CN107590075A - A kind of method for testing software and device - Google Patents
A kind of method for testing software and device Download PDFInfo
- Publication number
- CN107590075A CN107590075A CN201710848321.0A CN201710848321A CN107590075A CN 107590075 A CN107590075 A CN 107590075A CN 201710848321 A CN201710848321 A CN 201710848321A CN 107590075 A CN107590075 A CN 107590075A
- Authority
- CN
- China
- Prior art keywords
- test
- assignment
- information
- main frame
- test assignment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Debugging And Monitoring (AREA)
Abstract
The invention discloses a kind of method for testing software, applied to the test server in test platform, also includes several test main frames in test platform, this method comprises the following steps:Receive the test request for target software;According to test request, test assignment information is determined, test assignment information comprises at least the information of test case script corresponding to information, the information of test main frame in Test Networking, the information of test scene and each test assignment of Test Networking;According to test assignment information, each test assignment is distributed into corresponding test main frame respectively, so that each test main frame performs corresponding test assignment.The technical scheme provided using the embodiment of the present invention, by test server according to test assignment information, each test assignment is distributed into corresponding test main frame respectively, completes test assignment, software test expense can be reduced, shortens product development cycle.The invention also discloses a kind of software testing device, has relevant art effect.
Description
Technical field
The present invention relates to Computer Applied Technology field, more particularly to a kind of method for testing software and device.
Background technology
With the development of Computer Applied Technology, software industry has also obtained quick development.For example, in network storage system
In system, based on software engineering.Wherein, software test occupies very important status in the whole development process of software, is
Ensure software quality, improve the key of software reliability.Experience of Software Testing Work be made how, directly decide software product matter
The quality of amount.Also, a large amount of statistics show, the cost and workload of software test stage input will often account for software development
40% to the 50% of totle drilling cost and amount of work is even more more.
Existing software test mode is designed for special software test task, still, is deposited for such as network
Storage system etc. has the characteristics that software test tasks complicated, that system software function is more, and software test expense is high, and product is opened
Send out cycle length.
The content of the invention
In order to solve the above technical problems, the present invention provides following technical scheme:
A kind of method for testing software, applied to the test server in test platform, if also including in the test platform
Dry test main frame, methods described include:
Receive the test request for target software;
According to the test request, it is determined that test assignment information corresponding to one or more test assignments, the test is appointed
Information of being engaged in comprise at least the information of Test Networking, the information of test main frame in the Test Networking, the information of test scene and
The information of test case script corresponding to each test assignment;
According to the test assignment information, each test assignment is distributed into corresponding test main frame respectively, so that each survey
Try main frame and perform corresponding test assignment.
In a kind of embodiment of the present invention, described according to the test assignment information, will each it survey respectively
After corresponding test main frame is distributed in trial business, in addition to:
Obtain the test log information that each test main frame generates during corresponding test assignment is performed;
Export the test log information.
In a kind of embodiment of the present invention, described according to the test assignment information, will each it survey respectively
After corresponding test main frame is distributed in trial business, in addition to:
Obtain test result of each test main frame to corresponding test assignment;
According to the test result of acquisition, test report is generated;
Export the test report.
It is described according to the test assignment information in a kind of embodiment of the present invention, will each it test respectively
Task distributes to corresponding test main frame, including:
According to the test assignment information, the execution sequence of each test assignment is determined;
According to the execution sequence of each test assignment, each test assignment is distributed into corresponding test main frame respectively.
A kind of software testing device, applied to the test server in test platform, if also including in the test platform
Dry test main frame, described device include:
Request receiving module, for receiving the test request for target software;
Information determination module, for according to the test request, appointing it is determined that being tested corresponding to one or more test assignments
Business information, the information of test main frame of the test assignment information including at least the information of Test Networking, in the Test Networking,
The information of test case script corresponding to the information of test scene and each test assignment;
Task allocating module, for according to the test assignment information, respectively distributing to each test assignment accordingly
Test main frame, so that each test main frame performs corresponding test assignment.
In a kind of embodiment of the present invention, in addition to journal output module, it is used for:
Described according to the test assignment information, respectively by each test assignment distribute to corresponding test main frame it
Afterwards, the test log information that each test main frame generates during corresponding test assignment is performed is obtained;
Export the test log information.
In a kind of embodiment of the present invention, in addition to report output module, it is used for:
Described according to the test assignment information, respectively by each test assignment distribute to corresponding test main frame it
Afterwards, test result of each test main frame to corresponding test assignment is obtained;
According to the test result of acquisition, test report is generated;
Export the test report.
In a kind of embodiment of the present invention, the task allocating module, it is specifically used for:
According to the test assignment information, the execution sequence of each test assignment is determined;
According to the execution sequence of each test assignment, each test assignment is distributed into corresponding test main frame respectively.
The technical scheme provided using the embodiment of the present invention, the test server in test platform receive soft for target
The test request of part, according to test request, it is determined that test assignment information corresponding to one or more test assignments, test assignment letter
Breath is including at least the information of Test Networking, the information of test main frame in Test Networking, the information of test scene and each test
The information of test case script corresponding to task, according to test assignment information, each test assignment is distributed to accordingly respectively
Test main frame, so that each test main frame performs corresponding test assignment.Please according to test by the test server of test platform
Ask, determine test assignment information, and according to test assignment information, each test assignment is distributed into corresponding test master respectively
Machine, test assignment is completed, can be reduced for having the characteristics that software test tasks complicated, that system software function is more
Software test expense, shorten product development cycle.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this
Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with
Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is a kind of structured flowchart of test platform in the embodiment of the present invention;
Fig. 2 is a kind of implementing procedure figure of method for testing software in the embodiment of the present invention;
Fig. 3 is a kind of structural representation of software testing device in the embodiment of the present invention.
Embodiment
In order that those skilled in the art more fully understand the present invention program, with reference to the accompanying drawings and detailed description
The present invention is described in further detail.Obviously, described embodiment is only part of the embodiment of the present invention, rather than
Whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art are not making creative work premise
Lower obtained every other embodiment, belongs to the scope of protection of the invention.
The core of the present invention is to provide a kind of method for testing software, the test clothes that this method can apply in test platform
It is engaged in device, also includes several test main frames in test platform.Test server in test platform is received for target software
Test request, according to test request, it is determined that test assignment information corresponding to one or more test assignments, test assignment information is extremely
Include information, the information of test main frame in Test Networking, the information of test scene and each test assignment of Test Networking less
The information of corresponding test case script, according to test assignment information, each test assignment is distributed into corresponding test respectively
Main frame, so that each test main frame performs corresponding test assignment.By the test server of test platform according to test request, really
Determine test assignment information, and according to test assignment information, each test assignment is distributed into corresponding test main frame respectively, completed
Test assignment, it can reduce for having the characteristics that the survey of the software of software test tasks complicated, that system software function is more
Runin pin, shorten product development cycle.
Test platform realizes that it includes host software, storage software and hardware using CS client-servers Frame Design
Equipment etc..Wherein, hardware device generally includes network access device and network storage equipment, network access device such as interchanger,
Network storage equipment such as disk array, head and test main frame etc..As shown in figure 1, whole test platform is by a testing service
Device and multiple Test Networkings form, and can have one or more test main frames in a Test Networking.Test server includes SQL
Database, Web service and service processes, test server can control multiple test main frames to perform the test times each distributed
Business.User can check the test process of software by browser.In general, can be specifically by by some test main frame groups
Test assignment is performed into 1 Test Networking.Now, test server can be communicated with these test main frames, and inform this
A little test main frames perform the test assignment of distribution.It is soft to host software, storage that the design principle of test platform is required to completion
The test such as part function and test main frame IO read-write uniformity, and need to manage these hardware devices concentratedly, realize resource-sharing.
Test platform can record the information of each hardware device and Test Networking, such as unit type, IP, configuration, operating system, network
Layout etc..
In order to carry out comprehensive test to software, test platform needs integrated conventional test main frame read-write IO instruments, such as
IOMETER, VDBENCH, FIO etc..
Be a kind of implementing procedure figure of method for testing software in the embodiment of the present invention referring to Fig. 2, this method can include with
Lower step:
S201:Receive the test request for target software.
As user it should be understood that the quality of a software or when whether can meet that design requirement is assessed to it, Ke Yixiang
Test server in test platform sends the test request for target software.When test server receives test request
When, step S202 can be continued executing with.
S202:According to test request, it is determined that test assignment information corresponding to one or more test assignments.
Wherein, the information of test main frame of the test assignment information including at least the information of Test Networking, in Test Networking, survey
The information of test case script corresponding to the information of examination hall scape and each test assignment.
, can be according to test request, it is determined that test is appointed after test server receives the test request for target software
The number of business, and test assignment information corresponding to each test assignment can be determined.Test assignment information comprises at least each test and appointed
The information of Test Networking that the execution of business needs to use, the information of test main frame in Test Networking, the information of test scene and
The information of test case script corresponding to each test assignment.
In embodiments of the present invention, the test assignment relevant information that user specifies can be included in test request.Such as such as
Fruit test platform exists per se in the Test Networking with the information match of Test Networking, then user can be logged in by browser
System, directly select Test Networking, if test platform in itself in test group with the information match of Test Networking is not present
Net, then user need by browser login system, create Test Networking.Equally, if test platform is existed per se in and surveyed
The test main frame of the information match of main frame is tried, then user can directly select test main frame, such as by browser login system
Fruit test platform in itself in test main frame with the information match of test main frame is not present, then user needs to step on by browser
Recording system, create test main frame, and the configuration information such as the operating system of nominative testing main frame, host name, IP.So as to test platform
Test Networking and the test main frame in Test Networking are determined, and is existed in the test main frame used if desired independently of test
The test main frame of networking, then test server the test main frame can be added in Test Networking.
According to the difference of test assignment, it can also be multiple that test main frame corresponding to test assignment, which can be one,.
Test Networking is test environment, is opened up comprising software version, hardware device model, hardware device quantity, hardware device
Flutter relation etc..
User can be designed to describe the test scene of test assignment according to test assignment, and test scene is sent
To test server.So as to which test server determines test scene corresponding with test assignment, and by the test scene with determining
The Test Networking association gone out.
Test scene is a test case for being often directed to user's field application.
Test server receives the checkout area that user designs according to test assignment in the test assignment information that user sends
After the information of the test scene of scape, test scene can be associated with Test Networking, according to Test Networking and test scene, pre-
Test case script is selected in the test case script bank first established, so that it is determined that test case script.
S203:According to test assignment information, each test assignment is distributed into corresponding test main frame respectively, so that each survey
Try main frame and perform corresponding test assignment.
, can be according to test assignment information after test server determines test assignment information, automatically respectively will be each
Test assignment distributes to corresponding test main frame, so that each test main frame performs corresponding test assignment so that test platform makes
With convenient, test simplification.Simultaneously in order to realize that hardware device efficiently utilizes, test assignment waiting time is reduced, test server
Idle hardware equipment can be distributed automatically according to test assignment information, realize hardware resource sharing.
In a kind of embodiment of the present invention, it may comprise steps of in step S203:
Step 1:According to test assignment information, the execution sequence of each test assignment is determined;
Step 2:According to the execution sequence of each test assignment, each test assignment is distributed into corresponding test respectively
Main frame.
For convenience of description, above-mentioned two step can be combined and illustrated.
Test server may determine out multiple test assignments according to the test request for target software received, respectively
Two or more test assignments are there may be in test assignment to be needed to use same test main frame, therefore, it is necessary to according to test
Mission bit stream, determine the execution sequence of each test assignment.According to the execution sequence of each test assignment, will each test respectively
Task distributes to corresponding test main frame, avoids influenceing test result because each test assignment fights for test main frame.And can be with
Each test assignment is sequentially performed in a test main frame, multinomial test can also be performed parallel in multiple test main frames and appointed
Business, improves testing efficiency.
Test server can also determine to perform the startup strategy of each test assignment according to test assignment information and stop plan
Slightly.
Test platform can be managed collectively the testing tool in all test case scripts and Test Networking, and can be by this
A little test case scripts, which are stored in a foundation, to be had in the private server of NFS file system.Each test main frame is performing test
During task, in order to ensure the uniformity of the version of the same section of each test case script that each test assignment determines and each survey
The uniformity of the version of same software testing tool in the Test Networking that trial business is used, each test main frame can be from NFS texts
Newest test case script and Software Testing Tool are downloaded in the private server of part system, avoids inconsistent version to surveying
Influence caused by test result.
The method provided using the embodiment of the present invention, the test server in test platform are received for target software
Test request, according to test request, it is determined that test assignment information corresponding to one or more test assignments, test assignment information is extremely
Include information, the information of test main frame in Test Networking, the information of test scene and each test assignment of Test Networking less
The information of corresponding test case script, according to test assignment information, each test assignment is distributed into corresponding test respectively
Main frame, so that each test main frame performs corresponding test assignment.By the test server of test platform according to test request, really
Determine test assignment information, and according to test assignment information, each test assignment is distributed into corresponding test main frame respectively, completed
Test assignment, it can reduce for having the characteristics that the survey of the software of software test tasks complicated, that system software function is more
Runin pin, shorten product development cycle.
In a kind of embodiment of the present invention, according to test assignment information, each test assignment is divided respectively
After the corresponding test main frame of dispensing, this method can also comprise the following steps:
Step 1:Obtain the test log letter that each test main frame generates during corresponding test assignment is performed
Breath;
Step 2:Export test log information.
For convenience of description, above-mentioned two step can be combined and illustrated.
Test server can obtain each test after each test assignment is distributed into corresponding test main frame respectively
The test log information that main frame generates during corresponding test assignment is performed, test platform can be to these test logs
Information is managed.Test server can export test log information, so as to provide the work(that user checks test log information
Can, user can check the execution states such as the process of each test case script execution, result.
In a kind of embodiment of the present invention, according to test assignment information, each test assignment is divided respectively
After the corresponding test main frame of dispensing, this method can also comprise the following steps:
Step 1:Obtain test result of each test main frame to corresponding test assignment;
Step 2:According to the test result of acquisition, test report is generated;
Step 3:Export test report.
For convenience of description, above three step can be combined and illustrated.
Each test assignment is distributed to corresponding test main frame by test server respectively according to test assignment information
Afterwards, test result of each test main frame to corresponding test assignment can be obtained, test result is stored in database.Root
According to the test result of acquisition, test report is generated, and test report can be exported, it is for instance possible to use the mode such as Email will be surveyed
Examination report is sent to user, so as to which user can check the test result of test assignment by browser in time.
Corresponding to above method embodiment, the embodiment of the present invention additionally provides a kind of software testing device, is described below
A kind of software testing device can be mutually to should refer to a kind of above-described method for testing software.
Referring to Fig. 3, the device can include with lower module:
Request receiving module 301, for receiving the test request for target software;
Information determination module 302, for according to test request, it is determined that test assignment corresponding to one or more test assignments
Information, test assignment information comprise at least the information of Test Networking, the information of test main frame in Test Networking, test scene
The information of test case script corresponding to information and each test assignment;
Task allocating module 303, for according to test assignment information, each test assignment to be distributed into corresponding survey respectively
Main frame is tried, so that each test main frame performs corresponding test assignment.
The device provided using the embodiment of the present invention, the test server in test platform are received for target software
Test request, according to test request, it is determined that test assignment information corresponding to one or more test assignments, test assignment information is extremely
Include information, the information of test main frame in Test Networking, the information of test scene and each test assignment of Test Networking less
The information of corresponding test case script, according to test assignment information, each test assignment is distributed into corresponding test respectively
Main frame, so that each test main frame performs corresponding test assignment.By the test server of test platform according to test request, really
Determine test assignment information, and according to test assignment information, each test assignment is distributed into corresponding test main frame respectively, completed
Test assignment, it can reduce for having the characteristics that the survey of the software of software test tasks complicated, that system software function is more
Runin pin, shorten product development cycle.
In a kind of embodiment of the present invention, the device can also include journal output module, be used for:
According to test assignment information, after each test assignment is distributed into corresponding test main frame respectively, obtain every
The test log information that individual test main frame generates during corresponding test assignment is performed;
Export test log information.
In a kind of embodiment of the present invention, the device can also include report output module, be used for:
According to test assignment information, after each test assignment is distributed into corresponding test main frame respectively, obtain every
Test result of the individual test main frame to corresponding test assignment;
According to the test result of acquisition, test report is generated;
Export test report.
In a kind of embodiment of the present invention, task allocating module 303, it is specifically used for:
According to test assignment information, the execution sequence of each test assignment is determined;
According to the execution sequence of each test assignment, each test assignment is distributed into corresponding test main frame respectively.
Each embodiment is described by the way of progressive in this specification, what each embodiment stressed be with it is other
The difference of embodiment, between each embodiment same or similar part mutually referring to.For dress disclosed in embodiment
For putting, because it is corresponded to the method disclosed in Example, so description is fairly simple, related part is referring to method part
Explanation.
Professional further appreciates that, with reference to the unit of each example of the embodiments described herein description
And algorithm steps, can be realized with electronic hardware, computer software or the combination of the two, in order to clearly demonstrate hardware and
The interchangeability of software, the composition and step of each example are generally described according to function in the above description.These
Function is performed with hardware or software mode actually, application-specific and design constraint depending on technical scheme.Specialty
Technical staff can realize described function using distinct methods to each specific application, but this realization should not
Think beyond the scope of this invention.
Directly it can be held with reference to the step of method or algorithm that the embodiments described herein describes with hardware, processor
Capable software module, or the two combination are implemented.Software module can be placed in random access memory (RAM), internal memory, read-only deposit
Reservoir (ROM), electrically programmable ROM, electrically erasable ROM, register, hard disk, moveable magnetic disc, CD-ROM or technology
In any other form of storage medium well known in field.
Specific case used herein is set forth to the principle and embodiment of the present invention, and above example is said
It is bright to be only intended to help and understand technical scheme and its core concept.It should be pointed out that for the common of the art
For technical staff, under the premise without departing from the principles of the invention, some improvement and modification can also be carried out to the present invention, these
Improve and modification is also fallen into the protection domain of the claims in the present invention.
Claims (8)
1. a kind of method for testing software, it is characterised in that applied to the test server in test platform, in the test platform
Also include several test main frames, methods described includes:
Receive the test request for target software;
According to the test request, it is determined that test assignment information corresponding to one or more test assignments, the test assignment letter
Breath is including at least the information of Test Networking, the information of test main frame in the Test Networking, the information of test scene and each
The information of test case script corresponding to test assignment;
According to the test assignment information, each test assignment is distributed into corresponding test main frame respectively, so that each test master
Machine performs corresponding test assignment.
2. according to the method for claim 1, it is characterised in that, respectively will be every described according to the test assignment information
After individual test assignment distributes to corresponding test main frame, in addition to:
Obtain the test log information that each test main frame generates during corresponding test assignment is performed;
Export the test log information.
3. according to the method for claim 2, it is characterised in that, respectively will be every described according to the test assignment information
After individual test assignment distributes to corresponding test main frame, in addition to:
Obtain test result of each test main frame to corresponding test assignment;
According to the test result of acquisition, test report is generated;
Export the test report.
4. the method according to any one of claims 1 to 3, it is characterised in that described to be believed according to the test assignment
Breath, distributes to corresponding test main frame by each test assignment respectively, including:
According to the test assignment information, the execution sequence of each test assignment is determined;
According to the execution sequence of each test assignment, each test assignment is distributed into corresponding test main frame respectively.
5. a kind of software testing device, it is characterised in that applied to the test server in test platform, in the test platform
Also include several test main frames, described device includes:
Request receiving module, for receiving the test request for target software;
Information determination module, for according to the test request, it is determined that test assignment corresponding to one or more test assignments is believed
Breath, the information of test main frame of the test assignment information including at least the information of Test Networking, in the Test Networking, test
The information of test case script corresponding to the information of scene and each test assignment;
Task allocating module, for according to the test assignment information, each test assignment to be distributed into corresponding test respectively
Main frame, so that each test main frame performs corresponding test assignment.
6. device according to claim 5, it is characterised in that also including journal output module, be used for:
Described according to the test assignment information, after each test assignment is distributed into corresponding test main frame respectively, obtain
Obtain the test log information that each test main frame generates during corresponding test assignment is performed;
Export the test log information.
7. device according to claim 6, it is characterised in that also including report output module, be used for:
Described according to the test assignment information, after each test assignment is distributed into corresponding test main frame respectively, obtain
Obtain test result of each test main frame to corresponding test assignment;
According to the test result of acquisition, test report is generated;
Export the test report.
8. the device according to any one of claim 5 to 7, it is characterised in that the task allocating module, it is specific to use
In:
According to the test assignment information, the execution sequence of each test assignment is determined;
According to the execution sequence of each test assignment, each test assignment is distributed into corresponding test main frame respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710848321.0A CN107590075B (en) | 2017-09-19 | 2017-09-19 | Software testing method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710848321.0A CN107590075B (en) | 2017-09-19 | 2017-09-19 | Software testing method and device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107590075A true CN107590075A (en) | 2018-01-16 |
CN107590075B CN107590075B (en) | 2021-06-29 |
Family
ID=61047310
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710848321.0A Active CN107590075B (en) | 2017-09-19 | 2017-09-19 | Software testing method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107590075B (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108519934A (en) * | 2018-03-15 | 2018-09-11 | 广州视源电子科技股份有限公司 | Board card testing method and device, readable storage medium and computer equipment |
CN108984419A (en) * | 2018-08-23 | 2018-12-11 | 郑州云海信息技术有限公司 | A kind of storage method for testing software, device and equipment |
CN109614330A (en) * | 2018-12-06 | 2019-04-12 | 广东浪潮大数据研究有限公司 | Storage system service test method, device, system, storage control and medium |
CN110046081A (en) * | 2019-03-18 | 2019-07-23 | 平安普惠企业管理有限公司 | Performance test methods, performance testing device, electronic equipment and storage medium |
CN110659198A (en) * | 2018-06-28 | 2020-01-07 | 亿度慧达教育科技(北京)有限公司 | Application program test case execution method and device and software test system |
CN110795217A (en) * | 2019-09-27 | 2020-02-14 | 广东浪潮大数据研究有限公司 | Task allocation method and system based on resource management platform |
WO2021135809A1 (en) * | 2019-12-30 | 2021-07-08 | 北京金山云网络技术有限公司 | Testing method, device, terminal apparatus, and storage medium |
CN113158146A (en) * | 2020-01-07 | 2021-07-23 | 网联清算有限公司 | Script management method, script management platform, computing device and medium |
CN114286378A (en) * | 2021-12-28 | 2022-04-05 | 湖南智领通信科技有限公司 | System and method for testing network performance of ad hoc network wireless communication equipment |
CN114579473A (en) * | 2022-05-09 | 2022-06-03 | 太平金融科技服务(上海)有限公司深圳分公司 | Application testing method, device, equipment and storage medium |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102012845A (en) * | 2010-12-16 | 2011-04-13 | 迈普通信技术股份有限公司 | Method for improving utilization rate of automatic testing resources |
CN102075384A (en) * | 2010-12-20 | 2011-05-25 | 创新科存储技术有限公司 | Performance test system and method |
US20140026123A1 (en) * | 2012-07-20 | 2014-01-23 | Infosys Limited | Systems and methods for replication of test results in a network environment |
CN104461856A (en) * | 2013-09-22 | 2015-03-25 | 阿里巴巴集团控股有限公司 | Performance test method, device and system based on cloud computing platform |
-
2017
- 2017-09-19 CN CN201710848321.0A patent/CN107590075B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102012845A (en) * | 2010-12-16 | 2011-04-13 | 迈普通信技术股份有限公司 | Method for improving utilization rate of automatic testing resources |
CN102075384A (en) * | 2010-12-20 | 2011-05-25 | 创新科存储技术有限公司 | Performance test system and method |
US20140026123A1 (en) * | 2012-07-20 | 2014-01-23 | Infosys Limited | Systems and methods for replication of test results in a network environment |
CN104461856A (en) * | 2013-09-22 | 2015-03-25 | 阿里巴巴集团控股有限公司 | Performance test method, device and system based on cloud computing platform |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108519934A (en) * | 2018-03-15 | 2018-09-11 | 广州视源电子科技股份有限公司 | Board card testing method and device, readable storage medium and computer equipment |
CN110659198A (en) * | 2018-06-28 | 2020-01-07 | 亿度慧达教育科技(北京)有限公司 | Application program test case execution method and device and software test system |
CN108984419A (en) * | 2018-08-23 | 2018-12-11 | 郑州云海信息技术有限公司 | A kind of storage method for testing software, device and equipment |
CN109614330A (en) * | 2018-12-06 | 2019-04-12 | 广东浪潮大数据研究有限公司 | Storage system service test method, device, system, storage control and medium |
CN110046081A (en) * | 2019-03-18 | 2019-07-23 | 平安普惠企业管理有限公司 | Performance test methods, performance testing device, electronic equipment and storage medium |
CN110795217A (en) * | 2019-09-27 | 2020-02-14 | 广东浪潮大数据研究有限公司 | Task allocation method and system based on resource management platform |
US11822969B2 (en) | 2019-09-27 | 2023-11-21 | Guangdong Inspur Smart Computing Technology Co., Ltd. | Resource management platform-based task allocation method and system |
WO2021135809A1 (en) * | 2019-12-30 | 2021-07-08 | 北京金山云网络技术有限公司 | Testing method, device, terminal apparatus, and storage medium |
CN113158146A (en) * | 2020-01-07 | 2021-07-23 | 网联清算有限公司 | Script management method, script management platform, computing device and medium |
CN114286378A (en) * | 2021-12-28 | 2022-04-05 | 湖南智领通信科技有限公司 | System and method for testing network performance of ad hoc network wireless communication equipment |
CN114286378B (en) * | 2021-12-28 | 2024-01-30 | 湖南智领通信科技有限公司 | Ad hoc network wireless communication device network performance test system and method |
CN114579473A (en) * | 2022-05-09 | 2022-06-03 | 太平金融科技服务(上海)有限公司深圳分公司 | Application testing method, device, equipment and storage medium |
Also Published As
Publication number | Publication date |
---|---|
CN107590075B (en) | 2021-06-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107590075A (en) | A kind of method for testing software and device | |
US10275345B2 (en) | Application experiment system | |
CN106940428B (en) | Chip verification method, device and system | |
CN107302475A (en) | The method of testing and device of a kind of Based on Distributed storage cluster | |
US9465718B2 (en) | Filter generation for load testing managed environments | |
US8930918B2 (en) | System and method for SQL performance assurance services | |
US9262373B2 (en) | Cloud-based software eco-system | |
Brunnert et al. | Automatic performance model generation for java enterprise edition (ee) applications | |
CN104243617B (en) | Towards the method for scheduling task and system of mixed load in a kind of isomeric group | |
CN108182058A (en) | A kind of software development methodology and cloud development platform based on cloud platform | |
US20170192802A1 (en) | Cloud computing simulator | |
US20060031813A1 (en) | On demand data center service end-to-end service provisioning and management | |
CN107370796A (en) | A kind of intelligent learning system based on Hyper TF | |
CN110389903B (en) | Test environment deployment method and device, electronic equipment and readable storage medium | |
CN107608897A (en) | The method of testing and system of a kind of distributed type assemblies | |
US20120117531A1 (en) | Instantiating a Software Development Environment From an Environment Class | |
US8661305B2 (en) | Method and system for test vector generation | |
CN107395456A (en) | Distributed file system stream directly deposits method of testing and platform | |
CN107741909A (en) | A kind of automated testing method and system for distributed block storage | |
O'Brien et al. | Business transformation to SOA: aspects of the migration and performance and QoS issues | |
CN108462745B (en) | Novel cloud platform resource management and delivery method and device | |
CN111078527B (en) | Auxiliary system and method for pressure testing of server | |
US20060015841A1 (en) | Control on demand data center service configurations | |
Chai et al. | Modeling distributed platforms from application traces for realistic file transfer simulation | |
CN109933512A (en) | A kind of method and system device based on long-range connection operation reserve |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |