the initial depression amount of these passages Value, drafts adjusted value and offset, the drafts for the passage for increasing drafts pre-calculated values in this step is redistributed, is obtained Drafts pre-calculated values after to optimization;
C, subsequent treatment:Total rolling pass number is checked, if total rolling pass number does not change, recovers all pressures being adjusted Lower amount pre-calculated values are to initial depression amount drafts pre-calculated values, if causing the reduction of total rolling pass number, next time When calculating rolling procedure table, the drafts pre-calculated values after optimization are performed, finally calculate the total road number of final rolling.
In the technical scheme of the control method of above-mentioned reciprocal reversable mill passage load optimal, more specifically technical scheme is also Can be:The decision logic for biting failure is:In the case where milling train is in rolling mode, when rolling force sensor detect roll-force by Drift value increases to more than 300 tons, through being down to drift value from 300 tons again after a while, if the steering of whole process roll Changed, be then determined as that there occurs bite failure for the passage;Biting successful decision logic is:Rolling die is in milling train Under formula, when rolling force sensor detects that roll-force increases to more than 300 tons by drift value, by certain time again from 300 tons Drift value is down to, if the steering of whole process roll does not change, is determined as that the passage bites success.
Further, when judging that the passage bites successfully, check whether the drafts pre-calculated values of the passage have passed through Adjustment, if it is expected that calculating gap values between rollers and surveying the difference of gap values between rollers more than 1 millimeter, then it is assumed that drafts pre-calculated values are adjusted It is whole, then the drafts adjusted value is recorded, if without adjustment, any action need not be carried out;When to next piece of same rule When lattice rolled piece is rolled, are there is biting failure and have adjusted the passage of drafts in these first and is found out, and by these passages Drafts pre-calculated values be adjusted according to actual value.
Further, it is assumed that the maximum rolling force that milling train allows is Fmax, unit is ton;Actual measurement when rolling certain passage is rolled Power processed is F, and unit is ton;The precomputation roll-force of the passage is Fset, unit is ton;The maximum electricity for the main transmission that milling train allows Flow for Amax, unit is ampere;Measured current is A when rolling the passage, and unit is ampere;The precomputation electric current of the passage is Aset, unit is ampere;Safety coefficient is λ, and safety coefficient λ span is 0.8≤λ≤1;Check that all of the rolled piece roll The actual rolling load situation of passage processed, works as F<Fmaxλ and A<AmaxDuring λ, then need further to be judged as follows:
(1) judge to survey roll-force and measured current it is less than normal whether be due to that rolling force model and current model calculate and deviation occur It is caused;When checking Fset- F>200 and Aset- A>When 100, tackle rolling force model and current model is modified, without Need to be adjusted drafts pre-calculated values;If not caused by model bias, that needs to continue to judge into (2);
(2) judge survey roll-force and measured current it is less than normal whether be due to reduction settings it is too small caused by;Check whether and deposit In Fmaxλ-Fset>200 and Amaxλ-Aset>100 situation, if there is the situation, then illustrate to be implicitly present in drafts The problem of too small is set, now increases the drafts pre-calculated values of the passage, substitutes into roll-force and model and current-mode again Type is calculated, and constantly increases drafts pre-calculated values, then the pre-calculated values of roll-force and electric current also increase, until Fset= Fmaxλ or Aset=AmaxDuring λ, stop increase drafts pre-calculated values.
Further, when producing steel plate of the thickness less than 16 millimeters or thickness is less than 20 millimeters of aluminium sheet, latter three The drafts pre-calculated values of passage are not involved in adjusting.
By adopting the above-described technical solution, the present invention has the advantages that compared with prior art:Pass through process The adjustment situation of Controlling model systems inspection drafts, capacity calculation further according to milling train simultaneously optimize rolling procedure table, realized The optimization of secondary load, during solving reciprocal rolled plate at present, easily there is the problem of omitting and be wrong in drafts adjustment, Reduce the workload of adjustment drafts.
Embodiment
With reference to embodiment, the invention will be further described:
The control method of the reciprocal reversable mill passage load optimal of the present embodiment comprises the following steps:
Step A, drafts pre-calculated values are adjusted:
When the rolling of one piece of rolled piece of completion, first, process control model systems inspection goes out the rolled piece in the operation of rolling, i.e. institute Exist in some rolling passes and bite failure and successful passage is bitten after it have adjusted drafts, record the pressure of these passages Measure adjusted value;The decision logic for biting failure is:In the case where milling train is in rolling mode, when rolling force sensor detects roll-force More than 300 tons are increased to by drift value, through being down to drift value from 300 tons again after a while, if whole process roll turns To being changed, then it is determined as that there occurs bite failure for the passage;Biting successful decision logic is:Rolling is in milling train Under pattern, when rolling force sensor detects that roll-force increases to more than 300 tons by drift value, by certain time again from 300 Ton is down to drift value, if the steering of whole process roll does not change, is determined as that the passage bites success.When judgement should When passage bites successfully, check whether the initial depression amount pre-calculated values of the passage have passed through the adjustment of technologist, if in advance Calculate gap values between rollers and survey the difference of gap values between rollers more than 1 millimeter, then it is assumed that initial depression amount pre-calculated values are adjusted, then are remembered The lower drafts adjusted value of record, if without adjustment, need not carry out any action.Enter when to next piece of same specification rolled piece During row rolling, these passages for occurring biting failure and have adjusted initial depression amount pre-calculated values by technologist are looked for first Go out, the drafts of these passages be adjusted according to the drafts adjusted value of technologist, and calculate drafts adjusted value with The difference of initial depression amount pre-calculated values, obtains the offset for optimization.The related data such as table 1 of specific rolling procedure table Shown in, it is assumed that the original thickness of ingot casting or blank is 510 millimeters, and the target thickness of required rolling is 37 millimeters.According to biting The decision logic of failure signal, wherein the 4th passage and the 6th passage there is a situation where to bite failure.Check the 4th passage and the 6th Whether secondary precomputation gap values between rollers and the difference of actual measurement gap values between rollers are more than 1 millimeter, it can be found that the precomputation gap values between rollers of the 4th passage 1 millimeter is less than with the difference of actual measurement gap values between rollers, and the difference of the precomputation gap values between rollers of the 6th passage and actual measurement gap values between rollers is more than 1 Millimeter, therefore the actual drafts of the 6th passage is recorded, as the drafts pre-calculated values of the passage of rolling procedure table the 6th next time, That is the drafts pre-calculated values of the 6th passage are adjusted to 41.3 millimeters by 42.7 millimeters.In the calculating subsequently optimized, certain is such as found Passage has that drafts pre-calculated values are less than normal, then offset compensation is entered, if the drafts of all passages is estimated Calculation value has reached maximum or the compensated rear maximum reduction pre-calculated values that can allow beyond passage, then needs increase by one Individual passage completes the rolling of the drafts adjusted value.
Step B, according to mill capacity, drafts pre-calculated values are optimized:
Assuming that the maximum rolling force that milling train allows is Fmax=2500 tons;Actual measurement roll-force when rolling certain passage is F, and unit is Ton;The precomputation roll-force of the passage is Fset, unit is ton;The maximum current for the main transmission that milling train allows is Amax=2500 peaces Training;Measured current is A when rolling the passage, and unit is ampere;The precomputation electric current of the passage is Aset, unit is ampere;Safety Coefficient is λ=0.8.Check that all rolling passes of the rolled piece whether there is actual rolling load (roll-force and main transmission electric current) The not up to situation of desired value, i.e., with the presence or absence of F<Fmaxλ and A<Amaxλ situation.On inspection, the 1st, 7,8,9,10, 11st, 12,13,14,15,16 passages meet the above situation, it is necessary to further be judged these passages as follows:
(1) judge to survey whether roll-force and measured current (being not up to desired value) less than normal are due to rolling force model and electric current Model calculating occurs caused by deviation.Check for Fset- F>200 and Aset- A>100 situation, if there is the feelings Condition, tackles rolling force model and current model is modified, to ensure the accuracy of pre-calculated values, without to initial depression Amount pre-calculated values are adjusted.If not caused by model bias, that needs to continue to judge into (2).On inspection the 9th, 11st, 13 passages meet the above situation, it is necessary to be modified to the rolling force model and current model of these passages, without right Initial depression amount pre-calculated values are adjusted.1st, 7,8,10,12,14,15,16 passages need to continue to judge into (2);
(2) judge survey roll-force and measured current it is less than normal whether be due to drafts pre-calculated values setting it is too small caused by.Inspection Look into and whether there is Fmaxλ-Fset>200 and Amaxλ-Aset>100 situation, if there is the situation, then illustrate to deposit really The problem of too small is set in drafts pre-calculated values, now increases the drafts pre-calculated values of the passage, substitutes into rolling again Power and model and current model are calculated, and constantly increase drafts pre-calculated values, then the pre-calculated values of roll-force and electric current Increase, until Fset=Fmaxλ or Aset=AmaxUntill λ, i.e. precomputation roll-force or precomputation electric current reaches desired value When, stop increase drafts pre-calculated values.On inspection, the 12nd, 14,15,16 passages meet the above situation, need to increase 4 roads Secondary drafts, and the drafts pre-calculated values after increase are substituted into rolling force model and calculated, until Fset=Fmaxλ or Aset=AmaxUntill λ.
The drafts adjusted value of the passage of increase drafts pre-calculated values is calculated, according to the initial depression gauge of these passages Calculation value, drafts adjusted value and offset, the drafts for the passage for increasing drafts pre-calculated values in this step is redistributed, Drafts pre-calculated values after being optimized.It is computed, the drafts pre-calculated values of the 12nd passage are increased to by 17.7 millimeters 28.5 millimeter, the drafts pre-calculated values of the 14th passage increase to 22.3 millimeters by 11.6 millimeters, and the drafts of the 15th passage is pre- Calculated value increases to 19.5 millimeters by 10.3 millimeters, and the drafts pre-calculated values of the 16th passage increase to 12.8 millis by 5.8 millimeters Rice.The 6th reduction in pass pre-calculated values are adjusted, and after the drafts of 4 passages of increase, the overall reduction of rolled piece is by 473 millis Rice increases to 510.7 millimeters, the drafts of 4 passages need to be re-started into distribution.The drafts sum of 4 passages is 45.4 millimeters, firstly, since the drafts of the 12nd passage is no more than 45.4 millimeters, therefore it can be identified as 28.5 millimeters.Make 4 roads It is remaining unappropriated drafts sum that secondary drafts sum, which subtracts difference obtained by the drafts adjusted value of the 12nd passage, i.e., 45.4-28.5=16.9 millimeters, consider that the 6th passage has unappropriated 1.4 millimeters of drafts due to biting unsuccessfully, make 16.9+ 1.4=18.3 millimeters, because the value is less than the drafts adjusted value of the 14th passage, therefore it can determine that the pressure after the 14th suboptimization Lower amount pre-calculated values are 18.3 millimeters.Due to being only achieved that original needs 4 by increasing the drafts of the 12nd passage and the 14th passage The drafts that individual passage could be completed, the drafts pre-calculated values after optimization are as shown in table 1, original to need 16 passages complete Into rolling, be optimized for 14 passages now, saved 2 passages.
C, subsequent treatment:
By step A and step B, it is possible to the initial depression amount pre-calculated values of wherein some passages are adjusted, by mistake Process control model system checks whether the reduction for causing total rolling pass number, if total rolling pass number does not change, recovers All drafts pre-calculated values being adjusted are to initial depression amount pre-calculated values, if causing subtracting for total rolling pass number It is few, then when calculating rolling procedure table next time, the drafts pre-calculated values after optimization are performed, it is total finally to calculate final rolling Road number.
When producing steel plate of the thickness less than 16 millimeters, rear three passages are not involved in adjusting.When production thickness is less than 20 millis During the aluminium sheet of rice, rear three passages are not involved in adjusting.In addition, when producing sheet material finished product, due to be carried out to the precision of thickness Control, therefore rear three passages are not involved in adjusting.
Table 1

Claims (5)

1. a kind of control method of reciprocal reversable mill passage load optimal, it is characterised in that comprise the following steps:
A, drafts pre-calculated values are adjusted:When the rolling of one piece of rolled piece of completion, process control model systems inspection, which goes out to exist, stings Enter failure and successful passage is bitten after it have adjusted drafts, the drafts adjusted value of these passages is recorded, to next piece Before same specification rolled piece is rolled, the initial depression amount pre-calculated values of these passages are adjusted to the drafts adjusted value, and count The difference of drafts adjusted value and initial depression amount pre-calculated values is calculated, obtains the offset for optimization;
B, according to mill capacity, drafts pre-calculated values are optimized:The rolling of all rolling passes of the rolled piece of rolling is checked Load condition, rolling load include roll-force and main transmission electric current;The passage of desired value is not up to actual rolling load, is judged Whether it is due to that model calculating deviation and not up to desired value occurs, if it is, entering to rolling force model and current model Row amendment, without being adjusted to the drafts pre-calculated values of these passages;If it is not, then determine whether actually to roll Whether load processed is due to that the setting of drafts pre-calculated values is too small and not up to desired value, if it is, increasing the passage Drafts pre-calculated values, rolling force model is substituted into again and is calculated, constantly increases drafts pre-calculated values, then roll-force and electric current Pre-calculated values also increase, until when precomputation roll-force or precomputation electric current reach desired value, it is estimated to stop increase drafts Calculation value;The drafts adjusted value of the passage of increase drafts pre-calculated values is calculated, is calculated according to the initial depression amount of these passages Value, drafts adjusted value and offset, the drafts for the passage for increasing drafts pre-calculated values in this step is redistributed, is obtained Drafts pre-calculated values after to optimization;
C, subsequent treatment:Total rolling pass number is checked, if total rolling pass number does not change, recovers all pressures being adjusted Lower amount pre-calculated values are to initial depression amount drafts pre-calculated values, if causing the reduction of total rolling pass number, next time When calculating rolling procedure table, the drafts pre-calculated values after optimization are performed, finally calculate the total road number of final rolling.
2. the control method of reciprocal reversable mill passage load optimal according to claim 1, it is characterised in that:Bite mistake The decision logic lost is:In the case where milling train is in rolling mode, when rolling force sensor detects that roll-force is increased to by drift value More than 300 tons, through being down to drift value from 300 tons again after a while, if the steering of whole process roll is changed, It is determined as that there occurs bite failure for the passage;Biting successful decision logic is:In the case where milling train is in rolling mode, work as roll-force Sensor detects that roll-force increases to more than 300 tons by drift value, and drift value is down to from 300 tons again by certain time, whole If the steering of individual process roll does not change, it is determined as that the passage bites success.
3. the control method of reciprocal reversable mill passage load optimal according to claim 2, it is characterised in that:Work as judgement When the passage bites successfully, check whether the drafts pre-calculated values of the passage have passed through adjustment, if it is expected that calculate gap values between rollers and The difference for surveying gap values between rollers is more than 1 millimeter, then it is assumed that drafts pre-calculated values are adjusted, then record drafts adjustment Value, if without adjustment, need not carry out any action;When being rolled to next piece of same specification rolled piece, first will These, which occur biting failure and have adjusted the passage of drafts, finds out, and by the drafts pre-calculated values of these passages according to reality Value is adjusted.
4. the control method of reciprocal reversable mill passage load optimal according to claim 3, it is characterised in that:Assuming that roll The maximum rolling force that machine allows is Fmax, unit is ton;Actual measurement roll-force when rolling certain passage is F, and unit is ton;The passage Precomputation roll-force be Fset, unit is ton;The maximum current for the main transmission that milling train allows is Amax, unit is ampere;Rolling Measured current is A during the passage, and unit is ampere;The precomputation electric current of the passage is Aset, unit is ampere;Safety coefficient is λ, safety coefficient λ span are 0.8≤λ≤1;The actual rolling load situation of all rolling passes of the rolled piece is checked, Work as F<Fmaxλ and A<AmaxDuring λ, then need further to be judged as follows:
(1) judge to survey roll-force and measured current it is less than normal whether be due to that rolling force model and current model calculate and deviation occur It is caused, when checking Fset- F>200 and Aset- A>When 100, tackle rolling force model and current model is modified, without Need to be adjusted drafts pre-calculated values;If not caused by model bias, that needs to continue to judge into (2);
(2) judge survey roll-force and measured current it is less than normal whether be due to reduction settings it is too small caused by;Check whether and deposit In Fmaxλ-Fset>200 and Amaxλ-Aset>100 situation, if there is the situation, then illustrate to be implicitly present in drafts The problem of too small is set, now increases the drafts pre-calculated values of the passage, substitutes into roll-force and model and current-mode again Type is calculated, and constantly increases drafts pre-calculated values, then the pre-calculated values of roll-force and electric current also increase, until Fset= Fmaxλ or Aset=AmaxDuring λ, stop increase drafts pre-calculated values.
5. the control method of the reciprocal reversable mill passage load optimal according to any one of Claims 1-4 claim, It is characterized in that:When producing steel plate of the thickness less than 16 millimeters or thickness is less than 20 millimeters of aluminium sheet, rear three passages Drafts pre-calculated values are not involved in adjusting.
CN201710855443.2A 2017-09-20 2017-09-20 The control method of reciprocal reversable mill passage load optimal Active CN107597854B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710855443.2A CN107597854B (en) 2017-09-20 2017-09-20 The control method of reciprocal reversable mill passage load optimal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710855443.2A CN107597854B (en) 2017-09-20 2017-09-20 The control method of reciprocal reversable mill passage load optimal

Publications (2)

Publication Number Publication Date
CN107597854A true CN107597854A (en) 2018-01-19
CN107597854B CN107597854B (en) 2019-08-13

Family

ID=61060471

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710855443.2A Active CN107597854B (en) 2017-09-20 2017-09-20 The control method of reciprocal reversable mill passage load optimal

Country Status (1)

Country Link
CN (1) CN107597854B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112570463A (en) * 2020-10-15 2021-03-30 中冶南方工程技术有限公司 Reduction ratio distribution method and equipment for single-stand cold rolling mill

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10137825A (en) * 1996-11-07 1998-05-26 Toshiba Corp Pass schedule determining device
US6003354A (en) * 1998-12-22 1999-12-21 Danieli United, A Division Of Danieli Corporation Extrusion rolling method and apparatus
CN1243047A (en) * 1999-08-27 2000-02-02 冶金工业部钢铁研究总院 Interlinked control method for plate-band rolling course based on coordination law of plate shape and plate thickness
JP2002263716A (en) * 2001-03-13 2002-09-17 Toshiba Corp Device for calculating pass schedule in reversing mill
JP2003112214A (en) * 2001-09-29 2003-04-15 Achenbach Buschhuetten Gmbh Method for setting and adjusting flatness of belt when performing flexible one-way and reverse direction rolling of belt-like fiber web
CN103203358A (en) * 2012-01-13 2013-07-17 宝山钢铁股份有限公司 Rolling method capable of improving biting condition in rolling process of reversible rolling mill
CN103203359A (en) * 2012-01-13 2013-07-17 宝山钢铁股份有限公司 Rolling method for improving bite conditions of reversible mill
CN103252356A (en) * 2013-04-25 2013-08-21 中冶赛迪电气技术有限公司 Method and device for setting single-machine-frame reversible rolling mill initial roll gap difference
CN105521999A (en) * 2014-09-30 2016-04-27 宝山钢铁股份有限公司 Pass transfer control method with adaptive rolling force for reversible mill

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10137825A (en) * 1996-11-07 1998-05-26 Toshiba Corp Pass schedule determining device
US6003354A (en) * 1998-12-22 1999-12-21 Danieli United, A Division Of Danieli Corporation Extrusion rolling method and apparatus
CN1243047A (en) * 1999-08-27 2000-02-02 冶金工业部钢铁研究总院 Interlinked control method for plate-band rolling course based on coordination law of plate shape and plate thickness
JP2002263716A (en) * 2001-03-13 2002-09-17 Toshiba Corp Device for calculating pass schedule in reversing mill
JP2003112214A (en) * 2001-09-29 2003-04-15 Achenbach Buschhuetten Gmbh Method for setting and adjusting flatness of belt when performing flexible one-way and reverse direction rolling of belt-like fiber web
CN103203358A (en) * 2012-01-13 2013-07-17 宝山钢铁股份有限公司 Rolling method capable of improving biting condition in rolling process of reversible rolling mill
CN103203359A (en) * 2012-01-13 2013-07-17 宝山钢铁股份有限公司 Rolling method for improving bite conditions of reversible mill
CN103252356A (en) * 2013-04-25 2013-08-21 中冶赛迪电气技术有限公司 Method and device for setting single-machine-frame reversible rolling mill initial roll gap difference
CN105521999A (en) * 2014-09-30 2016-04-27 宝山钢铁股份有限公司 Pass transfer control method with adaptive rolling force for reversible mill

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘彬: "铝板带多道次热轧轧制规程优化与软件开发", 《中国优秀硕士学位论文全文数据库》 *
金尧成,等: "提高可逆轧机轧制节奏的措施和在梅钢热轧生产中的应用", 《 中国计量协会冶金分会2007年会论文集》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112570463A (en) * 2020-10-15 2021-03-30 中冶南方工程技术有限公司 Reduction ratio distribution method and equipment for single-stand cold rolling mill

Also Published As

Publication number Publication date
CN107597854B (en) 2019-08-13

Similar Documents

Publication Publication Date Title
CN102553940B (en) Method for controlling width of plate blank by using stokehold width gauge
CN102581036B (en) Hot tandem mill zero-position adjusting method with rolling force protection effect
CN102825072A (en) Method for setting vertical roll gap by centering side guide plates, measuring width and correcting
CN103464471A (en) Automatic gauge control (AGC) self-adaptive control method for hot rolling mill
CN105268748B (en) Productized hot rolling load distribution method
CN106475420A (en) A kind of board-shape control method being set based on cold-strip steel target flatness
CN103068502B (en) The method of rolled piece is manufactured, for the control device of strand Direct Rolling combined unit and/or adjusting device and strand Direct Rolling combined unit by means of strand Direct Rolling combined unit
CN109570241A (en) A kind of wedge-shaped control system and method with sideslip protection
CN105251778B (en) Feedback control method for edge drop of taper work roll shifting mill (T-WRS)
CN109201745A (en) A kind of same plate difference control method of cold-reduced sheet
CN104923568B (en) A kind of control method for preventing thin strip cold rolling process broken belt
CN103962391A (en) Rolling load optimization method for hot continuous finishing mill group
CN101670371A (en) Method for controlling quality of edges of intermediate slabs
CN103706644A (en) Roller gap set value self-adaptive control method based on measured thickness of thickness gauge
WO2012034875A2 (en) Method for determining control variables of a rolling train comprising a plurality of roll stands for rolling a metal strip
CN107597854A (en) The control method of reciprocal reversable mill passage load optimal
CN102716917B (en) Method for manually adjusting and computing shape target curve of cold-rolled steel strip
CN108838213B (en) Roughing vertical roll idle-passing method
CN106269908B (en) Strip wedge shape autocontrol method based on heredity
CN109772894A (en) A kind of strip width control method of hot rolling wedge shape base
CN109365543B (en) Control system and method for hot rolling rough rolling final stand rolling mill in fault state
CN101979167A (en) Method for positioning roll seam of roughly rolling vertical miller
CN105290116A (en) Method for controlling transverse rolling width and longitudinal rolling width of moderately-thick plate
CN104321151A (en) Method for processing rolling stock and rolling mill
CN113042542B (en) Method, device and system for setting horizontal value of roughing mill

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant