CN107552585A - The first-born production. art of one-shot forming electrical wire wiring - Google Patents

The first-born production. art of one-shot forming electrical wire wiring Download PDF

Info

Publication number
CN107552585A
CN107552585A CN201710777088.1A CN201710777088A CN107552585A CN 107552585 A CN107552585 A CN 107552585A CN 201710777088 A CN201710777088 A CN 201710777088A CN 107552585 A CN107552585 A CN 107552585A
Authority
CN
China
Prior art keywords
station
rod
axle clamp
flat
carries out
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710777088.1A
Other languages
Chinese (zh)
Inventor
陈晓武
马丁
陈港
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenzhou Boyu Machinery Co Ltd
Original Assignee
Wenzhou Boyu Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Boyu Machinery Co Ltd filed Critical Wenzhou Boyu Machinery Co Ltd
Priority to CN201710777088.1A priority Critical patent/CN107552585A/en
Publication of CN107552585A publication Critical patent/CN107552585A/en
Pending legal-status Critical Current

Links

Abstract

A kind of first-born production. art of one-shot forming electrical wire wiring, its step are as follows:Step 1: a:Blank is cut and is directly brought into the first station by shear knife from blanking die;b:First station rushes rod and carries out rough stretch;Step 2: a:First station pincers axle clamp holds rough forging material of stretching and moves to second station;b:Second station circle rush rod stretch it is preforming;Step 3: a:Second station pincers axle clamp holds preforming 180 ° of forging material rotation and is moved to 3rd station;b:3rd station circle rushes rod and carries out stretching hole forming;Step 4: a:3rd station pincers axle clamp holds hole forming forging material and is rotated by 90 ° and is moved to the 4th station;b:4th station is flat rush rod rushed in advance it is flat;Step 5: a:4th station pincers axle clamp hold it is pre- rush it is flat forging material move to the 5th station;b:The flat rod that rushes of 5th station carries out product shaping;Step 6: a:5th station pincers axle clamp holds finished product material and moves to the 6th station;b:6th station punching circle rushes rod and carries out finished product punching.

Description

The first-born production. art of one-shot forming electrical wire wiring
Technical field
The present invention relates to a kind of production technology, and in particular to the first-born production. art of one-shot forming electrical wire wiring.
Background technology
At present, the electric wire connector that people use is made up of electrical wire wiring part with fastening contact portion, its concrete structure Mainly include two kinds of structure types, a kind of electrical wire wiring part of electric wire connector is the cylinder with cannelure, and fastening connects Contact portion is divided into no horizontal joint flat board plug;The electrical wire wiring part of another electric wire connector is without cannelure cylinder, is fastened Contact portion is the platysome with horizontal joint, and the complex manufacturing of the electric wire connector of both the above is cumbersome.
The content of the invention
Technical scheme is used by present invention offer solves its technical problem:The first-born production work of one-shot forming electrical wire wiring Skill, its step are as follows:
Step 1: a:Blank is cut and is directly brought into the first station by shear knife from blanking die;
b:First station rushes rod and carries out rough stretch;
Step 2: a:First station pincers axle clamp holds rough forging material of stretching and moves to second station;
b:Second station circle rush rod stretch it is preforming;
Step 3: a:Second station pincers axle clamp holds preforming 180 ° of forging material rotation and is moved to 3rd station;
b:3rd station circle rushes rod and carries out stretching hole forming;
Step 4: a:3rd station pincers axle clamp holds hole forming forging material and is rotated by 90 ° and is moved to the 4th station;
b:4th station is flat rush rod rushed in advance it is flat;
Step 5: a:4th station pincers axle clamp hold it is pre- rush it is flat forging material move to the 5th station;
b:The flat rod that rushes of 5th station carries out product shaping;
Step 6: a:5th station pincers axle clamp holds finished product material and moves to the 6th station;
b:6th station punching circle rushes rod and carries out finished product punching;
Beneficial effect:Present invention process flow succinctly facilitates, one-shot forming, it is not necessary to which substantial amounts of equipment is processed with regard to energy Complete.
Brief description of the drawings
Fig. 1 is the first-born production. art block diagram of one-shot forming electrical wire wiring of the present invention;
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made Embodiment, belong to the scope of protection of the invention.
As it is shown in the figures, the technical solution adopted for the present invention to solve the technical problems is:One-shot forming electrical wire wiring First-born production. art, its step are as follows:
Step 1: a:Blank is cut and is directly brought into the first station by shear knife from blanking die;
b:First station rushes rod and carries out rough stretch;
Step 2: a:First station pincers axle clamp holds rough forging material of stretching and moves to second station;
b:Second station circle rush rod stretch it is preforming;
Step 3: a:Second station pincers axle clamp holds preforming 180 ° of forging material rotation and is moved to 3rd station;
b:3rd station circle rushes rod and carries out stretching hole forming;
Step 4: a:3rd station pincers axle clamp holds hole forming forging material and is rotated by 90 ° and is moved to the 4th station;
b:4th station is flat rush rod rushed in advance it is flat;
Step 5: a:4th station pincers axle clamp hold it is pre- rush it is flat forging material move to the 5th station;
b:The flat rod that rushes of 5th station carries out product shaping;
Step 6: a:5th station pincers axle clamp holds finished product material and moves to the 6th station;
b:6th station punching circle rushes rod and carries out finished product punching;
As known by the technical knowledge, the present invention can pass through the embodiment party of other essence without departing from its spirit or essential feature Case is realized.Therefore, embodiment disclosed above, for each side, all it is merely illustrative, is not only.It is all It is included in the invention within the scope of the present invention or in the change being equal in the scope of the present invention.

Claims (1)

1. a kind of first-born production. art of one-shot forming electrical wire wiring, its step are as follows:
Step 1: a:Blank is cut and is directly brought into the first station by shear knife from blanking die;
b:First station rushes rod and carries out rough stretch;
Step 2: a:First station pincers axle clamp holds rough forging material of stretching and moves to second station;
b:Second station circle rush rod stretch it is preforming;
Step 3: a:Second station pincers axle clamp holds preforming 180 ° of forging material rotation and is moved to 3rd station;
b:3rd station circle rushes rod and carries out stretching hole forming;
Step 4: a:3rd station pincers axle clamp holds hole forming forging material and is rotated by 90 ° and is moved to the 4th station;
b:4th station is flat rush rod rushed in advance it is flat;
Step 5: a:4th station pincers axle clamp hold it is pre- rush it is flat forging material move to the 5th station;
b:The flat rod that rushes of 5th station carries out product shaping;
Step 6: a:5th station pincers axle clamp holds finished product material and moves to the 6th station;
b:6th station punching circle rushes rod and carries out finished product punching.
CN201710777088.1A 2017-08-26 2017-08-26 The first-born production. art of one-shot forming electrical wire wiring Pending CN107552585A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710777088.1A CN107552585A (en) 2017-08-26 2017-08-26 The first-born production. art of one-shot forming electrical wire wiring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710777088.1A CN107552585A (en) 2017-08-26 2017-08-26 The first-born production. art of one-shot forming electrical wire wiring

Publications (1)

Publication Number Publication Date
CN107552585A true CN107552585A (en) 2018-01-09

Family

ID=60978591

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710777088.1A Pending CN107552585A (en) 2017-08-26 2017-08-26 The first-born production. art of one-shot forming electrical wire wiring

Country Status (1)

Country Link
CN (1) CN107552585A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110125306A (en) * 2018-02-02 2019-08-16 温州博宇机械有限公司 A kind of copper lug manufacturing process of six stations Cold header clamping

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100895446B1 (en) * 2008-08-18 2009-05-07 (주)보원화스너 Manufacture method recliner-shaft
CN203356999U (en) * 2013-07-09 2013-12-25 湖州锐狮标准件制造有限公司 Cold extrusion die
CN206083589U (en) * 2016-09-26 2017-04-12 无锡市喜德金属科技有限公司 Steel wire punching press integration automatic production line that bends
CN106734566A (en) * 2016-11-22 2017-05-31 浙江巨宏工贸有限公司 Gas meter shell housing fully-automatic production is combined the unit and its method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100895446B1 (en) * 2008-08-18 2009-05-07 (주)보원화스너 Manufacture method recliner-shaft
CN203356999U (en) * 2013-07-09 2013-12-25 湖州锐狮标准件制造有限公司 Cold extrusion die
CN206083589U (en) * 2016-09-26 2017-04-12 无锡市喜德金属科技有限公司 Steel wire punching press integration automatic production line that bends
CN106734566A (en) * 2016-11-22 2017-05-31 浙江巨宏工贸有限公司 Gas meter shell housing fully-automatic production is combined the unit and its method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110125306A (en) * 2018-02-02 2019-08-16 温州博宇机械有限公司 A kind of copper lug manufacturing process of six stations Cold header clamping

Similar Documents

Publication Publication Date Title
CN203426280U (en) Continuous stamping die for manufacturing connector terminal
CN102610978B (en) Method and device for machining motor carbon brush carrier
CN203862710U (en) Forged ring processing device
CN105414898B (en) A kind of preparation method of the direct-current motor shell of flange shaping
CN107552585A (en) The first-born production. art of one-shot forming electrical wire wiring
CN103464608A (en) High-speed progressive die for correcting coplanarity of lead frame
CN201956830U (en) Crossed riveted type stator die
CN204441014U (en) A kind of double attaching type composite insulator compression bonding apparatus
CN108292814A (en) Electric contact with the different pointed tooth of edge length
CN203864084U (en) Collar turning bag-making molding device
CN203386796U (en) LED luminous strip packaging structure
CN208067126U (en) A kind of automotive wire bundle terminal compression joint Auxiliary support seat
CN207994308U (en) A kind of automotive wire bundle terminal crimping mold
CN105436829A (en) Manufacturing method for direct-current motor case
CN205211956U (en) High stability H molded lines presss from both sides
CN203983697U (en) A kind of two riveting cutter
CN204109332U (en) Extruding machine air extractor
CN202405703U (en) Compression joint structure of soft cable and tubular terminal
CN106734640B (en) A kind of dog-ear bonding clamp mold
CN211360449U (en) Bending die head
CN206145410U (en) Special -shaped fracture surface structural steel
CN202749149U (en) Flexible-conductor compressing die
CN102723656B (en) Joint forming device and method for flat copper conductor
CN105161299A (en) Preparation method for multi-core-set porcelain capacitor lead wire and lead wire
CN206732007U (en) A kind of glass sealing, Ceramic brazing silk material Bending Mould

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180109

WD01 Invention patent application deemed withdrawn after publication