A kind of steel structure scaffold is built with steel pipe market device
Technical field
The present invention relates to a kind of conveying device, more particularly to a kind of steel structure scaffold is built with steel pipe market device.
Background technology
Scaffold is to ensure workbench that each work progress is smoothed out and set up.Position by setting up is divided into outer
Scaffold, internal scaffolding;It can be divided into timber scaffolding, bamboo scaffolding, steel pipe scaffold by material difference;It is divided into by structural form vertical
Rod-type scaffold, bridge scaffold, door-type scaffold, swinging scaffold, suspended scaffold, choose formula scaffold, climb formula pin hand
Frame.With the tie point of wall, the binding character variation to scaffold is larger.Research to problem above lacks system accumulation and statistics
Data, do not possess it is independent carry out the condition of probability analysis, therefore structure reactance is multiplied by its value system of regulation coefficient less than 1 by with
The safety coefficient used in the past carries out calibration determination.Therefore, this specification use design method be substantially belong to half probability,
It is semiempirical.Supporting rod type overhanging scaffold erection need to control working load, set up firm.In first being set up when setting up
Shelf, cross bar is stretched out outside wall, then brace is propped up and chooses cross bar and is connected firmly, then set up part of encorbelmenting again, spread pin hand
Plate, periphery will set railing and foot guard plate, install safety net below, to ensure safety.Existing metal scaffolding is inconvenient to build, especially
It is that inconvenience is moved horizontally to the steel pipe for building scaffold and conveyed vertically, and it is low to carry out transfer efficiency to steel pipe.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of can facilitate by piston rod and Mobile base are carried out back and forth
Motion control, Mobile base realize horizontal slidable adjustment along the axis of guide, can carry out vertical lifting delivery to steel pipe, be conveniently used for
Build scaffold;The steel structure scaffold that ride operation efficiency is more increased is carried out to steel pipe to build with steel pipe market device.
The present invention is achieved through the following technical solutions:
A kind of steel structure scaffold is built with steel pipe market device, including base, and the inside of base is cavity structure, the top of base
For hatch frame;The inside of base is provided with some axis of guides, and the axis of guide is in horizontally disposed;Mobile base, Mobile base are provided with base
It is sleeved on the outer peripheral face of the axis of guide;The bottom side of Mobile base is provided with the first installation axle, and the both ends of the first installation axle are equipped with
First movable pulley, the bottom opposite side of Mobile base are provided with the second installation axle, and the both ends of the second installation axle are equipped with the second movable pulley,
Second movable pulley and the first movable pulley are arranged on the inner bottom part of base;The top surface of base is provided with hydraulic cylinder, the front portion of hydraulic cylinder
Provided with piston rod, piston rod is in horizontally disposed, the end of piston rod and the sidepiece connection of Mobile base;Mobile base is provided with first
Support and the second support frame, Mobile base are provided with the first supporting table, and the top of the first supporting table is provided with the first fixed plate, and first is solid
Fixed board is provided with the first motor, and the front portion of the first motor is provided with the first drive shaft, the periphery surface cover of the first drive shaft
Equipped with the first rotating cylinder, the first rotating cylinder is arranged in the top of the first support frame, and the first rotating cylinder is wound with the first receipts
Unwrapping wire, the lower end of the first retractable cable are provided with first set fitted tube;Mobile base is provided with the second supporting table, is set at the top of the second supporting table
There is the second fixed plate, the second fixed plate is provided with the second motor, and the front portion of the second motor is provided with the second drive shaft, the
The outer peripheral face of two drive shafts is set with the second rotating cylinder, and the second rotating cylinder is wound with the second retractable cable, the second retractable cable
Lower end is provided with second set of fitted tube;Second set of fitted tube is corresponding with first set fitted tube.
Further, second set of fitted tube is identical with the shape size of first set fitted tube, and first set fitted tube includes lower half
Cylinder and upper half cylinder, set tankage is provided between lower half cylinder and upper half cylinder;It is spacing that the both sides of upper half cylinder are equipped with first
Block, the both sides of lower half cylinder are equipped with the second limited block, are provided with lock shaft between the second limited block and the first limited block, lock shaft it is upper
End is provided with the first lock nut, and the first lock nut is arranged on the top of the first limited block, and the bottom of lock shaft is provided with the second lock nut, the second lock nut
It is arranged on the bottom of the second limited block;The inner top of upper half cylinder is provided with magnetic adsorption plate, and magnetic adsorption plate is arc shape, the top of magnetic adsorption plate
Extension spring is provided between the inner top of portion and upper half cylinder, buffer spring is provided between the both sides of magnetic adsorption plate and upper half cylinder.
Further, locating shaft, one end peace of locating shaft are provided between first rotating cylinder and the second rotating cylinder
Mounted in the axis center position of the first rotating cylinder, the other end of locating shaft is arranged on the axis center position of the second rotating cylinder.
Further, the first fixed plate is provided between one end of the axis of guide, the first fixed plate is fixed on the one of base
Outer fix, the second fixed plate is provided between the other end of the axis of guide, the second fixed plate is fixed on another outer fix of base.
Further, the inside of the Mobile base is provided with the first moving tube and the second moving tube, the first moving tube and second
Moving tube is sleeved on the outer peripheral face of the axis of guide.
Further, the top surface of the base is provided with Button Block, and Button Block snaps onto the back of hydraulic cylinder.
Further, the top surface of the base is provided with support frame, and the top of support frame is provided with guide pipe, and guide pipe is sleeved on
On the outer peripheral face of piston rod.
The beneficial effects of the invention are as follows:By the conveyor carrying to building scaffold position;By first set fitted tube with
Second set of fitted tube can cover the steel pipe loaded for building scaffold;Installation, hydraulic cylinder hydraulic cylinder are fixed by base
Control piston rod realizes that horizontal extension is adjusted;The control that moved back and forth to Mobile base, Mobile base can be facilitated by piston rod
Horizontal slidable adjustment is realized along the axis of guide, Mobile base is realized by the first movable pulley and the second movable pulley in the inner bottom part of base
Mobile regulation, so as to so that Mobile base the moving stability is better;The movement of Mobile base can facilitate to first set fitted tube with
Steel pipe between second set of fitted tube moves operation;First motor controls the first rotating cylinder real by the first drive shaft
Now rotate, the first rotating cylinder can be wound to the first retractable cable, and first set fitted tube is lifted so as to convenient
Motion control, the second motor control the second rotating cylinder to realize and rotated by the second drive shaft, and the second rotating cylinder can be with
Second retractable cable is wound, elevating movement control is carried out to second set of fitted tube so as to convenient, so as to steel pipe
Vertical lifting delivery is carried out, is conveniently used for building scaffold;Ride operation efficiency is carried out to steel pipe more to increase.
Brief description of the drawings
For ease of explanation, the present invention is described in detail by following specific embodiment and accompanying drawing.
Fig. 1 builds the structural representation with steel pipe market device for steel structure scaffold of the present invention.
Fig. 2 is the structural representation of first set fitted tube of the present invention.
Embodiment
The preferred embodiments of the present invention are described in detail below in conjunction with the accompanying drawings, so that advantages and features of the invention energy
It is easier to be readily appreciated by one skilled in the art, apparent is clearly defined so as to be made to protection scope of the present invention.
As shown in Figures 1 and 2, a kind of steel structure scaffold is built with steel pipe market device, including base 11, base 11 it is interior
Portion is cavity structure, and the top of base 11 is hatch frame;The inside of base 11 is provided with some axis of guides 12, and the axis of guide 12 is in water
Plain cloth is put;Mobile base 15 is provided with base 11, Mobile base 15 is sleeved on the outer peripheral face of the axis of guide 12;The bottom one of Mobile base 15
Side is provided with the first installation axle 18, and the both ends of the first installation axle 18 are equipped with the first movable pulley 19, the bottom opposite side of Mobile base 15
Provided with the second installation axle 20, the both ends of the second installation axle 20 are equipped with the second movable pulley 21, the second movable pulley 21 and the first movement
Wheel 19 is arranged on the inner bottom part of base 11;The top surface of base 11 is provided with hydraulic cylinder 23, and the front portion of hydraulic cylinder 23 is provided with piston rod
22, piston rod 22 is in horizontally disposed, and the end of piston rod 22 is connected with the sidepiece of Mobile base 15;Mobile base 15 is provided with first
The support frame 28 of support 27 and second, Mobile base 15 are provided with the first supporting table 29, and the top of the first supporting table 29 is provided with first and consolidated
Fixed board 30, the first fixed plate 30 are provided with the first motor 31, and the front portion of the first motor 31 is provided with the first drive shaft 32,
The outer peripheral face of first drive shaft 32 is set with the first rotating cylinder 33, and the first rotating cylinder 33 is arranged in the upper of the first support frame 27
Portion, the first rotating cylinder 33 are wound with the first retractable cable 34, and the lower end of the first retractable cable 34 is provided with first set fitted tube 35;Mobile base
15 are provided with the second supporting table 36, and the top of the second supporting table 36 is provided with the second fixed plate 37, and the second fixed plate 37 is provided with the
Two motors 38, the front portion of the second motor 38 are provided with the second drive shaft 39, and the outer peripheral face of the second drive shaft 39 is set with
Second rotating cylinder 40, the second rotating cylinder 40 are wound with the second retractable cable 41, and the lower end of the second retractable cable 41 is provided with second set
Fitted tube 42;Second set of fitted tube 42 is corresponding with first set fitted tube 35;The shape size phase of second set of fitted tube 42 and first set fitted tube 35
Together, first set fitted tube 35 includes lower half cylinder 47 and upper half cylinder 48, and suit is provided between lower half cylinder 47 and upper half cylinder 48
Groove 49;The both sides of upper half cylinder 48 are equipped with the first limited block 50, and the both sides of lower half cylinder 47 are equipped with the second limited block 51, the
Lock shaft 52 is provided between two limited blocks 51 and the first limited block 50, the upper end of lock shaft 52 is provided with the first lock nut 53, the first lock nut 53
The top of the first limited block 50 is arranged on, the bottom of lock shaft 52 is provided with the second lock nut 54, and it is spacing that the second lock nut 54 is arranged on second
The bottom of block 51;The inner top of upper half cylinder 48 is provided with magnetic adsorption plate 55, and magnetic adsorption plate 55 is arc shape, the top of magnetic adsorption plate 55 with
Extension spring 56 is provided between the inner top of upper half cylinder 48, buffer spring is provided between the both sides of magnetic adsorption plate 55 and upper half cylinder 48
57;Locating shaft 43 is provided between first rotating cylinder 33 and the second rotating cylinder 40, one end of locating shaft 43 is arranged on the first rotation
The axis center position of tumbler cylinder 33, the other end of locating shaft 43 are arranged on the axis center position of the second rotating cylinder 40;The axis of guide
The first fixed plate 13 is provided between 12 one end, the first fixed plate 13 is fixed on an outer fix of base 11, the axis of guide 12
The second fixed plate 14 is provided between the other end, the second fixed plate 14 is fixed on another outer fix of base 11;Mobile base 15
Inside is provided with the first moving tube 16 and the second moving tube 17, and the first moving tube 16 and the second moving tube 17 are sleeved on the axis of guide 12
On outer peripheral face;The top surface of base 11 is provided with Button Block 24, and Button Block 24 snaps onto the back of hydraulic cylinder 23;The top surface of base 11 is provided with branch
Support 25, the top of support frame 25 are provided with guide pipe 26, and guide pipe 26 is sleeved on the outer peripheral face of piston rod 22;First support frame
27 and second support frame 28 top between be provided with upper frame 44, upper frame 44 is provided with fixed pulley 45, and fixed pulley 45 is wound with slide fastener
46;The lower end of slide fastener 46 is arranged between second set of fitted tube 42 and first set fitted tube 35.
Steel structure scaffold of the present invention is built with steel pipe market device, by the conveyor carrying to building scaffold position;
The steel pipe loaded for building scaffold can be covered by first set fitted tube 35 and second set of fitted tube 42;By base 11 to hydraulic pressure
Installation is fixed in cylinder 23, and hydraulic cylinder 23 controls piston rod 22 to realize that horizontal extension is adjusted;By piston rod 22 can conveniently pair
Mobile base 15 moves back and forth control, and Mobile base 15 realizes horizontal slidable adjustment along the axis of guide 12, and Mobile base 15 passes through
One movable pulley 19 and the second movable pulley 21 realize mobile regulation in the inner bottom part of base 11, so as to so that Mobile base 15 moves surely
It is qualitative better;The movement of Mobile base 15 can facilitate to move to the steel pipe between first set fitted tube 35 and second set of fitted tube 42
Dynamic operation;First motor 31 controls the first rotating cylinder 33 to realize and rotated by the first drive shaft 32, the first rotating cylinder
33 can be wound to the first retractable cable 34, and elevating movement control is carried out to first set fitted tube 35 so as to facilitate, and second
Motor 38 controls the second rotating cylinder 40 to realize and rotated by the second drive shaft 39, and the second rotating cylinder 40 can be to second
Retractable cable 41 is wound, and elevating movement control is carried out to second set of fitted tube 42 so as to convenient, so as to enter to steel pipe
Row vertical lifting delivers, and is conveniently used for building scaffold;Ride operation efficiency is carried out to steel pipe more to increase.
Wherein, second set of fitted tube 42 is identical with the shape size of first set fitted tube 35, and first set fitted tube 35 includes lower half cylinder
Body 47 and upper half cylinder 48, set tankage 49 is provided between lower half cylinder 47 and upper half cylinder 48;The both sides of upper half cylinder 48 are all provided with
There is the first limited block 50, the both sides of lower half cylinder 47 are equipped with the second limited block 51, the second limited block 51 and the first limited block 50
Between be provided with lock shaft 52, the upper end of lock shaft 52 is provided with the first lock nut 53, and the first lock nut 53 is arranged on the top of the first limited block 50,
The bottom of lock shaft 52 is provided with the second lock nut 54, and the second lock nut 54 is arranged on the bottom of the second limited block 51;Upper half cylinder 48 it is interior
Top is provided with magnetic adsorption plate 55, and magnetic adsorption plate 55 is arc shape, is set between the top of magnetic adsorption plate 55 and the inner top of upper half cylinder 48
There is extension spring 56, buffer spring 57 is provided between the both sides of magnetic adsorption plate 55 and upper half cylinder 48;So can be to by lock shaft 52
The both sides of two sets of fitted tubes 42 and first set fitted tube 35 carry out firm interlocking, and magnetic can be carried out to the top of steel pipe by magnetic adsorption plate 55
Absorption installation, magnetic adsorption plate 55 realize installation of ceiling by buffer spring 57 and extension spring 56, and the top of steel pipe can be carried out more
Absorption securely is added to install, security greatly improves.
Wherein, locating shaft 43, one end peace of locating shaft 43 are provided between the first rotating cylinder 33 and the second rotating cylinder 40
Mounted in the axis center position of the first rotating cylinder 33, the other end of locating shaft 43 is arranged on the axis center position of the second rotating cylinder 40
Put;So by locating shaft 43 the first rotating cylinder 33 and the rotational stability of the second rotating cylinder 40 can be made better.
Wherein, the inside of Mobile base 15 is provided with the first moving tube 16 and the second moving tube 17, the first moving tube 16 and second
Moving tube 17 is sleeved on the outer peripheral face of the axis of guide 12;So the moving stability of Mobile base 15 can be made better.
Wherein, the top surface of base 11 is provided with support frame 25, and the top of support frame 25 is provided with guide pipe 26, and guide pipe 26 is set with
On the outer peripheral face of piston rod 22;So by guide pipe 26 the telescopic moving stability of piston rod 22 can be made better.
Wherein, upper frame 44 is provided between the top of the first support frame 27 and the second support frame 28, upper frame 44 is provided with fixed sliding
Wheel 45, fixed pulley 45 is wound with slide fastener 46;The lower end of slide fastener 46 is arranged between second set of fitted tube 42 and first set fitted tube 35;Institute
Can firmly be installed to upper frame 44 by the first support frame 27 and the second support frame 28, upper frame 44 is carried out to fixed pulley 45
Firmly installation, the lower end of slide fastener 46 can be pulled on the outer peripheral face of steel pipe by fixed pulley 45 to slide fastener 46, from
It and can greatly improve steel pipe security during lifting.
The foregoing is only a specific embodiment of the invention, but protection scope of the present invention is not limited thereto, any
The change or replacement expected without creative work, it should all be included within the scope of the present invention.Therefore, it is of the invention