CN107578144A - A kind of big line discharging method - Google Patents

A kind of big line discharging method Download PDF

Info

Publication number
CN107578144A
CN107578144A CN201710656110.7A CN201710656110A CN107578144A CN 107578144 A CN107578144 A CN 107578144A CN 201710656110 A CN201710656110 A CN 201710656110A CN 107578144 A CN107578144 A CN 107578144A
Authority
CN
China
Prior art keywords
num
cable
blanking
cut
big line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710656110.7A
Other languages
Chinese (zh)
Inventor
桑占良
侯秀芳
董力群
高月欣
杨红萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRRC Qingdao Sifang Co Ltd
Original Assignee
CRRC Qingdao Sifang Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRRC Qingdao Sifang Co Ltd filed Critical CRRC Qingdao Sifang Co Ltd
Priority to CN201710656110.7A priority Critical patent/CN107578144A/en
Publication of CN107578144A publication Critical patent/CN107578144A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a kind of big line discharging method, using efficient blanking algorithm, realizes the optimum utilization of big line discharge technology and cable so that clout is minimum;And remote transmission and the control between the technical data of technological design and big line automatic blanking equipment are realized using database analysis and technology of sharing, improves utilization rate of raw materials and production efficiency, it is cost-effective.

Description

A kind of big line discharging method
Technical field
The present invention relates to the big line discharging method in a kind of big line discharging method, especially rail vehicle blanking workshop.
Background technology
Need to carry out during track vehicle production, under car a large amount of cables arrangement and installation, it is necessary to carry out cable Blanking, but in actual production, according to actual scheduling situation, entry, which intersects, to be carried out, and new projects are more, rhythm of production is fast, technology The phenomenon changed more than item is relatively conventional, and how to realize the optimal utilization of cable in blanking operation is the side for needing to study and solve To.
During projects perform preliminary project change, technology alteration is more, and change is frequent, in the produce reality of high rhythm In the case of, there is workshop blanking operation cable utilization rate is low, the shortcomings that production technology falls behind, how using one it is efficient under Material method simultaneously saves cable and is one and need to solve the problems, such as.
The content of the invention
Present invention is primarily aimed at solve the above problems and deficiency, there is provided a kind of big line discharging method, using efficient Algorithm, realize the optimum utilization of big line discharge technology and cable clout.
To achieve the above object, the technical scheme is that:
A kind of big line discharging method, comprises the following steps,
S1, by original blanking data and the database of distribution data inputting discharge programing system, and by system under original Material data and distribution data are handled and preserved;
S2, cutting analysis are carried out one by one to original blanking data and distribution data using the blanking algorithm of systemic presupposition, point The different cutting schemes of each cable are not drawn;
S3, the cutting scheme of the various cables of comprehensive assessment, select optimum Cutting scheme;
S4, by selected cutting scheme remote transmission to blanking machine, carry out discharge production.
Further, the default blanking algorithm directly determines method to divide.
Further, in step S3, it is preferred plan to select the minimum cutting scheme of clout.
Further, the system realizes system interface using Java Swing.
Further, in step S4, the data remote transmission between system and blanking machine is completed by wireless data.
Further, in step S4, Samba servers are built in blanking generator terminal, will by SMB agreements and ICP/IP protocol Communication is established between system and blanking machine, completes the remote transmission of data.
Further, the original blanking data are stored in excel forms imported into system again.
Further, original blanking data and distribution data can be increased through database, be deleted, being changed, looking into function treatment simultaneously Preserve in systems.
Further, the default blanking algorithm comprises the following steps:
S21, the cable to be cut is ranked up by length, with l1、l2、l3……li……lmIt is identified;With numij、lengthijRepresent the quantity and the remaining clout of expression of i-th kind of demand cable cut out on jth kind raw material cable; With L1、L2、L3……LjRepresent the not synteny of raw material cable;
S22, calculate analysis LjRaw material cable is at best able to cut liThe number num of cablei
S23, inspection have cut through numiIndividual liRemaining clout length after cableiWhether the length of i+1 cable is more than or equal to Degree, if so, then calculating the maximum quantity num that can cut i+1 cablesi+1
S24, make i=i+1, and resumes step S23, be examined in whether other cables can be cut, terminate as i=m-1, Draw the array that a length is m, a kind of cutting scheme;
S25, k=m-1 is made, if numk>0, make numk=numk- 1, recalculate numk+1Value, obtain new array as one The new cutting scheme of kind, until numkUntill=0;
S26, k=k-1 is made, if numk>0, make numk=numk- 1, recalculate numk+1Value, record current k values, and Resumes step S25, until numkUntill=0;
S27, k=k-1 is made, if numk>0, make numk=numk- 1, recalculate numk+1Value, record current k values, and Resumes step S26, until numkUntill=0;
S28, repeat step S25 to S27, as j=1 and numkWhen=0, calculating terminates.
In summary, a kind of big line discharging method provided by the invention, using efficient blanking algorithm, realizes big line discharge The optimum utilization of technology and cable so that clout is minimum;And realize technological design using database analysis and technology of sharing Remote transmission and control between technical data and big line automatic blanking equipment, improve utilization rate of raw materials and production efficiency, section About cost.
Embodiment
With reference to embodiment, the present invention is described in further detail.
The present invention provides a kind of big line discharging method, using efficient algorithm, realizes big line discharge technology and cable clout Optimum utilization.
To achieve the above object, the technical scheme is that:
A kind of big line discharging method, comprises the following steps:
S1, by original blanking data and the database of distribution data inputting discharge programing system, and by system under original Material data and distribution data are handled and preserved.
Discharge programing system is required to run under windows systems, improves the scope of application, and can be required according to blanking It can quickly and accurately calculate and export blanking data.In the present invention provides embodiment, discharge programing system is under Java Write, there is very strong system compatibility, with suitable for all windows systems.
Java is that one kind is simple, object-oriented, distributed, explanation type, Robust Security, architecture neutral, It is transplantable, excellent performance, the dynamic language of multithreading.Swing is realized by 100% pure Java, and Swing components are to use The Lightweight component that Java is realized, without local code, the support independent of operating system.Swing components have powerful reality The property used.Swing is showed unanimously on different platforms, and has the ability to provide other characteristics that native window system is not supported. Therefore, in embodiment provided by the invention, system interface is realized using Java Swing.
Original blanking data are stored in excel forms, systems with data introducting interface, can be by excel forms Data realize that a key imports, and unartificial typing one by one, improve operating efficiency, while reduce error, certainly, in practical application In, also can manual typing, in Input Process, system automatically will be handled initial data data, and be stored in database In.Raw material data and distribution data in system the function such as can be increased by database, delete, change, looking into and accurately being presented In systems.
S2, cutting analysis are carried out one by one to original blanking data and distribution data using the blanking algorithm of systemic presupposition, point The different cutting schemes of each cable are not drawn.
Substantial amounts of experimental comparison analysis is have passed through during the blanking algorithmization of systemic presupposition, final decision is straight using dividing Connect foundation of the method for determining as blanking algorithm.
In the present invention is embodied, the blanking algorithm based on dividing and directly determine method, comprise the following steps:
S21, the cable to be cut is ranked up by its length, here with l1、l2、l3……li……lmArranged simultaneously Mark, with L1、L2……LjThe line style of raw material cable is identified;With numij、lengthijRepresent in jth kind raw material The quantity for the i-th kind of demand cable cut out on cable and remaining clout.
Such as, there is three kinds of line styles (i.e. j maximums be 3) i.e. raw material cable there are 3 kinds in the distribution data form of typing to be 1.25 is flat, 2 flat, 3.5 flat, or is measured with other conventional units, and first the cable in form is classified, selects a kind of line style Such as 1.25 is flat, and as L1 raw material cables, the length of 1.25 flat cables in original blanking data form as required is carried out Sequence from big to small.Assuming that the needed length of cable is 4 meters, 6 meters, 8 meters (i.e. m maximum is 3), be 8 meters after sequence, 6 Rice, 4 meters, l1For 8 rice noodles cables, l2For 6 rice noodles cables, l3For four-meter line cable.In the present invention, arrangement mode includes but is not limited to by big , also can be ascending to small arrangement of successively decreasing, or other arrangement modes, such as demand, it is not limited herein, but all in this hair In bright protection domain.
When below with j=1, i.e., with L1Exemplified by raw material cable, the specific method of blanking algorithm is introduced:
S22, calculate analysis L1Raw material cable is at best able to cut liThe number num of cablei
numijMiddle i, j represent it is variable number, such as num in softwareijThat is j=1 (be exactly j be 1 when) represents 1.25 horizontal lines Cable (L1Raw material cable) the 8 rice noodles cable (l that can cut out1) quantity, such as L in drum1Raw material length of cable is 19 meters, then The quantity that 8 rice noodles cables can be cut out (counts num for 211It is worth for 2), lengthijIt is variable number that middle i, j are also illustrated that in software, length11Represent 1.25 horizontal line cable (L1Raw material cable) cut out 8 meters of cable (l of integer1) after residue length be 19-8*2=3 Rice.
S23, num is cut throughiIndividual liAfter cable, remaining clout lengthi, check whether it is more than or equal to i+1 cables Length, if calculating the maximum quantity num that can cut i+1 cables more than or equal to ifi+1
It is remaining 3 meters after 28 meters of cable has been cut through, check whether he is more than second number (l2) 6 meters, if greater than Can be cut out by seeing by several whole 6 meters, because also surplus 3 meters are less than 6 meters, num2(i.e. numi+1) it is 0,
S24, make i=i+1, and return to step S24, be examined in whether other cables can be cut, terminate as i=m-1. Now, we can obtain the array that a length is m, and each value of array is exactly that this root raw material cable can be cut The quantity of every cable, this is the first cutting scheme.
Then look back whether remaining 3 meters be more than the 3rd number (l again3) 4 meters, 3 meters are less than 4 meters, can cut out 0 integer 4 meters, num3It is worth for 0.The array that a length is 3 (m) can be obtained after so calculating【2,0,0】, an also residue length (lengthi) 3 meters of numerical value, 19 meters of L1The cutting result that raw material cable occurs is as shown in table 1:
Table 1:L1The first cutting scheme of raw material cable
It is required that the species of blanking 8 meters 6 meters 4 meters Surplus material
Result of calculation 2 0 0 3 meters
S25, k=m-1 is made, if numk>0, make numk=numk- 1, recalculate numk+1Value, obtained new array is A kind of new cutting scheme, until numkUntill=0.
In embodiment provided by the invention, m value is 3, so k value is 2, that is, from the inverse of m array the Two numbers come into effect, if num2More than 0, by num2- 1, calculate num3Value.
S26, k=k-1 is made, if numk>0, make numk=numk- 1, recalculate numk+1Value, record current k values, and Resumes step S26, until numkUntill=0.
K=k-1 is made, value now is 1, is by num1(value is 2) subtracts 1, will cut out 8 meters of radical and subtract 1, Ran Houzai Calculate the radical of 6 meters and 4 meters of sanction below.
S27, k=k-1 is made, if numk>0, make numk=numk- 1, recalculate numk+1Value, record current k values, and Resumes step S27, until numkUntill=0.
K=k-1 is made, that is, is come into effect from the number third from the bottom of m array, then performs a step S2.
S28, repeat step S26 to S28, as j=1 and numkWhen=0, calculating terminates.
In this step, by the number inside m numerical value from penultimate forward, all perform one time.
Such as, by step S23 to S25, the first cutting scheme as shown in table 2 is obtained:
Table 2:The first cutting scheme
l1 l2 l3 Lengthi1
Need the length of cable cut out 8 meters 6 meters 4 meters /
Cut the radical of every kind of length cable 2 0 0 3 meters
After completing step S27, in step S28, with the first cutting scheme【2,0,0】Based on, from penultimate Look for the number more than 1 to subtract 1, obtain second of cutting scheme
Table 3:Second of cutting scheme
l1 l2 l3 Lengthi1
Need the length of cable cut out 8 meters 6 meters 4 meters /
Cut the radical of every kind of length cable 1 1 1 1 meter
Further with【1,1,1】Based on, the number more than 1 is looked for from penultimate, as shown in table 4 the third is obtained and cuts Cut scheme
Table 4:The third cutting scheme
l1 l2 l3 Lengthi1
Need the length of cable cut out 8 meters 6 meters 4 meters /
Cut the radical of every kind of length cable 1 0 2 3 meters
Further with【1,0,2】Based on, the number more than 1 is looked for from penultimate, as shown in table 5 the 4th kind is obtained and cuts Cut scheme.
Table 5:4th kind of cutting scheme
l1 l2 l3 Lengthi1
Need the length of cable cut out 8 meters 6 meters 4 meters /
Cut the radical of every kind of length cable 0 3 0 1 meter
Further with【0,3,0】Based on, the number more than 1 is looked for from penultimate, as shown in table 6 the 5th kind is obtained and cuts Cut scheme.
Table 6:5th kind of cutting scheme
l1 l2 l3 Lengthi1
Need the length of cable cut out 8 meters 6 meters 4 meters /
Cut the radical of every kind of length cable 0 2 1 3 meters
Further with【0,2,1】Based on, the number more than 1 is looked for from penultimate, as shown in table 7 the 6th kind is obtained and cuts Cut scheme.
Table 7:6th kind of cutting scheme
l1 l2 l3 Lengthi1
Need the length of cable cut out 8 meters 6 meters 4 meters /
Cut the radical of every kind of length cable 0 1 3 1 meter
Further with【0,1,3】Based on, the number more than 1 is looked for from penultimate, as shown in table 8 the 7th kind is obtained and cuts Cut scheme.
Table 8:7th kind of cutting scheme
l1 l2 l3 Lengthi1
Need the length of cable cut out 8 meters 6 meters 4 meters /
Cut the radical of every kind of length cable 0 0 4 3 meters
L is calculated1After raw material cable, then remaining raw material cable L is calculated according to step S23 to S29 respectively2、L3…… LjCutting scheme, and each raw material cable will all obtain one group of cutting scheme.To LjThe line style of raw material cable enters rower Know and compare the tangent line scheme progress blanking that clout most saves.
After having calculated 1.25 flat line styles, then calculate 2 flat, 3.5 flat cables.Find the minimum cutting scheme of clout.This 3 kinds of cables are simply lifted, the example of 3 kinds of length, can be explained for a variety of cable situations and a variety of length of cable with analogy.
I.e. when j is different value, respectively according to step S22 to S28 carry out Cutting calculation, so as to draw each cable, The different cutting schemes of each line style.
S3, calculating include various situations, then cable residue length are compared, the various cutting sides of comprehensive assessment Case, the minimum cutting scheme of residue length is looked for, with reference to field demand, and therefrom looks for optimal case.
S4, by cutting scheme remote transmission to blanking machine, carry out discharge production.
Cutting scheme is formed into blanking information table, arrived in table form by data remote transmission, transmission blanking data Blanking machine.Discharge programing system is arranged on the PC end of office, according to the blanking information of obtained optimal cutling schemes generation Table wants remote transmission in embodiment provided by the invention, to build Samba servers to blanking generator terminal in blanking generator terminal, pass through SMB agreements and ICP/IP protocol will be established between two operating systems to be communicated, and realizes the remote transmission of data.
In summary, a kind of big line discharging method provided by the invention, using efficient blanking algorithm, realizes big line discharge The optimum utilization of technology and cable, make clout minimum;And the skill of technological design is realized using database analysis and technology of sharing Remote transmission and control between art data and big line automatic blanking equipment, utilization rate of raw materials and production efficiency are improved, saved Cost.
As described above, combining given plan content, similar technical scheme can be derived.In every case it is without departing from this The content of inventive technique scheme, any simple modification made according to technical spirit of the invention to above example, equally become Change and modification, in the range of still falling within technical solution of the present invention.

Claims (9)

  1. A kind of 1. big line discharging method, it is characterised in that:Comprise the following steps,
    S1, by original blanking data and the database of distribution data inputting discharge programing system, and by system to original blanking number According to and distribution data handled and preserved;
    S2, cutting analysis are carried out one by one to original blanking data and distribution data using the blanking algorithm of systemic presupposition, respectively Go out the different cutting schemes of each cable;
    S3, the cutting scheme of the various cables of comprehensive assessment, select optimum Cutting scheme;
    S4, by selected cutting scheme remote transmission to blanking machine, carry out discharge production.
  2. A kind of 2. big line discharging method as claimed in claim 1, it is characterised in that:The default blanking algorithm is direct to divide Determine method.
  3. A kind of 3. big line discharging method as claimed in claim 1, it is characterised in that:In step S3, select clout is minimum to cut It is preferred plan to cut scheme.
  4. A kind of 4. big line discharging method as claimed in claim 1, it is characterised in that:The system is realized using JAVA SWING System interface.
  5. A kind of 5. big line discharging method as claimed in claim 1, it is characterised in that:In step S4, completed by wireless data Data remote transmission between system and blanking machine.
  6. A kind of 6. big line discharging method as claimed in claim 5, it is characterised in that:In step S4, built in blanking generator terminal Samba servers, it will be established and communicated between system and blanking machine by SMB agreements and ICP/IP protocol, complete the long-range of data Transmission.
  7. A kind of 7. big line discharging method as claimed in claim 1, it is characterised in that:The original blanking data are stored in It is imported into again in system in excel forms.
  8. A kind of 8. big line discharging method as claimed in claim 1, it is characterised in that:Original blanking data and distribution data can Increased through database, deleted, being changed, looked into function treatment and preserve in systems.
  9. A kind of 9. big line discharging method as described in any one of claim 1 to 8, it is characterised in that:The default blanking is calculated Method comprises the following steps:
    S21, the cable to be cut is ranked up by length, with l1、l2、l3……li……lmIt is identified;With numij、 lengthijRepresent the quantity and the remaining clout of expression of i-th kind of demand cable cut out on jth kind raw material cable;With L1、 L2、L3……LjRepresent the not synteny of raw material cable;
    S22, calculate analysis LjRaw material cable is at best able to cut liThe number num of cablei
    S23, inspection have cut through numiIndividual liRemaining clout length after cableiWhether the length of i+1 cable is more than or equal to, If so, then calculate the maximum quantity num that can cut i+1 cablesi+1
    S24, make i=i+1, and resumes step S23, be examined in whether other cables can be cut, terminate as i=m-1, draw The array that one length is m, a kind of cutting scheme;
    S25, k=m-1 is made, if numk>0, make numk=numk- 1, recalculate numk+1Value, obtain new array to be a kind of new Cutting scheme, until numkUntill=0;
    S26, k=k-1 is made, if numk>0, make numk=numk- 1, recalculate numk+1Value, record current k values, and return Step S25, until numkUntill=0;
    S27, k=k-1 is made, if numk>0, make numk=numk- 1, recalculate numk+1Value, record current k values, and return Step S26, until numkUntill=0;
    S28, repeat step S25 to S27, as j=1 and numkWhen=0, calculating terminates.
CN201710656110.7A 2017-08-03 2017-08-03 A kind of big line discharging method Pending CN107578144A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710656110.7A CN107578144A (en) 2017-08-03 2017-08-03 A kind of big line discharging method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710656110.7A CN107578144A (en) 2017-08-03 2017-08-03 A kind of big line discharging method

Publications (1)

Publication Number Publication Date
CN107578144A true CN107578144A (en) 2018-01-12

Family

ID=61035101

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710656110.7A Pending CN107578144A (en) 2017-08-03 2017-08-03 A kind of big line discharging method

Country Status (1)

Country Link
CN (1) CN107578144A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109947043A (en) * 2019-03-28 2019-06-28 深圳市清雅科技有限公司 A kind of cable big linear system system of offline system-automatically
CN111353189A (en) * 2020-02-21 2020-06-30 广东三维家信息科技有限公司 Configuration method and device of home decoration line material and electronic equipment

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060197769A1 (en) * 2005-03-02 2006-09-07 International Business Machines Corporation Method and apparatus for generating profile of solutions trading off number of activities utilized and objective value for bilinear integer optimization models
CN102346810A (en) * 2011-07-05 2012-02-08 重庆大学 Mass data networked grouped and optimized blanking method
CN103425876A (en) * 2013-07-31 2013-12-04 国家电网公司 Cable optimization segmentation method based on global elicitation - two-layer algorithm
CN105005277A (en) * 2015-05-11 2015-10-28 南车青岛四方机车车辆股份有限公司 Rail vehicle large wire manufacturing system design and production method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060197769A1 (en) * 2005-03-02 2006-09-07 International Business Machines Corporation Method and apparatus for generating profile of solutions trading off number of activities utilized and objective value for bilinear integer optimization models
CN102346810A (en) * 2011-07-05 2012-02-08 重庆大学 Mass data networked grouped and optimized blanking method
CN103425876A (en) * 2013-07-31 2013-12-04 国家电网公司 Cable optimization segmentation method based on global elicitation - two-layer algorithm
CN105005277A (en) * 2015-05-11 2015-10-28 南车青岛四方机车车辆股份有限公司 Rail vehicle large wire manufacturing system design and production method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
秦平平等: "分支界定算法优化一维下料问题", 《科学技术与工程》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109947043A (en) * 2019-03-28 2019-06-28 深圳市清雅科技有限公司 A kind of cable big linear system system of offline system-automatically
CN111353189A (en) * 2020-02-21 2020-06-30 广东三维家信息科技有限公司 Configuration method and device of home decoration line material and electronic equipment

Similar Documents

Publication Publication Date Title
Mahdavi et al. Evaluating the effect of load growth on annual network losses in TNEP considering bundle lines using DCGA
CN107591799B (en) Power distribution network short-term planning method based on maximum power supply capacity
CN107578144A (en) A kind of big line discharging method
CN110556847B (en) Energy storage system planning operation joint optimization method and system in photovoltaic-containing power distribution network
CN105119279B (en) A kind of distributed power source planing method and its system
CN112650888B (en) Regional comprehensive energy system site selection planning method and system based on graph theory
CN107479856A (en) Arctan function data structure and method for building up, function value-acquiring method and device
CN1323478C (en) Reactive optimizing method of power system based on coordinate evolution
CN109710542A (en) A kind of completely N-ary tree construction method and device
CN108923817B (en) Method for reducing interference between terminals in LoRa network
CN104578055A (en) Power system transient stability simulation method based on network node numbering optimization
Shayeghi et al. DCGA based-transmission network expansion planning considering network adequacy
CN103823998A (en) Weak cross section determination method taking influence of network topology changes on power transmission capacity into consideration
CN107644069A (en) High density Monitoring Data vacuates method
CN107292437A (en) A kind of fault current limiter, which is layouted, to be optimized and Capacity Selection method and system
Wang et al. MOEA/D using covariance matrix adaptation evolution strategy for complex multi-objective optimization problems
Charles et al. Effects of distributed generation penetration on system power losses and voltage profiles
CN103208804A (en) Branch voltage stability analysis based selection method for reactive power compensation point of microgrid
CN108985639A (en) A kind of electric system Synthetic Decision Method based on the double-deck fuzzy optimization
Mahdavi et al. Evaluation of GA performance in TNEP considering voltage level, network losses and number of bundle lines
CN107766290A (en) Convergent multiple regression engineering statistics new method
Shayeghi et al. Optimization of transmission lines loading in TNEP using decimal codification based GA
CN105205622A (en) Planning method for transformer substations and distributed generation distribution points
CN111898796A (en) Method for optimizing reliability of multi-service converged power distribution network
CN105337277B (en) The computational methods that power distribution network project yet to be built is affected on rate of qualified voltage

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180112

RJ01 Rejection of invention patent application after publication