CN107583540A - A kind of preparation facilities of instrument drier - Google Patents
A kind of preparation facilities of instrument drier Download PDFInfo
- Publication number
- CN107583540A CN107583540A CN201711059841.XA CN201711059841A CN107583540A CN 107583540 A CN107583540 A CN 107583540A CN 201711059841 A CN201711059841 A CN 201711059841A CN 107583540 A CN107583540 A CN 107583540A
- Authority
- CN
- China
- Prior art keywords
- mounting bracket
- charging
- steel wire
- block
- wire rope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Drying Of Solid Materials (AREA)
- Apparatuses For Bulk Treatment Of Fruits And Vegetables And Apparatuses For Preparing Feeds (AREA)
Abstract
The present invention relates to a kind of preparation facilities, more particularly to a kind of preparation facilities of instrument drier.The drier of instrument and meter can fully be prepared the technical problem to be solved in the present invention is to provide a kind of, and the preparation facilities of the good instrument drier of effect prepared.In order to solve the above-mentioned technical problem, the invention provides the preparation facilities of such a instrument drier, mounting bracket etc. is included;Mounting bracket bottom is placed with blending bin, and the upper right of mounting bracket is provided with charging mechanism, and the upper left-hand of mounting bracket is provided with rabbling mechanism, and charging mechanism cooperates with rabbling mechanism.Invention achieves can fully be prepared to the drier of instrument and meter, and the effect that the effect for preparing is good, there is provided charging mechanism, it can realize that interval feeds, so as to which the preparation to drier is more uniform, there is provided rabbling mechanism, it is possible to achieve prepared by the stirring to drier.
Description
Technical field
The present invention relates to a kind of preparation facilities, more particularly to a kind of preparation facilities of instrument drier.
Background technology
Instrument and meter is the utensil detect, measure, observing, calculating various physical quantitys, material composition, physical parameter etc.
Or equipment.Vacuum leak detector, pressure gauge, horizontal metroscope, microscope, multiplier etc. belong to instrument and meter.In broad terms, instrument instrument
Table can also have automatically control, alarm, the function such as signal transmission and data processing, such as automatically controlled for industrial processes
In pneumatic regulation meter, and motorized adjustment instrument, and collective and distributive type blind controller system also comes under instrument and meter.With instrument
Instruments and meters and TT&C system application field expand day by day, reliability engineering particularly some military affairs, Aero-Space, electric power,
The important function for improving its combat capabilities and safeguarding normal work is played in nuclear industrial facility, heavy construction and industrial production.
Instrument and meter needs to use in a dry environment, if in a humid environment, instrument and meter can be caused to work
When in the presence of certain potential safety hazard, and can serious curtailment instrument and meter service life, but the therefore effect of drier
It is particularly important, but the usage time of present drier is not to grow very much, to it is certain when will lose its effect, institute
It is also particularly important with the preparation of drier.
Therefore need that research and development are a kind of fully to be prepared to the drier of instrument and meter badly, and the good instrument of effect prepared
The preparation facilities of instrument drier, to overcome the drier of instrument and meter in the prior art preparation effect bad, cause drying
The usage time of agent is not long and needs continuous the shortcomings that changing.
The content of the invention
(1) technical problems to be solved
The present invention is bad in order to overcome the drier of instrument and meter in the prior art preparation effect, causes the use of drier
Time is not long and the shortcomings that need constantly to change, the technical problem to be solved in the present invention is to provide it is a kind of can be to instrument and meter
Drier is fully prepared, and the preparation facilities of the good instrument drier of effect prepared.
(2) technical scheme
In order to solve the above-mentioned technical problem, the invention provides the preparation facilities of such a instrument drier,
Include mounting bracket, blending bin, charging mechanism and rabbling mechanism, mounting bracket bottom is placed with blending bin, and the top of mounting bracket is right
Side is provided with charging mechanism, and the upper left-hand of mounting bracket is provided with rabbling mechanism, and charging mechanism cooperates with rabbling mechanism.
Preferably, charging mechanism includes charging box, charging swash plate, cover plate, the first spring, the first directive wheel, the first steel
Cord, guide rail and guide pin bushing, mounting bracket right upper portion are connected with charging box, and the left bottom of charging box is connected with charging swash plate, entered
The bottom of material swash plate is located at the top right side of blending bin, and charging box left lower rotary type is connected with cover plate, cover plate bottom and dress
The first spring is connected between the left lower of hopper, is connected with the first steel wire rope at the top of cover plate, mounting bracket top it is to the right
Side is connected with the first directive wheel, and the first steel wire rope bypasses the first directive wheel, and the centre on mounting bracket top is connected with guide rail, on guide rail
Provided with guide pin bushing, guide rail coordinates with guide pin bushing, and the top of guide pin bushing is connected with the left end of the first steel wire rope.
Preferably, rabbling mechanism includes the first motor, switch block, the first bull stick, guide rod, movable block, second spring, set
Pipe and stirring loop bar, mounting bracket upper left-hand are connected with the first motor, and the output shaft front end of the first motor is connected with switch block, guide pin bushing
Left end be connected with guide rod, guide rod is provided with movable block, and guide rod coordinates with movable block, and rotary type is connected with movable block
First bull stick, the first bull stick pass through switch block, and the first bull stick coordinates with switch block, and second spring is connected between switch block and movable block,
First bull stick passes through second spring, and the bottom of movable block is connected with sleeve pipe, and sleeve pipe is provided with stirring loop bar, sleeve pipe and stirring loop bar
Top coordinates, and stirring loop bar bottom is located in blending bin.
Preferably, also include the second motor, the second bull stick, gear, endless glide, the first sliding block and ring gear, install
Frame bottom is connected with the second motor, and the output shaft top of the second motor is connected with the second bull stick, and the connection of the second bull stick top is with teeth
Wheel, mounting bracket bottom are connected with endless glide, and the second motor is located in endless glide, and slidingtype is connected with first in endless glide
Sliding block, endless glide coordinate with the first sliding block, and ring gear is connected between the top of the first sliding block, and gear engages with ring gear,
The left and right sides at the top of ring gear is connected with the left and right sides of blending bin bottom.
Preferably, also include fix bar, pull bar, the 3rd spring, strike block, the second directive wheel and the second steel wire rope, feed
The lower front of case is connected with fix bar, and fix bar is provided with pull bar, and pull bar passes through the bottom of fix bar, and fix bar right side is with drawing
The 3rd spring is connected between the right part of bar, pull bar passes through the 3rd spring, and the left end of pull bar, which is connected with, strikes block, the top of fix bar
Right side is connected with the second directive wheel, is connected with the second steel wire rope on the right side of pull bar, and the second steel wire rope is around the second directive wheel and the
One directive wheel, the second steel wire rope are located at the front side of charging box, and the left end of the second steel wire rope at the top of guide pin bushing with being connected.
Preferably, mounting rod, the first slide rail and the second sliding block are also included, mounting bracket left side central portion is connected with mounting rod,
Mounting rod is connected with the first slide rail positioned at the rear side for stirring loop bar, mounting rod antetheca, and slidingtype is connected with second on the first slide rail
Sliding block, the first slide rail and the second sliding block coordinate, and the antetheca of the second sliding block in the middle part of stirring loop bar with being connected.
Preferably, installing plate, placing box and handle are also included, the bottom right of mounting bracket is connected with installing plate, installation
Placing box is placed with plate, places and handle is connected with left and right sides of upper box part.
Operation principle:When needing to prepare drier to instrument and meter, first stirred toward addition substrate raw material, startup in blending bin
Mix mechanism so that rabbling mechanism is sufficiently stirred to the mixture in blending bin, while in the presence of rabbling mechanism, charging mechanism
Charging to interval in blending bin, so as to realize prepared by drier.After preparing, stop rabbling mechanism.
Because charging mechanism includes charging box, charging swash plate, cover plate, the first spring, the first directive wheel, the first steel wire
Rope, guide rail and guide pin bushing, mounting bracket right upper portion are connected with charging box, and the left bottom of charging box is connected with charging swash plate, charging
The bottom of swash plate is located at the top right side of blending bin, and charging box left lower rotary type is connected with cover plate, cover plate bottom and charging
The first spring is connected between the left lower of case, the first steel wire rope, the side to the right on mounting bracket top are connected with the top of cover plate
The first directive wheel is connected with, the first steel wire rope bypasses the first directive wheel, and the centre on mounting bracket top is connected with guide rail, set on guide rail
There is guide pin bushing, guide rail coordinates with guide pin bushing, and the top of guide pin bushing is connected with the left end of the first steel wire rope.So working as needs to adding in blending bin
During material, when rabbling mechanism stirs, rabbling mechanism drives guide pin bushing to move up and down, and when guide pin bushing moves down, guide pin bushing is downward
The first steel wire rope is pulled, the first steel wire rope drives cover plate to be rotated up, and now the first spring is stretched, and the preparation in charging box is former
Material is by feeding swash plate into blending bin, and when guide pin bushing moves up, the first steel wire rope is in the state of relaxation, now the
In the presence of one spring force, cover plate rotates down, so as to which charging box be covered, so repeatedly, it is possible to achieve and interval feeds, from
And the preparation to drier is more uniform.
Because rabbling mechanism includes the first motor, switch block, the first bull stick, guide rod, movable block, second spring, sleeve pipe
With stirring loop bar, mounting bracket upper left-hand is connected with the first motor, and the output shaft front end of the first motor is connected with switch block, guide pin bushing
Left end is connected with guide rod, and guide rod is provided with movable block, and guide rod coordinates with movable block, and rotary type is connected with the in movable block
One bull stick, the first bull stick pass through switch block, and the first bull stick coordinates with switch block, and second spring is connected between switch block and movable block, the
One bull stick passes through second spring, and the bottom of movable block is connected with sleeve pipe, and sleeve pipe is provided with stirring loop bar, and sleeve pipe is with stirring on loop bar
Portion coordinates, and stirring loop bar bottom is located in blending bin.After adding substrate raw material in institute's blending bin in the past, start the first motor, the
One motor driven switch block rotates, and switch block drives bar rotation, and bull stick drives movable block constantly left and right in the presence of guide rod
Movement, movable block drive stirring loop bar constantly to move left and right by sleeve pipe, so as to which constantly left and right is stirred mixing in case
Compound, under the cooperation of guide rail and guide pin bushing, when guide pin bushing drive guide rod moves up, movable block drives sleeve pipe to move up, by
Coordinating in sleeve pipe and stirring loop bar top, while sleeve pipe drive stirring loop bar moves up, stirring loop bar can drop downwards, from
And make it that the bottom of stirring loop bar still continues to stir mixture in blending bin, when guide pin bushing drives guide rod to move down
When, in the case where sleeve pipe coordinates with stirring loop bar top, sleeve pipe moves down, so that in the top retraction sleeve pipe of stirring loop bar,
So repeatedly, it is possible to achieve prepared by the stirring to drier.After preparing, the first motor is closed.
Because also include the second motor, the second bull stick, gear, endless glide, the first sliding block and ring gear, mounting bracket bottom
Portion is connected with the second motor, and the output shaft top of the second motor is connected with the second bull stick, and the second bull stick top is connected with gear, peace
To shelve bottom and be connected with endless glide, the second motor is located in endless glide, and slidingtype is connected with the first sliding block in endless glide,
Endless glide coordinates with the first sliding block, is connected with ring gear between the top of the first sliding block, gear engages with ring gear, ring gear
The left and right sides at top is connected with the left and right sides of blending bin bottom.So when stirring loop bar or so stirring mixture, start
Second motor, second the second bar rotation of motor driven, the second bull stick drive pinion rotation, because gear engages with ring gear,
Gear drives ring gear to rotate, and ring gear drives blending bin to rotate so that stirring loop bar is very abundant to the mixture in blending bin
Stirring, so that the preparation effect of drier is more, so as to improve overall operating efficiency.
Because also including fix bar, pull bar, the 3rd spring, striking block, the second directive wheel and the second steel wire rope, charging box
Lower front is connected with fix bar, and fix bar is provided with pull bar, and pull bar passes through the bottom of fix bar, fix bar right side and pull bar
The 3rd spring is connected between right part, pull bar passes through the 3rd spring, and the left end of pull bar, which is connected with, strikes block, the upper right of fix bar
The second directive wheel is connected with, the second steel wire rope is connected with the right side of pull bar, the second steel wire rope is led around the second directive wheel and first
To wheel, the second steel wire rope is located at the front side of charging box, and the left end of the second steel wire rope at the top of guide pin bushing with being connected.It is so downward in guide pin bushing
When mobile, guide pin bushing pulls the second steel wire rope, and the second steel wire rope drives pull bar to move right, and now the 3rd spring is in the shape of compression
State, pull bar drive is struck block and moved right, and when guide pin bushing moves up, the second steel wire rope is in the state of relaxation, and now pull bar exists
Be moved to the left in the presence of 3rd spring force, pull bar drive strikes block tap to the left charging swash plate bottom, so repeatedly,
Have a rest charging when can make to strike block and constantly tap charging swash plate so that the preparing raw material in charging box can rapidly enter mixed
In mould assembling, prevent preparing raw material attaches from not entering on charging swash plate in blending bin.
Because also including mounting rod, the first slide rail and the second sliding block, mounting bracket left side central portion is connected with mounting rod, installation
Bar is connected with the first slide rail positioned at the rear side for stirring loop bar, mounting rod antetheca, and slidingtype is connected with the second sliding block on the first slide rail,
First slide rail and the second sliding block coordinate, and the antetheca of the second sliding block in the middle part of stirring loop bar with being connected.So when sleeve pipe moves up,
Second sliding block can play fixation to stirring loop bar, while the effect of the first slide rail and the second sliding block can to stir loop bar
It can still move left and right.
Because also including installing plate, placing box and handle, the bottom right of mounting bracket is connected with installing plate, on installing plate
Placing box is placed with, places and handle is connected with left and right sides of upper box part.Placing box can enter luggage to the drier prepared
Material, handle facilitate picking and placeing for placing box.
(3) beneficial effect
Invention achieves can fully be prepared to the drier of instrument and meter, and the effect that the effect for preparing is good, if
Charging mechanism is put, it is possible to achieve interval feeds,, can be with there is provided rabbling mechanism so as to which preparation to drier is more uniform
Realize prepared by the stirring to drier, there is provided the second motor, the second bull stick, gear, endless glide, the first sliding block and internal tooth
Circle, ring gear drive blending bin to rotate so that stirring loop bar is sufficiently stirred very much to the mixture in blending bin, so that drying
The preparation effect of agent more, so as to improve overall operating efficiency, there is provided block is struck, can make to strike block when interval feeds
Constantly tap charging swash plate so that the preparing raw material in charging box can be rapidly entered in blending bin, prevent preparing raw material to be stained with
It is attached on charging swash plate and does not enter in blending bin, there is provided mounting rod, the first slide rail and the second sliding block, the second sliding block can be to stirs
Mix loop bar and play fixation, while the effect of the first slide rail and the second sliding block can cause stirring loop bar still being capable of left and right shifting
Dynamic, there is provided placing box and handle, the drier that prepared can be fed, handle facilitates picking and placeing for placing box.
Brief description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is second of main structure diagram of the present invention.
Fig. 3 is the third main structure diagram of the present invention.
Fig. 4 is the 4th kind of main structure diagram of the present invention.
Fig. 5 is the 5th kind of main structure diagram of the present invention.
Mark in accompanying drawing for:1- mounting brackets, 2- blending bins, 3- charging mechanisms, 31- charging boxs, 32- charging swash plates, 33-
Cover plate, the springs of 34- first, the directive wheels of 35- first, the steel wire ropes of 36- first, 37- guide rails, 38- guide pin bushings, 4- rabbling mechanisms, 41-
One motor, 42- switch blocks, the bull sticks of 43- first, 44- guide rods, 45- movable blocks, 46- second springs, 47- sleeve pipes, 48- stirring sets
Bar, the motors of 5- second, the bull sticks of 6- second, 7- gears, 8- endless glides, the sliding blocks of 9- first, 10- ring gears, 11- fix bars, 12-
Pull bar, the springs of 13- the 3rd, 14- strike block, the directive wheels of 15- second, the steel wire ropes of 16- second, 17- mounting rods, the slide rails of 18- first,
The sliding blocks of 19- second, 20- installing plates, 21- placing boxes, 22- handles.
Embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of preparation facilities of instrument drier, as Figure 1-5, include mounting bracket 1, blending bin 2, charging
Mechanism 3 and rabbling mechanism 4, the bottom of mounting bracket 1 are placed with blending bin 2, and the upper right of mounting bracket 1 is provided with charging mechanism 3, installation
The upper left-hand of frame 1 is provided with rabbling mechanism 4, and charging mechanism 3 cooperates with rabbling mechanism 4.
Embodiment 2
A kind of preparation facilities of instrument drier, as Figure 1-5, include mounting bracket 1, blending bin 2, charging
Mechanism 3 and rabbling mechanism 4, the bottom of mounting bracket 1 are placed with blending bin 2, and the upper right of mounting bracket 1 is provided with charging mechanism 3, installation
The upper left-hand of frame 1 is provided with rabbling mechanism 4, and charging mechanism 3 cooperates with rabbling mechanism 4.
Charging mechanism 3 includes charging box 31, charging swash plate 32, cover plate 33, the first spring 34, the first directive wheel 35, the
One steel wire rope 36, guide rail 37 and guide pin bushing 38, the right upper portion of mounting bracket 1 are connected with charging box 31, and the left bottom of charging box 31 connects
Charging swash plate 32 is connected to, the bottom of charging swash plate 32 is located at the top right side of blending bin 2, and the left lower rotary type of charging box 31 connects
Cover plate 33 is connected to, the first spring 34 is connected between the bottom of cover plate 33 and the left lower of charging box 31, the top of cover plate 33 connects
The first steel wire rope 36 is connected to, the side to the right on the top of mounting bracket 1 is connected with the first directive wheel 35, and the first steel wire rope 36 is led around first
To wheel 35, the centre on the top of mounting bracket 1 is connected with guide rail 37, and guide rail 37 is provided with guide pin bushing 38, and guide rail 37 coordinates with guide pin bushing 38, led
The top of set 38 is connected with the left end of the first steel wire rope 36.
Embodiment 3
A kind of preparation facilities of instrument drier, as Figure 1-5, include mounting bracket 1, blending bin 2, charging
Mechanism 3 and rabbling mechanism 4, the bottom of mounting bracket 1 are placed with blending bin 2, and the upper right of mounting bracket 1 is provided with charging mechanism 3, installation
The upper left-hand of frame 1 is provided with rabbling mechanism 4, and charging mechanism 3 cooperates with rabbling mechanism 4.
Charging mechanism 3 includes charging box 31, charging swash plate 32, cover plate 33, the first spring 34, the first directive wheel 35, the
One steel wire rope 36, guide rail 37 and guide pin bushing 38, the right upper portion of mounting bracket 1 are connected with charging box 31, and the left bottom of charging box 31 connects
Charging swash plate 32 is connected to, the bottom of charging swash plate 32 is located at the top right side of blending bin 2, and the left lower rotary type of charging box 31 connects
Cover plate 33 is connected to, the first spring 34 is connected between the bottom of cover plate 33 and the left lower of charging box 31, the top of cover plate 33 connects
The first steel wire rope 36 is connected to, the side to the right on the top of mounting bracket 1 is connected with the first directive wheel 35, and the first steel wire rope 36 is led around first
To wheel 35, the centre on the top of mounting bracket 1 is connected with guide rail 37, and guide rail 37 is provided with guide pin bushing 38, and guide rail 37 coordinates with guide pin bushing 38, led
The top of set 38 is connected with the left end of the first steel wire rope 36.
Rabbling mechanism 4 includes the first motor 41, switch block 42, the first bull stick 43, guide rod 44, movable block 45, the second bullet
Spring 46, sleeve pipe 47 and stirring loop bar 48, the upper left-hand of mounting bracket 1 are connected with the first motor 41, before the output shaft of the first motor 41
End is connected with switch block 42, and the left end of guide pin bushing 38 is connected with guide rod 44, and guide rod 44 is provided with movable block 45, and guide rod 44 is with moving
Motion block 45 coordinates, and rotary type is connected with the first bull stick 43 in movable block 45, and the first bull stick 43 passes through switch block 42, the first bull stick 43 with
Switch block 42 coordinates, and second spring 46 is connected between switch block 42 and movable block 45, and the first bull stick 43 passes through second spring 46, mobile
The bottom of block 45 is connected with sleeve pipe 47, and sleeve pipe 47 is provided with stirring loop bar 48, and sleeve pipe 47 coordinates with stirring loop bar 48 top, stirring
The bottom of loop bar 48 is located in blending bin 2.
Embodiment 4
A kind of preparation facilities of instrument drier, as Figure 1-5, include mounting bracket 1, blending bin 2, charging
Mechanism 3 and rabbling mechanism 4, the bottom of mounting bracket 1 are placed with blending bin 2, and the upper right of mounting bracket 1 is provided with charging mechanism 3, installation
The upper left-hand of frame 1 is provided with rabbling mechanism 4, and charging mechanism 3 cooperates with rabbling mechanism 4.
Charging mechanism 3 includes charging box 31, charging swash plate 32, cover plate 33, the first spring 34, the first directive wheel 35, the
One steel wire rope 36, guide rail 37 and guide pin bushing 38, the right upper portion of mounting bracket 1 are connected with charging box 31, and the left bottom of charging box 31 connects
Charging swash plate 32 is connected to, the bottom of charging swash plate 32 is located at the top right side of blending bin 2, and the left lower rotary type of charging box 31 connects
Cover plate 33 is connected to, the first spring 34 is connected between the bottom of cover plate 33 and the left lower of charging box 31, the top of cover plate 33 connects
The first steel wire rope 36 is connected to, the side to the right on the top of mounting bracket 1 is connected with the first directive wheel 35, and the first steel wire rope 36 is led around first
To wheel 35, the centre on the top of mounting bracket 1 is connected with guide rail 37, and guide rail 37 is provided with guide pin bushing 38, and guide rail 37 coordinates with guide pin bushing 38, led
The top of set 38 is connected with the left end of the first steel wire rope 36.
Rabbling mechanism 4 includes the first motor 41, switch block 42, the first bull stick 43, guide rod 44, movable block 45, the second bullet
Spring 46, sleeve pipe 47 and stirring loop bar 48, the upper left-hand of mounting bracket 1 are connected with the first motor 41, before the output shaft of the first motor 41
End is connected with switch block 42, and the left end of guide pin bushing 38 is connected with guide rod 44, and guide rod 44 is provided with movable block 45, and guide rod 44 is with moving
Motion block 45 coordinates, and rotary type is connected with the first bull stick 43 in movable block 45, and the first bull stick 43 passes through switch block 42, the first bull stick 43 with
Switch block 42 coordinates, and second spring 46 is connected between switch block 42 and movable block 45, and the first bull stick 43 passes through second spring 46, mobile
The bottom of block 45 is connected with sleeve pipe 47, and sleeve pipe 47 is provided with stirring loop bar 48, and sleeve pipe 47 coordinates with stirring loop bar 48 top, stirring
The bottom of loop bar 48 is located in blending bin 2.
Also include the second motor 5, the second bull stick 6, gear 7, endless glide 8, the first sliding block 9 and ring gear 10, install
The bottom of frame 1 is connected with the second motor 5, and the output shaft top of the second motor 5 is connected with the second bull stick 6, the connection of the top of the second bull stick 6
There is gear 7, the bottom of mounting bracket 1 is connected with endless glide 8, and the second motor 5 is located in endless glide 8, slidingtype in endless glide 8
The first sliding block 9 is connected with, endless glide 8 coordinates with the first sliding block 9, and ring gear 10, tooth are connected between the top of the first sliding block 9
Wheel 7 is engaged with ring gear 10, and the left and right sides at the top of ring gear 10 is connected with the left and right sides of the bottom of blending bin 2.
Also include fix bar 11, pull bar 12, the 3rd spring 13, strike block 14, the second directive wheel 15 and the second steel wire rope 16,
The lower front of charging box 31 is connected with fix bar 11, and fix bar 11 is provided with pull bar 12, and pull bar 12 is passed through under fix bar 11
Portion, the 3rd spring 13 is connected between the right side of fix bar 11 and the right part of pull bar 12, pull bar 12 passes through the 3rd spring 13, pull bar 12
Left end be connected with and strike block 14, the upper right of fix bar 11 is connected with the second directive wheel 15, and the right side of pull bar 12 is connected with
Two steel wire ropes 16, the second steel wire rope 16 bypass the second directive wheel 15 and the first directive wheel 35, and the second steel wire rope 16 is located at charging box
31 front side, the left end of the second steel wire rope 16 are connected with the top of guide pin bushing 38.
Also include mounting rod 17, the first slide rail 18 and the second sliding block 19, the left side central portion of mounting bracket 1 is connected with mounting rod
17, mounting rod 17 is connected with the first slide rail 18, slided on the first slide rail 18 positioned at the rear side for stirring loop bar 48, the antetheca of mounting rod 17
Formula is connected with the second sliding block 19, and the first slide rail 18 coordinates with the second sliding block 19, and the antetheca of the second sliding block 19 is with stirring in loop bar 48
Portion connects.
Also include installing plate 20, placing box 21 and handle 22, the bottom right of mounting bracket 1 is connected with installing plate 20, peace
Placing box 21 is placed with loading board 20, placing box 21 is connected with handle 22 at left and right sides of top.
Operation principle:When needing to prepare drier to instrument and meter, first toward addition substrate raw material in blending bin 2, start
Rabbling mechanism 4 so that rabbling mechanism 4 is sufficiently stirred to the mixture in blending bin 2, while in the presence of rabbling mechanism 4, is added
Expect charging of the mechanism 3 to interval in blending bin 2, so as to realize prepared by drier.After preparing, stop rabbling mechanism 4.
Because charging mechanism 3 includes charging box 31, charging swash plate 32, cover plate 33, the first spring 34, the first directive wheel
35th, the first steel wire rope 36, guide rail 37 and guide pin bushing 38, the right upper portion of mounting bracket 1 are connected with charging box 31, the left side bottom of charging box 31
Portion is connected with charging swash plate 32, and the bottom of charging swash plate 32 is located at the top right side of blending bin 2, and the left lower of charging box 31 rotates
Formula is connected with cover plate 33, and the first spring 34, the top of cover plate 33 are connected between the bottom of cover plate 33 and the left lower of charging box 31
Portion is connected with the first steel wire rope 36, and the side to the right on the top of mounting bracket 1 is connected with the first directive wheel 35, and the first steel wire rope 36 is around the
One directive wheel 35, the centre on the top of mounting bracket 1 are connected with guide rail 37, and guide rail 37 is provided with guide pin bushing 38, and guide rail 37 is matched somebody with somebody with guide pin bushing 38
Close, the top of guide pin bushing 38 is connected with the left end of the first steel wire rope 36.So when needing to being fed in blending bin 2, in mixer
When structure 4 stirs, rabbling mechanism 4 drives guide pin bushing 38 to move up and down, and when guide pin bushing 38 moves down, guide pin bushing 38 pulls downward on the
One steel wire rope 36, the first steel wire rope 36 drive cover plate 33 to be rotated up, and now the first spring 34 is stretched, the system in charging box 31
Standby raw material is entered in blending bin 2 by feeding swash plate 32, and when guide pin bushing 38 moves up, the first steel wire rope 36 is in the shape of relaxation
State, now in the presence of the elastic force of the first spring 34, cover plate 33 rotates down, so repeatedly, can so as to which charging box 31 be covered
To realize that interval feeds, so as to which the preparation to drier is more uniform.
Because rabbling mechanism 4 includes the first motor 41, switch block 42, the first bull stick 43, guide rod 44, movable block 45,
Two springs 46, sleeve pipe 47 and stirring loop bar 48, the upper left-hand of mounting bracket 1 are connected with the first motor 41, the output of the first motor 41
Axle front end is connected with switch block 42, and the left end of guide pin bushing 38 is connected with guide rod 44, and guide rod 44 is provided with movable block 45, guide rod 44
Coordinate with movable block 45, rotary type is connected with the first bull stick 43 in movable block 45, and the first bull stick 43 passes through switch block 42, the first bull stick
43 coordinate with switch block 42, and second spring 46 is connected between switch block 42 and movable block 45, and the first bull stick 43 passes through second spring 46,
The bottom of movable block 45 is connected with sleeve pipe 47, and sleeve pipe 47 is provided with stirring loop bar 48, and sleeve pipe 47 coordinates with stirring loop bar 48 top,
Stirring loop bar 48 bottom is located in blending bin 2.After substrate raw material being added in institute's blending bin 2 in the past, the first motor 41 of startup, first
Motor 41 drives switch block 42 to rotate, and switch block 42 drives bar rotation, and bull stick drives movable block 45 not in the presence of guide rod 44
Move left and right disconnectedly, movable block 45 drives stirring loop bar 48 constantly to move left and right by sleeve pipe 47, so as to which constantly left and right is stirred
The mixture in blending bin 2 is mixed, under the cooperation of guide rail 37 and guide pin bushing 38, when the drive guide rod 44 of guide pin bushing 38 moves up, is moved
Motion block 45 drives sleeve pipe 47 to move up, and because sleeve pipe 47 and stirring loop bar 48 top coordinate, sleeve pipe 47 drives stirring loop bar 48
While moving up, stirring loop bar 48 can drop downwards, so that the bottom of stirring loop bar 48 is still located in blending bin 2
Continue to stir mixture, when guide pin bushing 38 drives guide rod 44 to move down, in the case where sleeve pipe 47 coordinates with stirring loop bar 48 top,
Sleeve pipe 47 moves down, so that in the top retraction sleeve pipe 47 of stirring loop bar 48, so repeatedly, it is possible to achieve to drier
Stirring prepare.After preparing, the first motor 41 is closed.
Because also including the second motor 5, the second bull stick 6, gear 7, endless glide 8, the first sliding block 9 and ring gear 10,
The bottom of mounting bracket 1 is connected with the second motor 5, and the output shaft top of the second motor 5 is connected with the second bull stick 6, the top of the second bull stick 6
Gear 7 is connected with, the bottom of mounting bracket 1 is connected with endless glide 8, and the second motor 5 is located in endless glide 8, sliding in endless glide 8
Dynamic formula is connected with the first sliding block 9, and endless glide 8 coordinates with the first sliding block 9, and ring gear is connected between the top of the first sliding block 9
10, gear 7 is engaged with ring gear 10, and the left and right sides at the top of ring gear 10 is connected with the left and right sides of the bottom of blending bin 2.So
When stirring the stirring mixture of loop bar 48 or so, start the second motor 5, the second motor 5 drives the second bull stick 6 to rotate, second turn
Bar 6 rotates with moving gear 7, and because gear 7 engages with ring gear 10, gear 7 drives ring gear 10 to rotate, and ring gear 10 drives mixed
Mould assembling 2 is rotated so that stirring loop bar 48 is sufficiently stirred very much to the mixture in blending bin 2, so that the preparation effect of drier
Fruit more, so as to improve overall operating efficiency.
Because also include fix bar 11, pull bar 12, the 3rd spring 13, strike block 14, the second directive wheel 15 and the second steel wire
Rope 16, the lower front of charging box 31 is connected with fix bar 11, and fix bar 11 is provided with pull bar 12, and pull bar 12 passes through fix bar 11
Bottom, be connected with the 3rd spring 13 between the right side of fix bar 11 and the right part of pull bar 12, pull bar 12 pass through the 3rd spring 13, drawing
The left end of bar 12, which is connected with, strikes block 14, and the upper right of fix bar 11 is connected with the second directive wheel 15, the right side connection of pull bar 12
There is the second steel wire rope 16, the second steel wire rope 16 bypasses the second directive wheel 15 and the first directive wheel 35, and the second steel wire rope 16 is positioned at dress
The front side of hopper 31, the left end of the second steel wire rope 16 are connected with the top of guide pin bushing 38.So when guide pin bushing 38 moves down, guide pin bushing 38
The second steel wire rope 16 is pulled, the second steel wire rope 16 drives pull bar 12 to move right, and now the 3rd spring 13 is in the state of compression,
The drive of pull bar 12 is struck block 14 and moved right, and when guide pin bushing 38 moves up, the second steel wire rope 16 is in the state of relaxation, now draws
Bar 12 is moved to the left in the presence of the elastic force of the 3rd spring 13, and pull bar 12, which drives, strikes the bottom that block 14 taps charging swash plate 32 to the left
Portion, so repeatedly, it can make to strike block 14 when interval feeds and constantly taps and feed swash plate 32 so that in charging box 31
Preparing raw material can be rapidly entered in blending bin 2, prevent preparing raw material attaches from not entering in blending bin 2 on charging swash plate 32.
Because also including mounting rod 17, the first slide rail 18 and the second sliding block 19, the left side central portion of mounting bracket 1 is connected with installation
Bar 17, for mounting rod 17 positioned at the rear side for stirring loop bar 48, the antetheca of mounting rod 17 is connected with the first slide rail 18, is slided on the first slide rail 18
Dynamic formula is connected with the second sliding block 19, and the first slide rail 18 coordinates with the second sliding block 19, antetheca and the stirring loop bar 48 of the second sliding block 19
Middle part connects.So when sleeve pipe 47 moves up, the second sliding block 19 can play fixation, while first to stirring loop bar 48
The effect of the sliding block 19 of slide rail 18 and second can make it that stirring loop bar 48 can still move left and right.
Because also including installing plate 20, placing box 21 and handle 22, the bottom right of mounting bracket 1 is connected with installing plate
20, placing box 21 is placed with installing plate 20, and placing box 21 is connected with handle 22 at left and right sides of top.Placing box 21 can be right
The drier prepared is fed, and handle 22 facilitates picking and placeing for placing box 21.
Embodiment described above only expresses the preferred embodiment of the present invention, and its description is more specific and detailed, but simultaneously
Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art
For, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these belong to this hair
Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (7)
1. a kind of preparation facilities of instrument drier, it is characterised in that include mounting bracket (1), blending bin (2), add
Expect mechanism (3) and rabbling mechanism (4), mounting bracket (1) bottom is placed with blending bin (2), and the upper right of mounting bracket (1), which is provided with, to be added
Expect mechanism (3), the upper left-hand of mounting bracket (1) is provided with rabbling mechanism (4), charging mechanism (3) and rabbling mechanism (4) phase interworking
Close.
A kind of 2. preparation facilities of instrument drier according to claim 1, it is characterised in that charging mechanism
(3) charging box (31), charging swash plate (32), cover plate (33), the first spring (34), the first directive wheel (35), the first steel are included
Cord (36), guide rail (37) and guide pin bushing (38), mounting bracket (1) right upper portion are connected with charging box (31), a left side for charging box (31)
Side bottom is connected with charging swash plate (32), and the bottom of charging swash plate (32) is located at the top right side of blending bin (2), charging box (31)
Left lower rotary type is connected with cover plate (33), and first is connected between cover plate (33) bottom and the left lower of charging box (31)
Spring (34), the first steel wire rope (36) is connected with the top of cover plate (33), the side to the right on mounting bracket (1) top is connected with first and led
To wheel (35), the first steel wire rope (36) bypasses the first directive wheel (35), and the centre on mounting bracket (1) top is connected with guide rail (37),
Guide rail (37) is provided with guide pin bushing (38), and guide rail (37) coordinates with guide pin bushing (38), top and the first steel wire rope (36) of guide pin bushing (38)
Left end connection.
A kind of 3. preparation facilities of instrument drier according to claim 2, it is characterised in that rabbling mechanism
(4) the first motor (41), switch block (42), the first bull stick (43), guide rod (44), movable block (45), second spring are included
(46), sleeve pipe (47) and stirring loop bar (48), mounting bracket (1) upper left-hand are connected with the first motor (41), the first motor (41)
Output shaft front end be connected with switch block (42), the left end of guide pin bushing (38) is connected with guide rod (44), and guide rod (44), which is provided with, to be moved
Motion block (45), guide rod (44) and movable block (45) coordinate, and movable block (45) interior rotary type is connected with the first bull stick (43), and first
Bull stick (43) passes through switch block (42), and the first bull stick (43) coordinates with switch block (42), is connected between switch block (42) and movable block (45)
There is second spring (46), the first bull stick (43) passes through second spring (46), and the bottom of movable block (45) is connected with sleeve pipe (47), set
Manage (47) and be provided with stirring loop bar (48), sleeve pipe (47) coordinates with stirring loop bar (48) top, and stirring loop bar (48) bottom is located at
In blending bin (2).
4. the preparation facilities of a kind of instrument drier according to claim 3, it is characterised in that also include
Two motors (5), the second bull stick (6), gear (7), endless glide (8), the first sliding block (9) and ring gear (10), mounting bracket (1) bottom
Portion is connected with the second motor (5), and the output shaft top of the second motor (5) is connected with the second bull stick (6), the second bull stick (6) top
Gear (7) is connected with, mounting bracket (1) bottom is connected with endless glide (8), and the second motor (5) is located in endless glide (8), ring
Slidingtype is connected with the first sliding block (9) on shape slide rail (8), and endless glide (8) coordinates with the first sliding block (9), the first sliding block (9)
Ring gear (10) is connected between top, gear (7) engages with ring gear (10), and the left and right sides at the top of ring gear (10) is with mixing
The left and right sides connection of mould assembling (2) bottom.
5. the preparation facilities of a kind of instrument drier according to claim 4, it is characterised in that also include solid
Fixed pole (11), pull bar (12), the 3rd spring (13), strike block (14), the second directive wheel (15) and the second steel wire rope (16), charging box
(31) lower front is connected with fix bar (11), and fix bar (11) is provided with pull bar (12), and pull bar (12) passes through fix bar
(11) bottom, the 3rd spring (13) is connected between fix bar (11) right side and the right part of pull bar (12), pull bar (12) passes through
3rd spring (13), the left end of pull bar (12), which is connected with, strikes block (14), and the upper right of fix bar (11) is connected with the second guiding
Take turns (15), be connected with the second steel wire rope (16) on the right side of pull bar (12), the second steel wire rope (16) around the second directive wheel (15) and
First directive wheel (35), the second steel wire rope (16) are located at the front side of charging box (31), the left end and guide pin bushing of the second steel wire rope (16)
(38) top connects.
6. the preparation facilities of a kind of instrument drier according to claim 5, it is characterised in that also include peace
Dress bar (17), the first slide rail (18) and the second sliding block (19), mounting bracket (1) left side central portion are connected with mounting rod (17), mounting rod
(17) positioned at the rear side of stirring loop bar (48), mounting rod (17) antetheca is connected with the first slide rail (18), is slided on the first slide rail (18)
Dynamic formula is connected with the second sliding block (19), and the first slide rail (18) coordinates with the second sliding block (19), and the antetheca of the second sliding block (19) is with stirring
Mix and connected in the middle part of loop bar (48).
7. the preparation facilities of a kind of instrument drier according to claim 6, it is characterised in that also include peace
Loading board (20), placing box (21) and handle (22), the bottom right of mounting bracket (1) are connected with installing plate (20), installing plate (20)
On be placed with placing box (21), be connected with handle (22) at left and right sides of placing box (21) top.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711059841.XA CN107583540A (en) | 2017-11-01 | 2017-11-01 | A kind of preparation facilities of instrument drier |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711059841.XA CN107583540A (en) | 2017-11-01 | 2017-11-01 | A kind of preparation facilities of instrument drier |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107583540A true CN107583540A (en) | 2018-01-16 |
Family
ID=61045595
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711059841.XA Pending CN107583540A (en) | 2017-11-01 | 2017-11-01 | A kind of preparation facilities of instrument drier |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107583540A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109329095A (en) * | 2018-11-20 | 2019-02-15 | 胡思雨 | A kind of livestock-raising device for feeding |
CN110813140A (en) * | 2019-11-26 | 2020-02-21 | 衢州光雅染料有限公司 | Dye stirring equipment |
CN110963668A (en) * | 2019-12-27 | 2020-04-07 | 江苏唐电电力工程设计有限公司 | Superheated steam drying sludge incineration device with preheating function |
CN111974989A (en) * | 2020-08-25 | 2020-11-24 | 刘占国 | Many shower nozzles of aluminum alloy plate 3D printing device |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106110992A (en) * | 2016-08-20 | 2016-11-16 | 毕广敏 | A kind of animal husbandry Livestock pollution thing recovery material mixed stirring device |
CN107116715A (en) * | 2017-05-23 | 2017-09-01 | 汤国忠 | A kind of medical packaging high efficiency PVC stock stirring devices |
-
2017
- 2017-11-01 CN CN201711059841.XA patent/CN107583540A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106110992A (en) * | 2016-08-20 | 2016-11-16 | 毕广敏 | A kind of animal husbandry Livestock pollution thing recovery material mixed stirring device |
CN107116715A (en) * | 2017-05-23 | 2017-09-01 | 汤国忠 | A kind of medical packaging high efficiency PVC stock stirring devices |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109329095A (en) * | 2018-11-20 | 2019-02-15 | 胡思雨 | A kind of livestock-raising device for feeding |
CN110813140A (en) * | 2019-11-26 | 2020-02-21 | 衢州光雅染料有限公司 | Dye stirring equipment |
CN110813140B (en) * | 2019-11-26 | 2020-11-13 | 明光鑫烨制衣有限公司 | Dye stirring equipment |
CN110963668A (en) * | 2019-12-27 | 2020-04-07 | 江苏唐电电力工程设计有限公司 | Superheated steam drying sludge incineration device with preheating function |
CN111974989A (en) * | 2020-08-25 | 2020-11-24 | 刘占国 | Many shower nozzles of aluminum alloy plate 3D printing device |
CN111974989B (en) * | 2020-08-25 | 2022-10-18 | 江西普辉铝业有限公司 | Adjustable 3D printing device of aluminum alloy plate shower nozzle bore |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107583540A (en) | A kind of preparation facilities of instrument drier | |
CN107650264B (en) | A kind of power construction pylon pedestal, which is built, is mixed equipment with cement sand | |
CN107262365A (en) | One kind stirring vibrations Sand screen | |
CN208615062U (en) | A kind of architectural engineering proportioner being conveniently adjusted ratio | |
CN104588183B (en) | Earth broken sieve mixing and conveying system | |
CN208465695U (en) | A kind of adhesive mixing equipment | |
CN107351243A (en) | A kind of special mixing apparatus of During Geotechnical Tests test specimen | |
CN201519559U (en) | Blender for blending paint putty | |
CN207653532U (en) | A kind of automation pannage agitating device | |
CN208263169U (en) | A kind of quick burden agitator suitable for road and bridge construction | |
CN207825155U (en) | A kind of mixing apparatus of building concrete interval charging | |
CN108527656B (en) | A kind of construction slurry mixing equipment | |
CN209052730U (en) | A kind of converter charging (feeding) equipment | |
CN106628647A (en) | Storage device of talcum powder for producing household water purifier | |
CN216879009U (en) | Horizontal agitating unit of fire retardant coating | |
CN208493898U (en) | A kind of medical drug mixing arrangement | |
CN202421180U (en) | Cement stirring tester | |
CN107890835A (en) | A kind of automatic charging paints dispersal device | |
CN200989875Y (en) | Planetary type castable refractory rheometer | |
CN209601490U (en) | A kind of clearing apparatus of fertilizer conveyer belt | |
CN207371834U (en) | A kind of stirring vibrations Sand screen | |
CN208824355U (en) | Double worm mixer is used in a kind of production of powder of lacquer putty for use on | |
CN207310234U (en) | A kind of concrete mixing control device | |
CN202097103U (en) | Drum screen capable of measuring material flow | |
CN203510463U (en) | Vertical mortar mixer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180116 |