CN107587528B - It is a kind of to protect the design and construction method across the underground high voltage cable box culvert of foundation pit - Google Patents

It is a kind of to protect the design and construction method across the underground high voltage cable box culvert of foundation pit Download PDF

Info

Publication number
CN107587528B
CN107587528B CN201710746811.XA CN201710746811A CN107587528B CN 107587528 B CN107587528 B CN 107587528B CN 201710746811 A CN201710746811 A CN 201710746811A CN 107587528 B CN107587528 B CN 107587528B
Authority
CN
China
Prior art keywords
box culvert
steel
cable box
cable
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710746811.XA
Other languages
Chinese (zh)
Other versions
CN107587528A (en
Inventor
张正
朱亮来
吴庆润
程波
金剑
曾毅
丁鹏飞
刘新功
陈红
邓江
陈霄
周祯淳
张建启
陈柯霖
沈水龙
吕海敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 24th Bureau Group Co Ltd
China Railway 24th Bureau Group Co Ltd Rail Transport Branch
Original Assignee
China Railway 24th Bureau Group Co Ltd
China Railway 24th Bureau Group Co Ltd Rail Transport Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 24th Bureau Group Co Ltd, China Railway 24th Bureau Group Co Ltd Rail Transport Branch filed Critical China Railway 24th Bureau Group Co Ltd
Priority to CN201710746811.XA priority Critical patent/CN107587528B/en
Publication of CN107587528A publication Critical patent/CN107587528A/en
Application granted granted Critical
Publication of CN107587528B publication Critical patent/CN107587528B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The design and construction method of underground high voltage cable box culvert the present invention provides a kind of protection across foundation pit, comprising: collect cable box culvert data, determine cable box culvert globality;Surveying and locating determines cable box culvert and fender post position;Cable box culvert soil at both sides is excavated, steel I-beam is preset;It draws except cable box culvert lower recess soil, and applies connecting rod;Triangle square steel frame is welded in each connecting rod two end;Lifting i-beam frame simultaneously anchors;It after concrete hardening, draws except the soil body between groove, and the welded reinforcement mesh sheet between the lower link of cable box culvert, and gunite concrete anchors.The present invention solves the problems, such as to be embedded with underground high voltage cable box culvert on constructing tunnel channel, more effectively guarantee the safety of cable box culvert with I-shaped bracing members, avoid the relocating work of cable box culvert, the duration has been saved for entire work progress, construction efficiency has been improved, save removal charge, reduce construction cost, and has alleviated the influence to surrounding resident.

Description

It is a kind of to protect the design and construction method across the underground high voltage cable box culvert of foundation pit
Technical field
The present invention relates to a kind of method of construction engineering technical field, it is specifically a kind of with cast-in-place support to cross over base The design and construction method that the underground high voltage cable box culvert in hole is protected.
Background technique
In recent years, with the rapid growth of the quickening of Urbanization in China and urban population, urban ground traffic system Increasingly congestion, urban track traffic are rapidly developed in each big and medium-sized cities.In the construction of urban track traffic, often Encounter the City Buried Pipelines such as underground high voltage cable.In the construction process, part unit in charge of construction is to work to tight deadlines to construct by force, and pole has The City Buried Pipelines such as underground high voltage cable may be forced large deformation occur or generate destruction.And the buried pipes such as underground high voltage cable Line is the important infrastructure for ensureing city operations, especially underground high voltage cable, and importance is high, is influenced big.And underground high-voltage Cable usually occurs at track traffic station foundation pit and constructing tunnel channel, it is difficult to avoid, it is necessary to be protected.At present Safeguard measure to underground high voltage cable is usually to cut to change underground utilities, or by underground high voltage cable temporary shift to widened road Face, after then move to original position after the completion of engineering.But not only cost is high for the migration position that changes of underground high voltage cable, time-consuming, delays work Phase, and seriously interfere the normal life of resident nearby.If can be protected in underground high voltage cable original place, guarantor will be greatly simplified Shield measure reduces the waste of manpower financial capacity, mitigates the influence to society.Therefore, a kind of setting for high-tension cable in-situ conservation is invented Counting construction technology has highly important engineering application value.
By finding to existing patent retrieval, the existing in-situ conservation construction method to high-tension cable relates generally to cable The suspension protection method of box culvert, Chinese Patent Application No. 201410853049.1, application publication number are 104518473 A of CN, Patent name are as follows: cable box culvert pipe line suspension protection structure and method, the patent readme are as follows: " present invention passes through in cable box culvert Crossbeam is longitudinally shelved in the top of the stake of two sides in parallel, and several top fashioned iron are arranged in interval on the crossbeam, excavates box culvert two sides The soil body is laid with steel plate in box culvert bottom, and bottom fashioned iron is arranged in corresponding top fashioned iron, then connects top and bottom fashioned iron with wirerope Box culvert is suspended in midair." set in parallel however, having beside the requirement of cable box culvert guard method described in invention box culvert position That sets shelves crossbeam, the protection of cable box culvert and is not suitable on the constructing tunnel channel for not shelving crossbeam, meanwhile, the skill Art carries out suspension protection using wirerope, suspends in midair for a long time under big load and is easy to make wirerope that creep occurs, and scene is applied Since transporting equipment frequently enters and leaves scene under work state, the careless slightly wirerope that may encounter suspension apparatus keeps box culvert left The right side is rocked, and wirerope is then it is possible that unbalance stress, and local stress increases, and is broken, be may cause accident when serious, Construction personnel's life is endangered, the wealth of society is wasted.
Summary of the invention
The present invention is directed to the above-mentioned deficiency of the prior art, propose it is a kind of it is simple, convenient, and reliable with cast-in-place support to leap The design and construction method that the underground high voltage cable box culvert of foundation pit is protected is calculated with strict design, for applying for rail traffic The protection problem of underground utilities proposes rationally reliable solution in work, avoids the extension of construction period, construction cost The adverse effect for increasing and constructing to society.
What the present invention made to be achieved through the following technical solutions:
The present invention provides a kind of design and construction method protected and cross over the underground high voltage cable box culvert of foundation pit, including following step It is rapid:
The first step collects cable box culvert related data, determines cable box culvert globality;Include:
(1) according to the related data of cable box culvert, cable box culvert weight G is determined;
(2) according to cable box culvert weight G, size and cable box culvert concrete strength, if determine do not apply safeguard measure, Maximal bending moment M when cable box culvert suspends in midair naturallymaxWith the moment of inertia I;
(3) the maximum (normal) stress σ when suspention of cable box culvert is determinedmax, and compare the allowable tensile stress of cable slab culvert concrete [σ] is obtained according to " Code for design of concrete structures " (GB 50010-2010), is checked the globality intensity of cable box culvert;It is described σmaxIt is determined by following formula:
For [σ] < σmaxIf expression does not apply safeguard measure, suspends cable box culvert naturally in midair, cable box culvert can be by broken Bad, the globality of cable box culvert is bad, needs to carry out supporting in advance;
Second step, surveying and locating determine cable box culvert and fender post position;
That is: it using total station according to construction drawing, determines cable box culvert and is located at foundation pit both sides, cable box culvert two sides and most Close to four fender post positions of cable box culvert, checked by least two people;Selection indicates contour line on the profile of cable box culvert 8~12 points mark, filament is pulled between label, and mark in fender post center, is gone along with sb. to guard him adjacent two Filament is pulled between stake, and is sprinkled with lime on ground along filament;
Third step excavates cable box culvert soil at both sides, presets steel I-beam;Include:
(1) with the cable box culvert soil at both sides in excavator excavation pit apart from box culvert 50cm or more;
(2) manual type is used, the remaining whole soil bodys in excavation pit inner cable box culvert two sides form cable duct;
(3) manual type is used, four grooves is excavated in foundation pit side-wall, four grooves is made to be located on foundation pit side four Fender post far from box culvert side and closely fender post, and retaining groove bottom is flushed with cable duct bottom;
(4) electricity consumption welder I-steel prepares two steel I-beams, two steel I-beams is lifted by crane with loop wheel machine, along cable box culvert It is longitudinally placed in four grooves that foundation pit side-wall has excavated, so that the both ends of steel I-beam is close to cable box culvert side and be parallel to The setting of cable box culvert, and be fixed with I-steel fixing clamp, so that steel I-beam is kept vertical;
(5) steel I-beam intensity is checked
The intensity of steel I-beam meets formula:
[σ]22max
Wherein: [σ]2For the allowable stress of steel I-beam, according to table in " Code for design of steel structures " (GB 50017-2014) 3.4.1-1 obtaining;σ2maxFor the maximum deflection direct stress that the steel I-beam after welding is subject to, σ2maxIt is determined by following formula:
In formula: M2maxFor the maximal bending moment on the steel I-beam after welding, y2It is one of the steel I-beam height after welding Half, Iz1It is the steel I-beam section after welding to its neutral equatorial moment of inertia;
For σ2max<[σ]2, indicate that design is met the requirements;For σ2max>[σ]2, indicate that design is unsatisfactory for requiring, then replace Steel I-beam specification, and redesign;
4th step is manually drawn except box culvert lower recess soil, and applies I-steel connecting rod;Include:
(1) soil body shape is uniformly dug out using hand excavation's mode along cable box culvert longitudinal direction in the soil body of cable box culvert bottom At groove, the bottom portion of groove before excavating in design pulls on horizontal line retaining groove bottom in same level;
(2) I-steel connecting rod is placed respectively in each groove on two steel I-beams, and electricity consumption welder I-shaped Steel connecting rod and two steel I-beams, to form two complete i-beam frames, when welding, keeps I-steel connecting rod and two I-shapeds Girder steel is vertical;
(3) intensity of I-steel connecting rod is checked
The intensity of I-steel connecting rod meets formula:
[σ]33max
Wherein: [σ]3For the allowable stress of I-steel connecting rod, according in " Code for design of steel structures " (GB 50017-2014) Table 3.4.1-1 is obtained;σ3maxFor the maximum deflection direct stress of I-steel connecting rod, σ3maxIt is determined by following formula:
In formula: M3maxFor the maximal bending moment on I-steel connecting rod, y3For the half of I-steel connecting rod height;Iz2For I-steel Connecting rod section is determined the moment of inertia of its neutral axis by specification hot-rolled steel section (GB/T 706-2008);
For σ3max<[σ]3, indicate that design is met the requirements, for σ3max>[σ]3, indicate that design is unsatisfactory for requiring, then replace I-steel connecting rod specification, and redesign;
5th step uses three square steel welding triangle square steel framves at the both ends of each I-steel connecting rod respectively:
(1) first square steel electricity consumption welder on the edge of a wing of I-steel connecting rod, and reserve apart from cable box culvert 2~ The position of 3cm;
(2) second square steel are welded in first square steel close to one end of cable box culvert vertically, and with cable box culvert distance Remain 2~3cm;
(3) the both ends electric welding machine of third root square steel is welded in the one end and second of first square steel far from box culvert respectively The upper end of root square steel forms a triangle with preceding two square steel;
6th step, lifting i-beam frame simultaneously anchor;Include:
(1) I-steel fixing clamp is shed, is lifted i-beam frame and cable box culvert bottom gentle touchdown with loop wheel machine, and make I-shaped The triangle steelframe of steel connecting rod two end is 2~3cm at a distance from cable box culvert, then four ends and its institute to i-beam frame Gap between the bottom portion of groove soil body is filled with steel building block;
(2) four grooves where four ends of i-beam frame are set up with the template of long 100cm wide 50cm high 100cm, and Casting concrete anchoring;
(3) casting concrete intensity is checked
The casting concrete meets formula in intensity:
[fc] > p
In formula: [fc] it is concrete crushing strength;P is the practical pressure by steel I-beam of concrete, and p is true by following formula It is fixed:
In formula: G is cable box culvert weight;A is floor space of the steel I-beam in concrete;
For p < [fc], indicate that design is met the requirements;For p > [fc], indicate that design is unsatisfactory for requiring, then replacement pours mixed Solidifying soil species class, and redesign;
7th step, after concrete hardening, manually draw except the soil body between the groove for placing I-steel connecting rod, and in cable box culvert Lower section and I-steel connecting rod between welded reinforcement mesh sheet, and gunite concrete anchor.
Preferably, in the first step, the related data is the design drawing of cable box culvert, comprising: cable box culvert cross section Figure and the long L of size, that is, cable box culvert, width b, high h, type, the density p of cable slab culvert concretec, thickness d and allowable tensile stress [σ], cable box culvert inner cable line density ρlAnd length L1
Preferably, in (1) of the first step, the cable box culvert weight G is determined by following formula:
G=ρcg×2[Lbh+(h-2d)d(L+b)]+ρlg×L1
In formula: ρcFor cable box culvert concrete density, L is cable box culvert length, and b is cable box culvert width, and h is cable box Contain height, d is cable box culvert concrete thickness, and g is local gravitational acceleration, ρlFor cable box culvert inner cable line density, L1For electricity Cable box culvert inner cable length.
Preferably, in (2) of the first step:
Maximal bending moment M when the cable box culvert suspends in midair naturallymaxIt is determined by following formula:
The moment of inertia I when the cable box culvert suspends in midair naturally is determined by following formula:
Preferably, in (1) of third step, the excavation cable box culvert soil at both sides slope gradient control is 1:1, excavation Depth is cable box culvert bottom or less 74cm.
Preferably, in (2) of third step, the width control of the cable duct is 200cm, and the excavation length of cable duct is base The width in hole.
Preferably, in (3) of third step, the size of four grooves is equal are as follows: height 100cm, width 50cm, depth 100cm。
Preferably, in (4) of third step, each steel I-beam is the common I-shaped of Q235 of I20b by two specifications The common I-steel of Q235 that steel and two specifications are I18 is welded, and two I18 I-steel are in intermediate, two I20b when welding I-steel is respectively welded in the upper and lower ends of an I18 I-steel, and guarantees two I20b I-steel and two I18 I-steel Web is in welding in same perpendicular;
The length of two I20b I-steel and two I18 I-steel be cable box culvert cross over foundation pit width+ 200cm。
Preferably, in (5) of third step:
The M2maxIt is determined by following formula:
WhereinTherefore,
The Iz1It is determined by following formula:
In formula: I18It is I18 I-steel section to the moment of inertia of its neutral axis, I20bIt is I20b I-steel section to its neutrality The moment of inertia of axis, I18And I20bIt is determined by specification hot-rolled steel section (GB/T 706-2008);h18For the height of I18 I-steel, h20For The height of I20b I-steel, A18For the area of I18 I-steel, A20For the area of I20b I-steel.
Preferably, in (1) of the 4th step, each groove interval holding is 100cm, the specification of groove be 20cm × The number of 20cm, groove are identical as the number of I-steel connecting rod.
Preferably, in (2) of the 4th step, the I-steel connecting rod is the Q235 I-steel of specification I10, I-steel connecting rod Length is the distance between two steel I-beams.
Preferably, in (3) of the 4th step, the M3maxIt is determined by following formula:
In formula:G is cable box culvert weight, and n is the number of I-steel connecting rod;L3For the length of I-steel connecting rod;
Therefore:
Preferably, in the 4th step (3), the Iz2For I-steel connecting rod I10 Q235 I-steel section to its neutral axis The moment of inertia is determined by specification hot-rolled steel section (GB/T 706-2008).
Preferably, in the 5th step, the square steel is the square steel of side length 5cm.
Preferably, in (1) of the 5th step, the length of first square steel is I-steel link end to cable box culvert side The distance of the upper position 2~3cm.
It is highly preferred that the length of second square steel is 2/3rds of cable box culvert height in (2) of the 5th step.
It is highly preferred that the length of the third root square steel is first square steel far from cable box culvert in (3) of the 5th step Distance of the end to second square steel upper end.
Preferably, in (2) of the 6th step, the concrete is C30 slightly expanded concrete.
Preferably, in (3) of the 6th step, the A is determined by following formula:
A=l1×d1
In formula: l1The length in the concrete of both ends, d are embedded in for steel I-beam1It is wide for the leg of steel I-beam.
Preferably, in the 7th step, the reinforced mesh is 12@150mm steel meshes.
Preferably, in the 7th step, the concrete is C25 early strength concrete.
The present invention compared with prior art, has the following beneficial effects:
The method of the invention efficiently solves the problems, such as to be embedded with underground high voltage cable box culvert on constructing tunnel channel, The safety that more effectively ensure that cable box culvert with the support of I-steel, avoids the relocating work of high-tension cable box culvert, is whole A work progress has saved the duration, improves construction efficiency, saves removal charge, reduces construction cost, and alleviates pair The influence of surrounding resident.
Detailed description of the invention
High-tension cable box culvert construction method embodiment under cast-in-place steelframe protecting field is made referring to the following drawings by reading Detailed description, other features, purposes and advantages of the invention will become more apparent:
Fig. 1 is that the cable box culvert of one embodiment of the present invention protects plan view;
Fig. 2 is that the cable box culvert of one embodiment of the present invention protects sectional view;
Fig. 3 is that the cable box culvert of one embodiment of the present invention protects side view;
In figure:
1 is steel I-beam, and 1-1 is I20b I-steel, and 1-2 is I18 I-steel;2 be I10 I-steel connecting rod;3 be triangle Square steel frame, 3-1 are horizontal square steel, and 3-2 is vertical square steel, and 3-3 is bevel edge square steel;4 be steel mesh;5 be cable box culvert;6 be base Pit enclosure stake;7 be excavation slope line of demarcation, and 8 be the groove for placing I-steel connecting rod, and 9 be the recessed of filling C30 slightly expanded concrete Slot.
Specific embodiment
The present invention is described in detail combined with specific embodiments below.Following embodiment will be helpful to the technology of this field Personnel further understand the present invention, but the invention is not limited in any way.It should be pointed out that the ordinary skill of this field For personnel, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the present invention Protection scope.
By taking the light railways of Chongqing as an example, involved cable box culvert is 110KV high-tension cable box culvert, and cable box culvert is cut Face is 21m across foundation pit length having a size of 1.7m (width) × 1.5m (height), cable box culvert;It is entered and left on construction channel positioned at tunnel, It is imbedded in the underground depths about 1m.The fender post diameter for channel both sides arrangement of constructing is 70cm, spacing 210cm, and is located at cable Box culvert two sides.
It is a kind of that base is crossed over using the protection of cast-in-place concrete bracket to prevent the excavation in construction channel from causing cable box culvert hanging Plan view, sectional view, the side view of the design and construction method of the underground high voltage cable box culvert in hole distinguish as shown in Figure 1, Figure 2, Fig. 3 institute Show;The method specifically includes the following steps:
The first step collects cable box culvert related data, determines cable box culvert globality
The cable box culvert related data is the size of cable box culvert: long L is 21m, width b is 1.7m, high h is 1.5m; Cable slab culvert concrete is C30 concrete, antiseepage grade S6, density pcIt is 2.38 × 103kg/m3, according to " concrete structure Design specification " (GB 50010-2010) cable slab culvert concrete allowable tensile stress [σ] be 1.43N/mm2, thickness d 0.3m; Cable density p in cable box culvertlIt is 21m for 32.5kg/m, length L;Local gravitational acceleration g takes 9.8N/kg.
(1) according to cable box culvert related data, cable box culvert weight G is determined are as follows:
G=ρcg×2[Lbh+(h-2d)d(L+b)]+ρlg×L1
=2.38 × 103×9.8×2×[21×0.3×1.5+(1.5-2×0.3)×0.3×(21+1.7)]+32.5 ×9.8×21
=733417.69N
(2) the maximal bending moment M of pendant cables box culvert is determinedmaxIt is respectively as follows: with the moment of inertia I
(3) the maximum (normal) stress σ when suspention of cable box culvert is determinedmax, and the allowable tensile stress [σ] of the concrete is compared, with Check the globality intensity of cable box culvert:
[σ]=1.43MPa < σmax=10.83MPa must shift to an earlier date supporting if pendant cables box culvert will necessarily be destroyed.
Second step, surveying setting-out determine cable box culvert and foundation pit enclosure stake position
(1) according to design drawing, cable box culvert 5 and 6 profile point coordinate of foundation pit enclosure stake are calculated, selects TCR402 total station Coordinate setting-out is carried out to above-mentioned profile point, and is passed through by two people review;
(2) in setting-out, 5 labels are respectively carried out on the two sides contour line of cable box culvert 5, and are pulled on carefully between label Line is marked in four foundation pit enclosure stakes, 6 hearts, and lime is used to be sprinkling upon filament and foundation pit enclosure stake 6 in the heart as mark.
Third step excavates cable box culvert soil at both sides, presets steel I-beam
(1) using filament to away from being indicated and being spilt lime at 5 two sides 50cm of cable box culvert, with P315C excavator away from electricity Start to be excavated to far from 5 direction of cable box culvert at the 50cm of cable box culvert 5, the control of excavation slope ratio of slope is 1:1, cutting depth For 100cm, excavation width 150cm below 5 bottom of cable box culvert;To 5 two sides of cable box culvert close to the residue soil of cable box culvert 5 Body is excavated by the way of hand excavation, forms cable duct;
(2) manual type is used, four sides of the foundation pit enclosure stake 6 far from cable box culvert 5 on construction channel foundation pit side, One is excavated respectively using cable duct ground the bottom of as, long 100cm, wide 50cm, high 100cm groove 9 (groove is for filling C30 Slightly expanded concrete);
(3) the I18 I-steel of the I20b I-steel 1-1 tetra- of the steel Q235 of 23m long, the steel Q235 of 23m long are prepared 1-2 two, it will be welded to connect between an I20b I-steel 1-1 with an I18 I-steel 1-2 respectively, obtain two root beads and connect Steel I-beam 1;
(4) above-mentioned two be welded piece steel I-beam 1 is set up in 5 two sides cable duct of cable box culvert respectively using loop wheel machine It is 10cm with groove part, apart from cable box culvert 5,100cm in groove is inserted at the both ends of every steel I-beam 1, and makes two Steel I-beam 1 is longitudinal parallel with cable box culvert 5;Two steel I-beams 1 are fixed with I-steel fixing clamp again, and use I-shaped Steel fixing clamp keeps two steel I-beams 1 vertical;
(5) steel I-beam intensity is checked
Selected steel I-beam 1 meets following formula in intensity:
[σ]22max,
In formula: [σ]2For the allowable stress of steel I-beam, determined by the material and thickness of I-steel, according to " steel construction Design specification " (GB 50017-2014) table 3.4.1-1, [σ]2Take 205MPa;σ2maxMeet following formula:
In formula:
y2For welding after steel I-beam height half, by I20b I-steel and I18 I-steel welding after I-steel Y in beam2=38cm;
M2maxBy following formula
It is determined as 320870.24Nm;
Iz1It is determined by following formula:
Therefore:
[σ]2=205MPa > σ3max=161.85MPa, meets design requirement.
4th step is manually drawn except the lower recess soil body, and applies connecting rod
(1) manual type is used, is drawn under cable box culvert 5 except soil body grooving, forming groove 8, (groove is for placing I-steel connecting rod), specification is 20cm × 20cm, and the spacing of each groove 8 is 100cm, and the number n for writing down groove 8 is 18;
(2) it is put into the I10 I-steel connecting rod 2 that steel are Q235 in each groove 8 and is used as connecting rod, I10 I-steel connecting rod 2 Length be 410cm;
(3) I10 I-steel connecting rod 2 and two steel I-beams 1 are welded again, I10 I-steel connecting rod 2 and two when keeping welding Steel I-beam 1 is vertical, forms a complete i-beam frame;
(4) I-steel connecting rod strength is checked
Selected I10 I-steel connecting rod 2, which is answered, meets formula in intensity:
[σ]33max
In formula, [σ]3For the allowable stress of I-steel connecting rod, according to " Code for design of steel structures " (GB 50017-2014), [σ]3Take 205MPa;σ3maxMeet following formula:
In formula: y3For the half of I-steel connecting rod height, y in I10 I-steel3=5cm;Iz2For I-steel connecting rod section pair The moment of inertia of its neutral axis, I in I10 I-steelz2=245cm4;M3maxBy following formula:
It is determined as 6790.9Nm;
Therefore:
[σ]3=205MPa > σ3max=138.59MPa, meets design requirement.
Triangle steelframe respectively is respectively welded with three square steel at the both ends of each I-steel connecting rod in 5th step;It is specific:
(1) square steel that three side lengths are 5cm, the vertical side of horizontal square steel 3-1,100cm of respectively length 98cm are prepared The bevel edge square steel 3-3 of steel 3-2,155cm;
(2) the horizontal square steel 3-1 of long 98cm is welded on 2 one end of I10 I-steel connecting rod, and keeps itself and cable box culvert 5 Distance be 2cm;The vertical square steel 3-2 of long 100cm is welded vertically again in horizontal square steel 3-1 close to 5 side end of cable box culvert, And keeping vertical square steel 3-2 is 2cm at a distance from cable box culvert 5;The bevel edge square steel 3-3 and horizontal square steel 3- of 140cm are welded again 1, vertical square steel 3-2 forms triangle square steel frame 3, when welding the both ends of bevel edge square steel 3-3 be respectively welded in horizontal square steel 3-1 and The end of vertical square steel 3-2.
6th step, lifting i-beam frame simultaneously anchor
(1) I-steel fixing clamp is unloaded, i-beam frame is promoted using loop wheel machine, keeps I10 I-steel connecting rod 2 rigid with cable duct bottom Good contact, and make the triangle square steel frame 3 at 2 both ends of I10 I-steel connecting rod and 5 distance of cable box culvert be 2cm, then to I-steel It is filled with steel building block in gap between four ends of frame 1 and its 9 bottom soil body of groove;
(2) template that long 100cm, width 50cm, high 100cm are set up in construction channel foundation pit side upper groove 9, to I-steel Four ends of frame 1 pour C30 slightly expanded concrete and are anchored;
(3) selected concrete strength is checked;
The C30 slightly expanded concrete should meet formula in intensity:
[fc] > p,
In formula: [fc] it is C30 slightly expanded concrete compression strength, [fc]=14.3MPa;P is that C30 slightly expanded concrete is real Pressure of the border by steel I-beam, the p are determined by following formula:
In formula: G is the self weight of cable box culvert 5;A is floor space of the steel I-beam 1 in C30 slightly expanded concrete, and A is by following formula It determines:
A=l1×d1=100 × 10.2=1020cm2,
In formula: l1The length in both ends C30 slightly expanded concrete, l are embedded in for steel I-beam 11=100cm;d1For I-steel The leg of beam 1 is wide, d1=10.2cm;
Therefore:
Therefore: p=1.79MPa < [fc]=14.3MPa, meets design requirement.
7th step, after concrete hardening, using manual type, draw except the soil body between cable box culvert lower grooves 8, and The steel mesh 4 of 12 150mm is welded between I10 I-steel connecting rod 2 below cable box culvert, and sprays C25 early strength concrete and carries out anchor Gu.
The method of the invention efficiently solves the problems, such as to be embedded with underground high voltage cable box culvert on constructing tunnel channel, The safety that more effectively ensure that cable box culvert with the support of I-steel, avoids the relocating work of high-tension cable box culvert, is whole A work progress has saved the duration, improves construction efficiency, saves removal charge, reduces construction cost, and alleviates pair The influence of surrounding resident.
Specific embodiments of the present invention are described above.It is to be appreciated that the invention is not limited to above-mentioned Particular implementation, those skilled in the art can make various deformations or amendments within the scope of the claims, this not shadow Ring substantive content of the invention.

Claims (10)

1. a kind of design and construction method of underground high voltage cable box culvert of protection across foundation pit, which is characterized in that including following step It is rapid:
The first step collects cable box culvert data, determines cable box culvert globality;Include:
(1) according to the data of cable box culvert, cable box culvert weight G is determined;
(2) according to cable box culvert weight G, size and cable box culvert concrete strength, if determination does not apply safeguard measure, cable Maximal bending moment M when box culvert suspends in midair naturallymaxWith the moment of inertia I;
(3) the maximum (normal) stress σ when suspention of cable box culvert is determinedmax, and the allowable tensile stress [σ] of cable slab culvert concrete is compared, Check the globality intensity of cable box culvert;The σmaxIt is determined by following formula:
Wherein: ρcFor cable box culvert concrete density, L is cable box culvert length, and b is cable box culvert width, and h is that cable box culvert is high Degree, d are cable box culvert concrete thickness, and g is local gravitational acceleration, ρlFor cable box culvert inner cable line density, L1For cable box Contain inner cable line length;
For [σ] < σmaxIf expression does not apply safeguard measure, suspends cable box culvert naturally in midair, cable box culvert can be destroyed, electricity The globality of cable box culvert is bad, needs to carry out supporting in advance;
Second step, surveying and locating determine cable box culvert and fender post position;
Using total station according to construction drawing, determines cable box culvert and be located at foundation pit both sides, cable box culvert two sides and near electricity Four fender post positions of cable box culvert, selection indicates that 8~12 points of contour line mark on the profile of cable box culvert, Filament is pulled between label, and is marked in fender post center, pulls on filament between adjacent two fender post, and along thin Line is sprinkled with lime on ground;
Third step excavates cable box culvert soil at both sides, presets steel I-beam;Include:
(1) with the cable box culvert soil at both sides in excavator excavation pit apart from box culvert 50cm or more;
(2) the remaining whole soil bodys in excavation pit inner cable box culvert two sides, form cable duct;
(3) four grooves are excavated in foundation pit side-wall, four grooves is made to be located on foundation pit side four fender posts far from box culvert one Side and closely fender post, and retaining groove bottom is flushed with cable duct bottom;
(4) welding H-bar prepares two steel I-beams, lifts by crane two steel I-beams with loop wheel machine, is longitudinally placed at base along cable box culvert In four grooves having excavated of hole side wall, make the both ends of steel I-beam be close to cable box culvert side and be parallel to cable box culvert to set It sets, and is fixed with I-steel fixing clamp, steel I-beam is made to keep vertical;
(5) steel I-beam intensity is checked
The intensity of steel I-beam meets formula:
[σ]22max
Wherein: [σ]2For the allowable stress of steel I-beam, σ2maxFor the maximum deflection direct stress that is subject to of steel I-beam after welding, σ2maxIt is determined by following formula:
In formula: M2maxFor the maximal bending moment on the steel I-beam after welding, y2For the half of the steel I-beam height after welding, Iz1 It is the steel I-beam section after welding to its neutral equatorial moment of inertia;
For σ2max<[σ]2, indicate that design is met the requirements;For σ2max>[σ]2, indicate that design is unsatisfactory for requiring, then replace I-shaped Girder steel specification, and redesign;
4th step is manually drawn except box culvert lower recess soil, and applies I-steel connecting rod;Include:
(1) in the soil body of cable box culvert bottom along cable box culvert it is longitudinal uniformly using hand excavation's mode dig out the soil body formed it is recessed Slot, the bottom portion of groove before excavating in design pull on horizontal line retaining groove bottom in same level;
(2) I-steel connecting rod is placed respectively in each groove on two steel I-beams, and electricity consumption welder I-steel connects Bar and two steel I-beams, to form two complete i-beam frames, when welding, keeps I-steel connecting rod and two steel I-beams Vertically;
(3) intensity of I-steel connecting rod is checked
The intensity of I-steel connecting rod meets formula:
[σ]33max
Wherein: [σ]3For the allowable stress of I-steel connecting rod, σ3maxFor the maximum deflection direct stress of I-steel connecting rod, σ3maxUnder Formula determines:
In formula: M3maxFor the maximal bending moment on I-steel connecting rod, y3For the half of I-steel connecting rod height;Iz2For I-steel connecting rod The moment of inertia of the section to its neutral axis;
For σ3max<[σ]3, indicate that design is met the requirements, for σ3max>[σ]3, indicate that design is unsatisfactory for requiring, then replace I-shaped Steel connecting rod specification, and redesign;
5th step uses three square steel welding triangle square steel framves at the both ends of each I-steel connecting rod respectively:
(1) first square steel electricity consumption welder is reserved apart from 2~3cm of cable box culvert on the edge of a wing of I-steel connecting rod Position;
(2) second square steel are welded in first square steel close to one end of cable box culvert vertically, and keep with cable box culvert distance For 2~3cm;
(3) one end and second square steel in first square steel far from box culvert are respectively welded with electric welding machine for the both ends of third root square steel Upper end, with preceding two square steel form a triangle;
6th step, lifting i-beam frame simultaneously anchor, comprising:
(1) I-steel fixing clamp is shed, is lifted i-beam frame and cable box culvert bottom gentle touchdown with loop wheel machine, and connect I-steel The triangle steelframe at bar both ends is 2~3cm at a distance from cable box culvert, then recessed to four ends of i-beam frame and its place Gap between the trench bottom soil body is filled with steel building block;
(2) to four grooves where four ends of i-beam frame set up with the matched template of the groove size, and pour mixed Solidifying soil anchoring;
(3) casting concrete intensity is checked
The casting concrete meets formula in intensity:
[fc] > p
In formula: [fc] it is concrete crushing strength;P is the practical pressure by steel I-beam of concrete, and p is determined by following formula:
In formula: G is cable box culvert weight;A is floor space of the steel I-beam in concrete;
For p < [fc], indicate that design is met the requirements;For p > [fc], it indicates that design is unsatisfactory for requiring, then replaces casting concrete Type, and redesign;
7th step, after concrete hardening, manually draw except the soil body between the groove for placing I-steel connecting rod, and under cable box culvert Welded reinforcement mesh sheet between side and I-steel connecting rod, and gunite concrete anchors.
2. a kind of design and construction method of underground high voltage cable box culvert of the protection according to claim 1 across foundation pit, It is characterized in that, in the first step, the data is the design drawing of cable box culvert, comprising: cable box culvert cross-sectional view and size are Long L, the width b, high h of cable box culvert, type, the density p of cable slab culvert concretec, thickness d and allowable tensile stress [σ], cable box Contain inner cable line density ρlAnd length L1
3. a kind of design and construction method of underground high voltage cable box culvert of the protection according to claim 1 across foundation pit, It is characterized in that there is one or more of feature:
In (1) of the first step, the cable box culvert weight G is determined by following formula:
G=ρcg×2[Lbh+(h-2d)d(L+b)]+ρlg×L1
In formula: ρcFor cable box culvert concrete density, L is cable box culvert length, and b is cable box culvert width, and h is that cable box culvert is high Degree, d are cable box culvert concrete thickness, and g is local gravitational acceleration, ρlFor cable box culvert inner cable line density, L1For cable box Contain inner cable line length;
In (2) of the first step:
Maximal bending moment M when the cable box culvert suspends in midair naturallymaxIt is determined by following formula:
The moment of inertia I when the cable box culvert suspends in midair naturally is determined by following formula:
4. a kind of design and construction method of underground high voltage cable box culvert of the protection according to claim 1 across foundation pit, It is characterized in that there is one or more of feature:
In (1) of third step, the excavation cable box culvert soil at both sides slope gradient control is 1:1, and the depth of excavation is cable 74cm below box culvert bottom;
In (2) of third step, the width control of the cable duct is 200cm, and the excavation length of cable duct is the width of foundation pit;
In (3) of third step, the size of four grooves is equal are as follows: height 100cm, width 50cm, depth 100cm;
In (4) of third step, each steel I-beam is by the common I-steel of Q235 that two specifications are I20b and two rule Lattice are that the common I-steel of Q235 of I18 is welded, and two I18 I-steel are in intermediate, two I20b I-steel difference when welding The upper and lower ends of an I18 I-steel are welded in, and guarantee that the web of two I20b I-steel and two I18 I-steel is welding When in same perpendicular;The length of two I20b I-steel and two I18 I-steel is the base that cable box culvert is crossed over Cheat width+200cm.
5. a kind of design and construction method of underground high voltage cable box culvert of the protection according to claim 1 across foundation pit, It is characterized in that, in (5) of third step:
The M2maxIt is determined by following formula:
WhereinTherefore,
The Iz1It is determined by following formula:
In formula: I18It is I18 I-steel section to the moment of inertia of its neutral axis, I20bIt is I20b I-steel section to its neutral axis The moment of inertia;h18For the height of I18 I-steel, h20For the height of I20b I-steel, A18For the area of I18 I-steel, A20For I20b The area of I-steel.
6. a kind of design and construction of underground high voltage cable box culvert of the protection according to claim 1-5 across foundation pit Method, which is characterized in that there is one or more of feature:
In (1) of-the four step, each groove interval holding is 100cm, and the specification of the groove is 20cm × 20cm, recessed The number of slot is identical as the number of I-steel connecting rod;
In (2) of-the four step, the I-steel connecting rod is the Q235 I-steel of specification I10, and the length of I-steel connecting rod is two Distance between steel I-beam.
7. a kind of design and construction of underground high voltage cable box culvert of the protection according to claim 1-5 across foundation pit Method, which is characterized in that in (3) of the 4th step, the M3maxIt is determined by following formula:
In formula:G is cable box culvert weight, and n is the number of I-steel connecting rod;L3For the length of I-steel connecting rod;
Therefore:
8. a kind of design and construction of underground high voltage cable box culvert of the protection according to claim 1-5 across foundation pit Method, which is characterized in that there is one or more of feature:
In-the five step, the square steel is the square steel of side length 5cm;
In (1) of-the five step, the length of first square steel is 2~3cm on I-steel link end to cable box culvert side The distance set;
In (2) of-the five step, the length of second square steel is 2/3rds of cable box culvert height;
In (3) of-the five step, the length of the third root square steel is first end of the square steel far from cable box culvert to second The distance of square steel upper end.
9. a kind of design and construction of underground high voltage cable box culvert of the protection according to claim 1-5 across foundation pit Method, which is characterized in that there is one or more of feature:
In (2) of-the six step, the concrete is C30 slightly expanded concrete;
In (3) of-the six step, the A is determined by following formula:
A=l1×d1
In formula: l1The length in the concrete of both ends, d are embedded in for steel I-beam1It is wide for the leg of steel I-beam.
10. a kind of design of underground high voltage cable box culvert of the protection according to claim 1-5 across foundation pit is applied Work method, which is characterized in that there is one or more of feature:
In-the seven step, the reinforced mesh is 12@150mm steel meshes;
In-the seven step, the concrete is C25 early strength concrete.
CN201710746811.XA 2017-08-27 2017-08-27 It is a kind of to protect the design and construction method across the underground high voltage cable box culvert of foundation pit Active CN107587528B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710746811.XA CN107587528B (en) 2017-08-27 2017-08-27 It is a kind of to protect the design and construction method across the underground high voltage cable box culvert of foundation pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710746811.XA CN107587528B (en) 2017-08-27 2017-08-27 It is a kind of to protect the design and construction method across the underground high voltage cable box culvert of foundation pit

Publications (2)

Publication Number Publication Date
CN107587528A CN107587528A (en) 2018-01-16
CN107587528B true CN107587528B (en) 2019-04-12

Family

ID=61042802

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710746811.XA Active CN107587528B (en) 2017-08-27 2017-08-27 It is a kind of to protect the design and construction method across the underground high voltage cable box culvert of foundation pit

Country Status (1)

Country Link
CN (1) CN107587528B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114583651B (en) * 2022-02-28 2023-04-14 中铁十一局集团有限公司 Subway station high-voltage cable relocation structure and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009060710A (en) * 2007-08-31 2009-03-19 Chubu Electric Power Co Inc Relocation construction method for underwater cable
CN104518473A (en) * 2014-12-31 2015-04-15 上海市机械施工集团有限公司 Suspension protection structure and method of cable box culvert pipeline
CN104676110A (en) * 2015-01-22 2015-06-03 中国地质大学(武汉) On-site overhanging protection method of high-voltage cable bailey truss under condition of excavation of foundation pit
CN105972313A (en) * 2016-05-30 2016-09-28 广州地铁设计研究院有限公司 Overhang method and overhang structure for engineering pipeline stretching across foundation pit

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009060710A (en) * 2007-08-31 2009-03-19 Chubu Electric Power Co Inc Relocation construction method for underwater cable
CN104518473A (en) * 2014-12-31 2015-04-15 上海市机械施工集团有限公司 Suspension protection structure and method of cable box culvert pipeline
CN104676110A (en) * 2015-01-22 2015-06-03 中国地质大学(武汉) On-site overhanging protection method of high-voltage cable bailey truss under condition of excavation of foundation pit
CN105972313A (en) * 2016-05-30 2016-09-28 广州地铁设计研究院有限公司 Overhang method and overhang structure for engineering pipeline stretching across foundation pit

Also Published As

Publication number Publication date
CN107587528A (en) 2018-01-16

Similar Documents

Publication Publication Date Title
CN105064397B (en) Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation
CN106979021B (en) Large-section loess tunnel excavates and preliminary bracing quick closure cyclization method
CN201053123Y (en) Deep foundation ditch tower crane platform base frame
CN110485429A (en) A kind of prestressing force fashioned iron assembled combination inner support construction method
CN207829006U (en) Sizing moves retaining wall mould bases
CN113482044B (en) Power pipeline relocation method for invading subway station structure
CN106087746A (en) A kind of cast-in-situ box girder falsework construction method and bridge
CN113863367A (en) In-situ protection suspension method for existing underground pipeline
CN109184699A (en) Existing river construction is worn under open trench tunnel
CN107653787B (en) It is a kind of to protect the construction method across the underground high voltage cable box culvert of foundation pit
CN109736591A (en) A kind of ruggedized construction and reinforcement means suitable for building hoist basement roof
CN107587528B (en) It is a kind of to protect the design and construction method across the underground high voltage cable box culvert of foundation pit
CN113417300A (en) Slope support system and construction method thereof
CN209669718U (en) A kind of existing hangar tunnel combination stone cut off wall structure of rockfall protection
CN209722993U (en) A kind of embankment side slope framework parts La Tuoding anchor slab supporting construction a little
CN111997043A (en) Segmented reinforcement cage and diaphragm wall construction method under low-clearance high-voltage line
CN209066508U (en) Cross the existing electric power piping lane protection structure of tunnel foundation pit
CN106917358A (en) A kind of cable-stayed bridge main-beam combination constructing method thereof and its counter weight construction system
CN109024670B (en) Underground comprehensive pipe gallery protection and reinforcement system penetrating through buried high-voltage cable and reinforcement method
CN110578833A (en) Underground rigid pipeline supporting structure and method
CN115387207A (en) Shallow covering layer steel-concrete composite pile pier structure and construction method
CN114583651A (en) Subway station high-voltage cable relocation structure and construction method thereof
CN209260748U (en) A kind of stepped tower crane
CN106968271B (en) Underground pipe gallery excavates and the construction method of support
CN113629647A (en) Large-span ultrahigh-voltage power pipe trench suspension device and method in subway station foundation pit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant