CN107571188A - Combined electrical apparatus disintegration Special assisting tool - Google Patents

Combined electrical apparatus disintegration Special assisting tool Download PDF

Info

Publication number
CN107571188A
CN107571188A CN201710850316.3A CN201710850316A CN107571188A CN 107571188 A CN107571188 A CN 107571188A CN 201710850316 A CN201710850316 A CN 201710850316A CN 107571188 A CN107571188 A CN 107571188A
Authority
CN
China
Prior art keywords
train wheel
wheel bridge
push rod
installation
fixed plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710850316.3A
Other languages
Chinese (zh)
Inventor
张凯
张伟
孙兆国
李海东
高栋
赵航
周学涛
王文琪
褚慧石
董景强
赵利富
刘冰
张丽娟
张雷
褚云健
郑鲁星
刘涛
高国福
李祥伟
董正亮
林忠军
孔君
李伟
卢伟
高锐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Maintenance Branch of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Maintenance Branch of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Maintenance Branch of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710850316.3A priority Critical patent/CN107571188A/en
Publication of CN107571188A publication Critical patent/CN107571188A/en
Pending legal-status Critical Current

Links

Abstract

Combined electrical apparatus disintegration Special assisting tool, including train wheel bridge and train wheel bridge, train wheel bridge top is installed by push rod, quick high stable attaching/detaching apparatus is installed between push rod and train wheel bridge, the top installation separator tube of push rod, separator tube is the tubular shell of upper end closure, the upper end installation piston of push rod, it is poor using stability in conventional method operation to be solved in the present invention, security is low, the problem of inconvenient for operation, conventional method, which needs people to coordinate, to be completed, instrument of the present invention can easily realize one man operation, and operation is more stable, it is safer, improve the efficiency of combined electrical apparatus solution body running.The upper ejector pin and lower push rod of the present invention combines, and improves the promotion scope of hydraulic press, so as to realize the spacing operation of expansion bus bar canister.

Description

Combined electrical apparatus disintegration Special assisting tool
Technical field
The present invention relates to a kind of aid, specifically a kind of combined electrical apparatus disintegration Special assisting tool.
Background technology
During combined electrical apparatus disintegrates at present, expansion bus bar canister spacing is the combination using jack and waddy, passes through wood Rod is by the pressure transmission of jack to bus bar canister, and both are without being fixedly connected, if waddy can not be aligned in one with jack Not contacted on straight line or with bus bar canister in center, waddy easily departs from jack, operates and is inconvenient, and to people Body and equipment have very big danger.
The content of the invention
It is an object of the invention to provide a kind of combined electrical apparatus disintegration Special assisting tool, above mentioned problem can solve the problem that.
The present invention to achieve the above object, is achieved through the following technical solutions:A kind of special backman of combined electrical apparatus disintegration Tool, including train wheel bridge and train wheel bridge, train wheel bridge top installation push rod, quick high stable dismounting dress is installed between push rod and train wheel bridge Put, the top of push rod installation separator tube, separator tube is the tubular shell of upper end closure, the upper end installation piston of push rod, piston with The inwall of separator tube coordinates, installation spring in separator tube, and lower end and the piston of spring coordinate, and are installed on the outside of the sealing end of separator tube The first arc is installed in upper ejector pin, the upper end of upper ejector pin, installs hydraulic press between train wheel bridge and train wheel bridge, in the regulation of oil pressure function Gap between clamping plate and train wheel bridge, the bottom installation lower push rod of lower plate, the second arc is installed in the lower end of lower push rod.It is described Train wheel bridge(18)And train wheel bridge(18)Material be doping formula High-strength steel, the material of the doping formula High-strength steel (weight) component is by mass percentage:
The .041-0 .043% of carbon 0;
The .3-0 .4% of chromium 0;
The .1-0 .2% of calcium 0;
0 .05-0 .06% of silver;
The .02-0 .03% of magnesium 0;
Lead tungstate 0.57-0.58%;
Surplus is iron.
In order to further realize the purpose of the present invention, following technical scheme can also be used:The quick high stable dismounting Device includes fixed plate and shank, and fixed plate is arranged on push rod, and shank is arranged on train wheel bridge, and fixed plate is in inverted U-board structure, fixed plate are enclosed on the upper end of shank, and fixing hole is opened up on shank, and the bottom side of fixed plate opens up open-work, The opposite side of fixed plate opens up blind hole, and fix bar is installed in open-work, and fix bar can be slided in open-work, and fix bar can be passed through and fixed Hole, one end of fix bar can coordinate with blind hole grafting, and the outside installation connecting tube of fixed plate, connecting tube is located at open-work sidepiece, Gu The other end installation bearing of fixed pole, inner ring and the fix bar of bearing coordinate, and the outer ring installation fixing pipe of bearing, fixing pipe is one end The tubular shell of sealing, the sealing end and bearing fit of fixing pipe, the inner side of fixing pipe set internal thread, set on the outside of connecting tube External screw thread is put, connecting tube is coordinated with fixing pipe by screw thread.The first strong magnet of installation in the blind hole, the end installation of fix bar Second strong magnet, the second strong magnet can attract to coordinate with the first strong magnet.
The advantage of the invention is that:The train wheel bridge of the present invention and the material of train wheel bridge are doping formula High-strength steel, phase Compared with common iron and steel material quality, improvement well that yield strength obtains, we through overtesting find carbon, chromium, calcium, silver, magnesium and In the case of iron content identical, it is doped into and the intensity of formula High-strength steel is adulterated after lead tungstate can be improved, particularly wolframic acid When lead content reaches 0.57-0.59%, the yield strength of doping formula High-strength steel obtains rising to for certain numerical value, reaches 248- 249Mpa.The quick high stable attaching/detaching apparatus includes fixed plate and shank, and fixed plate is arranged on push rod, shank installation On train wheel bridge, fixed plate is in inverted U-board structure, and fixed plate is enclosed on the upper end of shank, fixing hole is opened up on shank, The bottom side of fixed plate opens up open-work, and the opposite side of fixed plate opens up blind hole, installs fix bar in open-work, fix bar can be saturating Slided in hole, fix bar can pass through fixing hole, and one end of fix bar can coordinate with blind hole grafting, the outside installation connection of fixed plate Pipe, connecting tube are located at open-work sidepiece, and the other end installation bearing of fix bar, inner ring and the fix bar of bearing coordinate, outside bearing Circle installation fixing pipe, fixing pipe be an end closure tubular shell, the sealing end and bearing fit of fixing pipe, the inner side of fixing pipe Internal thread is set, and the outside of connecting tube sets external screw thread, and connecting tube is coordinated with fixing pipe by screw thread.Installation the in the blind hole The second strong magnet is installed in one strong magnet, the end of fix bar, and the second strong magnet can attract to coordinate with the first strong magnet.
Solve the problems, such as using stability in conventional method operation is poor, security is low, inconvenient for operation, pass in the present invention System method needs-people, which coordinates, to complete, and instrument of the present invention can easily realize one man operation, and operate and more stablize, It is safer, improve the efficiency of combined electrical apparatus solution body running.The upper ejector pin and lower push rod of the present invention combines, and makes pushing away for hydraulic press Dynamic scope improves, so as to realize the spacing operation of expansion bus bar canister.The spring of the present invention can operate one to the top pressure of upper ejector pin Buffering, so that bus bar canister is expanded in uniform force under can acting on, bus bar canister is avoided the damage of fractureing property occur.The work of the present invention Plug can make push rod more stable, and the first arc and the second arc of the invention can be bonded the structure of bus bar canister, avoid Slipped in process of expansion with bus bar canister.The present invention also has cheap and easy to use excellent of compact, manufacturing cost simple for structure Point.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;Fig. 2 is Fig. 1 I mplifying structure schematic diagram.
Embodiment
Combined electrical apparatus disintegration Special assisting tool, as depicted in figs. 1 and 2, including train wheel bridge 18 and train wheel bridge 18, train wheel bridge Push rod 17 is installed on 18 tops, and quick high stable attaching/detaching apparatus, the top installation of push rod 17 are installed between push rod 17 and train wheel bridge 18 Separator tube 3, separator tube 3 are the tubular shell of upper end closure, and piston 5 is installed in the upper end of push rod 17, and piston 5 is interior with separator tube 3 Wall coordinates, and installation spring 4, lower end and the piston 5 of spring 4 coordinate in separator tube 3, and top is installed on the outside of the sealing end of separator tube 3 Bar 2, the upper end of upper ejector pin 2 install the first arc 1, hydraulic press 19, hydraulic press 19 are installed between train wheel bridge 18 and train wheel bridge 18 The gap between train wheel bridge 18 and train wheel bridge 18, the bottom installation lower push rod 22 of lower plate 21, the lower end of lower push rod 22 can be adjusted Second arc 23 is installed.Solved in the present invention using stability in conventional method operation is poor, security is low, inconvenient for operation The problem of, conventional method, which needs 2-3 people to coordinate, to be completed, and instrument of the present invention can easily realize one man operation, and grasp Work is more stable, safer, improves the efficiency of combined electrical apparatus solution body running.The upper ejector pin 2 and the knot of lower push rod 22 of the present invention Close, improve the promotion scope of hydraulic press 19, so as to realize the spacing operation of expansion bus bar canister.The spring 4 of the present invention can be to upper The top pressure of push rod 2 operates a buffering, so that bus bar canister is expanded in uniform force under can acting on, avoids bus bar canister from rolling over Disconnected property damage.The piston 5 of the present invention can make push rod 17 more stable, the first arc 1 and the second arc 23 of the invention The structure of bus bar canister can be bonded, avoids slipping with bus bar canister in process of expansion.The material of the train wheel bridge 18 and train wheel bridge 18 Matter is doping formula High-strength steel, and material (weight) component of the doping formula High-strength steel is by mass percentage:
The .041-0 .043% of carbon 0;
The .3-0 .4% of chromium 0;
The .1-0 .2% of calcium 0;
0 .05-0 .06% of silver;
The .02-0 .03% of magnesium 0;
Lead tungstate 0.57-0.58%;
Surplus is iron.
The quick high stable attaching/detaching apparatus includes fixed plate 6 and shank 20, and fixed plate 6 is arranged on push rod 17, is inserted Extension bar 20 is arranged on train wheel bridge 18, and fixed plate 6 is in inverted U-board structure, and fixed plate 6 is enclosed on the upper end of shank 20, is inserted Fixing hole 14 is opened up on extension bar 20, the bottom side of fixed plate 6 opens up open-work 15, and the opposite side of fixed plate 6 opens up blind hole 16, thoroughly Installation fix bar 13 in hole 15, fix bar 13 can be slided in open-work 15, and fix bar 13 can pass through fixing hole 14, fix bar 13 One end can coordinate with the grafting of blind hole 16, and the outside installation connecting tube 9 of fixed plate 6, connecting tube 9 is located at the sidepiece of open-work 15, fix bar 13 other end installation bearing 10, inner ring and the fix bar 13 of bearing 10 coordinate, the outer ring installation fixing pipe 8 of bearing 10, fixed Pipe 8 is the tubular shell of an end closure, and sealing end and the bearing 10 of fixing pipe 8 coordinate, and the inner side of fixing pipe 8 sets internal thread, The outside of connecting tube 9 sets external screw thread, and connecting tube 9 is coordinated with fixing pipe 8 by screw thread.The quick high stable dismounting dress of the present invention The quick disassembly and installation of push rod 17 can be facilitated by putting, meanwhile, push rod 17 is firmly fixed on train wheel bridge 18.It is fixed Bar 13 coordinates with the grafting of fixing hole 14 to be connected compared to traditional bolt and nut, can substantially increase quick high stable dismounting dress The fixed speed with train wheel bridge 18 is put, meanwhile, connecting tube 9 can make fixing pipe 8 and connecting tube 9 by rotation after the grafting of fix bar 13 Threaded connection, it both ensure that the fixation and can of push rod 17 enough shortened the length of screw thread cooperation, so as to substantially increase installation effectiveness. The bearing 10 of the present invention can facilitate the rotation and can of fixing pipe 8 to make fix bar 13 keep connecting with fixing pipe 8.The present invention's consolidates One end of fixed pole 13 can coordinate the local pressure that can mitigate fix bar 13 with the grafting of blind hole 16, avoid fix bar 13 from damaging.
The second strong magnet 12, the last the second magnetic are installed in the first strong magnet 11 of installation in the blind hole 16, the end of fix bar 13 Iron 12 can attract to coordinate with the first strong magnet 11.The second strong magnet 12 of the present invention can attract cooperation can be with the first strong magnet 11 Further improve the stability of fix bar 13.
Technical scheme is not restricted in the range of embodiment of the present invention.The not detailed description of the present invention Technology contents be known technology.

Claims (3)

1. combined electrical apparatus disintegration Special assisting tool, it is characterised in that:Including train wheel bridge(18)And train wheel bridge(18), train wheel bridge (18)Top is installed by push rod(17), push rod(17)With train wheel bridge(18)Between quick high stable attaching/detaching apparatus, push rod are installed(17) Top installation separator tube(3), separator tube(3)For the tubular shell of upper end closure, push rod(17)Upper end installation piston(5), Piston(5)With separator tube(3)Inwall coordinate, separator tube(3)Interior installation spring(4), spring(4)Lower end and piston(5)Match somebody with somebody Close, separator tube(3)Sealing end on the outside of installation upper ejector pin(2), upper ejector pin(2)Upper end install the first arc(1), train wheel bridge (18)And train wheel bridge(18)Between hydraulic press is installed(19), hydraulic press(19)Train wheel bridge can be adjusted(18)And train wheel bridge(18)Between Gap, lower plate(21)Bottom installation lower push rod(22), lower push rod(22)Lower end install the second arc(23),
The train wheel bridge(18)And train wheel bridge(18)Material be doping formula High-strength steel, the doping formula High-strength steel Material (weight) component be by mass percentage:
The .041-0 .043% of carbon 0;
The .3-0 .4% of chromium 0;
The .1-0 .2% of calcium 0;
0 .05-0 .06% of silver;
The .02-0 .03% of magnesium 0;
Lead tungstate 0.57-0.58%;
Surplus is iron.
2. combined electrical apparatus disintegration Special assisting tool according to claim 1, it is characterised in that:The quick high stable is torn open Assembling device includes fixed plate(6)And shank(20), fixed plate(6)Installed in push rod(17)On, shank(20)Installed in upper Clamping plate(18)On, fixed plate(6)In inverted U-board structure, fixed plate(6)It is enclosed on shank(20)Upper end, shank (20)On open up fixing hole(14), fixed plate(6)Bottom side open up open-work(15), fixed plate(6)Opposite side open up it is blind Hole(16), open-work(15)Interior installation fix bar(13), fix bar(13)Can be in open-work(15)Interior slip, fix bar(13)It can pass through Fixing hole(14), fix bar(13)One end can and blind hole(16)Grafting coordinates, fixed plate(6)Outside installation connecting tube(9), Connecting tube(9)Positioned at open-work(15)Sidepiece, fix bar(13)The other end installation bearing(10), bearing(10)Inner ring and fixation Bar(13)Coordinate, bearing(10)Outer ring installation fixing pipe(8), fixing pipe(8)For the tubular shell of an end closure, fixing pipe (8)Sealing end and bearing(10)Coordinate, fixing pipe(8)Inner side set internal thread, connecting tube(9)Outside outer spiral shell is set Line, connecting tube(9)With fixing pipe(8)Coordinated by screw thread.
3. combined electrical apparatus disintegration Special assisting tool according to claim 2, it is characterised in that:The blind hole(16)Interior peace Fill the first strong magnet(11), fix bar(13)End install the second strong magnet(12), the second strong magnet(12)Can be with the last the first Magnet(11)Attract to coordinate.
CN201710850316.3A 2017-09-14 2017-09-14 Combined electrical apparatus disintegration Special assisting tool Pending CN107571188A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710850316.3A CN107571188A (en) 2017-09-14 2017-09-14 Combined electrical apparatus disintegration Special assisting tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710850316.3A CN107571188A (en) 2017-09-14 2017-09-14 Combined electrical apparatus disintegration Special assisting tool

Publications (1)

Publication Number Publication Date
CN107571188A true CN107571188A (en) 2018-01-12

Family

ID=61033935

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710850316.3A Pending CN107571188A (en) 2017-09-14 2017-09-14 Combined electrical apparatus disintegration Special assisting tool

Country Status (1)

Country Link
CN (1) CN107571188A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110153352A (en) * 2019-06-19 2019-08-23 江苏太平洋齿轮传动有限公司 A kind of automatic forging material cup clamping and positioning device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2651166A1 (en) * 1989-08-25 1991-03-01 Alsthom Gec Device for extracting pins
CN2202018Y (en) * 1994-06-18 1995-06-28 深圳市石化业成化工电子有限公司 Disattaching device for electric connector contacts
CN1540026A (en) * 2003-04-25 2004-10-27 住友金属工业株式会社 Austenitic stainless steels
CN101927472A (en) * 2010-09-01 2010-12-29 青岛港(集团)有限公司 Multifunctional disassembling tool for equipment maintenance
CN103952638A (en) * 2014-04-04 2014-07-30 日照钢铁控股集团有限公司 Pipeline steel having excellent low-temperature toughness and manufacturing process
CN206416110U (en) * 2016-12-30 2017-08-18 国家电网公司 Combined electrical apparatus disintegration Special assisting tool

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2651166A1 (en) * 1989-08-25 1991-03-01 Alsthom Gec Device for extracting pins
CN2202018Y (en) * 1994-06-18 1995-06-28 深圳市石化业成化工电子有限公司 Disattaching device for electric connector contacts
CN1540026A (en) * 2003-04-25 2004-10-27 住友金属工业株式会社 Austenitic stainless steels
CN101927472A (en) * 2010-09-01 2010-12-29 青岛港(集团)有限公司 Multifunctional disassembling tool for equipment maintenance
CN103952638A (en) * 2014-04-04 2014-07-30 日照钢铁控股集团有限公司 Pipeline steel having excellent low-temperature toughness and manufacturing process
CN206416110U (en) * 2016-12-30 2017-08-18 国家电网公司 Combined electrical apparatus disintegration Special assisting tool

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110153352A (en) * 2019-06-19 2019-08-23 江苏太平洋齿轮传动有限公司 A kind of automatic forging material cup clamping and positioning device

Similar Documents

Publication Publication Date Title
CN107639584A (en) Combined electrical apparatus disintegration Special assisting tool
CN107571188A (en) Combined electrical apparatus disintegration Special assisting tool
CN206416110U (en) Combined electrical apparatus disintegration Special assisting tool
CN206123541U (en) Impeller and shaft coupling dismouting machines
CN208138636U (en) Spring steel ball-type stainless steel pipes connection structure
CN103216691A (en) Connecting method of polyethylene composite tubes of steel wire gauze framework
CN206807232U (en) A kind of frock for high pressure rotor iron core laminated hot jacket
CN201671610U (en) Thermal production well sleeve heat stress compensator
CN201934444U (en) Pipe connector with locking knob
CN205950554U (en) Corrugated pipe clamp
CN205929428U (en) PE pipeline tip school circle device
CN202655381U (en) Collapse prevention device of steel coil trolley
CN210774442U (en) Pressure gauge device for metering detection
CN104300436A (en) Auxiliary pull ring manufactured from power stay wire and method for manufacturing stay wire
CN107834725A (en) The mounting structure and its installation method of silicon steel sheet on a kind of magnetic suspension rotor
CN201525710U (en) Standard section joint of tower crane
CN207093976U (en) A kind of pipeline connecting device being easily installed with dismounting
CN207518241U (en) A kind of aluminum or aluminum alloy conducting wire strain clamp
CN202302421U (en) Pipe joint locking assembly
CN108091471A (en) Leg clamping device
CN204103365U (en) Line of power makes auxiliary draw ring
CN205656077U (en) Intraductal sealed pressure testing frock
CN206561628U (en) The bindiny mechanism of connecting rod and ball screw rod with guide function
CN205428685U (en) Dry -type transformer high -pressure coil casting mold
CN206206350U (en) A kind of high-strength one-way bolt auxiliary connection of torque-shear type self-locking

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180112

RJ01 Rejection of invention patent application after publication