CN107553695A - A kind of side mould laying method for PC Numerical control production lines - Google Patents

A kind of side mould laying method for PC Numerical control production lines Download PDF

Info

Publication number
CN107553695A
CN107553695A CN201710805834.3A CN201710805834A CN107553695A CN 107553695 A CN107553695 A CN 107553695A CN 201710805834 A CN201710805834 A CN 201710805834A CN 107553695 A CN107553695 A CN 107553695A
Authority
CN
China
Prior art keywords
mould
numerical control
production lines
control production
side mould
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710805834.3A
Other languages
Chinese (zh)
Other versions
CN107553695B (en
Inventor
刘品潇
蔡广宇
马金发
宗荣珍
郑雄文
张林海
马海鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanyang Seiko Craftsman Assembly Construction Technology Co., Ltd.
Original Assignee
Henan Jinsha Intelligent Assembly Building Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Jinsha Intelligent Assembly Building Technology Co Ltd filed Critical Henan Jinsha Intelligent Assembly Building Technology Co Ltd
Priority to CN201710805834.3A priority Critical patent/CN107553695B/en
Publication of CN107553695A publication Critical patent/CN107553695A/en
Application granted granted Critical
Publication of CN107553695B publication Critical patent/CN107553695B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of side mould laying method for PC Numerical control production lines, realized by following steps:Mould when making first respectively mould, the 3rd are in mould and the 4th in mould, second, each side mould include matrix and multiple fixed blocks located at described matrix surface;The PC scantlings established as needed, mould when placing first respectively on the table mould, the 3rd are in mould and the 4th in mould, second, are moved according to scantling until meeting the size requirement of component;Magnetic switch is opened, the first mould while mould, the 3rd are in mould and the 4th in mould, second tightly adsorbs on the table.Compared with prior art, the present invention can not only freely change the placement location of side mould according to the size of PC components, and after placement each side mould sealing it is good, it is not easy to seepage, convenient to use, effect is good.

Description

A kind of side mould laying method for PC Numerical control production lines
Technical field
The present invention relates to assembling technical field of buildings, and in particular to a kind of side mould placement side for PC Numerical control production lines Method.
Background technology
At present, the central government and local governments at all levels, many supports and incentives have been put into effect to assembled architecture, quickly Ground promotes the development of " assembled architecture " industry.And building enterprise, be to Industry Policy it is very sensitive, some enterprises in order to Gain the initiative, start quickly to cut this industry.Certainly become a hot word of building trade in recent years.Assembled is built Build be technology upgrading result, in fact, the core of technology is to realize the means of assembled architecture, that is, design, produce, building course Industrialization with it is information-based.Only the means of realization have all been had thorough grasp, made good use of, the product of this new model of assembled architecture Quality just can be secure.Assembled monolithic concrete structure is attached simultaneously by reliable way by precast concrete Overall prefabricated concrete structure is formed with pouring concrete, strength cement-based grouting material behind scene.Assembled architecture is current at home Also it is used widely, is included in the assembled architecture that design, function, production, installation etc. can also produce above-mentioned condition. In PC components pour, the size of side mould is often fixed, it is impossible to is adjusted, in the market with telescopic side mould knot Structure, but after such a side mould use, the poor sealing of end and bottom, the easy seepage of concrete liquid.
The content of the invention
To solve drawbacks described above, it is an object of the invention to provide a kind of side mould laying method for PC Numerical control production lines, Can not only freely change the placement location of side mould according to the size of PC components, and after placing each side mould sealing it is good, no Easy seepage, convenient to use, effect is good.
To reach above-mentioned purpose, the technical solution adopted by the present invention is:A kind of side mould for PC Numerical control production lines is placed Method, it is characterised in that comprise the following steps:
1)Side mould is placed:The PC scantlings established as needed, place respectively on the table first in mould, second mould, 3rd in mould and the 4th mould, described first when the inner side of mould one end is with described second mould one end end contact, described second With mould one end end contact when the described 3rd on the inside of the other end of mould, the described 3rd when mould other end inner side is with the described 4th Mould one end end contact, the described 4th on the inside of the mould other end with mould other end end contact when described first, enclose the area after setting Domain is matched by any adjustment of length and width with that need to establish the size of PC components, is set region enclosing and is put into reinforced frame, institute The reinforcing bar for stating reinforced frame edge is each fallen within inside adjacent edge mould.
2)Side mould absorption and sealing:Mould is fastened on workbench when making first mould, the 3rd are in mould and the 4th in mould, second On;It is each be in contact in mould end position and while mould bottom and workbench between position effectively seal, complete PC Numerical control production lines Side mould place.
Preferably, the described first mould while mould, the 3rd are in mould and the 4th in mould, second includes matrix and located at institute State multiple fixed blocks of matrix surface.
Step 2)Described in the first mould while mould, the 3rd are in mould and the 4th in mould, second fasten and be on the table Realized by multiple strong magnetic devices inside described matrix, the strong magnetic device include strong magnets and with The magnetic switch of the strong magnets connection, the magnetic switch stretch out described matrix surface and are provided with an action bars, each behaviour Make bar collinearly to set on described matrix surface.
Step 2)In each position effectively sealing be is realized by sealing device, the sealing device include each fix The gas ducting of connection, the gas ducting are wrapped and wrapped inside described matrix and with the inflation in the inflation that block both ends are provided with The gas-charging connection to connect with the gas ducting is additionally provided with described matrix surface, the gas-charging connection is connected with outside supply Source, the reinforcing bar of the reinforced frame edge is between adjacent inflation bag.
Holddown spring is provided between strong magnets and the described matrix bottom, side mould can be promoted when magnetic switch is closed Workbench is left as early as possible.
In the use of the present invention, each side mould can be realized and arbitrarily moved, different PC scantlings are adapted to, are realized general Property, avoid needing to make the phenomenon of a variety of side moulds in scale PC component production lines, reduce the wasting of resources, reduce enterprise Input cost;The strong magnetic device of the present invention, magnetic switch, side modular belt magnetic, absorption are opened by mechanical arm when in use On the table, now strong magnets are pressed downward contracting holddown spring, and spring is in compressive state, when closing magnetic switch, Bian Mo Without magnetic, now strong magnets are moved up, and holddown spring is withdrawn, and side mould can be made to be in without magnetic state as early as possible, are easy to needing Side mould is departed from into workbench as early as possible when wanting, the solidification between construction material and platform that side mould is stained with itself is reduced, avoids side mould from existing The cleaning of cost manpower and materials is needed before next use;The gas ducting being provided with side mould of the present invention, each inflation bag is filled Gas, the inner tube of a tyre full of gas eliminate the gap between the indoor wall PC sides mould and the reinforcing bar, solve concrete by The problem of gap is omitted, while the leaching of side mould bottom prevents from omitting concrete between template and workbench, end, which protrudes, prevents side mould splicing Omit concrete in place;Each action bars in the present invention is collinearly set, and is brought convenience during to mechanical arm automatic tracing.
Compared with prior art, the present invention it is reasonable in design, by each any movement in mould and while intermode sealing, not only Meet constructing for more size PC components, realize the versatility of side mould, and the region after constructing solves PC sides mould and the steel The problem of omitting concrete and side mould stitching portion omission concrete in gap between muscle between material leakage, template and workbench, effectively improves Sealing, while presentation quality is also improved, for enterprise, production efficiency is substantially improved, and reduces production cost, makes enterprise Industry benefit is maximized.
Brief description of the drawings
Below according to drawings and Examples, the feature of the present invention is further described.
Fig. 1 is a kind of embodiment of the present invention.
Fig. 2 is the structural representation of heretofore described strong magnetic device.
In accompanying drawing 1 and Fig. 2,1. the 4th side moulds, 2. workbench, 3. reinforced frames, 4. the 3rd side moulds, 5. second side moulds, 6. behaviour Make bar, 7. gas-charging connections, 8. fixed blocks, 9. inflation bags, 11. first side moulds, 12. strong magnets, 13. holddown springs.
Embodiment
It is a kind of embodiment of the present invention referring to accompanying drawing 1 and Fig. 2.
A kind of side mould laying method for PC Numerical control production lines, realized by following steps:1)Side molding is made:Respectively Mould 1 when making first mould the 5, the 3rd is in mould 4 and the 4th in mould 11, second, each side mould include matrix and located at described matrixes Multiple fixed blocks 8 on surface, each both ends of fixed block 8 are equipped with inflation bag 9, gas ducting, surface are provided with inside described matrix Provided with the gas-charging connection 7 to connect with the gas ducting, the gas ducting is also connected with each inflation bag 9 respectively;Described matrix Inside is additionally provided with multiple strong magnetic devices, and the strong magnetic device includes strong magnets 12 and connected with the strong magnets 12 The magnetic switch connect, the magnetic switch stretch out described matrix surface and are provided with an action bars 6, and each action bars 6 is in the base Body surface face is collinearly set;
2)Place side mould:The PC scantlings established as needed, when placing first on workbench 2 respectively in mould 11, second The mould 1 at mould 4 and the 4th of mould the 5, the 3rd, described first while the one end of mould 11 inner side with described second while one end end contact of mould 5, Described second on the inside of the other end of mould 5 with one end end contact of mould 4 when the described 3rd, on the inside of the other end of the 3rd side mould 4 With one end end contact of the 4th side mould 1, the described 4th on the inside of the other end of mould 1 with the other end end face of mould 11 when described first Contact, encloses any adjustment of the region after setting by length and width and matches with that need to establish the size of PC components, in Wei She areas Domain is put into reinforced frame 3, and the reinforcing bar of the edge of reinforced frame 3 is each fallen between adjacent inflation bag 9;
3)Side mould absorption and sealing:Magnetic switch is opened, the first mould 1 while mould the 5, the 3rd is in mould 4 and the 4th in mould 11, second is tight Tightly adsorb on workbench 2;By external source of the gas access gas-charging connection 7, inflation bag 9 gassies, by between the end of each side mould, Reinforcing bar and side mould sealed bottom get up, and the side mould for completing PC Numerical control production lines is placed.
Preferably, holddown spring 13 is provided between strong magnets and the described matrix bottom, can be closed in magnetic switch Side mould is promoted to leave workbench as early as possible when closing.
When in use, each side mould can be realized arbitrarily to be moved embodiments of the invention, adapts to different PC scantlings, Versatility is realized, avoids needing to make the phenomenon of a variety of side moulds in scale PC component production lines, reduces the wasting of resources, is dropped The input cost of Di Liao enterprises;The strong magnetic device of the present invention, magnetic switch, side modular belt are opened by mechanical arm when in use Magnetic, on the table, now strong magnets are pressed downward contracting holddown spring for absorption, and spring is in compressive state, closes magnetic switch When, side mould is moved up without magnetic, now strong magnets, and holddown spring is withdrawn, and side mould can be made to be in without magnetic state as early as possible, just Side mould is departed from into workbench as early as possible in when needed, the solidification between construction material and platform that side mould is stained with itself is reduced, avoids Side mould needs to spend the cleaning of manpower and materials before next use;The gas ducting being provided with side mould of the present invention, each inflation is wrapped It is inflated, the inner tube of a tyre full of gas eliminates the gap between the indoor wall PC sides mould and the reinforcing bar, solves concrete The problem of being omitted by gap, while the leaching of side mould bottom prevents from omitting concrete between template and workbench, end, which protrudes, prevents side Omit concrete in mould stitching portion.
Described above is only presently preferred embodiments of the present invention, and above-mentioned specific embodiment is not limitation of the present invention, Retouching, modification or the equivalent substitution that all one of ordinary skill in the art are made as described above, belong to the guarantor of the present invention Protect scope.

Claims (5)

1. a kind of side mould laying method for PC Numerical control production lines, it is characterised in that comprise the following steps:
1)Side mould is placed:The PC scantlings established as needed, place respectively on the table first in mould, second mould, 3rd in mould and the 4th mould, described first when the inner side of mould one end is with described second mould one end end contact, described second With mould one end end contact when the described 3rd on the inside of the other end of mould, the described 3rd when mould other end inner side is with the described 4th Mould one end end contact, the described 4th on the inside of the mould other end with mould other end end contact when described first, enclose the area after setting Domain is matched by any adjustment of length and width with that need to establish the size of PC components, is set region enclosing and is put into reinforced frame, institute The reinforcing bar for stating reinforced frame edge is each fallen within inside adjacent edge mould;
2)Side mould absorption and sealing:Mould fastens on the table when making first mould, the 3rd are in mould and the 4th in mould, second; It is each be in contact in mould end position and while mould bottom and workbench between position effectively seal, complete PC Numerical control production lines side Mould is placed.
2. the side mould laying method according to claim 1 for PC Numerical control production lines, it is characterised in that:Described first Bian Mo, second mould and the 4th side mould in mould, the 3rd include matrix and multiple fixed blocks located at described matrix surface.
3. the side mould laying method according to claim 2 for PC Numerical control production lines, it is characterised in that:Step 2)Middle institute Mould fastens first stated while in mould, second, mould, the 3rd are in mould and the 4th is by described matrix on the table What multiple strong magnetic devices in portion were realized, the strong magnetic device includes strong magnets and is connected with the strong magnets Magnetic switch, the magnetic switch stretch out described matrix surface and are provided with an action bars, and each action bars is on described matrix surface It is conllinear to set.
4. the side mould laying method according to claim 2 for PC Numerical control production lines, it is characterised in that:Step 2)In The effectively sealing of each position is realized by sealing device, and the sealing device includes the inflation bag that each fixed block both ends are provided with Also set on described matrix surface with inside described matrix and with the gas ducting of the inflation bag connection, the gas ducting There is the gas-charging connection to connect with the gas ducting, the gas-charging connection is connected with outside air supply source, the reinforced frame edge Reinforcing bar located at it is adjacent inflation bag between.
5. the side mould laying method according to claim 3 for PC Numerical control production lines, it is characterised in that:The strong magnetic Holddown spring is provided between iron and described matrix bottom, side mould can be promoted to leave workbench as early as possible when magnetic switch is closed.
CN201710805834.3A 2017-09-08 2017-09-08 A kind of side mode laying method for PC Numerical control production line Active CN107553695B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710805834.3A CN107553695B (en) 2017-09-08 2017-09-08 A kind of side mode laying method for PC Numerical control production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710805834.3A CN107553695B (en) 2017-09-08 2017-09-08 A kind of side mode laying method for PC Numerical control production line

Publications (2)

Publication Number Publication Date
CN107553695A true CN107553695A (en) 2018-01-09
CN107553695B CN107553695B (en) 2019-07-16

Family

ID=60980319

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710805834.3A Active CN107553695B (en) 2017-09-08 2017-09-08 A kind of side mode laying method for PC Numerical control production line

Country Status (1)

Country Link
CN (1) CN107553695B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108858690A (en) * 2018-07-10 2018-11-23 青岛腾远设计事务所有限公司 It is a kind of for producing the mold and application method of precast concrete
CN109676757A (en) * 2018-12-28 2019-04-26 河南金厦智能装配建筑科技有限公司 A kind of intelligence side mode die device
CN112936527A (en) * 2021-02-20 2021-06-11 湖北宝业建筑工业化有限公司 Superimposed shear wall module assembling system and module assembling method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106545162A (en) * 2017-01-16 2017-03-29 曹龙 A kind of concrete blinding sealing device of geometry
CN206066661U (en) * 2016-09-28 2017-04-05 贵州省绿筑科建住宅产业化发展有限公司 A kind of side mould for exempting from out muscle hole and overlapping board mold
CN107053439A (en) * 2017-05-04 2017-08-18 胡德 A kind of concrete plate is molded positioner

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206066661U (en) * 2016-09-28 2017-04-05 贵州省绿筑科建住宅产业化发展有限公司 A kind of side mould for exempting from out muscle hole and overlapping board mold
CN106545162A (en) * 2017-01-16 2017-03-29 曹龙 A kind of concrete blinding sealing device of geometry
CN107053439A (en) * 2017-05-04 2017-08-18 胡德 A kind of concrete plate is molded positioner

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108858690A (en) * 2018-07-10 2018-11-23 青岛腾远设计事务所有限公司 It is a kind of for producing the mold and application method of precast concrete
CN109676757A (en) * 2018-12-28 2019-04-26 河南金厦智能装配建筑科技有限公司 A kind of intelligence side mode die device
CN109676757B (en) * 2018-12-28 2024-01-05 南阳精工匠人装配建筑科技有限公司 Intelligent side die device
CN112936527A (en) * 2021-02-20 2021-06-11 湖北宝业建筑工业化有限公司 Superimposed shear wall module assembling system and module assembling method

Also Published As

Publication number Publication date
CN107553695B (en) 2019-07-16

Similar Documents

Publication Publication Date Title
CN107553695A (en) A kind of side mould laying method for PC Numerical control production lines
CN102407601B (en) A kind of mouth-sealing method of steel wire frame plastic composite pipe and equipment
CN103264513A (en) Integrated co-curing forming technology method for composite material multi-beam box section
CN109958143A (en) A kind of piping lane prefabricated mould and piping lane construction method
CN108381753A (en) The production method of precast concrete
CN205325962U (en) Prefabricated component buried sleeve positioner
CN207142323U (en) A kind of turnover device of the production of heat preservation plate material
CN109025059A (en) A kind of door and window Cast-in-situ Beam casting method
CN207553647U (en) A kind of novel crack glue injection machine equipment
CN206646549U (en) Underground engineering assembly concrete air channel
CN209364939U (en) The side mode and precast concrete mold of precast concrete
CN208502233U (en) A kind of air inflation sealing device for PC side mode
CN204944762U (en) PCCP steel cylinder sealing hydrostatic test machine
CN206812177U (en) A kind of PC sides mould with strong magnets
CN212406110U (en) Structure for pouring concrete beam post-cast strip by adopting inflatable template
CN211074021U (en) Embedded novel concrete member and pouring equipment thereof
CN107345438A (en) It is a kind of to realize that structure turns over the construction method of the prefabricated assembled awning of eaves based on EPS warming plates
CN207711011U (en) Assembling die for producing precast concrete
CN206752448U (en) Combination against seepage wall construction
CN206873936U (en) One kind inflation indoor wall PC sides mould sealing device
CN207260292U (en) A kind of steel pipe encapsulates concrete apparatus
CN105328771A (en) Method for manufacturing hollow block in laboratory room, special die and manufacturing method of special die
CN206551326U (en) A kind of light-cured resin lens machining device
CN206123900U (en) Cement flue machine
CN204590620U (en) A kind of construction formwork support member

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190611

Address after: 473000 Northeast corner of the intersection of Weishi Road and Zhongjing Road in Lihe Township, Wancheng District, Nanyang City, Henan Province

Applicant after: Nanyang Seiko Craftsman Assembly Construction Technology Co., Ltd.

Address before: 473000 Weishi Road, Wancheng Eco-Industrial Park, Nanyang City, Henan Province

Applicant before: Henan Jinsha Intelligent Assembly Building Technology Co., Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant