CN107567095B - Physical uplink control channel PUCCH resource allocation method and base station - Google Patents

Physical uplink control channel PUCCH resource allocation method and base station Download PDF

Info

Publication number
CN107567095B
CN107567095B CN201610505970.6A CN201610505970A CN107567095B CN 107567095 B CN107567095 B CN 107567095B CN 201610505970 A CN201610505970 A CN 201610505970A CN 107567095 B CN107567095 B CN 107567095B
Authority
CN
China
Prior art keywords
cell
pucch
csi
parameter
current
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610505970.6A
Other languages
Chinese (zh)
Other versions
CN107567095A (en
Inventor
王阿妮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201610505970.6A priority Critical patent/CN107567095B/en
Priority to PCT/CN2017/083557 priority patent/WO2018000940A1/en
Publication of CN107567095A publication Critical patent/CN107567095A/en
Application granted granted Critical
Publication of CN107567095B publication Critical patent/CN107567095B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/04Wireless resource allocation

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

A Physical Uplink Control Channel (PUCCH) resource allocation method and a base station are provided. The embodiment of the invention discloses a PUCCH resource allocation method; the method can comprise the following steps: collecting identification parameters of a current cell; and optimally configuring at least one of a cell level parameter of the PUCCH, an SR/CSI resource parameter in the PUCCH and a static ACK/NACK resource region in the PUCCH according to a preset optimization strategy based on the initial configuration parameter of the cell PUCCH and the identification parameter of the current cell. The embodiment of the invention also discloses a base station.

Description

Physical uplink control channel PUCCH resource allocation method and base station
Technical Field
The present invention relates to wireless communication technologies, and in particular, to a Physical Uplink Control CHannel (PUCCH) resource allocation method and a base station.
Background
In a Long Term Evolution (LTE) system, a PUCCH is mainly used to carry Uplink L1/L2 Control Information (UCI) to support Uplink and downlink data transmission. Specifically, the UCI may include Scheduling Request (SR), Hybrid Automatic Repeat Request (HARQ ACK/NACK) acknowledgement/Negative acknowledgement (CSI) and Channel State Information (CSI). The frequency domain resources occupied by the PUCCH may include frequency domain resources occupied by CSI, frequency domain resources occupied by SR, and frequency domain resources occupied by HARQ. The frequency domain resources occupied by the CSI and the SR can be obtained by calculation according to the user capacity of the cell and the periodic configuration of the CSI and the SR; in the frequency domain resources occupied by HARQ, a part of the frequency domain resources is configured semi-statically by the base station, and may be referred to as static HARQ resources, and a part of the frequency domain resources is determined by a minimum unit of a Physical Downlink Control Channel (PDCCH), that is, an index of a Control Channel Element (CCE), and may be referred to as dynamic HARQ.
Due to the particularity of the PUCCH, the Resource overhead of the PUCCH is usually large, and dynamic HARQ is used more in some scenarios, and may occupy 30 Resource Blocks (RBs) at maximum, that is, 3/10 of the total bandwidth, and in addition to the mirror symmetry characteristic of the PUCCH distribution and the randomness characteristic of the HARQ distribution caused by the PDCCH Resource search following the hash function, the PUCCH HARQ region bandwidth may be divided into fragments. Therefore, as the PUCCH is used, more fragments are generated, thereby reducing the resource utilization rate of the PUCCH.
Disclosure of Invention
In order to solve the above technical problems, embodiments of the present invention are expected to provide a PUCCH resource allocation method and a base station, which can improve the resource utilization rate of a PUCCH and improve the performance of uplink transmission.
The technical scheme of the invention is realized as follows:
in a first aspect, an embodiment of the present invention provides a method for allocating physical uplink control channel PUCCH resources, where the method includes:
collecting identification parameters of a current cell; wherein the identification parameters of the current cell include: the method comprises the following steps that the number of current connected users of a cell, the number of current activated users of the cell, the scene state of the cell, the current network configuration capacity of SR/CSI and the number of users performing services in a preset time period in the cell are determined;
and optimally configuring at least one of a cell level parameter of the PUCCH, an SR/CSI resource parameter in the PUCCH and a static ACK/NACK resource region in the PUCCH according to a preset optimization strategy based on the initial configuration parameter of the cell PUCCH and the identification parameter of the current cell.
In the foregoing solution, before optimally configuring at least one of a cell level parameter of a PUCCH, an SR/CSI resource parameter in the PUCCH, and a static ACK/NACK resource region in the PUCCH according to a preset optimization strategy based on an initial configuration parameter of a cell PUCCH and an identification parameter of a current cell, the method further includes:
and initially configuring the cell level parameters of the PUCCH and the SR/CSI resource parameters.
In the foregoing scheme, the initially configuring the cell level parameter of the PUCCH includes:
and initially configuring the nCS-AN parameter, the deltaPUCCH-Shift parameter and the starting position of the dynamic ACK/NACK resource region in the PUCCH.
In the foregoing scheme, the initially configuring the SR/CSI resource parameter includes:
and initially configuring the initial value of the number of users to be supported by the cell, the period to be supported by the SR/CSI and the number of frequency domain resources.
In the above aspect, the method further includes:
setting the number of users to be initially supported by a cell; the number of users initially required to be supported by the cell is the sum of the number of users supported by each period of the cell; the number of users supported in a single period is equal to the frequency domain resource, the time domain resource and the code domain resource; specifically, the frequency domain resource represents the number of RBs occupied by a single subframe, the time domain resource represents the number of uplink subframes in a single period, and the number of code domain resources represents the maximum number of multiplexed users on a single RB.
In the above scheme, the performing optimized configuration on the cell-level parameter of the PUCCH according to a preset optimization strategy based on the initial configuration parameter of the cell PUCCH and the identification parameter of the current cell includes:
when the number of the current cell connection users in the identification parameter of the current cell does not exceed a pre-configured first threshold, setting the nCS _ AN parameter to be a non-zero value;
and when the number of the current cell connection users in the identification parameter of the current cell is larger than a pre-configured first threshold, setting the nCS _ AN parameter to be zero.
In the above scheme, the performing optimized configuration on the cell-level parameter of the PUCCH according to a preset optimization strategy based on the initial configuration parameter of the cell PUCCH and the identification parameter of the current cell includes:
when the cell scene state is low speed, setting the deltaPUCCH-Shift parameter to 1;
and when the cell scene state is high speed, setting the deltaPUCCH-Shift parameter to be 2.
In the above scheme, the performing optimized configuration on SR/CSI resource parameters in the PUCCH according to a preset optimization strategy based on the initial configuration parameter of the cell PUCCH and the identification parameter of the current cell includes:
when a first difference value between the SR/CSI current network configuration capacity and the number of the current access users of the cell or a second difference value between the SR/CSI current network configuration capacity and the number of the users performing services in a preset time period in the cell is smaller than a preset first difference value threshold, increasing SR/CSI resource capacity;
when a first difference between the SR/CSI current network configuration capacity and the number of the current access users of the cell or a second difference between the SR/CSI current network configuration capacity and the number of the users performing services in a preset time period in the cell is larger than a preset second difference threshold, reducing SR/CSI resource capacity;
when a first difference value between the SR/CSI current network configuration capacity and the number of the current access users of the cell or a second difference value between the SR/CSI current network configuration capacity and the number of the users performing services in a preset time period in the cell is between a preset first difference threshold and a preset second difference threshold, keeping the current SR/CSI resources unchanged; wherein the first difference threshold is less than the second difference threshold.
In the above scheme, the increasing the SR/CSI resource capacity includes: and increasing frequency domain resources and/or increasing the SR/CSI period of the current network configuration of the cell.
In the above scheme, the reducing the SR/CSI resource capacity includes: and reducing the number of SR/CSI frequency domain resources and/or reducing the SR/CSI period.
In the foregoing solution, the performing optimized configuration on the static ACK/NACK resource region in the PUCCH according to a preset optimization strategy based on the initial configuration parameter of the cell PUCCH and the identification parameter of the current cell specifically includes:
when a cell has a resource needing to be configured with downlink semi-persistent scheduling (SPS) scheduling ACK/NACK feedback resources or a Carrier Aggregation (CA) Channel selects Channel Selection PUCCH Format1b, PUCCH code Channel resources are allocated as the downlink SPS scheduling ACK/NACK feedback resources or the CA Channel Selection PUCCH 1b resources at preset inter-code intervals from the code Channel resources corresponding to the lowest frequency in a dynamic ACK/NACK resource region in the PUCCH; the inter-code interval is determined by a configuration value of deltaPUCCH-Shift or is a preset fixed value;
and in the PDCCH resource allocation process, if the dynamic ACK/NACK resource in the corresponding current allocated PUCCH collides with the static ACK/NACK resource scheduled by the downlink SPS scheduling and/or CA auxiliary carrier scheduling of the current time high priority scheduling, searching a new PDCCH resource position.
In a second aspect, an embodiment of the present invention provides a base station, where the base station includes a collection module and an optimized configuration module; wherein the content of the first and second substances,
the collection module is used for collecting the identification parameters of the current cell; wherein the identification parameters of the current cell include: the method comprises the following steps that the number of current connected users of a cell, the number of current activated users of the cell, the scene state of the cell, the current network configuration capacity of SR/CSI and the number of users performing services in a preset time period in the cell are determined;
the optimization configuration module is configured to perform optimization configuration on at least one of a cell level parameter of the PUCCH, an SR/CSI resource parameter in the PUCCH, and a static ACK/NACK resource region in the PUCCH according to a preset optimization strategy based on an initial configuration parameter of the cell PUCCH and an identification parameter of the current cell.
In the above scheme, the base station further includes AN initial configuration module, configured to perform initial configuration on the nCS-AN parameter, the deltaPUCCH-Shift parameter, and a starting position of the dynamic ACK/NACK resource region in the PUCCH.
In the above scheme, the initial configuration module is configured to perform initial configuration on AN nCS-AN parameter, a deltaPUCCH-Shift parameter, and a starting position of a dynamic ACK/NACK resource region in a PUCCH.
In the foregoing solution, the initial configuration module is configured to perform initial configuration on an initial value of a number of users that the cell needs to support, a period that SR/CSI needs to support, and a number of frequency domain resources.
In the above scheme, the initial configuration module is further configured to set a number of users that need to be initially supported by a cell; the number of users to be supported initially in the cell is the sum of the number of users supported in each period of the cell; the number of users supported in a single period is equal to the frequency domain resource, the time domain resource and the code domain resource; specifically, the frequency domain resource represents the number of RBs occupied by a single subframe, the time domain resource represents the number of uplink subframes in a single period, and the number of code domain resources represents the maximum number of multiplexed users on a single RB.
In the foregoing solution, the optimized configuration module includes a PUCCH cell level parameter optimized configuration submodule, configured to:
when the number of the current cell connection users in the identification parameter of the current cell does not exceed a pre-configured first threshold, setting the nCS _ AN parameter to be a non-zero value;
and when the number of the current cell connection users in the identification parameter of the current cell is larger than a pre-configured first threshold, setting the nCS _ AN parameter to be zero.
In the foregoing solution, the optimized configuration module includes a PUCCH cell level parameter optimized configuration submodule, configured to:
when the cell scene state is low speed, setting the deltaPUCCH-Shift parameter to 1;
and when the cell scene state is high speed, setting the deltaPUCCH-Shift parameter to be 2.
In the foregoing solution, the optimized configuration module includes an SR/CSI resource parameter optimized configuration submodule, configured to:
when a first difference value between the SR/CSI current network configuration capacity and the number of the current access users of the cell or a second difference value between the SR/CSI current network configuration capacity and the number of the users performing services in a preset time period in the cell is smaller than a preset first difference value threshold, increasing SR/CSI resource capacity;
when a first difference between the SR/CSI current network configuration capacity and the number of the current access users of the cell or a second difference between the SR/CSI current network configuration capacity and the number of the users performing services in a preset time period in the cell is larger than a preset second difference threshold, reducing SR/CSI resource capacity;
when a first difference value between the SR/CSI current network configuration capacity and the number of the current access users of the cell or a second difference value between the SR/CSI current network configuration capacity and the number of the users performing services in a preset time period in the cell is between a preset first difference threshold and a preset second difference threshold, keeping the current SR/CSI resources unchanged; wherein the first difference threshold is less than the second difference threshold.
In the above scheme, the SR/CSI resource parameter optimization configuration sub-module is configured to increase frequency domain resources and/or increase SR/CSI cycles of cell existing network configuration.
In the above scheme, the SR/CSI resource parameter optimization configuration sub-module is configured to reduce the number of SR/CSI frequency domain resources and/or reduce the SR/CSI period.
In the foregoing solution, the optimization configuration module includes a static ACK/NACK resource region optimization configuration sub-module, configured to:
when a cell has a resource needing to be configured with downlink semi-persistent scheduling (SPS) scheduling ACK/NACK feedback resources or a Carrier Aggregation (CA) Channel selects Channel Selection PUCCH Format1b, PUCCH code Channel resources are allocated as the downlink SPS scheduling ACK/NACK feedback resources or the CA Channel Selection PUCCH 1b resources at preset inter-code intervals from the code Channel resources corresponding to the lowest frequency in a dynamic ACK/NACK resource region in the PUCCH; the inter-code interval is determined by a configuration value of deltaPUCCH-Shift or is a preset fixed value;
and in the PDCCH resource allocation process, if the dynamic ACK/NACK resource in the corresponding current allocated PUCCH collides with the static ACK/NACK resource scheduled by the downlink SPS scheduling and/or CA auxiliary carrier scheduling of the current time high priority scheduling, searching a new PDCCH resource position.
The embodiment of the invention provides a PUCCH resource allocation method and a base station, which can perform optimal configuration from multiple aspects of PUCCH, thereby solving the problem of high PUCCH overhead, improving the resource utilization rate of the PUCCH and improving the performance of uplink transmission.
Drawings
Fig. 1 is a flowchart illustrating a PUCCH resource allocation method according to an embodiment of the present invention;
fig. 2 is a schematic flowchart of performing optimal configuration on SR/CSI resource parameters in a PUCCH according to an embodiment of the present invention;
fig. 3 is a schematic structural diagram of a base station according to an embodiment of the present invention;
fig. 4 is a schematic structural diagram of another base station according to an embodiment of the present invention.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
Example one
Referring to fig. 1, it shows a PUCCH resource allocation method provided in an embodiment of the present invention, which may be applied to a base station side, and the method may include:
s101: collecting identification parameters of a current cell;
specifically, the identification parameters of the current cell may include, but are not limited to: the number of current connected users of the cell, the number of current activated users of the cell, the current scene state of the cell, the current network configuration capacity of the SR/CSI, the number of users performing services in a preset time period in the cell and other parameters. In a specific implementation process, the identification parameters may be obtained from a higher service layer of the base station.
S102: and optimally configuring at least one of a cell level parameter of the PUCCH, an SR/CSI resource parameter in the PUCCH and a static ACK/NACK resource region in the PUCCH according to a preset optimization strategy based on the initial configuration parameter of the cell PUCCH and the identification parameter of the current cell.
Through the scheme shown in fig. 1, optimal configuration can be performed from multiple aspects of the PUCCH, so that the problem of high PUCCH overhead is solved, the resource utilization rate of the PUCCH is improved, and the performance of uplink transmission is improved.
For example, for the initial configuration parameters of the cell PUCCH, the scheme shown in fig. 1 may further include, before step S102: and initially configuring the cell level parameters of the PUCCH and the SR/CSI resource parameters.
Optionally, the initial configuration of the cell level parameter of the PUCCH may include:
and initially configuring the starting position of the dynamic ACK/NACK resource region in nCS-AN, deltaPUCCH-Shift and PUCCH.
Note that nCS _ AN represents the number of code channels reserved for PUCCH Format1/1a/1b when PUCCH Format1/1a/1b and PUCCH Format2/2a/2b are mixed in one RB; when the parameter is configured to be 0, the cell does not support the mixing of the PUCCH Format1/1a/1b and the PUCCH Format2/2a/2b in one RB, otherwise, the cell supports the mixing of the PUCCH Format1/1a/1b and the PUCCH Format2/2a/2b in one RB. In this embodiment, the configuration may be initially 0.
It should be noted that deltaPUCCH-Shift represents the inter-code space of PUCCH Format1/1a/1b, and the parameter directly determines the number of users that the PUCCH Format1/1a/1b can support on one RB; the smaller the deltaPUCCH-Shif configuration is, the less resources of the dynamic PUCCH HARQ-ACK region are. In the present embodiment, 3 may be configured.
It should be further noted that the starting position of the dynamic ACK/NACK resource region in the PUCCH may be configured as "static ACK/NACK resource region next to PUCCH" in this embodiment "
Optionally, the initial configuration of the SR/CSI resource parameter may include:
and initially configuring the initial value of the number of users to be supported by the cell, the period to be supported by the SR/CSI and the number of frequency domain resources.
For the initial configuration of the cell level parameter of the PUCCH and the SR/CSI resource parameter, the number of users that need to be initially supported by the cell may also be set, which specifically includes:
the number of users to be supported initially in the cell is the sum of the number of users supported in each period of the cell; the number of users supported in a single period is equal to frequency domain resources multiplied by time domain resources multiplied by code domain resources; specifically, the frequency domain resource represents the number of RBs occupied by a single subframe, the time domain resource represents the number of uplink subframes in a single period, and the number of code domain resources represents the maximum number of multiplexed users on a single RB.
It can be understood that, after the initial configuration is performed by the above preferred scheme, a configuration basis can be provided for the optimized configuration in the subsequent step S102, and a basic PUCCH resource configuration at runtime is also provided.
For step S102, preferably, the optimally configuring the cell level parameters of the PUCCH includes:
when the number of the current cell connection users in the identification parameter of the current cell does not exceed a pre-configured first threshold, setting nCS _ AN as a non-zero value;
and when the number of the current cell connection users in the identification parameter of the current cell is larger than a pre-configured first threshold, setting nCS _ AN to be zero.
It can be understood that, when the number of connected users of a cell is small, PUCCH Format2/2a/2b and PUCCH Format1/1a/1b may be mixed on one RB, thereby reducing PUCCH overhead.
For step S102, preferably, the performing optimized configuration on the cell level parameter of the PUCCH may also include:
when the cell scene state is low speed, setting deltaPUCCH-Shift as 1;
and when the cell scene state is high speed, setting deltaPUCCH-Shift to 2.
It can be understood that the smaller the deltaPUCCH-Shif configuration, the less resources of the dynamic PUCCH HARQ-ACK region, that is, the range of PUCCH resource distribution is reduced. Under the condition that the TDD subframe ratio is 2, the fixed deltaPUCCH-Shift is 1, and compared with the deltaPUCCH-Shift being 3, the dynamic PUCCH HARQ-ACK area can be reduced by 20 RBs.
For step S102, preferably, performing optimal configuration on SR/CSI resource parameters in the PUCCH may include:
when a first difference value between the SR/CSI current network configuration capacity and the number of the current access users of the cell or a second difference value between the SR/CSI current network configuration capacity and the number of the users performing services in a preset time period in the cell is smaller than a preset first difference value threshold, increasing the SR/CSI resource capacity;
when a first difference value between the SR/CSI current network configuration capacity and the number of the current access users of the cell or a second difference value between the SR/CSI current network configuration capacity and the number of the users performing services in a preset time period in the cell is larger than a preset second difference value threshold, the SR/CSI resource capacity is reduced;
and when a first difference value between the SR/CSI current network configuration capacity and the current access user number or a second difference value between the SR/CSI current network configuration capacity and the user number performing services in a preset time period in the cell is between a preset first difference value threshold and a preset second difference value threshold, keeping the current SR/CSI resources unchanged.
It should be noted that, the setting of the first difference threshold and the second difference threshold needs to consider the number of access users of the base station in a certain time, and the first difference threshold is smaller than the second difference threshold.
In the implementation process of the above preferred embodiment, as shown in fig. 2, the method may include:
s201: comparing a first difference value between the SR/CSI current network configuration capacity and the number of the current access users of the cell or a second difference value between the SR/CSI current network configuration capacity and the number of the users performing services within a preset time period in the cell with a preset first difference threshold; when the first difference or the second difference is smaller than the first difference threshold, executing step S202; when the first difference or the second difference is greater than the first difference threshold, executing step S203;
s202: increasing the SR/CSI resource capacity;
s203: comparing the first difference or the second difference with a second difference threshold; when the first difference or the second difference is smaller than the second difference threshold, executing step S204; when the first difference or the second difference is greater than the first difference threshold, performing step S205;
s204: maintaining the existing SR/CSI resources unchanged;
s205: reduce the SR/CSI resource capacity.
Specifically, increasing SR/CSI resource capacity may include: and increasing frequency domain resources and/or increasing the SR/CSI period of the current network configuration of the cell.
In a specific implementation process, the added frequency domain resources may only support one SR/CSI cycle or support multiple SR/CSI cycles, and when multiple SR/CSI cycles are supported, the SR/CSI resources of a cell may be allocated by means of code division or time division during multiple cycles on the principle that the number of users of the cell and service requirements are met; and increasing the SR/CSI period configured by the current network of the cell, and increasing the period of the SR/CSI resource which is not allocated to the UE until the capacity requirement of the current network of the cell is met. If the SR/CSI period is not satisfied, more SR/CSI resources can be obtained by increasing the SR/CSI period of the reconfigured online user; the frequency domain resources are increased, the SR/CSI period configured by the current cell network is increased, frequency domain expansion can be performed firstly, the period is enlarged, or the period is lengthened firstly, and the frequency domain expansion is performed secondly.
Specifically, reducing the SR/CSI resource capacity may include: and reducing the number of SR/CSI frequency domain resources and/or reducing the SR/CSI period.
In the specific implementation process, the process of reducing the SR/CSI resource capacity is similar to the specific implementation process of increasing the SR/CSI resource capacity, and details are not repeated in this embodiment.
It can be understood that the number of the PUCCH CSI/SR resources is adaptively adjusted according to the number of users and the current SR/CSI network configuration capacity in the above manner, so that the PUCCH CSI/SR resources are fully utilized, and the overhead of the PUCCH resources is reduced when the number of users is reduced.
For step S102, preferably, the optimally configuring the static ACK/NACK resource region in the PUCCH may include:
when a cell has a resource which needs to be configured with downlink Semi-persistent Scheduling (SPS) to schedule ACK/NACK feedback resources or Carrier Aggregation (CA) Channel Selection (Channel Selection) PUCCH Format1b, allocating PUCCH code Channel resources as downlink SPS Scheduling ACK/NACK feedback resources or CA Channel Selection PUCCH Format1b resources at a preset inter-code interval from code Channel resources corresponding to the lowest frequency in a dynamic ACK/NACK resource region in the PUCCH; the inter-code interval is determined by a configuration value of deltaPUCCH-Shift or is a preset fixed value;
when the PDCCH resources are allocated, if the dynamic ACK/NACK resources in the corresponding currently allocated PUCCH collide with the static ACK/NACK resources scheduled by the downlink SPS scheduling and/or CA auxiliary carrier scheduling of the current time high priority, a new PDCCH resource position is searched, so that the dynamic ACK/NACK resources corresponding to the new PDCCH resource position are ensured to be unused.
It can be understood that, for the planning of the PUCCH static ACK/NACK resource region, according to the resource planning mode of SR, a fixed resource may be reserved in the PUCCH resource region for use by the static ACK/NACK resource region, but when there is no UE with corresponding attribute in the cell, uplink resource waste may be caused, and in order to reduce the resource waste, especially in TDD, a solution may be adopted in which the static ACK/NACK resource and the dynamic ACK/NACK resource occupy resources in a mixed manner.
The embodiment provides a PUCCH resource allocation method, which can perform optimal configuration from multiple aspects of a PUCCH, thereby solving the problem of high PUCCH overhead, improving the resource utilization rate of the PUCCH, and improving the performance of uplink transmission.
Example two
Based on the same technical concept of the foregoing embodiments, referring to fig. 3, a base station 30 provided in an embodiment of the present invention is shown, where the base station 30 includes a collection module 301 and an optimal configuration module 302; wherein the content of the first and second substances,
the collecting module 301 is configured to collect identification parameters of a current cell; wherein the identification parameters of the current cell include: the method comprises the following steps that the number of current connected users of a cell, the number of current activated users of the cell, the scene state of the cell, the current network configuration capacity of SR/CSI and the number of users performing services in a preset time period in the cell are determined;
the optimal configuration module 302 is configured to perform optimal configuration on at least one of a cell level parameter of the PUCCH, an SR/CSI resource parameter in the PUCCH, and a static ACK/NACK resource region in the PUCCH according to a preset optimization strategy based on an initial configuration parameter of the cell PUCCH and an identification parameter of the current cell.
In the above scheme, referring to fig. 4, the base station 30 further includes AN initial configuration module 303, configured to perform initial configuration on the nCS-AN parameter, the deltaPUCCH-Shift parameter, and the starting position of the dynamic ACK/NACK resource region in the PUCCH.
In the above scheme, the initial configuration module 303 is configured to perform initial configuration on AN nCS-AN parameter, a deltaPUCCH-Shift parameter, and a starting position of a dynamic ACK/NACK resource region in a PUCCH.
In the above scheme, the initial configuration module 303 is configured to perform initial configuration on an initial value of a number of users that the cell needs to support, a period that SR/CSI needs to support, and a number of frequency domain resources.
In the above scheme, the initial configuration module 303 is further configured to set a number of users that need to be initially supported by a cell; the number of users initially required to be supported by the cell is the sum of the number of users supported by each period of the cell; the number of users supported in a single period is equal to frequency domain resources multiplied by time domain resources multiplied by code domain resources; specifically, the frequency domain resource represents the number of RBs occupied by a single subframe, the time domain resource represents the number of uplink subframes in a single period, and the number of code domain resources represents the maximum number of multiplexed users on a single RB.
In the foregoing scheme, referring to fig. 4, the optimized configuration module 302 includes a PUCCH cell level parameter optimized configuration submodule 3021, configured to:
when the number of the current cell connection users in the identification parameter of the current cell does not exceed a pre-configured first threshold, setting the nCS _ AN parameter to be a non-zero value;
and when the number of the current cell connection users in the identification parameter of the current cell is larger than a pre-configured first threshold, setting the nCS _ AN parameter to be zero.
In the foregoing scheme, referring to fig. 4, the optimized configuration module 302 includes a PUCCH cell level parameter optimized configuration submodule 3021, configured to:
when the cell scene state is low speed, setting the deltaPUCCH-Shift parameter to 1;
and when the cell scene state is high speed, setting the deltaPUCCH-Shift parameter to be 2.
In the above scheme, referring to fig. 4, the optimized configuration module 302 includes an SR/CSI resource parameter optimized configuration sub-module 3022, configured to:
when a first difference value between the SR/CSI current network configuration capacity and the number of the current access users of the cell or a second difference value between the SR/CSI current network configuration capacity and the number of the users performing services in a preset time period in the cell is smaller than a preset first difference value threshold, increasing SR/CSI resource capacity;
when a first difference between the SR/CSI current network configuration capacity and the number of the current access users of the cell or a second difference between the SR/CSI current network configuration capacity and the number of the users performing services in a preset time period in the cell is larger than a preset second difference threshold, reducing SR/CSI resource capacity;
when a first difference value between the SR/CSI current network configuration capacity and the number of the current access users of the cell or a second difference value between the SR/CSI current network configuration capacity and the number of the users performing services in a preset time period in the cell is between a preset first difference threshold and a preset second difference threshold, keeping the current SR/CSI resources unchanged; wherein the first difference threshold is less than the second difference threshold.
In the above scheme, the SR/CSI resource parameter optimization configuration submodule 3022 is configured to increase frequency domain resources and/or increase an SR/CSI cycle of a cell current network configuration.
In the above scheme, the SR/CSI resource parameter optimization configuration sub-module 3022 is configured to reduce the number of SR/CSI frequency domain resources and/or reduce the SR/CSI period.
In the above scheme, referring to fig. 4, the optimization configuration module 302 includes a static ACK/NACK resource region optimization configuration sub-module 3023, configured to:
when a cell has a resource needing to be configured with downlink semi-persistent scheduling (SPS) scheduling ACK/NACK feedback resources or a Carrier Aggregation (CA) Channel selects Channel Selection PUCCH Format1b, PUCCH code Channel resources are allocated as the downlink SPS scheduling ACK/NACK feedback resources or the CA Channel Selection PUCCH Format1b resources at a preset inter-code interval from a code Channel resource corresponding to the lowest frequency in a dynamic ACK/NACK resource region in a PUCCH; the inter-code interval is determined by a configuration value of deltaPUCCH-Shift or is a preset fixed value;
and in the PDCCH resource allocation process, if the dynamic ACK/NACK resource in the corresponding current allocated PUCCH collides with the static ACK/NACK resource scheduled by the downlink SPS scheduling and/or CA auxiliary carrier scheduling of the current time high priority scheduling, searching a new PDCCH resource position.
The embodiment provides a base station 30, which can perform optimal configuration from multiple aspects of the PUCCH, thereby solving the problem of high PUCCH overhead, improving the resource utilization rate of the PUCCH, and improving the performance of uplink transmission.
As will be appreciated by one skilled in the art, embodiments of the present invention may be provided as a method, system, or computer program product. Accordingly, the present invention may take the form of a hardware embodiment, a software embodiment, or an embodiment combining software and hardware aspects. Furthermore, the present invention may take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, optical storage, and the like) having computer-usable program code embodied therein.
The present invention is described with reference to flowchart illustrations and/or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the invention. It will be understood that each flow and/or block of the flow diagrams and/or block diagrams, and combinations of flows and/or blocks in the flow diagrams and/or block diagrams, can be implemented by computer program instructions. These computer program instructions may be provided to a processor of a general purpose computer, special purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, create means for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing apparatus to function in a particular manner, such that the instructions stored in the computer-readable memory produce an article of manufacture including instruction means which implement the function specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be loaded onto a computer or other programmable data processing apparatus to cause a series of operational steps to be performed on the computer or other programmable apparatus to produce a computer implemented process such that the instructions which execute on the computer or other programmable apparatus provide steps for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the scope of the present invention.

Claims (20)

1. A Physical Uplink Control Channel (PUCCH) resource allocation method, the method comprising:
collecting identification parameters of a current cell; wherein the identification parameters of the current cell include: the method comprises the following steps that the number of current connected users of a cell, the number of current activated users of the cell, the scene state of the cell, the current network configuration capacity of SR/CSI and the number of users performing services in a preset time period in the cell are determined;
optimally configuring at least one of a cell level parameter of a PUCCH, an SR/CSI resource parameter in the PUCCH and a static ACK/NACK resource region in the PUCCH according to a preset optimization strategy based on an initial configuration parameter of the cell PUCCH and an identification parameter of a current cell;
the optimal configuration is performed on the static ACK/NACK resource region in the PUCCH according to a preset optimization strategy based on the initial configuration parameter of the cell PUCCH and the identification parameter of the current cell, and specifically includes:
when a cell has a resource which needs to be configured with downlink semi-persistent scheduling (SPS) scheduling ACK/NACK feedback resources or a Carrier Aggregation (CA) Channel selects Channel Selection PUCCH Format1b, PUCCH code Channel resources are allocated as downlink SPS scheduling ACK/NACK feedback resources or CA Channel Selection PUCCH Format1b resources at preset inter-code intervals from a code Channel resource corresponding to the lowest frequency in a dynamic ACK/NACK resource region in a PUCCH; the inter-code interval is determined by a configuration value of deltaPUCCH-Shift or is a preset fixed value;
and in the PDCCH resource allocation process, if the dynamic ACK/NACK resource in the corresponding current allocated PUCCH collides with the static ACK/NACK resource scheduled by the downlink SPS scheduling and/or CA auxiliary carrier scheduling of the current time high priority scheduling, searching a new PDCCH resource position.
2. The method of claim 1, wherein before optimally configuring at least one of a cell level parameter of a PUCCH, an SR/CSI resource parameter in the PUCCH, and a static ACK/NACK resource region in the PUCCH according to a preset optimization strategy based on an initial configuration parameter of a cell PUCCH and an identification parameter of a current cell, the method further comprises:
and initially configuring the cell level parameters of the PUCCH and the SR/CSI resource parameters.
3. The method of claim 2, wherein the initially configuring the cell level parameter of the PUCCH comprises:
and initially configuring the nCS _ AN parameter, the deltaPUCCH-Shift parameter and the starting position of the dynamic ACK/NACK resource region in the PUCCH.
4. The method of claim 2, wherein the initially configuring the SR/CSI resource parameters comprises:
and initially configuring the initial value of the number of users to be supported by the cell, the period to be supported by the SR/CSI and the number of frequency domain resources.
5. The method of claim 2, further comprising:
setting the number of users to be initially supported by a cell; the number of users initially required to be supported by the cell is the sum of the number of users supported by each period of the cell; the number of users supported in a single period is equal to frequency domain resources multiplied by time domain resources multiplied by code domain resources; specifically, the frequency domain resource represents the number of RBs occupied by a single subframe, the time domain resource represents the number of uplink subframes in a single period, and the number of code domain resources represents the maximum number of multiplexed users on a single RB.
6. The method according to claim 3, wherein the optimally configuring based on the initial configuration parameter of the cell PUCCH and the identification parameter of the current cell according to a preset optimization strategy for the cell-level parameter of the PUCCH comprises:
when the number of the current cell connection users in the identification parameter of the current cell does not exceed a pre-configured first threshold, setting the nCS _ AN parameter to be a non-zero value;
and when the number of the current cell connection users in the identification parameter of the current cell is larger than a pre-configured first threshold, setting the nCS _ AN parameter to be zero.
7. The method according to claim 3, wherein the optimally configuring based on the initial configuration parameter of the cell PUCCH and the identification parameter of the current cell according to a preset optimization strategy for the cell-level parameter of the PUCCH comprises:
when the cell scene state is low speed, setting the deltaPUCCH-Shift parameter to 1;
and when the cell scene state is high speed, setting the deltaPUCCH-Shift parameter to be 2.
8. The method according to claim 4, wherein the optimally configuring the SR/CSI resource parameters in the PUCCH according to a preset optimization strategy based on the initial configuration parameters of the cell PUCCH and the identification parameters of the current cell comprises:
when a first difference value between the SR/CSI current network configuration capacity and the number of the current access users of the cell or a second difference value between the SR/CSI current network configuration capacity and the number of the users performing services in a preset time period in the cell is smaller than a preset first difference value threshold, increasing SR/CSI resource capacity;
when a first difference between the SR/CSI current network configuration capacity and the number of the current access users of the cell or a second difference between the SR/CSI current network configuration capacity and the number of the users performing services in a preset time period in the cell is larger than a preset second difference threshold, reducing SR/CSI resource capacity;
when a first difference value between the SR/CSI current network configuration capacity and the number of the current access users of the cell or a second difference value between the SR/CSI current network configuration capacity and the number of the users performing services in a preset time period in the cell is between a preset first difference threshold and a preset second difference threshold, keeping the current SR/CSI resources unchanged; wherein the first difference threshold is less than the second difference threshold.
9. The method of claim 8, wherein the increasing the SR/CSI resource capacity comprises: and increasing frequency domain resources and/or increasing the SR/CSI period of the current network configuration of the cell.
10. The method of claim 8, wherein the reducing the SR/CSI resource capacity comprises: and reducing the number of SR/CSI frequency domain resources and/or reducing the SR/CSI period.
11. A base station, characterized in that the base station comprises a collection module and an optimized configuration module; wherein the content of the first and second substances,
the collection module is used for collecting the identification parameters of the current cell; wherein the identification parameters of the current cell include: the method comprises the following steps that the number of current connected users of a cell, the number of current activated users of the cell, the scene state of the cell, the current network configuration capacity of SR/CSI and the number of users performing services in a preset time period in the cell are determined;
the optimization configuration module is used for carrying out optimization configuration on at least one of a cell level parameter of a PUCCH, an SR/CSI resource parameter in the PUCCH and a static ACK/NACK resource region in the PUCCH according to a preset optimization strategy based on an initial configuration parameter of the PUCCH and an identification parameter of a current cell;
wherein, the optimization configuration module comprises a static ACK/NACK resource region optimization configuration submodule for:
when a cell has a resource which needs to be configured with downlink semi-persistent scheduling (SPS) scheduling ACK/NACK feedback resources or a Carrier Aggregation (CA) Channel selects Channel Selection PUCCH Format1b, PUCCH code Channel resources are allocated as downlink SPS scheduling ACK/NACK feedback resources or CA Channel Selection PUCCH Format1b resources at preset inter-code intervals from a code Channel resource corresponding to the lowest frequency in a dynamic ACK/NACK resource region in a PUCCH; the inter-code interval is determined by a configuration value of deltaPUCCH-Shift or is a preset fixed value;
and in the PDCCH resource allocation process, if the dynamic ACK/NACK resource in the corresponding current allocated PUCCH collides with the static ACK/NACK resource scheduled by the downlink SPS scheduling and/or CA auxiliary carrier scheduling of the current time high priority scheduling, searching a new PDCCH resource position.
12. The base station of claim 11, wherein the base station further comprises an initial configuration module configured to perform initial configuration on the cell level parameter of the PUCCH and the SR/CSI resource parameter.
13. The base station of claim 12, wherein the initial configuration module is configured to perform initial configuration on AN nCS _ AN parameter, a deltaPUCCH-Shift parameter, and a starting position of a dynamic ACK/NACK resource region in PUCCH.
14. The base station of claim 12, wherein the initial configuration module is configured to perform initial configuration on an initial value of a number of users that the cell needs to support, a period that SR/CSI needs to support, and a number of frequency domain resources.
15. The base station of claim 12, wherein the initial configuration module is further configured to set a number of users that need to be supported initially in a cell; the number of users to be supported initially in the cell is the sum of the number of users supported in each period of the cell; the number of users supported in a single period is equal to frequency domain resources multiplied by time domain resources multiplied by code domain resources; specifically, the frequency domain resource represents the number of RBs occupied by a single subframe, the time domain resource represents the number of uplink subframes in a single period, and the number of code domain resources represents the maximum number of multiplexed users on a single RB.
16. The base station of claim 13, wherein the optimized configuration module comprises a PUCCH cell level parameter optimized configuration submodule configured to:
when the number of the current cell connection users in the identification parameter of the current cell does not exceed a pre-configured first threshold, setting the nCS _ AN parameter to be a non-zero value;
and when the number of the current cell connection users in the identification parameter of the current cell is larger than a pre-configured first threshold, setting the nCS _ AN parameter to be zero.
17. The base station of claim 13, wherein the optimized configuration module comprises a PUCCH cell level parameter optimized configuration submodule configured to:
when the cell scene state is low speed, setting the deltaPUCCH-Shift parameter to 1;
and when the cell scene state is high speed, setting the deltaPUCCH-Shift parameter to be 2.
18. The base station of claim 14, wherein the optimization configuration module comprises an SR/CSI resource parameter optimization configuration sub-module configured to:
when a first difference value between the SR/CSI current network configuration capacity and the number of the current access users of the cell or a second difference value between the SR/CSI current network configuration capacity and the number of the users performing services in a preset time period in the cell is smaller than a preset first difference value threshold, increasing SR/CSI resource capacity;
when a first difference between the SR/CSI current network configuration capacity and the number of the current access users of the cell or a second difference between the SR/CSI current network configuration capacity and the number of the users performing services in a preset time period in the cell is larger than a preset second difference threshold, reducing SR/CSI resource capacity;
when a first difference value between the SR/CSI current network configuration capacity and the number of the current access users of the cell or a second difference value between the SR/CSI current network configuration capacity and the number of the users performing services in a preset time period in the cell is between a preset first difference threshold and a preset second difference threshold, keeping the current SR/CSI resources unchanged; wherein the first difference threshold is less than the second difference threshold.
19. The base station of claim 18, wherein the SR/CSI resource parameter optimization configuration sub-module is configured to increase frequency domain resources and/or increase SR/CSI periodicity of cell existing network configuration.
20. The base station of claim 18, wherein the SR/CSI resource parameter optimization configuration sub-module is configured to reduce the number of SR/CSI frequency domain resources and/or reduce SR/CSI cycles.
CN201610505970.6A 2016-06-30 2016-06-30 Physical uplink control channel PUCCH resource allocation method and base station Active CN107567095B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201610505970.6A CN107567095B (en) 2016-06-30 2016-06-30 Physical uplink control channel PUCCH resource allocation method and base station
PCT/CN2017/083557 WO2018000940A1 (en) 2016-06-30 2017-05-09 Resource allocation method for physical uplink control channel, base station and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610505970.6A CN107567095B (en) 2016-06-30 2016-06-30 Physical uplink control channel PUCCH resource allocation method and base station

Publications (2)

Publication Number Publication Date
CN107567095A CN107567095A (en) 2018-01-09
CN107567095B true CN107567095B (en) 2021-11-09

Family

ID=60786639

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610505970.6A Active CN107567095B (en) 2016-06-30 2016-06-30 Physical uplink control channel PUCCH resource allocation method and base station

Country Status (2)

Country Link
CN (1) CN107567095B (en)
WO (1) WO2018000940A1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112039642B (en) * 2019-06-04 2022-06-07 大唐移动通信设备有限公司 PUCCH resource allocation method and base station
CN112311504B (en) * 2019-08-01 2022-08-26 华为技术有限公司 Transmission method of feedback information and terminal device
CN114554509A (en) * 2020-11-25 2022-05-27 中国移动通信有限公司研究院 Wireless resource optimization method, device and computer readable storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101841862A (en) * 2009-03-18 2010-09-22 大唐移动通信设备有限公司 Resource allocation method and device
CN102215085A (en) * 2010-04-07 2011-10-12 华为技术有限公司 Method, system, user equipment and base station for transmitting uplink control information
CN103209483A (en) * 2012-01-12 2013-07-17 华为技术有限公司 Method, user equipment and base station for transmitting uplink control information
CN105119696A (en) * 2010-11-02 2015-12-02 Lg电子株式会社 Method and apparatus for transmitting control information

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101640905B (en) * 2008-07-31 2012-07-25 电信科学技术研究院 Method for allocating uplink dispatch request
CN102014442B (en) * 2009-09-29 2014-01-08 电信科学技术研究院 Method for sending uplink resource scheduling request and user equipment
US9955431B2 (en) * 2010-08-17 2018-04-24 Google Technology Holdings LLC Method and apparatus for power headroom reporting during multi-carrier operation
US9544801B2 (en) * 2012-08-03 2017-01-10 Intel Corporation Periodic channel state information reporting for coordinated multipoint (coMP) systems
CN102821477B (en) * 2012-08-15 2015-10-21 中国联合网络通信集团有限公司 The method of adjustment in dispatch request cycle and device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101841862A (en) * 2009-03-18 2010-09-22 大唐移动通信设备有限公司 Resource allocation method and device
CN102215085A (en) * 2010-04-07 2011-10-12 华为技术有限公司 Method, system, user equipment and base station for transmitting uplink control information
CN105119696A (en) * 2010-11-02 2015-12-02 Lg电子株式会社 Method and apparatus for transmitting control information
CN103209483A (en) * 2012-01-12 2013-07-17 华为技术有限公司 Method, user equipment and base station for transmitting uplink control information

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
PUCCH Evaluation;Huawei;《3GPP TSG-RAN WG2 Meeting #73bis R2-111958》;20110405;全文 *

Also Published As

Publication number Publication date
WO2018000940A1 (en) 2018-01-04
CN107567095A (en) 2018-01-09

Similar Documents

Publication Publication Date Title
US8982833B2 (en) Communication resource allocation strategy
US8897240B2 (en) Methods and apparatus for physical uplink control channel (PUCCH) load control by physical downlink control channel (PDCCH) restrictions
CN102761968B (en) The detection reference signal uplink resource allocating method of multi-user installation and base station
JP5571195B2 (en) Control channel element resource allocation method and apparatus
CN109526056A (en) Resource selection method, device and computer equipment, storage medium under multicarrier
CN102595612B (en) A kind of resource allocation methods and device
KR102161007B1 (en) Uplink channel transmission method and apparatus
JP2019536351A (en) Power allocation method, power adjustment method, terminal, and access network device
JP2019533352A (en) Method and apparatus for data transmission
US10680766B2 (en) Dynamic UL PRB resource allocation
CN107567105B (en) PUCCH resource scheduling method and device
US10306605B2 (en) Allocation of uplink control channel resources from mapped resource region
CN107567095B (en) Physical uplink control channel PUCCH resource allocation method and base station
CN104168656A (en) Detection reference signal SRS resource allocation method and device
CN114208076A (en) Sharing HARQ processes by multiple configuration grant resources
CN105611638B (en) A kind of method of dispatch terminal and base station
CN110324123B (en) Time domain resource allocation method and device of PUSCH, storage medium and terminal
CN108029107A (en) Shorten uplink data transmission method, device and the communication system of time delay
CN106332285A (en) Semi-static resource allocation method and base station
CN102387497B (en) Base station and allocation method of radio network temporary identities
CN109041118B (en) Resource allocation method and communication equipment
JP2014520481A (en) Method and configuration in communication system
CN108183775A (en) A kind of ascending control information processing method and equipment
CN105282853A (en) Multi-user SPS resource allocation method based on QOS
EP3131224A1 (en) Method, apparatus and computer program product for enhanced control channel usage in carrier aggregation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant