CN107585409A - A kind of conveying arrangement for polyethylene tube - Google Patents
A kind of conveying arrangement for polyethylene tube Download PDFInfo
- Publication number
- CN107585409A CN107585409A CN201710790308.4A CN201710790308A CN107585409A CN 107585409 A CN107585409 A CN 107585409A CN 201710790308 A CN201710790308 A CN 201710790308A CN 107585409 A CN107585409 A CN 107585409A
- Authority
- CN
- China
- Prior art keywords
- polyethylene tube
- pipe sleeve
- bottom plate
- substrate
- fixedly connected
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000004698 Polyethylene Substances 0.000 title claims abstract description 38
- -1 polyethylene Polymers 0.000 title claims abstract description 38
- 229920000573 polyethylene Polymers 0.000 title claims abstract description 38
- 239000000758 substrate Substances 0.000 claims abstract description 37
- 238000009434 installation Methods 0.000 claims abstract description 5
- 238000010276 construction Methods 0.000 abstract description 3
- 230000037431 insertion Effects 0.000 abstract 1
- 238000003780 insertion Methods 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 229920003023 plastic Polymers 0.000 description 2
- 239000004033 plastic Substances 0.000 description 2
- 238000005096 rolling process Methods 0.000 description 2
- 230000032258 transport Effects 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000032683 aging Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 239000003651 drinking water Substances 0.000 description 1
- 235000020188 drinking water Nutrition 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000004800 polyvinyl chloride Substances 0.000 description 1
- 229920000915 polyvinyl chloride Polymers 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000008929 regeneration Effects 0.000 description 1
- 238000011069 regeneration method Methods 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Abstract
The invention provides a kind of conveying arrangement for polyethylene tube,Including bottom plate and fixing device,Fixing device includes several substrates,The bottom of substrate is provided with supporting plate between setting several fluted substrates,Projection is fixedly mounted in the top of support column,In projection insertion groove,Chute is additionally provided with the top of substrate,Chute is fixedly connected with fixed seat,The first pipe sleeve is fixedly connected with the top of fixed seat,Slide connects Mobile base,The second pipe sleeve is fixedly connected with the top of Mobile base,First pipe sleeve and the second pipe sleeve are respectively sleeved on polyethylene tube,Hook circle is fixedly mounted in bottom plate and substrate side,It is to hang with bundle rope on hook circle,The present invention is simple in construction,Easy installation and removal,It can be stablized by the first pipe sleeve and the second pipe sleeve and polyethylene tube is fixed on substrate,And multiple substrates can realize laminated multi-layer by joggle,Save the floor space of polyethylene tube,Convenience in transport.
Description
Technical field
The present invention relates to plastic pipe technical field of transportation, specially a kind of conveying arrangement for polyethylene tube.
Background technology
Generally using there is a polyethylene tube in water engineering construction, polyethylene feedwater pipe fitting possess have interface it is reliable and stable,
The series of advantages such as material shock resistance, cracking resistance, ageing-resistant, corrosion-resistant, it is traditional steel tubing, polyvinyl chloride drinking-water pipe
Regeneration product.
Because polyethylene tube is circular cross-section structure, and length is grown, and easily rolling occurs at random, so polyethylene tube
Fixed is always the heavier problem regarded of plastic pipe technical field of transportation operating personnel.To avoid polyethylene tube from transporting
Jolted during defeated, and cause the rolling of pipe fitting, collision, therefore need during for some important pipe fitting bulk transports to make
With the special fixing device of pipe fitting.
The content of the invention
It is an object of the invention to provide a kind of conveying arrangement for polyethylene tube, to solve in above-mentioned background technology
The problem of proposition.
To achieve the above object, the present invention provides following technical scheme:A kind of conveying arrangement for polyethylene tube, bag
Bottom plate is included, fixing device is provided with the top of the bottom plate, the fixing device includes several substrates, several described substrates
Equally it is uniformly distributed vertically in the top of the bottom plate, the bottom plate is fixedly connected with the substrate of the bottom, the substrate
Bottom is provided with supporting plate between setting several fluted described substrates, and projection, institute is fixedly mounted in the top of the support column
State projection to be embedded in the groove, chute is additionally provided with the top of the substrate, the chute is fixedly connected with fixed seat, described solid
The first pipe sleeve is fixedly connected with the top of reservation, the slide connects Mobile base, second is fixedly connected with the top of the Mobile base
Pipe sleeve, first pipe sleeve and second pipe sleeve are respectively sleeved on polyethylene tube, and the side of the Mobile base is fixedly connected
Fixture, the fixture are provided with fastening bolt, and the fastening bolt runs through after the fixture against the chute, described
Hook circle is fixedly mounted in bottom plate and the substrate side, is to hang with bundle rope on the hook circle.
Preferably, uniformly rubber is fixedly mounted in four runners of installation, the bottom of the runners to the bottom surrounding of the bottom plate
Slipmat.
Preferably,:It is provided with circular groove in first pipe sleeve to be used to place polyethylene tube, the nominal diameter of its circular groove is big
In 200mm.
Preferably, through hole is provided with second pipe sleeve to be used to place polyethylene tube, the nominal diameter of its through hole is big
In 200mm, and using threaded connection or clasp connecting cover plate.
Preferably, the bundle rope is finally banded in the bottom successively staggeredly through the hook circle several described on substrate
On the hook circle of plate.
Compared with prior art, the beneficial effects of the invention are as follows:
1st, simple in construction, easy installation and removal of the invention, can be stablized polyethylene by the first pipe sleeve and the second pipe sleeve
Pipe fitting is fixed on substrate, and multiple substrates can realize laminated multi-layer by joggle, saves the floor space of polyethylene tube,
Convenience in transport;
2nd, the present invention on the first pipe sleeve by setting circular groove and cover plate to ensure that polyethylene tube will not be from substrate
Tumble, by setting through hole on the second pipe sleeve, reach without dismounting fixing device, it is possible to very easily by polyethylene tube
Extracted out from the through hole of the second pipe sleeve;
3rd, the present invention can adapt to the length of different polyethylene tubes by installing chute in the lower section of the second pipe sleeve;
4th, the present invention improves stability of the substrate in longitudinal direction, kept away by setting hook circle and bundle to restrict on bottom plate and substrate
Exempt from longitudinal direction vibrations occur and cause base member to be mutually disengaged.
Brief description of the drawings
Fig. 1 is front view of the present invention;
Fig. 2 is left view of the present invention;
Fig. 3 is A portions of the present invention mplifying structure schematic diagram;
Fig. 4 is the second pipe sleeve and sliding groove structure schematic diagram of the invention.
In figure:1 bottom plate, 2 fixing devices, 3 substrates, 4 grooves, 5 support columns, 6 projections, 7 chutes, 8 fixed seats, 9 first pipes
Set, 10 Mobile bases, 11 second pipe sleeves, 12 fixtures, 13 fastening bolts, 14 hook circles, 15 bundle ropes, 16 runners, 17 cover plates.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made
Embodiment, belong to the scope of protection of the invention.
Fig. 1-4 are referred to, the present invention provides a kind of technical scheme:A kind of conveying arrangement for polyethylene tube, including
Bottom plate 1, uniformly rubber antiskid pad is fixedly mounted in four runners 16 of installation, the bottom of runners 16 to the bottom surrounding of bottom plate 1.Bottom plate 1
Top be provided with fixing device 2, fixing device 2 includes several substrates 3.
Several substrates 3 are equally uniformly distributed vertically in the top of bottom plate 1, and bottom plate 1 is fixedly connected with the base of the bottom
Plate 3, the bottom of substrate 3 set fluted 4, and supporting plate 5 is provided between several substrates 3, and the top of support column 5 is fixedly mounted
Projection 6, projection 6 are embedded in groove 4, and the top of substrate 3 is additionally provided with several chutes 7, and chute 7 is fixedly connected with fixed seat 8, Gu
The top of reservation 8 is fixedly connected with the first pipe sleeve 9, and chute 7 is slidably connected Mobile base 10, and the top of Mobile base 10 is fixedly connected with the second pipe
11 are covered, one end that circular groove is used to place polyethylene tube is provided with the first pipe sleeve 9, the nominal diameter of its hole slot is more than 200mm.
The other end that through hole is used to place polyethylene tube is provided with second pipe sleeve 11, the nominal diameter of its through hole is more than 200mm, and
And using threaded connection or clasp connecting cover plate 17.The side of Mobile base 10 is fixedly connected with fixture 12, and fixture 12 is set
There is fastening bolt 13, fastening bolt 13 is after fixture 12 against chute 7.
Hook circle 14 is fixedly mounted in bottom plate 1 and the side of substrate 3, is to hang with bundle rope 15 on hook circle 14, bundle rope 15 is successively
Staggeredly through the hook circle 14 on several substrates 3, finally it is banded on the hook circle 14 of bottom plate 1.
Operation principle:Unscrew fastening bolt 13, slip Mobile base 10 is covered polyethylene tube one end away from fixed seat 8
Enter the first pipe sleeve 9, the polyethylene tube other end is inserted in the second pipe sleeve 11, covers cover plate 17, polyethylene tube is born against first
The circular groove and cover plate 17 of pipe sleeve 9, then tighten fastening bolt 13.Remaining polyethylene tube is fixed according to the method described above successively
Afterwards, residual substrate is stacked, finally ties up hook circle 14 with bundle rope 15, polyethylene tube is completed and fixes.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of changes, modification can be carried out to these embodiments, replace without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (5)
1. a kind of conveying arrangement for polyethylene tube, including bottom plate (1), fixed dress is provided with the top of the bottom plate (1)
Put (2), it is characterised in that:The fixing device (2) includes several substrates (3), and several described substrates (3) are in the bottom plate
(1) top is equally uniformly distributed vertically, and the bottom plate (1) is fixedly connected with the substrate (3) of the bottom, the substrate (3)
Bottom fluted (4) are set, be provided with supporting plate (5), the top of the support column (5) between several described substrates (3)
Projection (6) is fixedly mounted, the projection (6) is embedded in the groove (4), and several are additionally provided with the top of the substrate (3)
Chute (7), the chute (7) are fixedly connected with fixed seat (8), the first pipe sleeve (9) are fixedly connected with the top of the fixed seat (8),
The chute (7) is slidably connected Mobile base (10), is fixedly connected with the second pipe sleeve (11) at the top of the Mobile base (10), and described first
Pipe sleeve (9) and second pipe sleeve (11) are respectively sleeved on polyethylene tube, and the side of the Mobile base (10) is fixedly connected
Determine part (12), the fixture (12) is provided with fastening bolt (13), and the fastening bolt (13) runs through the fixture (12)
Hook circle (14), the hook circle is fixedly mounted against the chute (7), the bottom plate (1) and the substrate (3) side afterwards
(14) it is to hang with bundle rope (15) on.
A kind of 2. conveying arrangement for polyethylene tube according to claim 1, it is characterised in that:The bottom plate (1)
Bottom surrounding uniformly rubber antiskid pad is fixedly mounted in four runners (16) of installation, the bottom of the runners (16).
A kind of 3. conveying arrangement for polyethylene tube according to claim 1, it is characterised in that:First pipe sleeve
(9) it is provided with circular groove in be used to place polyethylene tube, the nominal diameter of its hole slot is more than 200mm.
A kind of 4. conveying arrangement for polyethylene tube according to claim 1, it is characterised in that:Second pipe sleeve
(11) through hole is provided be used to place polyethylene tube, the nominal diameter of its through hole is more than 200mm, and using threaded connection
Or clasp connecting cover plate (17).
A kind of 5. conveying arrangement for polyethylene tube according to claim 1, it is characterised in that:The bundle rope (15)
Interlock successively through the hook circle (14) on substrate several described (3), be finally banded in the hook circle (14) of the bottom plate (1)
On.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710790308.4A CN107585409A (en) | 2017-09-05 | 2017-09-05 | A kind of conveying arrangement for polyethylene tube |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710790308.4A CN107585409A (en) | 2017-09-05 | 2017-09-05 | A kind of conveying arrangement for polyethylene tube |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107585409A true CN107585409A (en) | 2018-01-16 |
Family
ID=61050964
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710790308.4A Pending CN107585409A (en) | 2017-09-05 | 2017-09-05 | A kind of conveying arrangement for polyethylene tube |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107585409A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110589192A (en) * | 2019-09-20 | 2019-12-20 | 韩树杰 | Low-abrasion building material conveying device |
CN112495935A (en) * | 2020-12-22 | 2021-03-16 | 合肥皖液液压元件有限公司 | A correct grinding truss for gear pump automated transportation |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102951345A (en) * | 2012-10-22 | 2013-03-06 | 北京京东方光电科技有限公司 | Tray and tray set |
CN204688922U (en) * | 2015-03-24 | 2015-10-07 | 天津杰锋钢管工贸有限公司 | Steel pipe transmission device |
CN206050380U (en) * | 2016-06-16 | 2017-03-29 | 楚天科技股份有限公司 | Bottle pedestal, pallet apparatus and water-bath sterilization cabinet |
CN206351840U (en) * | 2017-01-04 | 2017-07-25 | 宁波喜悦包装科技股份有限公司 | Bottle delivery unit |
CN207773789U (en) * | 2017-09-05 | 2018-08-28 | 煌盛集团重庆管业有限公司 | A kind of polyethylene tube assistant conveyance device |
-
2017
- 2017-09-05 CN CN201710790308.4A patent/CN107585409A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102951345A (en) * | 2012-10-22 | 2013-03-06 | 北京京东方光电科技有限公司 | Tray and tray set |
CN204688922U (en) * | 2015-03-24 | 2015-10-07 | 天津杰锋钢管工贸有限公司 | Steel pipe transmission device |
CN206050380U (en) * | 2016-06-16 | 2017-03-29 | 楚天科技股份有限公司 | Bottle pedestal, pallet apparatus and water-bath sterilization cabinet |
CN206351840U (en) * | 2017-01-04 | 2017-07-25 | 宁波喜悦包装科技股份有限公司 | Bottle delivery unit |
CN207773789U (en) * | 2017-09-05 | 2018-08-28 | 煌盛集团重庆管业有限公司 | A kind of polyethylene tube assistant conveyance device |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110589192A (en) * | 2019-09-20 | 2019-12-20 | 韩树杰 | Low-abrasion building material conveying device |
CN112495935A (en) * | 2020-12-22 | 2021-03-16 | 合肥皖液液压元件有限公司 | A correct grinding truss for gear pump automated transportation |
CN112495935B (en) * | 2020-12-22 | 2023-08-15 | 合肥皖液液压元件有限公司 | Accurate grinding truss for automatic transportation of gear pump |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20190017334A1 (en) | Horizontal offline stand building system and method of its use in drilling operations | |
CN107585409A (en) | A kind of conveying arrangement for polyethylene tube | |
CN203806934U (en) | Special lifting appliance for elbow | |
US10648241B2 (en) | Marine riser section for subsea wellbore related operations | |
CN207773789U (en) | A kind of polyethylene tube assistant conveyance device | |
CN207016426U (en) | A kind of device for forklift transport GRP pipe | |
CN202988568U (en) | Vertical pipeline hoisting apparatus | |
CN206358794U (en) | Coil car walking tunnel protection device | |
CN203753629U (en) | Pipe cluster device matched with stringing vehicle and common transport vehicle | |
CN210086743U (en) | Combined vertical pipe placing device in high-rise pipe well | |
CN103993558A (en) | Main cable anti-slip device, anti-slip saddle and anti-slip cable clamp | |
CN101435270A (en) | High layer post subsection butt-joint operating method | |
CN206664588U (en) | A kind of mine car retractor device | |
CN204660390U (en) | A kind of laterally zygomorphic pipe bunching device | |
CN205602291U (en) | Diesel oil pump, motor -driven pump water pipe containerized storage and transportation device | |
CN206427910U (en) | A kind of novel hanging basket | |
JP6954752B2 (en) | Tube lifting device | |
CN205013853U (en) | High strength cleans connection structure that lays of heat -preservation type feed pipe | |
CN205675994U (en) | The oil pipeline erecting device that installation effectiveness is higher | |
CN204628839U (en) | The laying linkage structure of high strength cleaning type supply pipe | |
CN105712183A (en) | Large angle belt special lifting device | |
CN108868098A (en) | Support frame and its installation method are used outside a kind of novel hoistway | |
CN210063741U (en) | Petroleum pipeline transportation frame | |
CN214530777U (en) | Utility tunnel suitable for longitudinal slope | |
CN210256098U (en) | Transfer device for installing underground pipeline |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180116 |
|
WD01 | Invention patent application deemed withdrawn after publication |