CN107571188A - Combined electrical apparatus disintegration Special assisting tool - Google Patents
Combined electrical apparatus disintegration Special assisting tool Download PDFInfo
- Publication number
- CN107571188A CN107571188A CN201710850316.3A CN201710850316A CN107571188A CN 107571188 A CN107571188 A CN 107571188A CN 201710850316 A CN201710850316 A CN 201710850316A CN 107571188 A CN107571188 A CN 107571188A
- Authority
- CN
- China
- Prior art keywords
- train wheel
- wheel bridge
- push rod
- installation
- fixed plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
Combined electrical apparatus disintegration Special assisting tool, including train wheel bridge and train wheel bridge, train wheel bridge top is installed by push rod, quick high stable attaching/detaching apparatus is installed between push rod and train wheel bridge, the top installation separator tube of push rod, separator tube is the tubular shell of upper end closure, the upper end installation piston of push rod, it is poor using stability in conventional method operation to be solved in the present invention, security is low, the problem of inconvenient for operation, conventional method, which needs people to coordinate, to be completed, instrument of the present invention can easily realize one man operation, and operation is more stable, it is safer, improve the efficiency of combined electrical apparatus solution body running.The upper ejector pin and lower push rod of the present invention combines, and improves the promotion scope of hydraulic press, so as to realize the spacing operation of expansion bus bar canister.
Description
Technical field
The present invention relates to a kind of aid, specifically a kind of combined electrical apparatus disintegration Special assisting tool.
Background technology
During combined electrical apparatus disintegrates at present, expansion bus bar canister spacing is the combination using jack and waddy, passes through wood
Rod is by the pressure transmission of jack to bus bar canister, and both are without being fixedly connected, if waddy can not be aligned in one with jack
Not contacted on straight line or with bus bar canister in center, waddy easily departs from jack, operates and is inconvenient, and to people
Body and equipment have very big danger.
The content of the invention
It is an object of the invention to provide a kind of combined electrical apparatus disintegration Special assisting tool, above mentioned problem can solve the problem that.
The present invention to achieve the above object, is achieved through the following technical solutions:A kind of special backman of combined electrical apparatus disintegration
Tool, including train wheel bridge and train wheel bridge, train wheel bridge top installation push rod, quick high stable dismounting dress is installed between push rod and train wheel bridge
Put, the top of push rod installation separator tube, separator tube is the tubular shell of upper end closure, the upper end installation piston of push rod, piston with
The inwall of separator tube coordinates, installation spring in separator tube, and lower end and the piston of spring coordinate, and are installed on the outside of the sealing end of separator tube
The first arc is installed in upper ejector pin, the upper end of upper ejector pin, installs hydraulic press between train wheel bridge and train wheel bridge, in the regulation of oil pressure function
Gap between clamping plate and train wheel bridge, the bottom installation lower push rod of lower plate, the second arc is installed in the lower end of lower push rod.It is described
Train wheel bridge(18)And train wheel bridge(18)Material be doping formula High-strength steel, the material of the doping formula High-strength steel
(weight) component is by mass percentage:
The .041-0 .043% of carbon 0;
The .3-0 .4% of chromium 0;
The .1-0 .2% of calcium 0;
0 .05-0 .06% of silver;
The .02-0 .03% of magnesium 0;
Lead tungstate 0.57-0.58%;
Surplus is iron.
In order to further realize the purpose of the present invention, following technical scheme can also be used:The quick high stable dismounting
Device includes fixed plate and shank, and fixed plate is arranged on push rod, and shank is arranged on train wheel bridge, and fixed plate is in inverted
U-board structure, fixed plate are enclosed on the upper end of shank, and fixing hole is opened up on shank, and the bottom side of fixed plate opens up open-work,
The opposite side of fixed plate opens up blind hole, and fix bar is installed in open-work, and fix bar can be slided in open-work, and fix bar can be passed through and fixed
Hole, one end of fix bar can coordinate with blind hole grafting, and the outside installation connecting tube of fixed plate, connecting tube is located at open-work sidepiece, Gu
The other end installation bearing of fixed pole, inner ring and the fix bar of bearing coordinate, and the outer ring installation fixing pipe of bearing, fixing pipe is one end
The tubular shell of sealing, the sealing end and bearing fit of fixing pipe, the inner side of fixing pipe set internal thread, set on the outside of connecting tube
External screw thread is put, connecting tube is coordinated with fixing pipe by screw thread.The first strong magnet of installation in the blind hole, the end installation of fix bar
Second strong magnet, the second strong magnet can attract to coordinate with the first strong magnet.
The advantage of the invention is that:The train wheel bridge of the present invention and the material of train wheel bridge are doping formula High-strength steel, phase
Compared with common iron and steel material quality, improvement well that yield strength obtains, we through overtesting find carbon, chromium, calcium, silver, magnesium and
In the case of iron content identical, it is doped into and the intensity of formula High-strength steel is adulterated after lead tungstate can be improved, particularly wolframic acid
When lead content reaches 0.57-0.59%, the yield strength of doping formula High-strength steel obtains rising to for certain numerical value, reaches 248-
249Mpa.The quick high stable attaching/detaching apparatus includes fixed plate and shank, and fixed plate is arranged on push rod, shank installation
On train wheel bridge, fixed plate is in inverted U-board structure, and fixed plate is enclosed on the upper end of shank, fixing hole is opened up on shank,
The bottom side of fixed plate opens up open-work, and the opposite side of fixed plate opens up blind hole, installs fix bar in open-work, fix bar can be saturating
Slided in hole, fix bar can pass through fixing hole, and one end of fix bar can coordinate with blind hole grafting, the outside installation connection of fixed plate
Pipe, connecting tube are located at open-work sidepiece, and the other end installation bearing of fix bar, inner ring and the fix bar of bearing coordinate, outside bearing
Circle installation fixing pipe, fixing pipe be an end closure tubular shell, the sealing end and bearing fit of fixing pipe, the inner side of fixing pipe
Internal thread is set, and the outside of connecting tube sets external screw thread, and connecting tube is coordinated with fixing pipe by screw thread.Installation the in the blind hole
The second strong magnet is installed in one strong magnet, the end of fix bar, and the second strong magnet can attract to coordinate with the first strong magnet.
Solve the problems, such as using stability in conventional method operation is poor, security is low, inconvenient for operation, pass in the present invention
System method needs-people, which coordinates, to complete, and instrument of the present invention can easily realize one man operation, and operate and more stablize,
It is safer, improve the efficiency of combined electrical apparatus solution body running.The upper ejector pin and lower push rod of the present invention combines, and makes pushing away for hydraulic press
Dynamic scope improves, so as to realize the spacing operation of expansion bus bar canister.The spring of the present invention can operate one to the top pressure of upper ejector pin
Buffering, so that bus bar canister is expanded in uniform force under can acting on, bus bar canister is avoided the damage of fractureing property occur.The work of the present invention
Plug can make push rod more stable, and the first arc and the second arc of the invention can be bonded the structure of bus bar canister, avoid
Slipped in process of expansion with bus bar canister.The present invention also has cheap and easy to use excellent of compact, manufacturing cost simple for structure
Point.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;Fig. 2 is Fig. 1 I mplifying structure schematic diagram.
Embodiment
Combined electrical apparatus disintegration Special assisting tool, as depicted in figs. 1 and 2, including train wheel bridge 18 and train wheel bridge 18, train wheel bridge
Push rod 17 is installed on 18 tops, and quick high stable attaching/detaching apparatus, the top installation of push rod 17 are installed between push rod 17 and train wheel bridge 18
Separator tube 3, separator tube 3 are the tubular shell of upper end closure, and piston 5 is installed in the upper end of push rod 17, and piston 5 is interior with separator tube 3
Wall coordinates, and installation spring 4, lower end and the piston 5 of spring 4 coordinate in separator tube 3, and top is installed on the outside of the sealing end of separator tube 3
Bar 2, the upper end of upper ejector pin 2 install the first arc 1, hydraulic press 19, hydraulic press 19 are installed between train wheel bridge 18 and train wheel bridge 18
The gap between train wheel bridge 18 and train wheel bridge 18, the bottom installation lower push rod 22 of lower plate 21, the lower end of lower push rod 22 can be adjusted
Second arc 23 is installed.Solved in the present invention using stability in conventional method operation is poor, security is low, inconvenient for operation
The problem of, conventional method, which needs 2-3 people to coordinate, to be completed, and instrument of the present invention can easily realize one man operation, and grasp
Work is more stable, safer, improves the efficiency of combined electrical apparatus solution body running.The upper ejector pin 2 and the knot of lower push rod 22 of the present invention
Close, improve the promotion scope of hydraulic press 19, so as to realize the spacing operation of expansion bus bar canister.The spring 4 of the present invention can be to upper
The top pressure of push rod 2 operates a buffering, so that bus bar canister is expanded in uniform force under can acting on, avoids bus bar canister from rolling over
Disconnected property damage.The piston 5 of the present invention can make push rod 17 more stable, the first arc 1 and the second arc 23 of the invention
The structure of bus bar canister can be bonded, avoids slipping with bus bar canister in process of expansion.The material of the train wheel bridge 18 and train wheel bridge 18
Matter is doping formula High-strength steel, and material (weight) component of the doping formula High-strength steel is by mass percentage:
The .041-0 .043% of carbon 0;
The .3-0 .4% of chromium 0;
The .1-0 .2% of calcium 0;
0 .05-0 .06% of silver;
The .02-0 .03% of magnesium 0;
Lead tungstate 0.57-0.58%;
Surplus is iron.
The quick high stable attaching/detaching apparatus includes fixed plate 6 and shank 20, and fixed plate 6 is arranged on push rod 17, is inserted
Extension bar 20 is arranged on train wheel bridge 18, and fixed plate 6 is in inverted U-board structure, and fixed plate 6 is enclosed on the upper end of shank 20, is inserted
Fixing hole 14 is opened up on extension bar 20, the bottom side of fixed plate 6 opens up open-work 15, and the opposite side of fixed plate 6 opens up blind hole 16, thoroughly
Installation fix bar 13 in hole 15, fix bar 13 can be slided in open-work 15, and fix bar 13 can pass through fixing hole 14, fix bar 13
One end can coordinate with the grafting of blind hole 16, and the outside installation connecting tube 9 of fixed plate 6, connecting tube 9 is located at the sidepiece of open-work 15, fix bar
13 other end installation bearing 10, inner ring and the fix bar 13 of bearing 10 coordinate, the outer ring installation fixing pipe 8 of bearing 10, fixed
Pipe 8 is the tubular shell of an end closure, and sealing end and the bearing 10 of fixing pipe 8 coordinate, and the inner side of fixing pipe 8 sets internal thread,
The outside of connecting tube 9 sets external screw thread, and connecting tube 9 is coordinated with fixing pipe 8 by screw thread.The quick high stable dismounting dress of the present invention
The quick disassembly and installation of push rod 17 can be facilitated by putting, meanwhile, push rod 17 is firmly fixed on train wheel bridge 18.It is fixed
Bar 13 coordinates with the grafting of fixing hole 14 to be connected compared to traditional bolt and nut, can substantially increase quick high stable dismounting dress
The fixed speed with train wheel bridge 18 is put, meanwhile, connecting tube 9 can make fixing pipe 8 and connecting tube 9 by rotation after the grafting of fix bar 13
Threaded connection, it both ensure that the fixation and can of push rod 17 enough shortened the length of screw thread cooperation, so as to substantially increase installation effectiveness.
The bearing 10 of the present invention can facilitate the rotation and can of fixing pipe 8 to make fix bar 13 keep connecting with fixing pipe 8.The present invention's consolidates
One end of fixed pole 13 can coordinate the local pressure that can mitigate fix bar 13 with the grafting of blind hole 16, avoid fix bar 13 from damaging.
The second strong magnet 12, the last the second magnetic are installed in the first strong magnet 11 of installation in the blind hole 16, the end of fix bar 13
Iron 12 can attract to coordinate with the first strong magnet 11.The second strong magnet 12 of the present invention can attract cooperation can be with the first strong magnet 11
Further improve the stability of fix bar 13.
Technical scheme is not restricted in the range of embodiment of the present invention.The not detailed description of the present invention
Technology contents be known technology.
Claims (3)
1. combined electrical apparatus disintegration Special assisting tool, it is characterised in that:Including train wheel bridge(18)And train wheel bridge(18), train wheel bridge
(18)Top is installed by push rod(17), push rod(17)With train wheel bridge(18)Between quick high stable attaching/detaching apparatus, push rod are installed(17)
Top installation separator tube(3), separator tube(3)For the tubular shell of upper end closure, push rod(17)Upper end installation piston(5),
Piston(5)With separator tube(3)Inwall coordinate, separator tube(3)Interior installation spring(4), spring(4)Lower end and piston(5)Match somebody with somebody
Close, separator tube(3)Sealing end on the outside of installation upper ejector pin(2), upper ejector pin(2)Upper end install the first arc(1), train wheel bridge
(18)And train wheel bridge(18)Between hydraulic press is installed(19), hydraulic press(19)Train wheel bridge can be adjusted(18)And train wheel bridge(18)Between
Gap, lower plate(21)Bottom installation lower push rod(22), lower push rod(22)Lower end install the second arc(23),
The train wheel bridge(18)And train wheel bridge(18)Material be doping formula High-strength steel, the doping formula High-strength steel
Material (weight) component be by mass percentage:
The .041-0 .043% of carbon 0;
The .3-0 .4% of chromium 0;
The .1-0 .2% of calcium 0;
0 .05-0 .06% of silver;
The .02-0 .03% of magnesium 0;
Lead tungstate 0.57-0.58%;
Surplus is iron.
2. combined electrical apparatus disintegration Special assisting tool according to claim 1, it is characterised in that:The quick high stable is torn open
Assembling device includes fixed plate(6)And shank(20), fixed plate(6)Installed in push rod(17)On, shank(20)Installed in upper
Clamping plate(18)On, fixed plate(6)In inverted U-board structure, fixed plate(6)It is enclosed on shank(20)Upper end, shank
(20)On open up fixing hole(14), fixed plate(6)Bottom side open up open-work(15), fixed plate(6)Opposite side open up it is blind
Hole(16), open-work(15)Interior installation fix bar(13), fix bar(13)Can be in open-work(15)Interior slip, fix bar(13)It can pass through
Fixing hole(14), fix bar(13)One end can and blind hole(16)Grafting coordinates, fixed plate(6)Outside installation connecting tube(9),
Connecting tube(9)Positioned at open-work(15)Sidepiece, fix bar(13)The other end installation bearing(10), bearing(10)Inner ring and fixation
Bar(13)Coordinate, bearing(10)Outer ring installation fixing pipe(8), fixing pipe(8)For the tubular shell of an end closure, fixing pipe
(8)Sealing end and bearing(10)Coordinate, fixing pipe(8)Inner side set internal thread, connecting tube(9)Outside outer spiral shell is set
Line, connecting tube(9)With fixing pipe(8)Coordinated by screw thread.
3. combined electrical apparatus disintegration Special assisting tool according to claim 2, it is characterised in that:The blind hole(16)Interior peace
Fill the first strong magnet(11), fix bar(13)End install the second strong magnet(12), the second strong magnet(12)Can be with the last the first
Magnet(11)Attract to coordinate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710850316.3A CN107571188A (en) | 2017-09-14 | 2017-09-14 | Combined electrical apparatus disintegration Special assisting tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710850316.3A CN107571188A (en) | 2017-09-14 | 2017-09-14 | Combined electrical apparatus disintegration Special assisting tool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107571188A true CN107571188A (en) | 2018-01-12 |
Family
ID=61033935
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710850316.3A Pending CN107571188A (en) | 2017-09-14 | 2017-09-14 | Combined electrical apparatus disintegration Special assisting tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107571188A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110153352A (en) * | 2019-06-19 | 2019-08-23 | 江苏太平洋齿轮传动有限公司 | A kind of automatic forging material cup clamping and positioning device |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2651166A1 (en) * | 1989-08-25 | 1991-03-01 | Alsthom Gec | Device for extracting pins |
CN2202018Y (en) * | 1994-06-18 | 1995-06-28 | 深圳市石化业成化工电子有限公司 | Disattaching device for electric connector contacts |
CN1540026A (en) * | 2003-04-25 | 2004-10-27 | 住友金属工业株式会社 | Austenitic stainless steels |
CN101927472A (en) * | 2010-09-01 | 2010-12-29 | 青岛港(集团)有限公司 | Multifunctional disassembling tool for equipment maintenance |
CN103952638A (en) * | 2014-04-04 | 2014-07-30 | 日照钢铁控股集团有限公司 | Pipeline steel having excellent low-temperature toughness and manufacturing process |
CN206416110U (en) * | 2016-12-30 | 2017-08-18 | 国家电网公司 | Combined electrical apparatus disintegration Special assisting tool |
-
2017
- 2017-09-14 CN CN201710850316.3A patent/CN107571188A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2651166A1 (en) * | 1989-08-25 | 1991-03-01 | Alsthom Gec | Device for extracting pins |
CN2202018Y (en) * | 1994-06-18 | 1995-06-28 | 深圳市石化业成化工电子有限公司 | Disattaching device for electric connector contacts |
CN1540026A (en) * | 2003-04-25 | 2004-10-27 | 住友金属工业株式会社 | Austenitic stainless steels |
CN101927472A (en) * | 2010-09-01 | 2010-12-29 | 青岛港(集团)有限公司 | Multifunctional disassembling tool for equipment maintenance |
CN103952638A (en) * | 2014-04-04 | 2014-07-30 | 日照钢铁控股集团有限公司 | Pipeline steel having excellent low-temperature toughness and manufacturing process |
CN206416110U (en) * | 2016-12-30 | 2017-08-18 | 国家电网公司 | Combined electrical apparatus disintegration Special assisting tool |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110153352A (en) * | 2019-06-19 | 2019-08-23 | 江苏太平洋齿轮传动有限公司 | A kind of automatic forging material cup clamping and positioning device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107639584A (en) | Combined electrical apparatus disintegration Special assisting tool | |
CN107571188A (en) | Combined electrical apparatus disintegration Special assisting tool | |
CN206416110U (en) | Combined electrical apparatus disintegration Special assisting tool | |
CN206123541U (en) | Impeller and shaft coupling dismouting machines | |
CN208138636U (en) | Spring steel ball-type stainless steel pipes connection structure | |
CN103216691A (en) | Connecting method of polyethylene composite tubes of steel wire gauze framework | |
CN206807232U (en) | A kind of frock for high pressure rotor iron core laminated hot jacket | |
CN201671610U (en) | Thermal production well sleeve heat stress compensator | |
CN201934444U (en) | Pipe connector with locking knob | |
CN205950554U (en) | Corrugated pipe clamp | |
CN205929428U (en) | PE pipeline tip school circle device | |
CN202655381U (en) | Collapse prevention device of steel coil trolley | |
CN210774442U (en) | Pressure gauge device for metering detection | |
CN104300436A (en) | Auxiliary pull ring manufactured from power stay wire and method for manufacturing stay wire | |
CN107834725A (en) | The mounting structure and its installation method of silicon steel sheet on a kind of magnetic suspension rotor | |
CN201525710U (en) | Standard section joint of tower crane | |
CN207093976U (en) | A kind of pipeline connecting device being easily installed with dismounting | |
CN207518241U (en) | A kind of aluminum or aluminum alloy conducting wire strain clamp | |
CN202302421U (en) | Pipe joint locking assembly | |
CN108091471A (en) | Leg clamping device | |
CN204103365U (en) | Line of power makes auxiliary draw ring | |
CN205656077U (en) | Intraductal sealed pressure testing frock | |
CN206561628U (en) | The bindiny mechanism of connecting rod and ball screw rod with guide function | |
CN205428685U (en) | Dry -type transformer high -pressure coil casting mold | |
CN206206350U (en) | A kind of high-strength one-way bolt auxiliary connection of torque-shear type self-locking |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180112 |
|
RJ01 | Rejection of invention patent application after publication |