CN107555327A - A kind of tower crane standard knot for being readily transported dismounting - Google Patents

A kind of tower crane standard knot for being readily transported dismounting Download PDF

Info

Publication number
CN107555327A
CN107555327A CN201711013197.2A CN201711013197A CN107555327A CN 107555327 A CN107555327 A CN 107555327A CN 201711013197 A CN201711013197 A CN 201711013197A CN 107555327 A CN107555327 A CN 107555327A
Authority
CN
China
Prior art keywords
main chord
web member
diagonal web
tower crane
support bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711013197.2A
Other languages
Chinese (zh)
Inventor
姜克鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nine Hebei Heavy Industry Ltd By Share Ltd
Original Assignee
Nine Hebei Heavy Industry Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nine Hebei Heavy Industry Ltd By Share Ltd filed Critical Nine Hebei Heavy Industry Ltd By Share Ltd
Priority to CN201711013197.2A priority Critical patent/CN107555327A/en
Publication of CN107555327A publication Critical patent/CN107555327A/en
Pending legal-status Critical Current

Links

Abstract

The invention belongs to derrick crane apparatus field, specifically provide a kind of tower crane standard knot for being readily transported dismounting, including four main chords in rectangular layout, it is fixedly connected between two adjacent main chords by diagonal web member group, each diagonal web member group is made up of the different upper diagonal web member of incline direction and lower diagonal web member, the top and bottom of each main chord are respectively provided with pin shaft hole, and dismountable plugged and fixed bearing pin is provided with the pin shaft hole of main chord upper end or lower end;Connecting platform is additionally provided between the upper end of four main chords.The tower crane standard knot dismounting and transport of the present invention is all more convenient, and body steadiness is stronger, employ chip angle steel main chord further reduce take volume facilitate transport, the tower crane standard knot installation accuracy of the present invention is higher simultaneously, and the main chord of four identical slice structures forms skeleton, it is higher compared to monolithic devices tower crane utilization rate therefore all tower crane standard knots of a tower crane can exchange.

Description

A kind of tower crane standard knot for being readily transported dismounting
Technical field
The invention belongs to derrick crane apparatus field, and in particular to a kind of tower crane standard knot for being readily transported and dismounting.
Background technology
The tower body of derrick crane is generally formed by several tower crane standard knot assembly and connections.Tower crane standard knot will bear lifting The work load and tower body superstructure gravity load of machine, it is crucial primary structure member.Therefore, tower crane standard knot will generally be abided by Follow the design principle of high intensity and high rigidity.
It is more in traditional tower crane standard knot structure to carry out part assembling by the way of welding based on above design principle. The mode of welding can no doubt obtain higher strength and stiffness, but also bring the problem of transport is inconvenient simultaneously.Cause is, After often section tower crane standard knot is welded and fixed, being transported to during workplace to dismantle, and take more transport space.Together When, tower crane standard knot of the tradition based on welding can also meet the problem of dismounting is inconvenient after tower crane production is carried out.Together When, it is connected with each other with adapter sleeve between traditional tower crane standard knot, connection is unstable, easily produces skew.Traditional tower crane mark Usually require to be reinforced from the bolt of high intensity between quasi- section, cost is higher.
It is main such as notification number CN202400757U Chinese utility model patent individually discloses a kind of tower crane standard knot To use welding etc. to be fixedly connected with mode and carry out part assembling.The stability of tower crane body for aforementioned transport inconvenience be present, forming is not strong The problems such as.
The content of the invention
In order to solve above mentioned problem existing for prior art, the invention provides a kind of convenient transportation, convenient disassembly, composition The strong tower crane standard knot of stability of tower crane body.
The orientation concept such as up and down occurred in the present invention is on the basis of usual daily habits is deferred to, with accompanying drawing 1 Shown in tower crane standard knot and its orientation such as up and down of parts be defined.
What is occurred in the present invention is fixedly connected including being detachably fixed connection, and being detachably fixed the concrete mode of connection includes Bearing pin, bolt, buckle etc..
The technical solution adopted in the present invention is:
The tower crane standard knot for being readily transported dismounting of the present invention, including in rectangular layout four main chords, adjacent two It is fixedly connected between individual main chord by diagonal web member group, each diagonal web member group is by the different upper diagonal web member of incline direction and oblique abdomen Bar forms, and the top and bottom of each main chord are respectively provided with pin shaft hole, is set in the pin shaft hole of main chord upper end or lower end It is equipped with dismountable plugged and fixed bearing pin;Connecting platform is additionally provided between the upper end of four main chords.
It can realize that the Fast Installation between two neighboring tower crane standard knot is torn open by pin shaft hole and plugged and fixed bearing pin Unload, use is more convenient.By the different upper and lower diagonal web member of incline direction, it is further ensured that tower crane standard knot is overall and consolidates Property;So-called incline direction difference means that when upper diagonal web member is obliquely installed by upper left lower right lower diagonal web member is i.e. by lower-left Direction upper right side tilts, and vice versa;The different and arranged in a crossed manner of incline direction can effectively lift the firm of tower crane standard knot Property.
Preferably, the connecting platform, which includes four, is respectively welded the platform connection for being fixed on four main chord upper ends Plate, connected by support bar between adjacent platform connecting plate, bolt hole, the support are provided with the platform connecting plate Bar is fixedly connected with the platform connecting plate by the bolt being inserted in bolt hole;The connecting platform also includes singletree First, strut and singletree two are erected, by four support bars according to being counterclockwise defined as support bar one, support bar successively respectively 2nd, support bar three and support bar four, one end of the perpendicular strut are fixedly installed on the middle part of the support bar one, the perpendicular strut The other end be fixedly installed on the middle part of the support bar three, one end of the singletree two is fixedly installed on the perpendicular strut Middle part, the other end of the singletree two are fixedly installed on the middle part of the support bar two, and one end of the singletree one is fixed It is arranged at the perpendicular strut and is fixedly installed on the support close to one end of the support bar one, the other end of the singletree one Bar four is close to one end of the support bar one;Expanded metal lath, the stull are provided between the perpendicular strut and the support bar two Expanded metal lath is also equipped between bar one and the support bar one.
Preferably, the connecting platform also includes hound, one end of the hound is bolted on support On the platform connecting plate that bar two and support bar three share, the other end of the hound is bolted on support bar one and branch On the shared platform connecting plate of strut four.
Preferably, upper diagonal web member and the main chord where lower diagonal web member one end closer to the distance are determined in each diagonal web member group Justice is main chord two, and backing plate is provided with the main chord two, and the backing plate pad is located at the main chord two and the upper oblique abdomen Between bar and between the main chord two and the lower diagonal web member, clamping plate is additionally provided with the main chord two, it is described Clamping plate is between the upper diagonal web member and the lower diagonal web member.
Preferably, being started with main chord two, it is main string successively to define remaining three main chords successively in the counterclockwise direction Bar three, main chord four and main chord one;Diagonal web member group and the main chord between the main chord one and the main chord two Diagonal web member group face between three and the main chord four is set, the main chord one and the main chord four and the main chord Diagonal web member group face between two and the main chord three is set;Pass through connection between two groups of diagonal web member groups that any face is set Securing plate is welded and fixed connection.
Preferably, multigroup diagonal web member group, the master are provided between two adjacent main chords from top to bottom The top and bottom of chord member one, which are respectively welded, is fixedly installed upper junction plate and lower connecting plate, the main chord one and the main string The left end of upper diagonal web member between bar two in the diagonal web member group of the top is welded and fixed with the upper junction plate to be connected, described The left end of lower diagonal web member between main chord one and the main chord two in the diagonal web member group of bottom and the lower connection Plate weld is fixedly connected, and the right-hand member of the diagonal web member group between the main chord one and the main chord two passes through bearing pin and main chord Two are fixedly connected.
Preferably, around pin shaft hole on the main chord, and between the main chord one and the main chord two The right-hand member of diagonal web member group be respectively provided with pasting board.
Preferably, it is additionally provided with reinforcing angle on the inside of the upper end of the main chord.
Preferably, be uniformly installed with the main chord it is multiple mark time, it is described to mark time as cat ladder pipe, the cat ladder pipe Upper end welding is provided with guard ring.
Preferably, the upper diagonal web member and the lower diagonal web member are made by Q345B channel-section steels, the main chord is by angle Steel is made.
Each scheme, beneficial effects of the present invention are based on more than:
First, carry out socket connection by bearing pin between tower crane standard knot provided by the invention to fix, keeping dismounting And while transporting more convenient, eliminate high intensity in tradition and require fixing bolt.Inclined by the intersection of upper and lower diagonal web member Tiltedly design, also further improve the steadiness of tower crane standard knot.
Secondly, it is detachably fixed in tower crane standard knot provided by the invention with bearing pin, bolt etc. based on connection, key position It is aided with and is welded and fixed connection.So that the tower crane standard knot of the present invention can be disassembled into more while body steadiness is ensured Scattered part, to further facilitate transport.Main chord uses angle steel slice structure, and space-consuming is smaller, can be further square Just transport.Such as connecting platform again, can be by demounting bolt, and then by the main platform body among four support bars from tower crane mark Disassembled completely on quasi- section, and then main platform body is superimposed and transported, further reduce space-consuming, convenience in transport.
3rd, tower crane standard knot of the invention can substantially reduce the maintenance cost of tower crane, monoblock type tower crane standard knot one Need the fastening bolt of more than ten times year, and the present invention is connected using chip tower crane standard knot using bearing pin, it is not necessary to fasten height Strength bolts, and then save maintenance cost.And the tower crane standard knot in the present invention is by four identical slice structures Main chord composition, so all tower crane standard knots of a tower crane can exchange, compare monolithic devices tower crane utilization rate more It is high.
4th, tower crane standard knot of the invention can grow one times compared to whole welding type standard knot length, install more Convenient and swift, all diagonal web members use the back-to-back welding sequentially facing each other of Q345B type groove steel, between the diagonal web member of two faces Uniform welding places securing plate, can further significantly increase the stability and reliability of tower crane standard knot of the present invention, while real Existing inserting mode connection, substantially increases installation rate.
5th, the clamping plate and backing plate set up in of the invention improve the steadiness of tower crane standard knot, while also ensure that phase The accuracy connected between adjacent every standard knot and between upper and lower diagonal web member.
6th, that sets up in the present invention marks time as cat ladder pipe, when cat ladder pipe is trampled above and below operator, can strangle into operation In the middle part of member's sole, avoid flat board from trampling the skidding easily occurred, and then ensure that operator climbs safety.Meanwhile positioned at behaviour Cat ladder pipe above work person can facilitate operator's firm grip as Handheld Division, and uniform welding protects on two rectangular tubes in addition Circle, and then further lifting operation person climbs safety.In order to further lift security, the both ends of one of cat ladder pipe are excellent Choosing is individually fixed in up and down on two connecting platforms.
7th, the upper and lower connecting plate and the reinforcing angle of inner side set up in of the invention can be further ensured that more piece tower crane Firm connection between standard knot.Pin shaft hole and pin shaft design realize socket connection side between two section tower crane standard knots Formula, it is easier for installation, consolidate.
8th, the connecting platform in the present invention provides the recreating facility of actual time safety for operator, four support bars and Platform connecting plate on main chord has collectively constituted a bearing space, is had a rest temporarily use with supplying operator.Two stulls Bar and a perpendicular strut are welded on four support bars, play a part of reinforcing, its more firm, safety made.Set up Hound can block the space formed between support bar, and then formed and avoid operator from being not intended to fall more between support bar For the Rest space of safety.
9th, a corner position of the connecting platform of tower crane standard knot of the present invention leaves a coffin, its excess-three Face is then paved with expanded metal lath.Cat ladder one end of tower crane standard knot of the present invention is connected to two platforms connection of connecting platform coffin On plate, the other end is welded on the singletree one of the coffin of next section tower crane standard knot connecting platform.So cause Cat ladder pipe has certain angle of inclination, and three face rings of connecting platform set expanded metal lath, such design, if when operator climbs Occur surprisingly dropping down from cat ladder, can fall on the platform of this section standard knot.Compared to remaining model tower crane standard knot Cat ladder can more be ensured the climbing safety of operator, be provided for safer practical using cat ladder passage straight up and down Working environment.
Brief description of the drawings
Fig. 1 is that a kind of main structure diagram of tower crane standard knot for being readily transported dismounting of the present invention (omits in figure Connecting platform);
Fig. 2 is the a-quadrant partial enlarged drawing in tower crane standard knot shown in Fig. 1;
Fig. 3 is a kind of structural representation of connecting platform being readily transported in the tower crane standard knot of dismounting of the present invention.
In figure:1 is main chord one;2 be to mark time;3 be pasting board;4 be platform connecting plate;5 be reinforcing angle;6 be pin shaft hole; 7 be upper junction plate;8 be upper diagonal web member;9 be reinforcement by connection plate;10 be clamping plate;11 be backing plate;12 be lower diagonal web member;13 be main string Bar two;14 be lower connecting plate;15 be main chord three;16 be main chord four;17 be hound;18 be singletree one;19 be perpendicular support Bar;20 be singletree two;21 be expanded metal lath;22 be support bar.
Embodiment
Below in conjunction with the accompanying drawings and specific embodiment is further explained to the present invention
As shown in FIG. 1 to 3, the present embodiment provides a kind of tower crane standard knot for being readily transported dismounting, including rectangular cloth Four main chords put, it is fixedly connected by diagonal web member group between adjacent two main chords, each diagonal web member group is by inclination side Being formed to different upper diagonal web members 8 and lower diagonal web member 12, the top and bottom of each main chord are respectively provided with pin shaft hole 6, Dismountable plugged and fixed bearing pin is provided with the pin shaft hole 6 of main chord upper end or lower end;Between the upper end of four main chords also It is provided with connecting platform.
For the safety and practical performance of lifting connecting platform, as shown in figure 3, the further refinement to connecting platform scheme It is optimized for:The platform connecting plate 4 for being fixed on four main chord upper ends is respectively welded including four in the connecting platform, and adjacent is flat Connected between platform connecting plate 4 by support bar 22, be provided with bolt hole on the platform connecting plate 4, the support bar 22 with The platform connecting plate 4 is fixedly connected by the bolt being inserted in bolt hole;The connecting platform also includes singletree one 18th, strut 19 and singletree 2 20 are erected, by four support bars 22 according to being counterclockwise defined as support bar one, branch successively respectively Strut two, support bar three and support bar four, one end of the perpendicular strut 19 is fixedly installed on the middle part of the support bar one, described The other end of perpendicular strut 19 is fixedly installed on the middle part of the support bar three, and one end of the singletree 2 20 is fixedly installed on institute The middle part of perpendicular strut 19 is stated, the other end of the singletree 2 20 is fixedly installed on the middle part of the support bar two, the stull One end of bar 1 is fixedly installed on the perpendicular strut 19 close to one end of the support bar one, the singletree 1 it is another End is fixedly installed on the support bar four close to one end of the support bar one;Between the perpendicular strut 19 and the support bar two Expanded metal lath 21 is provided with, expanded metal lath 21 is also equipped between the singletree 1 and the support bar one.The connecting platform Also include hound 17, one end of the hound 17 is bolted on the platform that support bar two and support bar three share and connected On fishplate bar 4, the other end of the hound 17 is bolted on the platform connecting plate 4 that support bar one and support bar four share On.
In order to further play the effect of diagonal web member, the stability and installation accuracy of tower crane standard knot are lifted, such as Fig. 2 institutes Show, further characteristic optimization has been carried out to the close region of diagonal web member group:Upper diagonal web member 8 and lower diagonal web member in each diagonal web member group Main chord where 12 one end closer to the distance is defined as main chord 2 13, and backing plate 11, institute are provided with the main chord 2 13 The pad of backing plate 11 is stated to be located between the main chord 2 13 and the upper diagonal web member 8 and the main chord 2 13 and the oblique abdomen Between bar 12, clamping plate 10 is additionally provided with the main chord 2 13, the clamping plate 10 is located at the upper diagonal web member 8 and described Between lower diagonal web member 12.
In order to further lift the stability of the present embodiment tower crane standard knot, started with main chord 2 13, along side counterclockwise Define remaining three main chords successively to (reference picture 3) and be followed successively by main chord 3 15, main chord 4 16 and main chord 1;It is described Between diagonal web member group and the main chord 3 15 and the main chord 4 16 between main chord 1 and the main chord 2 13 Diagonal web member group face is set, the main chord 1 and the main chord 4 16 and the main chord 2 13 and the main chord three Diagonal web member group face between 15 is set;Welded admittedly by reinforcement by connection plate 9 between two groups of diagonal web member groups that any face is set Fixed connection.The reinforcement by connection plate 9 set up connects the diagonal web member between different main chords, can further lift tower crane Stability, lift security performance.
As shown in figure 1, the further optimization to the present embodiment, it is provided with from top to bottom between adjacent two main chords Diagonal web member group described in three groups, first group, second group and the 3rd group is followed successively by from top to bottom.The upper end of the main chord 1 is with End is respectively welded and is fixedly installed upper junction plate 7 and lower connecting plate 14, the left end of the upper diagonal web member 8 in first group of diagonal web member group with The upper junction plate 7 is welded and fixed connection, left end and the lower connecting plate 14 of the lower diagonal web member 12 in the 3rd group of diagonal web member group Connection is welded and fixed, the right-hand member of the diagonal web member group between the main chord 1 and the main chord 2 13 passes through bearing pin and main string Bar 2 13 is fixedly connected.
As depicted in figs. 1 and 2, in order to further increase the steadiness of bearing pin grafting, the pin shaft hole on the main chord 6 weeks Enclose, and the right-hand member of the diagonal web member group between the main chord 1 and the main chord 2 13 is respectively provided with pasting board 3.Increase If pasting board 3 can strengthen thickness around pin shaft hole so that the bearing pin in pin shaft hole is not susceptible to deflection, more surely It is fixed.Further, from the point of view of for stable connection between the adjacent tower crane standard knot of increase, in the upper end of the main chord Side is additionally provided with reinforcing angle 5.Further, it is uniformly solid on the main chord in order to which lifting operation person climbs and security performance 2 are marked time provided with multiple, and described mark time 2 is cat ladder pipe, and the upper end welding of the cat ladder pipe is provided with guard ring.The upper diagonal web member 8 It is made with the lower diagonal web member 12 by Q345B channel-section steels, the main chord is made by angle steel.
The present invention is not limited to above-mentioned preferred forms, and anyone can show that other are various under the enlightenment of the present invention The product of form, however, make any change in its shape or structure, it is every that there is skill identical or similar to the present application Art scheme, is within the scope of the present invention.

Claims (10)

1. a kind of tower crane standard knot for being readily transported dismounting, including in rectangular layout four main chords, it is characterised in that:It is adjacent Two main chords between be fixedly connected by diagonal web member group, each diagonal web member group is by the different upper diagonal web member (8) of incline direction Formed with lower diagonal web member (12), the top and bottom of each main chord are respectively provided with pin shaft hole (6), main chord upper end or under Dismountable plugged and fixed bearing pin is provided with the pin shaft hole (6) at end;It is flat that connection is additionally provided between the upper end of four main chords Platform.
2. tower crane standard knot according to claim 1, it is characterised in that:The connecting platform is respectively welded solid including four Due between the platform connecting plate (4) of four main chord upper ends, adjacent platform connecting plate (4) by support bar (22) connect, Bolt hole is provided with the platform connecting plate (4), the support bar (22) is with the platform connecting plate (4) by being inserted in Bolt in bolt hole is fixedly connected;The connecting platform also includes singletree one (18), perpendicular strut (19) and singletree two (20), by four support bars (22) according to being counterclockwise defined as support bar one, support bar two, the and of support bar three successively respectively Support bar four, one end of the perpendicular strut (19) are fixedly installed on the middle part of the support bar one, the perpendicular strut (19) it is another One end is fixedly installed on the middle part of the support bar three, and one end of the singletree two (20) is fixedly installed on the perpendicular strut (19) middle part, the other end of the singletree two (20) are fixedly installed on the middle part of the support bar two, the singletree one (18) one end be fixedly installed on the perpendicular strut (19) close to the support bar one one end, the singletree one (18) it is another One end is fixedly installed on the support bar four close to one end of the support bar one;The perpendicular strut (19) and the support bar two Between be provided with expanded metal lath (21), expanded metal lath (21) is also equipped between the singletree one (18) and the support bar one.
3. tower crane standard knot according to claim 2, it is characterised in that:The connecting platform also includes hound (17), One end of the hound (17) is bolted on the platform connecting plate (4) that support bar two and support bar three share, institute The other end for stating hound (17) is bolted on the platform connecting plate (4) that support bar one and support bar four share.
4. tower crane standard knot according to claim 1, it is characterised in that:In each diagonal web member group upper diagonal web member (8) and under Main chord where diagonal web member (12) one end closer to the distance is defined as main chord two (13), is set on the main chord two (13) There is backing plate (11), backing plate (11) pad is located between the main chord two (13) and the upper diagonal web member (8) and the master Between chord member two (13) and the lower diagonal web member (12), clamping plate (10) is additionally provided with the main chord two (13), it is described Clamping plate (10) is between the upper diagonal web member (8) and the lower diagonal web member (12).
5. tower crane standard knot according to claim 4, it is characterised in that:Started with main chord two (13), along side counterclockwise Main chord three (15), main chord four (16) and main chord one (1) are followed successively by remaining three main chords are defined successively;The main string Diagonal web member group between bar one (1) and the main chord two (13) and the main chord three (15) and the main chord four (16) it Between diagonal web member group face set, the main chord one (1) and the main chord four (16) and the main chord two (13) and institute The diagonal web member group face stated between main chord three (15) is set;Added between two groups of diagonal web member groups that any face is set by connection Gu plate (9) is welded and fixed connection.
6. tower crane standard knot according to claim 5, it is characterised in that:Between two adjacent main chords from top to bottom Multigroup diagonal web member group is provided with, the top and bottom of the main chord one (1), which are respectively welded, is fixedly installed upper junction plate (7) and lower connecting plate (14), between the main chord one (1) and the main chord two (13) in the diagonal web member group of the top The left end of upper diagonal web member (8) be welded and fixed and be connected with the upper junction plate (7), the main chord one (1) and the main chord The left end of lower diagonal web member (12) between two (13) in the diagonal web member group of bottom and the lower connecting plate (14) welding are solid Fixed connection, the right-hand member of the diagonal web member group between the main chord one (1) and the main chord two (13) pass through bearing pin and main chord Two (13) are fixedly connected.
7. tower crane standard knot according to claim 6, it is characterised in that:Around pin shaft hole (6) on the main chord, with And the right-hand member of the diagonal web member group between the main chord one (1) and the main chord two (13) is respectively provided with pasting board (3).
8. tower crane standard knot according to claim 1, it is characterised in that:It is additionally provided with and adds on the inside of the upper end of the main chord Gu angle steel (5).
9. tower crane standard knot according to claim 1, it is characterised in that:Multiple mark time uniformly is installed with the main chord (2), described mark time (2) are cat ladder pipe, and the upper end welding of the cat ladder pipe is provided with guard ring.
10. tower crane standard knot according to claim 1, it is characterised in that:The upper diagonal web member (8) and the lower diagonal web member (12) it is made by Q345B channel-section steels, the main chord is made by angle steel.
CN201711013197.2A 2017-10-26 2017-10-26 A kind of tower crane standard knot for being readily transported dismounting Pending CN107555327A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711013197.2A CN107555327A (en) 2017-10-26 2017-10-26 A kind of tower crane standard knot for being readily transported dismounting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711013197.2A CN107555327A (en) 2017-10-26 2017-10-26 A kind of tower crane standard knot for being readily transported dismounting

Publications (1)

Publication Number Publication Date
CN107555327A true CN107555327A (en) 2018-01-09

Family

ID=61031399

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711013197.2A Pending CN107555327A (en) 2017-10-26 2017-10-26 A kind of tower crane standard knot for being readily transported dismounting

Country Status (1)

Country Link
CN (1) CN107555327A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756221A (en) * 2018-06-06 2018-11-06 朱宏宇 A kind of morpheme section and its transfer standpipe, switching group frame, switching group frame
CN115490162A (en) * 2022-09-22 2022-12-20 徐州建机工程机械有限公司 Standard joint of tower body of large tower crane

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0974546A1 (en) * 1998-07-24 2000-01-26 Potain Assembly device for metallic lattice members
CN201809083U (en) * 2009-12-29 2011-04-27 长沙中联重工科技发展股份有限公司 Tower crane, rod piece assembled type standard knot and rod piece used for assembled type standard knot
CN202400757U (en) * 2011-12-28 2012-08-29 新乡克瑞重型机械科技股份有限公司 Tower crane standard section
CN104310241A (en) * 2014-10-14 2015-01-28 徐州建机工程机械有限公司 Standard knot of tower crane
CN204251239U (en) * 2014-10-29 2015-04-08 山东大汉建设机械有限公司 A kind of tower crane inclined ladder and hoisting crane
CN204454349U (en) * 2015-03-06 2015-07-08 山东大汉建设机械有限公司 Chip tower body with access ramp and platform saves
CN205500627U (en) * 2016-01-14 2016-08-24 河北九通重工集团有限公司 Tower machine standard festival convenient to transportation
CN206538997U (en) * 2016-10-26 2017-10-03 中国建筑第八工程局有限公司 Operating platform
CN207330183U (en) * 2017-10-26 2018-05-08 河北九通重工股份有限公司 A kind of tower crane standard knot for being readily transported dismounting

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0974546A1 (en) * 1998-07-24 2000-01-26 Potain Assembly device for metallic lattice members
CN201809083U (en) * 2009-12-29 2011-04-27 长沙中联重工科技发展股份有限公司 Tower crane, rod piece assembled type standard knot and rod piece used for assembled type standard knot
CN202400757U (en) * 2011-12-28 2012-08-29 新乡克瑞重型机械科技股份有限公司 Tower crane standard section
CN104310241A (en) * 2014-10-14 2015-01-28 徐州建机工程机械有限公司 Standard knot of tower crane
CN204251239U (en) * 2014-10-29 2015-04-08 山东大汉建设机械有限公司 A kind of tower crane inclined ladder and hoisting crane
CN204454349U (en) * 2015-03-06 2015-07-08 山东大汉建设机械有限公司 Chip tower body with access ramp and platform saves
CN205500627U (en) * 2016-01-14 2016-08-24 河北九通重工集团有限公司 Tower machine standard festival convenient to transportation
CN206538997U (en) * 2016-10-26 2017-10-03 中国建筑第八工程局有限公司 Operating platform
CN207330183U (en) * 2017-10-26 2018-05-08 河北九通重工股份有限公司 A kind of tower crane standard knot for being readily transported dismounting

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756221A (en) * 2018-06-06 2018-11-06 朱宏宇 A kind of morpheme section and its transfer standpipe, switching group frame, switching group frame
CN108756221B (en) * 2018-06-06 2021-02-09 朱宏宇 Form and position joint and switching vertical pipe, switching frame and switching frame thereof
CN115490162A (en) * 2022-09-22 2022-12-20 徐州建机工程机械有限公司 Standard joint of tower body of large tower crane

Similar Documents

Publication Publication Date Title
CN202370253U (en) Assembly type single-row vertical rod machining shed for building construction site
CN206279743U (en) A kind of tool-type temporary steel support device
CN101824905B (en) Assembly type variable steel girder platform, distribution method and assembly method thereof
CN205500627U (en) Tower machine standard festival convenient to transportation
CN107555327A (en) A kind of tower crane standard knot for being readily transported dismounting
CN102644403A (en) Holding pole with detachable standard knots
CN207686014U (en) A kind of connecting node of H-type beam web interpolation concrete-filled steel square tubular column
CN207330183U (en) A kind of tower crane standard knot for being readily transported dismounting
CN102444270A (en) Sleeve joint oblique key type support bracket
CN103774838A (en) Assembly type safe operation platform for elevator shaft construction and use method thereof
CN206941364U (en) Bailey beam make-shift bridge
CN205474862U (en) Wet seam template operation platform of portable case roof beam
CN205874978U (en) A tie rod support for $descending hold formula steel pipe concrete tied arch bridge
CN101967902B (en) Basic guide rail for helicopter assembly transmission line iron tower leg section
CN106351430A (en) Truss-reinforced type fastener steel tube scaffolding
CN207959499U (en) A kind of steel construction
CN205990773U (en) A kind of construction discharging platform
CN212669031U (en) Novel split type jib loading boom of tower machine
CN202164864U (en) Holding pole equipped with detachable standard section
CN102674168B (en) Reinforced boom and crane with reinforced boom
CN104164889A (en) Demountable tower crane foundation
CN206110627U (en) Truss strenghthened type fastener -style steel pipe scaffold frame
CN207193774U (en) Knotted rope platform
CN208023387U (en) Overlap the edge-beam of girder segment
CN218708757U (en) Assembled standard festival

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination