CN107565561A - Closed loop network load simulation method based on closed loop power flow optimization analysis - Google Patents

Closed loop network load simulation method based on closed loop power flow optimization analysis Download PDF

Info

Publication number
CN107565561A
CN107565561A CN201710945275.6A CN201710945275A CN107565561A CN 107565561 A CN107565561 A CN 107565561A CN 201710945275 A CN201710945275 A CN 201710945275A CN 107565561 A CN107565561 A CN 107565561A
Authority
CN
China
Prior art keywords
closed loop
network
line
power flow
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710945275.6A
Other languages
Chinese (zh)
Inventor
严志发
是岳军
周春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHANGZHOU DONGRUI POWER SOFTWARE CO LTD
Original Assignee
CHANGZHOU DONGRUI POWER SOFTWARE CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGZHOU DONGRUI POWER SOFTWARE CO LTD filed Critical CHANGZHOU DONGRUI POWER SOFTWARE CO LTD
Priority to CN201710945275.6A priority Critical patent/CN107565561A/en
Publication of CN107565561A publication Critical patent/CN107565561A/en
Pending legal-status Critical Current

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a kind of closed loop network load simulation method based on closed loop power flow optimization analysis, comprise the following steps:A. closed loop power flow calculating and short circuit calculation analysis are carried out, the steady limit is moved as criterion using not out-of-limit protection definite value and equipment, auxiliary dispatching decision-making;B. live Check Phase Sequence, it is ensured that the line phase-sequence detection of looped network operation is consistent;C. interconnection switch L1 between transformer station A, B is first closed;D. block switch K1s of the faulty line A close to the interconnection switch L1 ends is separated again;E. block switch Z1 of the faulty line A close to transformer station A ends is finally separated.Closed loop power flow calculating, short circuit calculation analysis and present live Check Phase Sequence should be carried out before looped network back brake, it ensure that the safe operation of power network, the operational efficiency of power distribution network is effectively improved, efficiently avoid construction, maintenance to the adverse effect to power supply management and user.

Description

Closed loop network load simulation method based on closed loop power flow optimization analysis
Technical field
The present invention relates to the closed loop network load simulation method based on closed loop power flow optimization analysis.
Background technology
For the simplified electrical network method of operation, suppress short circuit current level, improve the power supply reliability of power network, maintain the peace of power network Full economical operation, China 110kV and following supply and distribution net are typically using looped network design, the pattern of open loop operation.When needing to shift When load or maintenance finish plan and restored electricity, typically use the operator scheme unlinked after first cyclization to avoid user from having a power failure, raising The power supply reliability of user.
There may be larger closed loop power flow during due to Loop Closing Operation, cause apparatus overload or relay protection to act, cause Loop Closing Operation failure has a power failure.If relay fail, device damage or upper level protection act may be caused, expands power failure model Enclose.Because the operation conditions of power network after cyclization is opaque to scheduling operations staff, management and running personnel are difficult pre- by rule of thumb First judge the reliability of Loop Closing Operation, it is likely that cause apparatus overload or trip protection after cyclization because closed loop power flow is excessive, most Cause Loop Closing Operation to fail eventually, cause user has a power failure or electrical equipment damages etc..Because closed loop power flow size is difficult to directly predict, In order to prevent device damage, sometimes operated using break-before-make principle, cause user to have a power failure in short-term, this sacrifices power network Power supply reliability, it is unacceptable in the important load power supply area such as urban district.Therefore, before Loop Closing Operation is carried out, it should Closed loop power flow budget is carried out, the situation after involutive ring accomplishes to know what's what, and ensures Loop Closing Operation success, improves power supply reliability. In the case of conditional, the situation that closed loop power flow size changes over time should be tracked by the in-service monitoring of involutive ring trend, Selection carries out cyclization solution operation at the closed loop power flow less moment, improves the success rate of Loop Closing Operation.
There is comprehensive measurement system under power transmission network usual condition, redundancy be present for the electrical quantity of equipment, but match somebody with somebody Power network lacks monitoring means, operation electric data deficiency, more Accurate Analysis is carried out to power distribution network and brings difficulty, it is necessary to the state of progress The analysis such as estimation.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of closed loop network load based on closed loop power flow optimization analysis Analogy method, ensure online closed loop power flow optimization precision of analysis.
In order to solve the above technical problems, the invention provides a kind of closed loop network based on closed loop power flow optimization analysis Load simulation method, comprise the following steps:A. closed loop power flow calculating and short circuit calculation analysis are carried out, with not out-of-limit protection definite value It is criterion to move the steady limit with equipment, auxiliary dispatching decision-making;B. live Check Phase Sequence, it is ensured that the line phase-sequence detection of looped network operation is consistent; C. interconnection switch L1 between transformer station A, B is first closed;D. points of the faulty line A close to the interconnection switch L1 ends is separated again Duan Kaiguan K1;E. block switch Z1 of the faulty line A close to transformer station A ends is finally separated.It should be carried out before looped network back brake Closed loop power flow is calculated, short circuit calculation is analyzed and present live Check Phase Sequence, it is ensured that and not out-of-limit protection definite value and equipment move the steady limit, Ensure looped network operation line phase-sequence detection it is consistent, and by cyclization time control to minimum, it is the smaller the better, efficiently avoid produce compared with Big circulation, causes circuit overload, make relay protection action tripping operation, and cyclization moment power network occur short circuit, jeopardize circuit and The safety of equipment, or even make the generation of the fortuitous events such as device damage, it is ensured that the safe operation of power network, it is effectively improved and matches somebody with somebody The operational efficiency of power network, construction, maintenance are efficiently avoid to the adverse effect to power supply management and user.
Applied to the distribution network load calibration method of online closed loop power flow optimization analysis, comprise the following steps:
Step 1, all load values of power distribution network are adjusted to the rated load of distribution transformer;
Step 2, the current value for carrying out obtaining feeder line head end after Load flow calculation is exactly the fully loaded current value of feeder line;
Step 3, with feeder line measured current and feeder line full-load current be calculated the actual loading rate of feeder line;
Step 4, calculated after the actual loading rate of feeder line is obtained:Scap feeder line full loads head end measures load, Sload feeder lines The new load that actual measurement load, Tcap distribution transformings rated capacity, Tload1 distribution transformings current loads, Tload2 distribution transformings are calculated;
Step 5, after with all distribution transformer load values are refreshed in once iterating to calculate, recalculate to obtain the new of feeder line head end Load value, whether newer load value equal with the actual measuring value difference of feeder line head end, if be unsatisfactory for require if again Adjustment distribution transformer load is calculated, until meeting convergence precision requirement.
The present invention should carry out closed loop power flow calculating, short circuit calculation analysis and present live Check Phase Sequence before looped network back brake, Ensuring that not out-of-limit protection definite value and equipment move the steady limit, it is ensured that the line phase-sequence detection of looped network operation is consistent, and by cyclization time control It is the smaller the better to minimum, it efficiently avoid and produce larger circulation, cause circuit overload, make relay protection action tripping operation, with And short circuit occurs for cyclization moment power network, jeopardizes the safety of circuit and equipment, or even make the generation of the fortuitous events such as device damage, really The safe operation of power network has been protected, has been effectively improved the operational efficiency of power distribution network, efficiently avoid construction, maintenance to power supply Management and the adverse effect of user.
By the load of the amount calculating transformer of feeder line head end and network load is calibrated, so as to ensure online cyclization Tide optimization precision of analysis.
Brief description of the drawings
Fig. 1 is the three two interconnector figures of segmentation of the present invention;
Fig. 2 shows the schematic diagram of the artificial picture legend of power distribution network wiring diagram cable run of the prior art;
Fig. 3 shows that power distribution network wiring diagram overhead transmission line of the prior art automatically generates the schematic diagram of legend;
Fig. 4 shows that power distribution network wiring diagram cable run of the prior art automatically generates the schematic diagram of legend;
Fig. 5 shows the schematic flow sheet of the power distribution network wiring diagram automatic generation method according to technical solution of the present invention;
Fig. 6 shows the schematic flow sheet of the power distribution network wiring diagram automatic generation method according to technical solution of the present invention.
Embodiment
A kind of closed loop network load simulation method based on closed loop power flow optimization analysis, comprises the following steps:
A. closed loop power flow calculating and short circuit calculation analysis are carried out, the steady limit is moved as criterion using not out-of-limit protection definite value and equipment, it is auxiliary Auxiliary dispatch decision-making;
B. live Check Phase Sequence, it is ensured that the line phase-sequence detection of looped network operation is consistent;
C. interconnection switch L1 between transformer station A, B is first closed;
D. block switch K1s of the faulty line A close to the interconnection switch L1 ends is separated again;
E. block switch Z1 of the faulty line A close to transformer station A ends is finally separated.
Closed loop power flow calculating, short circuit calculation analysis and present live Check Phase Sequence should be carried out before looped network back brake, it is ensured that not out-of-limit guarantor Shield definite value and equipment move the steady limit, it is ensured that looped network operation line phase-sequence detection it is consistent, and by cyclization time control to minimum, it is smaller get over It is good, it efficiently avoid and produce larger circulation, cause circuit overload, make relay protection action tripping operation, and cyclization moment electricity Short circuit occurs for net, jeopardizes the safety of circuit and equipment, or even make the generation of the fortuitous events such as device damage, it is ensured that the peace of power network Row for the national games, the operational efficiency of power distribution network is effectively improved, efficiently avoid construction, maintenance to power supply management and user Adverse effect.
The technical program is applied to 10kV power distribution networks, and distribution line type has:Overhead transmission line, cable run and aerial cable Joint line.
Fig. 3 shows that power distribution network wiring diagram overhead transmission line of the prior art automatically generates the schematic diagram of legend.Such as Fig. 3 institutes Show, for overhead transmission line:1st, the line name is selected or inputted, inputs the quantity of the electric pole of the circuit backbone, program is automatic Generate basic routing line electric pole sequence;2nd, electric pole type is defined(E.g., including straight line pole, branch bar), if branch bar(Example Such as, it is including T-shaped or cross), program generating branch line automatically, inputting the electricity of the branch at power pole symbol corresponding to the bar number The quantity of bar, so repeat, until generating the tree-like sequence of whole electric poles of the circuit;3rd, the equipment on having bar(E.g., including open Pass, disconnecting link, fuse switch, distribution transforming etc.)Power pole symbol on selection define bar on device attribute(E.g., including title, set Standby type etc.), until all having defined;4th, program according to equipment in the electric pole tree structure and bar of generation according to branch and main line Vertically, branch line does not intersect, not overlapping principle automatically generates wiring diagram to equipment on the diagram.Contrast overhead line is manually drawn(Fig. 1)With Automatic mapping legend(Fig. 3), because automatic mapping is the auxiliary device using switch, distribution transforming etc. as electric pole, it is therefore necessary to scheming Upper display power pole symbol (soft dot).
Fig. 4 shows that power distribution network wiring diagram cable run of the prior art automatically generates the schematic diagram of legend.Such as Fig. 4 institutes Show, for cable run:Only into electric pole need to be changed to feeder pillar or distribution station(E.g., including ring main unit, switchyard, distribution box, Power distribution room, cell change etc.), equipment changes the equipment inside distribution station on bar(E.g., including switch, distribution transforming etc.).
It is understood that said structure and method can be applied equally to aerial cable joint line.
Fig. 5 shows the schematic flow sheet of the power distribution network wiring diagram automatic generation method according to technical solution of the present invention.Such as Shown in Fig. 5, the present invention provides a kind of power distribution network wiring diagram automatic generation method, suitable for overhead transmission line, comprises the following steps: S101, by detection module, detect the input operation of user, and line name and the circuit are obtained according to the input operation of user The quantity of the electric pole of backbone;S102, by automatic mapping module, according to the input operation of user and the line name obtained and The quantity of the electric pole of the circuit backbone, generate basic routing line electric pole sequence;S103, by display module, show connecing for generation Line chart, wherein:The wiring diagram includes:The basic routing line electric pole sequence.
A kind of power distribution network wiring diagram automatic generation method also includes:The detection module further detects user's selection Electric pole type;The electric pole type that the automatic mapping module is selected according to user automatically in the bar number corresponding at power pole symbol Generate branch line;The branch line of the display module display generation.
The electric pole type includes:Straight line pole or branch bar.
The detection module further detects the electric pole type of user's selection, in addition to:By judging unit, described in judgement The type of electric pole, when it is branch bar to judge the electric pole, it will determine that result is sent to the automatic mapping module, to pass through The automatic mapping module is generating the branch line automatically at power pole symbol corresponding to the bar number.
The branch bar further comprises:It is T-shaped or cross.
The detection module further detects the quantity of the electric pole of the electric pole type of user's selection and the branch of input, such as This is repeated, until generating the tree-like sequence of whole electric poles of the circuit.
Further detection selects definition to the detection module on the electric pole on the power pole symbol for the equipment that user selects Device attribute on bar, untill detecting that the whole operation of user terminates;By automatic mapping module, according to the electric pole of generation Equipment automatically generates wiring diagram in tree structure and bar;By the display module, the wiring diagram of generation is shown, wherein: The display result of the wiring diagram includes:Branch and main line are mutually perpendicular to, do not intersect between branch line and branch line and electric pole on configure Equipment between display on the diagram it is not overlapping.
Fig. 6 shows the schematic flow sheet of the power distribution network wiring diagram automatic generation method according to technical solution of the present invention.Such as Shown in Fig. 6, according to another aspect of the present invention, there is provided a kind of power distribution network wiring diagram automatic generation method, suitable for cable Circuit, comprise the following steps:S201, by detection module, detect the input operation of user, and obtain according to the input operation of user Take the feeder pillar of line name and the circuit backbone or the quantity of distribution station;S202, by automatic mapping module, according to The input operation at family and the line name and the feeder pillar or distribution station quantity of the circuit backbone obtained, generate basic routing line The sequence of feeder pillar or distribution station;S203, by display module, show the wiring diagram of generation, wherein:The wiring diagram bag Include:The sequence of the basic routing line feeder pillar or distribution station.
The power distribution network wiring diagram automatic generation method also includes:The detection module further detects point of user's selection The type of branch case or distribution station;The feeder pillar or the type of distribution station that the automatic mapping module selects according to user are automatic Branch line is generated at the symbol of feeder pillar or distribution station corresponding to the bar number;Described point of the display module display generation Branch line.
The type of the distribution station includes:Ring main unit, switchyard, switching station, power distribution room or distribution box.
Equipment on the distribution station includes:Switch, disconnecting link, bus or distribution transforming.
A kind of power distribution network wiring diagram automatic generation method provided by the invention, can also be not required to independent of any wiring diagram Graphic elements are manually placed on the diagram and then draw the Plot Works such as connecting line, it is only necessary to safeguard the model of distribution line, just The line chart and GIS figures of one circuit of distribution can be automatically generated.
Those skilled in the art of the present technique are appreciated that in the various operations discussed in the present invention, method, flow Step, measure, scheme can be replaced, changed, combined or deleted.With discussed in the present invention various operations, side Other steps, measure, scheme in method, flow can also be replaced, changed, reset, decomposed, combined or deleted.Prior art In have can also be replaced, more with the step in the various operations disclosed in the present invention, method, flow, measure, scheme Change, reset, decompose, combine or delete.
Described above is only some embodiments of the present invention, it is noted that for the ordinary skill people of the art For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (2)

1. a kind of closed loop network load simulation method based on closed loop power flow optimization analysis, comprises the following steps:
A. closed loop power flow calculating and short circuit calculation analysis are carried out, the steady limit is moved as criterion using not out-of-limit protection definite value and equipment, it is auxiliary Auxiliary dispatch decision-making;
B. live Check Phase Sequence, it is ensured that the line phase-sequence detection of looped network operation is consistent;
C. interconnection switch L1 between transformer station A, B is first closed;
D. block switch K1s of the faulty line A close to the interconnection switch L1 ends is separated again;
E. block switch Z1 of the faulty line A close to transformer station A ends is finally separated.
2. according to the method for claim 1, it is characterised in that closed loop power flow calculating, short circuit should be carried out before looped network back brake Calculate analysis and present live Check Phase Sequence, it is ensured that not out-of-limit protection definite value and equipment move the steady limit, it is ensured that the line of looped network operation Road phase sequence is consistent, and by cyclization time control to minimum, it is the smaller the better, it efficiently avoid and produce larger circulation, cause line Load is passed by, makes relay protection action tripping operation, and cyclization moment power network that short circuit occur, jeopardizes the safety of circuit and equipment, even Make the generation of the fortuitous events such as device damage, it is ensured that the safe operation of power network, the operational efficiency of power distribution network is effectively improved, Construction, maintenance be efficiently avoid to the adverse effect to power supply management and user.
CN201710945275.6A 2017-10-12 2017-10-12 Closed loop network load simulation method based on closed loop power flow optimization analysis Pending CN107565561A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710945275.6A CN107565561A (en) 2017-10-12 2017-10-12 Closed loop network load simulation method based on closed loop power flow optimization analysis

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710945275.6A CN107565561A (en) 2017-10-12 2017-10-12 Closed loop network load simulation method based on closed loop power flow optimization analysis

Publications (1)

Publication Number Publication Date
CN107565561A true CN107565561A (en) 2018-01-09

Family

ID=60985318

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710945275.6A Pending CN107565561A (en) 2017-10-12 2017-10-12 Closed loop network load simulation method based on closed loop power flow optimization analysis

Country Status (1)

Country Link
CN (1) CN107565561A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109066676A (en) * 2018-10-10 2018-12-21 云南电网有限责任公司临沧供电局 A kind of cyclization based on SCADA system turns the safety evaluation method of power supply
CN110445108A (en) * 2019-07-31 2019-11-12 云南电网有限责任公司瑞丽供电局 A kind of cyclization tune electric protection control method improving power supply reliability
CN110880765A (en) * 2019-12-19 2020-03-13 深圳供电局有限公司 Power distribution network closed loop operation method and system, closed loop operation equipment and storage medium
CN110994623A (en) * 2019-12-26 2020-04-10 深圳供电局有限公司 10kV superconducting loop closing operation method
CN112529541A (en) * 2020-12-25 2021-03-19 山东鲁能软件技术有限公司 Method and system for generating equipment measurement label in distribution network line diagram

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109066676A (en) * 2018-10-10 2018-12-21 云南电网有限责任公司临沧供电局 A kind of cyclization based on SCADA system turns the safety evaluation method of power supply
CN110445108A (en) * 2019-07-31 2019-11-12 云南电网有限责任公司瑞丽供电局 A kind of cyclization tune electric protection control method improving power supply reliability
CN110445108B (en) * 2019-07-31 2021-10-08 云南电网有限责任公司瑞丽供电局 Loop-closing power-adjusting protection control method for improving power supply reliability
CN110880765A (en) * 2019-12-19 2020-03-13 深圳供电局有限公司 Power distribution network closed loop operation method and system, closed loop operation equipment and storage medium
CN110994623A (en) * 2019-12-26 2020-04-10 深圳供电局有限公司 10kV superconducting loop closing operation method
CN112529541A (en) * 2020-12-25 2021-03-19 山东鲁能软件技术有限公司 Method and system for generating equipment measurement label in distribution network line diagram

Similar Documents

Publication Publication Date Title
CN107565561A (en) Closed loop network load simulation method based on closed loop power flow optimization analysis
CN106021596B (en) A kind of analysis method of electric network fault rush of current topological diagram
Coffele et al. An adaptive overcurrent protection scheme for distribution networks
CN105576660B (en) Local distribution network in-circuit emulation analytical equipment and system
Du et al. On-line estimation of transmission line parameters, temperature and sag using PMU measurements
CN100431232C (en) Estimating of power transmission net state
Liu et al. The healing touch: Tools and challenges for smart grid restoration
CN103548228B9 (en) For protecting the system and method for electric power networks
Popovic et al. The optimal automation level of medium voltage distribution networks
CN106527394B (en) A kind of ECPS cascading failure methods of risk assessment considering multiple information factor
Dzafic et al. Impedance based fault location for weakly meshed distribution networks
US20130282317A1 (en) Method of controlling fault current in system for monitoring and controlling power system
KR100987167B1 (en) Multiple FACTS control system and method therefor
CN104993590A (en) CID model-based relay protection device secondary loop self-monitoring method
Jain et al. Augmentation of situational awareness by fault passage indicators in distribution network incorporating network reconfiguration
CN106528968A (en) Intelligent substation automatic dynamic simulation test method based on SSD file
CN102611085B (en) Intertripping simulation analysis method
Kim et al. Active TCC based protection coordination scheme for networked distribution system
CN109726482B (en) Construction method and related device of high-load-density power grid
Wang et al. A unified fault-location method of autotransformer traction network for high-speed railway
CN106786527B (en) Distribution network loop closing risk analysis method based on provincial and allocation integration
Shalash et al. New reliability index for power system protection based on multi-agent technique
Yin et al. High-Speed Falling Conductor Protection in Distribution Systems using Synchrophasor Data
Guillen Fault location identification in smart distribution networks with distributed generation
Venturini et al. Reliability analysis of active distribution systems

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180109

WD01 Invention patent application deemed withdrawn after publication