CN107552828A - A kind of water pump vane processing drilling equipment - Google Patents
A kind of water pump vane processing drilling equipment Download PDFInfo
- Publication number
- CN107552828A CN107552828A CN201710647979.5A CN201710647979A CN107552828A CN 107552828 A CN107552828 A CN 107552828A CN 201710647979 A CN201710647979 A CN 201710647979A CN 107552828 A CN107552828 A CN 107552828A
- Authority
- CN
- China
- Prior art keywords
- rotating shaft
- motor
- placing frame
- drill bit
- drilling equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Earth Drilling (AREA)
Abstract
The present invention relates to a kind of drilling equipment, more particularly to a kind of water pump vane processing drilling equipment.The technical problem to be solved in the present invention is to provide a kind of water pump vane processing drilling equipment.In order to solve the above-mentioned technical problem, the invention provides such a water pump vane processing drilling equipment, support etc. is included;The crown center of base is provided with rotating mechanism, the top of rotating mechanism is provided with placing frame, fixing axle is provided among placing frame inner bottom part, the periphery of fixing axle is provided with rubber blanket, the top right side of base is connected with support, support inner top is provided with borehole drill construction, and borehole drill construction is located at the upper right of placing frame, and placing frame bottom right is provided with first through hole.Invention achieves the safe and high effect of operating efficiency, the first drill bit and the second drill bit rotate together, more ensure that the hole of brill is symmetrical, while improve the efficiency of work, and pressing fixed blocks are downwardly against impeller so that boring procedure is more stable, and drilling is more accurate.
Description
Technical field
The present invention relates to a kind of drilling equipment, more particularly to a kind of water pump vane processing drilling equipment.
Background technology
Water pump is the machinery for conveying liquid or being pressurized liquid.It transmits the mechanical energy of prime mover or other external energies
Liquid, increase liquid energy, being mainly used to conveying liquid includes water, oil, acid & alkali liquid, emulsion, suspended emulsion and liquid gold
Category etc., can also convey liquid, admixture of gas and the liquid containing suspended solids.The technical parameter of pump performance have flow,
Suction, lift, shaft power, water-horse power, efficiency etc.;The types such as volume water pump, vane pump can be divided into according to different operation principles.
There is the low and ineffective shortcoming of security in existing impeller drilling equipment, therefore need a kind of safety of research and development badly
Property the high and high water pump vane processing drilling equipment of operating efficiency.
The content of the invention
(1) technical problems to be solved
The present invention is in order to overcome existing impeller drilling equipment the low and ineffective shortcoming of security to be present, the present invention
Technical problems to be solved are to provide a kind of water pump vane processing drilling equipment.
(2) technical scheme
In order to solve the above-mentioned technical problem, the invention provides such a water pump vane processing drilling equipment, including
There are support, base, rotating mechanism, placing frame, rubber blanket, fixing axle and borehole drill construction, the crown center of base is provided with rotating machine
Structure, the top of rotating mechanism are provided with placing frame, are provided with fixing axle among placing frame inner bottom part, the periphery of fixing axle is provided with rubber
Pad, the top right side of base are connected with support, and support inner top is provided with borehole drill construction, and borehole drill construction is right located at the top of placing frame
Side, placing frame bottom right are provided with first through hole.
Preferably, rotating mechanism includes gear wheel, first bearing seat, first rotating shaft, sector gear and the first motor, bottom
The middle top of seat is provided with first bearing seat and the first motor, and first bearing seat is located at the left side of the first motor, clutch shaft bearing
First rotating shaft is installed on seat, is connected among the top of first rotating shaft and the bottom of placing frame, is provided with first rotating shaft big
Gear, sector gear is connected with the top of the first motor, sector gear engages with gear wheel.
Preferably, borehole drill construction includes hydraulic cylinder, the second motor, the second rotating shaft and the first drill bit, support inner top peace
Equipped with hydraulic cylinder, the bottom of hydraulic cylinder is connected with the second motor, and the bottom of the second motor is connected with the second rotating shaft, the second rotating shaft
Bottom is connected with the first drill bit, and the first drill bit is located at the surface of first through hole.
Preferably, installing plate, driving wheel, belt, the second drill bit, driven pulley, the 3rd rotating shaft and second bearing are also included
Seat, the bottom left of placing frame are provided with the second through hole, and the bottom of hydraulic cylinder is connected with installing plate, and the first motor is arranged on installing plate
Bottom right-hand member, driving wheel is installed, installing plate bottom left end is provided with second bearing seat, in second bearing seat in the second rotating shaft
3rd rotating shaft is installed, driven pulley is installed in the 3rd rotating shaft, belt, the bottom of the 3rd rotating shaft are wound between driven pulley and driving wheel
End is connected with the second drill bit, and the second drill bit is directly over the second through hole.
Preferably, pressing fixed blocks, T-shaped guide rod and elastic component are also included, left and right sides symmetrical expression is provided with guiding on installing plate
Hole, installing plate bottom left and right sides symmetrical expression are connected with elastic component, and the bottom of elastic component is connected with pressing fixed blocks, the top of pressing fixed blocks
Centre is provided with T-shaped guide rod, and T-shaped guide rod passes through pilot hole.
Preferably, anti-slip veins are carved with the bottom of pressing fixed blocks.
Operation principle:When needing to carry out impeller drilling processing, impeller is placed in placing frame by staff first,
Impeller just with taking whole placing frame, passes through fixing axle, the frictional force of rubber blanket is big, impeller can be fixed among impeller
It is more firm.Then staff starts borehole drill construction and starts to drill, and after the completion of once drilling, staff starts rotating machine
Structure is started working, and impeller rotates, and during wheel rotation suitable location, rotating mechanism stops operating, then carries out drilling processing, together
Reason is repeatedly, you can completes the Drilling operation processing of impeller.
Because rotating mechanism includes gear wheel, first bearing seat, first rotating shaft, sector gear and the first motor, base
Middle top first bearing seat and the first motor be installed, first bearing seat is located at the left side of the first motor, first bearing seat
On first rotating shaft is installed, be connected among the top of first rotating shaft and the bottom of placing frame, canine tooth be installed in first rotating shaft
Take turns, sector gear is connected with the top of the first motor, sector gear engages with gear wheel, so staff starts the first motor
Start working, drive sector gear to rotate, when sector gear engages with gear wheel, drive its rotation, and then impeller rotates
Certain angle, when sector gear does not engage with gear wheel, staff closes the first motor, you can realizes intermittent rotation leaf
Wheel, its drilling is facilitated to handle.
Because borehole drill construction includes hydraulic cylinder, the second motor, the second rotating shaft and the first drill bit, support inner top is provided with
Hydraulic cylinder, the bottom of hydraulic cylinder are connected with the second motor, and the bottom of the second motor is connected with the second rotating shaft, the bottom of the second rotating shaft
The first drill bit is connected with, the first drill bit is located at placing frame upper right, so staff starts the second motor and started working, band
Dynamic first drill bit rotates, while starts hydraulic cylinder elongation, drives the first drill bit slowly to move downward, the first drill bit can be in impeller
Upper drilling, after the completion of drilling, start hydraulic cylinder and retract, close the second motor.
Because also including installing plate, driving wheel, belt, the second drill bit, driven pulley, the 3rd rotating shaft and second bearing seat,
The bottom of hydraulic cylinder is connected with installing plate, and the first motor is arranged on the bottom right-hand member of installing plate, is provided with the second rotating shaft actively
Wheel, installing plate bottom left end are provided with second bearing seat, the 3rd rotating shaft are provided with second bearing seat, is provided with the 3rd rotating shaft
Driven pulley, belt is wound between driven pulley and driving wheel, the bottom of the 3rd rotating shaft is connected with the second drill bit, and the second drill bit is located at and put
Frame upper left is put, so when the first motor rotates, drives driving wheel and driven pulley to rotate, so as to drive the first drill bit and the
Two drill bits rotate together, you can more ensure that the hole of brill is symmetrical, while improve the efficiency of work.
Because also including pressing fixed blocks, T-shaped guide rod and elastic component, left and right sides symmetrical expression is provided with pilot hole on installing plate,
Symmetrical expression is connected with elastic component at left and right sides of installing plate bottom, and the bottom of elastic component is connected with pressing fixed blocks, in the top of pressing fixed blocks
Between be provided with T-shaped guide rod, T-shaped guide rod passes through pilot hole, thus impeller drilling when, with pushing down on for hydraulic cylinder, pressing fixed blocks
Downwardly against impeller so that boring procedure is more stable, and drilling is more accurate.
The control mode of the present invention is automatically controlled by controller, the skill that the control circuit of controller passes through this area
Art personnel simple programming can be achieved, and belong to the common knowledge of this area, and the present invention is mainly used to protect mechanical device, institute
Control mode is not explained with the present invention to connect with circuit.
(3) beneficial effect
Invention achieves the safe and high effect of operating efficiency, the first drill bit and the second drill bit rotate together, more
Add the hole for ensureing to bore symmetrical, while improve the efficiency of work, pressing fixed blocks are downwardly against impeller so that boring procedure is more steady
Fixed, drilling is more accurate.
Brief description of the drawings
Fig. 1 is the main structure diagram of the present invention.
Fig. 2 is the overlooking the structure diagram of rotating mechanism of the present invention.
Fig. 3 is the main structure diagram of borehole drill construction of the present invention.
Fig. 4 is the first part main structure diagram of the present invention.
Fig. 5 is second of part main structure diagram of the present invention.
Mark in accompanying drawing for:1- supports, 2- bases, 3- rotating mechanisms, 31- gear wheels, 32- first bearing seats, 33-
One rotating shaft, 34- sector gears, the motors of 35- first, 4- placing frames, 40- first through hole, the through holes of 41- second, 5- rubber blankets, 6- are solid
Dead axle, 7- borehole drill constructions, 71- hydraulic cylinders, the motors of 72- second, the rotating shafts of 73- second, the drill bits of 74- first, 8- installing plates, 9- is actively
Wheel, 10- belts, the drill bits of 11- second, 12- driven pulleys, the rotating shafts of 13- the 3rd, 14- second bearing seats, 15- pilot holes, 16- pressures are solid
Block, 17-T shape guide rods, 18- elastic components.
Embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of water pump vane processing drilling equipment, as Figure 1-5, include support 1, base 2, rotating mechanism 3, put
Frame 4, rubber blanket 5, fixing axle 6 and borehole drill construction 7 are put, the crown center of base 2 is provided with rotating mechanism 3, the top of rotating mechanism 3
Provided with placing frame 4, fixing axle 6 is provided among the inner bottom part of placing frame 4, the periphery of fixing axle 6 is provided with rubber blanket 5, the top of base 2
Right side is connected with support 1, and the inner top of support 1 is provided with borehole drill construction 7, and borehole drill construction 7 is located at the upper right of placing frame 4, places
The bottom right of frame 4 is provided with first through hole 40.
Embodiment 2
A kind of water pump vane processing drilling equipment, as Figure 1-5, include support 1, base 2, rotating mechanism 3, put
Frame 4, rubber blanket 5, fixing axle 6 and borehole drill construction 7 are put, the crown center of base 2 is provided with rotating mechanism 3, the top of rotating mechanism 3
Provided with placing frame 4, fixing axle 6 is provided among the inner bottom part of placing frame 4, the periphery of fixing axle 6 is provided with rubber blanket 5, the top of base 2
Right side is connected with support 1, and the inner top of support 1 is provided with borehole drill construction 7, and borehole drill construction 7 is located at the upper right of placing frame 4, places
The bottom right of frame 4 is provided with first through hole 40.
Rotating mechanism 3 includes gear wheel 31, first bearing seat 32, first rotating shaft 33, the motor of sector gear 34 and first
35, the middle top of base 2 is provided with the motor 35 of first bearing seat 32 and first, and first bearing seat 32 is located at the first motor 35
Left side, first rotating shaft 33 is installed in first bearing seat 32, is connected among the top of first rotating shaft 33 and the bottom of placing frame 4
Connect, gear wheel 31 be installed in first rotating shaft 33, the top of the first motor 35 is connected with sector gear 34, sector gear 34 with it is big
Gear 31 engages.
Embodiment 3
A kind of water pump vane processing drilling equipment, as Figure 1-5, include support 1, base 2, rotating mechanism 3, put
Frame 4, rubber blanket 5, fixing axle 6 and borehole drill construction 7 are put, the crown center of base 2 is provided with rotating mechanism 3, the top of rotating mechanism 3
Provided with placing frame 4, fixing axle 6 is provided among the inner bottom part of placing frame 4, the periphery of fixing axle 6 is provided with rubber blanket 5, the top of base 2
Right side is connected with support 1, and the inner top of support 1 is provided with borehole drill construction 7, and borehole drill construction 7 is located at the upper right of placing frame 4, places
The bottom right of frame 4 is provided with first through hole 40.
Rotating mechanism 3 includes gear wheel 31, first bearing seat 32, first rotating shaft 33, the motor of sector gear 34 and first
35, the middle top of base 2 is provided with the motor 35 of first bearing seat 32 and first, and first bearing seat 32 is located at the first motor 35
Left side, first rotating shaft 33 is installed in first bearing seat 32, is connected among the top of first rotating shaft 33 and the bottom of placing frame 4
Connect, gear wheel 31 be installed in first rotating shaft 33, the top of the first motor 35 is connected with sector gear 34, sector gear 34 with it is big
Gear 31 engages.
Borehole drill construction 7 includes hydraulic cylinder 71, the second motor 72, the second rotating shaft 73 and the first drill bit 74, the inner top of support 1
Hydraulic cylinder 71 is installed, the bottom of hydraulic cylinder 71 is connected with the second motor 72, and the bottom of the second motor 72 is connected with the second rotating shaft
73, the bottom of the second rotating shaft 73 is connected with the first drill bit 74, and the first drill bit 74 is located at the surface of first through hole 40.
Embodiment 4
A kind of water pump vane processing drilling equipment, as Figure 1-5, include support 1, base 2, rotating mechanism 3, put
Frame 4, rubber blanket 5, fixing axle 6 and borehole drill construction 7 are put, the crown center of base 2 is provided with rotating mechanism 3, the top of rotating mechanism 3
Provided with placing frame 4, fixing axle 6 is provided among the inner bottom part of placing frame 4, the periphery of fixing axle 6 is provided with rubber blanket 5, the top of base 2
Right side is connected with support 1, and the inner top of support 1 is provided with borehole drill construction 7, and borehole drill construction 7 is located at the upper right of placing frame 4, places
The bottom right of frame 4 is provided with first through hole 40.
Rotating mechanism 3 includes gear wheel 31, first bearing seat 32, first rotating shaft 33, the motor of sector gear 34 and first
35, the middle top of base 2 is provided with the motor 35 of first bearing seat 32 and first, and first bearing seat 32 is located at the first motor 35
Left side, first rotating shaft 33 is installed in first bearing seat 32, is connected among the top of first rotating shaft 33 and the bottom of placing frame 4
Connect, gear wheel 31 be installed in first rotating shaft 33, the top of the first motor 35 is connected with sector gear 34, sector gear 34 with it is big
Gear 31 engages.
Borehole drill construction 7 includes hydraulic cylinder 71, the second motor 72, the second rotating shaft 73 and the first drill bit 74, the inner top of support 1
Hydraulic cylinder 71 is installed, the bottom of hydraulic cylinder 71 is connected with the second motor 72, and the bottom of the second motor 72 is connected with the second rotating shaft
73, the bottom of the second rotating shaft 73 is connected with the first drill bit 74, and the first drill bit 74 is located at the surface of first through hole 40.
Also include installing plate 8, driving wheel 9, belt 10, the second drill bit 11, driven pulley 12, the 3rd rotating shaft 13 and the second axle
Bearing 14, the bottom left of placing frame 4 are provided with the second through hole 41, and the bottom of hydraulic cylinder 71 is connected with installing plate 8, the first motor 35
Installed in the bottom right-hand member of installing plate 8, driving wheel 9 is installed in second rotating shaft 73, the bottom left end of installing plate 8 is provided with the second axle
Bearing 14, the 3rd rotating shaft 13 is installed in second bearing seat 14, driven pulley 12 is installed in the 3rd rotating shaft 13, driven pulley 12 with it is main
Belt 10 is wound between driving wheel 9, the bottom of the 3rd rotating shaft 13 is connected with the second drill bit 11, and the second drill bit 11 is located at the second through hole 41
Surface.
Also include pressing fixed blocks 16, T-shaped guide rod 17 and elastic component 18, left and right sides symmetrical expression is provided with guiding on installing plate 8
Hole 15, the bottom of installing plate 8 left and right sides symmetrical expression are connected with elastic component 18, and the bottom of elastic component 18 is connected with pressing fixed blocks 16, pressure
Gu the crown center of block 16 is provided with T-shaped guide rod 17, T-shaped guide rod 17 passes through pilot hole 15.
It is carved with anti-slip veins in the bottom of pressing fixed blocks 16.
Operation principle:When needing to carry out impeller drilling processing, impeller is placed on placing frame 4 by staff first
Interior, impeller just with taking whole placing frame 4, passes through fixing axle 6, the frictional force of rubber blanket 5 is big, can cause impeller among impeller
Fix more firm.Then staff starts borehole drill construction 7 and starts to drill, and after the completion of once drilling, staff opens
Dynamic rotating mechanism 3 is started working, and impeller rotates, and during wheel rotation suitable location, rotating mechanism 3 stops operating, then carries out
Drilling is handled, similarly repeatedly, you can completes the Drilling operation processing of impeller.
Because rotating mechanism 3 includes gear wheel 31, first bearing seat 32, first rotating shaft 33, sector gear 34 and first
Motor 35, the middle top of base 2 are provided with the motor 35 of first bearing seat 32 and first, and first bearing seat 32 is located at the first motor
35 left side, first rotating shaft 33, the top of first rotating shaft 33 and the bottom interphase of placing frame 4 are installed in first bearing seat 32
Connection, is provided with gear wheel 31 in first rotating shaft 33, and the top of the first motor 35 is connected with sector gear 34, sector gear 34 with
Gear wheel 31 engages, so staff starts the first motor 35 and started working, drives sector gear 34 to rotate, sector gear 34
When being engaged with gear wheel 31, drive its rotation, and then impeller turns an angle, sector gear 34 not with gear wheel 31
During engagement, staff closes the first motor 35, you can realizes intermittent wheel rotor, facilitates its drilling to handle.
Because borehole drill construction 7 includes hydraulic cylinder 71, the second motor 72, the second rotating shaft 73 and the first drill bit 74, in support 1
Top is provided with hydraulic cylinder 71, and the bottom of hydraulic cylinder 71 is connected with the second motor 72, and the bottom of the second motor 72 is connected with second
Rotating shaft 73, the bottom of the second rotating shaft 73 are connected with the first drill bit 74, and the first drill bit 74 is located at the upper right of placing frame 4, so work
Make personnel's the second motor 72 of startup to start working, drive the first drill bit 74 to rotate, while start hydraulic cylinder 71 and extend, drive first
Drill bit 74 slowly moves downward, and the first drill bit 74 can drill on impeller, after the completion of drilling, starts hydraulic cylinder 71 and retracts,
Close the second motor 72.
Because also include installing plate 8, driving wheel 9, belt 10, the second drill bit 11, driven pulley 12, the 3rd rotating shaft 13 and
Two bearing bracket 14, the bottom of hydraulic cylinder 71 are connected with installing plate 8, and the first motor 35 is arranged on the bottom right-hand member of installing plate 8, and second
Driving wheel 9 is installed, the bottom left end of installing plate 8 is provided with second bearing seat 14, is provided with second bearing seat 14 in rotating shaft 73
3rd rotating shaft 13, driven pulley 12 is installed in the 3rd rotating shaft 13, is wound with belt 10 between driven pulley 12 and driving wheel 9, the 3rd turn
The bottom of axle 13 is connected with the second drill bit 11, and the second drill bit 11 is located at the upper left of placing frame 4, so when the first motor 35 rotates
When, drive driving wheel 9 and driven pulley 12 to rotate, so as to drive the first drill bit 74 and the second drill bit 11 to rotate together, you can more
Ensure that the hole of brill is symmetrical, while improve the efficiency of work.
Because also including pressing fixed blocks 16, T-shaped guide rod 17 and elastic component 18, left and right sides symmetrical expression is provided with installing plate 8
Pilot hole 15, the bottom of installing plate 8 left and right sides symmetrical expression are connected with elastic component 18, and the bottom of elastic component 18 is connected with pressing fixed blocks
16, the crown center of pressing fixed blocks 16 is provided with T-shaped guide rod 17, and T-shaped guide rod 17 passes through pilot hole 15, thus impeller drilling when, with
Pushing down on for hydraulic cylinder 71, pressing fixed blocks 16 are downwardly against impeller so that boring procedure is more stable, and drilling is more accurate.
The control mode of the present invention is automatically controlled by controller, the skill that the control circuit of controller passes through this area
Art personnel simple programming can be achieved, and belong to the common knowledge of this area, and the present invention is mainly used to protect mechanical device, institute
Control mode is not explained with the present invention to connect with circuit.
Embodiment described above only expresses the preferred embodiment of the present invention, and its description is more specific and detailed, but simultaneously
Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art
For, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these belong to this hair
Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (6)
1. a kind of water pump vane processing drilling equipment, it is characterised in that include support (1), base (2), rotating mechanism
(3), placing frame (4), rubber blanket (5), fixing axle (6) and borehole drill construction (7), the crown center of base (2) are provided with rotating mechanism
(3), the top of rotating mechanism (3) is provided with placing frame (4), and fixing axle (6), fixing axle (6) are provided among placing frame (4) inner bottom part
Periphery be provided with rubber blanket (5), the top right side of base (2) is connected with support (1), and support (1) inner top is provided with borehole drill construction
(7), borehole drill construction (7) is located at the upper right of placing frame (4), and placing frame (4) bottom right is provided with first through hole (40).
2. a kind of water pump vane processing drilling equipment according to claim 1, it is characterised in that rotating mechanism (3) wraps
Gear wheel (31), first bearing seat (32), first rotating shaft (33), sector gear (34) and the first motor (35), base (2) are included
Middle top first bearing seat (32) and the first motor (35) be installed, first bearing seat (32) is located at the first motor (35)
Left side, is provided with first rotating shaft (33) in first bearing seat (32), the top of first rotating shaft (33) with the bottom of placing frame (4)
Between be connected, gear wheel (31) is installed in first rotating shaft (33), sector gear (34) is connected with the top of the first motor (35),
Sector gear (34) engages with gear wheel (31).
3. a kind of water pump vane processing drilling equipment according to claim 2, it is characterised in that borehole drill construction (7) wraps
Hydraulic cylinder (71), the second motor (72), the second rotating shaft (73) and the first drill bit (74) are included, support (1) inner top is provided with liquid
Cylinder pressure (71), the bottom of hydraulic cylinder (71) are connected with the second motor (72), and the bottom of the second motor (72) is connected with the second rotating shaft
(73), the bottom of the second rotating shaft (73) is connected with the first drill bit (74), the first drill bit (74) located at first through hole (40) just on
Side.
4. a kind of water pump vane processing drilling equipment according to claim 3, it is characterised in that also include installing plate
(8), driving wheel (9), belt (10), the second drill bit (11), driven pulley (12), the 3rd rotating shaft (13) and second bearing seat (14),
The bottom left of placing frame (4) is provided with the second through hole (41), and the bottom of hydraulic cylinder (71) is connected with installing plate (8), the first motor
(35) the bottom right-hand member of installing plate (8) is arranged on, driving wheel (9), installing plate (8) bottom left end are installed in the second rotating shaft (73)
Second bearing seat (14) is installed, the 3rd rotating shaft (13) is installed in second bearing seat (14), is provided with the 3rd rotating shaft (13)
Driven pulley (12), is wound with belt (10) between driven pulley (12) and driving wheel (9), the bottom of the 3rd rotating shaft (13) is connected with second
Drill bit (11), the second drill bit (11) is directly over the second through hole (41).
5. a kind of water pump vane processing drilling equipment according to claim 4, it is characterised in that also include pressing fixed blocks
(16), T-shaped guide rod (17) and elastic component (18), left and right sides symmetrical expression is provided with pilot hole (15), installing plate on installing plate (8)
(8) symmetrical expression is connected with elastic component (18) at left and right sides of bottom, and the bottom of elastic component (18) is connected with pressing fixed blocks (16), pressing fixed blocks
(16) crown center is provided with T-shaped guide rod (17), and T-shaped guide rod (17) passes through pilot hole (15).
A kind of 6. water pump vane processing drilling equipment according to claim 5, it is characterised in that the bottom of pressing fixed blocks (16)
It is carved with anti-slip veins in portion.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710647979.5A CN107552828A (en) | 2017-08-01 | 2017-08-01 | A kind of water pump vane processing drilling equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710647979.5A CN107552828A (en) | 2017-08-01 | 2017-08-01 | A kind of water pump vane processing drilling equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107552828A true CN107552828A (en) | 2018-01-09 |
Family
ID=60974911
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710647979.5A Pending CN107552828A (en) | 2017-08-01 | 2017-08-01 | A kind of water pump vane processing drilling equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107552828A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108500327A (en) * | 2018-03-30 | 2018-09-07 | 重庆市骞焰机械有限责任公司 | A kind of drilling device for flange plate |
CN110695400A (en) * | 2019-10-18 | 2020-01-17 | 佛山市同泰升精密机电科技有限公司 | Drilling equipment is used in processing of robot spare part |
CN112388017A (en) * | 2020-11-17 | 2021-02-23 | 杭州迪科机械有限公司 | Drilling machine for automobile water pump impeller |
CN112621231A (en) * | 2020-12-28 | 2021-04-09 | 广东顶固集创家居股份有限公司 | Handle drilling and tapping integrated machine |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004042198A (en) * | 2002-07-12 | 2004-02-12 | Daido Castings:Kk | Jig for finishing operations of precision casting |
DE102009005189A1 (en) * | 2009-01-20 | 2010-07-22 | Liebherr-Verzahntechnik Gmbh | Clamping device for retaining work pieces, has bearing including bearing part with bearing plane and another bearing part with another bearing plane that is partially pivotable to former bearing plane |
CN106316088A (en) * | 2016-11-19 | 2017-01-11 | 麻城小龟龟机械科技有限公司 | Cutting device for nano-glass production |
CN106424822A (en) * | 2016-11-29 | 2017-02-22 | 俞欢凤 | High-reliability intelligent watch drilling device |
CN106424974A (en) * | 2016-07-12 | 2017-02-22 | 海宁瑞贝特机械科技有限公司 | Full-automatic multi-functional servo tapping machine |
CN205981764U (en) * | 2016-08-27 | 2017-02-22 | 赣县金磊鑫矿业有限公司 | Fluorite mine surveys with drilling sampling device |
-
2017
- 2017-08-01 CN CN201710647979.5A patent/CN107552828A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004042198A (en) * | 2002-07-12 | 2004-02-12 | Daido Castings:Kk | Jig for finishing operations of precision casting |
DE102009005189A1 (en) * | 2009-01-20 | 2010-07-22 | Liebherr-Verzahntechnik Gmbh | Clamping device for retaining work pieces, has bearing including bearing part with bearing plane and another bearing part with another bearing plane that is partially pivotable to former bearing plane |
CN106424974A (en) * | 2016-07-12 | 2017-02-22 | 海宁瑞贝特机械科技有限公司 | Full-automatic multi-functional servo tapping machine |
CN205981764U (en) * | 2016-08-27 | 2017-02-22 | 赣县金磊鑫矿业有限公司 | Fluorite mine surveys with drilling sampling device |
CN106316088A (en) * | 2016-11-19 | 2017-01-11 | 麻城小龟龟机械科技有限公司 | Cutting device for nano-glass production |
CN106424822A (en) * | 2016-11-29 | 2017-02-22 | 俞欢凤 | High-reliability intelligent watch drilling device |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108500327A (en) * | 2018-03-30 | 2018-09-07 | 重庆市骞焰机械有限责任公司 | A kind of drilling device for flange plate |
CN110695400A (en) * | 2019-10-18 | 2020-01-17 | 佛山市同泰升精密机电科技有限公司 | Drilling equipment is used in processing of robot spare part |
CN112388017A (en) * | 2020-11-17 | 2021-02-23 | 杭州迪科机械有限公司 | Drilling machine for automobile water pump impeller |
CN112388017B (en) * | 2020-11-17 | 2023-09-15 | 杭州迪科机械有限公司 | Drilling machine for automobile water pump impeller |
CN112621231A (en) * | 2020-12-28 | 2021-04-09 | 广东顶固集创家居股份有限公司 | Handle drilling and tapping integrated machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107552828A (en) | A kind of water pump vane processing drilling equipment | |
CN2772491Y (en) | Heart press | |
CN105927140A (en) | Electromagnetic rock drill | |
CN105216987B (en) | Back-off ship perforate observation device | |
CA2232175C (en) | Wellhead drive brake system | |
US3867846A (en) | High slip prime mover for pumpjack apparatus | |
CN105464630A (en) | Screw pump directly driven through large-torque submersible motor | |
CN209308968U (en) | A kind of new structural centrifugal pump | |
CN201358917Y (en) | Ground drive system for oil extraction screw pump | |
WO2019233141A1 (en) | Drive method for screw elevator | |
CN100494614C (en) | Submersible reverse circulation engineering drilling rig | |
CN206873531U (en) | Guide rod type revolution cutting chute forming machine | |
CN201528297U (en) | Motor starting device of oil extractor | |
CN108405930A (en) | A kind of drilling machine with overload protection function | |
CN202467646U (en) | Spiral piling machine | |
CN206377023U (en) | Fluid power reverse turning-proof screw pump drive device | |
CN205446027U (en) | Oil of diving directly drives screw pump universal joint transmission | |
CN211550945U (en) | High-efficiency fluid conveying energy-saving water pump | |
CN208636034U (en) | Toothed belt special fatigue test machine | |
CN201396256Y (en) | Direct drive type borehole pump group | |
CN205822187U (en) | Compound piling machine | |
CN106989014B (en) | A kind of screw pump direct-driving device using hydraulic braking motor shaft | |
CN201953627U (en) | Ground driving device of screw pump | |
CN101702602A (en) | Motor starting device of oil extractor | |
CN212250366U (en) | High-power five-cylinder plunger pump |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180109 |
|
RJ01 | Rejection of invention patent application after publication |