CN107550073A - Screen presss from both sides and the fixed equipment of screen - Google Patents

Screen presss from both sides and the fixed equipment of screen Download PDF

Info

Publication number
CN107550073A
CN107550073A CN201710912017.8A CN201710912017A CN107550073A CN 107550073 A CN107550073 A CN 107550073A CN 201710912017 A CN201710912017 A CN 201710912017A CN 107550073 A CN107550073 A CN 107550073A
Authority
CN
China
Prior art keywords
screen
substrate
projection
shell
clamping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710912017.8A
Other languages
Chinese (zh)
Other versions
CN107550073B (en
Inventor
冉光银
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Yizhuo Intelligent Furniture Co ltd
Original Assignee
Guangdong You Miller Smart Home Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong You Miller Smart Home Co Ltd filed Critical Guangdong You Miller Smart Home Co Ltd
Priority to CN201710912017.8A priority Critical patent/CN107550073B/en
Publication of CN107550073A publication Critical patent/CN107550073A/en
Application granted granted Critical
Publication of CN107550073B publication Critical patent/CN107550073B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Connection Of Plates (AREA)
  • Overhead Projectors And Projection Screens (AREA)

Abstract

The present invention relates to the fixed equipment of a kind of screen folder and screen, the screen folder includes the first clamping split, the second clamping split and clamping element.First clamping split blocks a point shell, first substrate and the first conflict head including first.First substrate is installed on first one end for blocking point shell.Second clamping split blocks a point shell, second substrate and the second conflict head including second.Second substrate is installed on second one end for blocking point shell.Second conflict head is installed on second substrate, and second, which contradicts head, is used to contradict cooperation with the another side of screen.Clamping element, which is arranged on, to be blocked in shell, and clamping element is used to make the first clamping split clamp split clamping engagement with second.Above-mentioned screen folder, after first clamps split, the second clamping separable assembled to screen two sides, clamping element can be sheltered from by blocking shell, so as to be not easy to observe directly the connectors such as clamping element.

Description

Screen presss from both sides and the fixed equipment of screen
Technical field
The present invention relates to screen technical field, more particularly to the fixed equipment of a kind of screen folder and screen.
Background technology
After first clamping split of traditional screen folder clamps screen with the second clamping split, then pass through bolt or screw etc. Connector is horizontally through the mounting hole of the first clamping split and the mounting hole of the second clamping split by the first clamping split and second Fitted together between clamping split.The the first clamping split fitted together can clamp screen with the second clamping split.So And first clamps the mounting hole site of split in the side wall of the first clamping split, the mounting hole site of the second clamping split is in second In the side wall for clamping split, the first clamping split and the connector in the second clamping split that so fit together can be made User observes directly.
The content of the invention
Based on this, it is necessary to the defects of overcoming prior art, there is provided a kind of screen for being not easy to observe directly connector The fixed equipment of folder and screen.
Its technical scheme is as follows:A kind of screen folder, including:First clamping split, the first clamping split include first Block a point shell, first substrate and the first conflict head, the first substrate to be installed in described first and block on one end of point shell, institute State the first conflict head to be installed on the first substrate, described first, which contradicts head, is used to contradict with the wherein one side of screen Coordinate;Second clamping split, the second clamping split block a point shell, second substrate and the second conflict head, institute including second State second substrate and be installed in described second and block on one end of point shell, the second conflict head is installed in the second substrate On, described second, which contradicts head, is used to contradict with the another side of the screen and coordinates, and described first blocks point shell and described the Two, which block a point shell, is spliced to form and blocks shell, and the first substrate is spliced to form the bottom for supporting screen frame with the second substrate Plate;And clamping element, the clamping element be arranged on it is described block in shell, the clamping element is used to make the first clamping split and institute State the second clamping split clamping engagement.
Above-mentioned screen folder, after the first clamping split is respectively assembled in the two sides of screen with the second clamping split, pass through Clamping element makes the first clamping split mutually be clamped with the second clamping split, and first in the first clamping split contradicts head and second Screen can be clamped fixation by the second conflict head in clamping split.Clamping element, can be by blocking positioned at blocking in shell Shell is blocked.In this way, after first clamps split, the second clamping separable assembled to screen two sides, blocking shell can shelter from Clamping element, so as to be not easy to observe directly the connectors such as clamping element.
In one of the embodiments, the clamping element includes seat board and the first bolt, and being provided with the middle part of the seat board can Insert the first through hole of first bolt, the seat board towards be interval with the side of the first substrate the first projection with Second projection, the first side of first projection towards second projection are obliquely installed relative to the seat board plate face Inclined-plane, the second side of second projection towards first projection are oblique to be obliquely installed relative to the seat board plate face Face, the spacing between the first side and the second side become larger on the direction away from the seat board plate face;Institute State first substrate and be provided with the first screwed hole coordinated with first bolt, the plate face of the first substrate towards the seat board is set There is the first cell body corresponding with first projection, first cell body has the inclined-plane being engaged with the first side, The plate face of the second substrate towards the seat board is provided with the second cell body corresponding with second projection, the second cell body tool There is the inclined-plane being engaged with the second side.
In one of the embodiments, first projection, second projection are two, first cell body, institute It is two to state the second cell body, two first projections and two first cell bodies relative set one by one, two described Two projections and two second cell bodies relative set one by one.
In one of the embodiments, the seat board blocks the sidepiece of point shell towards described first and is provided with the first chute, institute State first and block point shell and be provided with the first sliding shoe coordinated with first slide, first sliding shoe slideably fills If into first chute;The seat board is provided with the second chute towards the described second sidepiece for blocking point shell, and described second hides Gear divides shell to be provided with the second sliding shoe coordinated with second slide, and the second sliding shoe is slideably installed up to second In chute.
In one of the embodiments, described first the end that point shell is used to block point shell with described second and splice is blocked Provided with the 3rd cell body, described second blocks point shell is provided with the 3rd projection for blocking a point end for shell splicing with described first, 3rd projection and the 3rd cell body relative set.
In one of the embodiments, the first substrate is used to be provided with first with the end face of second substrate splicing Projection, the second substrate are used to be provided be adapted with first projection first with the end face of first substrate splicing Recess;The first substrate is used to be provided with the second recess with the end face of second substrate splicing, and the second substrate is used for The second projection being adapted with second recess is provided with the end face of first substrate splicing.
In one of the embodiments, described second block a point shell madial wall and be connected with installing plate, the installing plate is located at Described to block inside shell, the installing plate is used to be installed up to desktop.
In one of the embodiments, the installing plate is provided with the second screwed hole, in the second screwed hole of the installing plate Provided with screw, described first, which blocks a point shell madial wall, is connected with guide pad, and the guide pad, which has, is located at second screwed hole The contact inclined-plane of top, the contact inclined-plane, which is used to contradict with the screw, to be coordinated.
In one of the embodiments, side and the first substrate plate face on the first conflict head be used to surrounding with The first adaptable receiving portion of a wherein sidepiece for screen frame;Described second contradicts the side on head and the second substrate plate face For surrounding the second receiving portion being adapted with the other side of the screen frame.
A kind of fixed equipment of screen, including described screen folder, in addition to the screen with screen folder clamping engagement Frame, the screen frame include the first framework and second framework;First framework is used to cover the peripheral sidewall for being filled to screen, institute It is resilient bezel to state the first framework;The second framework includes the first frame section and the second frame section, the first frame section and described second Frame section is spliced to form the second framework, and the second frame section is located on one of side of the second framework, and described One frame section is installed on the first framework peripheral sidewall with the second frame Duan Jun, and the second framework is rigid frame.
The fixed equipment of above-mentioned screen, there is technique effect caused by screen folder, in addition, screen frame is attached to screen When upper, first the first framework set of energy elastic telescopic can be filled on screen, such first framework can play protection to screen and make With then the first frame section, the second frame section being installed on the first framework peripheral sidewall by modes such as clamping, bondings again, hard The second framework of material can play a protective role to the first framework.Secondly as second framework is by the first frame section and described second Frame section is spliced to form, and the second frame section is located on one of side of second framework so that the splicing line in second framework is located at On the side of second framework, it can so be pressed from both sides by screen and shelter from the splicing line in second framework completely.In this way, it is installed up to Screen frame on screen can play preferable protective effect to screen, and the installation operation efficiency of screen frame is higher, on screen frame Splicing line can shelter from completely.
Brief description of the drawings
Fig. 1 is the configuration schematic diagram of the screen folder described in the embodiment of the present invention;
Fig. 2 is the top view of the screen folder described in the embodiment of the present invention;
Fig. 3 is sectional views of the Fig. 2 at A-A;
Fig. 4 is sectional views of the Fig. 2 at B-B;
Fig. 5 is that the fixed equipment of the screen described in the embodiment of the present invention fixes the structural representation of screen;
Fig. 6 is that the fixed equipment of the screen described in the embodiment of the present invention fixes screen in the structural representation on desktop Figure;
Fig. 7 is the structural representation that the screen frame described in the embodiment of the present invention is installed up on screen;
Fig. 8 is the schematic cross-sectional view that the screen frame described in the embodiment of the present invention is installed up on screen;
Fig. 9 is the structural representation of the first framework and the first shackle member described in the embodiment of the present invention;
Figure 10 is the structural representation of the second framework described in the embodiment of the present invention.
Reference:
100th, screen presss from both sides, and the 110, first clamping split, 111, first blocks a point shell, the 1111, the 3rd cell body, the 112, first base Plate, the 1121, first screwed hole, the 1122, first cell body, the 1123, first projection, the 1124, second recess, 113, first contradicts head Portion, the 114, first sliding shoe, 1151, contact inclined-plane, the 116, first receiving portion, 117, first contradict plate, 120, second clamping point Body, 121, second blocks a point shell, the 1211, the 3rd projection, and 122, second substrate, the 1221, second cell body, the 1222, first recess, 1223rd, the second projection, 123, second contradicts head, and 124, the second sliding shoe, the 125, second receiving portion, 126, second contradicts plate, 130th, clamping element, 131, seat board, 1311, first through hole, the 1312, first chute, the 1313, second chute, the 132, first bolt, 133rd, the first projection, 1331, first side, the 134, second projection, 1341, second side, 140, installing plate, the 141, second screw thread Hole, 142, screw, the 143, the 3rd screwed hole, the 144, second bolt, 150, desktop, 160, screen, the 161, first groove, 200, Screen frame, the 210, first framework, 211, card article, the 212, second groove, the 213, the 3rd groove, the 214, first shackle member, 220, Two frameworks, the 221, first frame section, the 222, second frame section, the 223, second shackle member, the 224, the 4th groove, 225, double faced adhesive tape, 231, Connecting plate, 232, screw.
Embodiment
In order to facilitate the understanding of the purposes, features and advantages of the present invention, below in conjunction with the accompanying drawings to the present invention Embodiment be described in detail.Many details are elaborated in the following description in order to fully understand this hair It is bright.But the invention can be embodied in many other ways as described herein, those skilled in the art can be not Similar improvement is done in the case of running counter to intension of the present invention, therefore the present invention is not limited by following public specific embodiment.
In the description of the invention, it is to be understood that term " first ", " second " are only used for describing purpose, and can not It is interpreted as indicating or implies relative importance or imply the quantity of the technical characteristic indicated by indicating.Thus, define " the One ", at least one this feature can be expressed or be implicitly included to the feature of " second ".In the description of the invention, " multiple " It is meant that at least two, such as two, three etc., unless otherwise specifically defined.
In the description of the invention, it is to be understood that, can be with when an element is considered as " connection " another element It is directly to another element or may be simultaneously present intermediary element.On the contrary, when element for be referred to as " direct " with it is another When element connects, in the absence of intermediary element.
As shown in Figures 1 to 4, a kind of screen folder, including the first clamping split 110, second clamp split 120 and clamped Part.The first clamping split 110 blocks point shell 111 including first, first substrate 112 and first contradicts head 113.Described One substrate 112 is installed in described first and blocked on one end of point shell 111.The first conflict head 113 is installed in described first On substrate 112, described first, which contradicts head 113, is used to contradict cooperation with the wherein one side of screen 160.Second clamping point Body 120 blocks point shell 121 including second, second substrate 122 and second contradicts head 123.The second substrate 122 is installed in institute State on second one end for blocking point shell 121.The second conflict head 123 is installed on the second substrate 122, and described second Head 123 is contradicted to be used to contradict cooperation with the another side of the screen 160.Described first blocks point shell 111 and described second Block point shell 121 and be spliced to form and block shell, the first substrate 112 is spliced to form for supporting screen with the second substrate 122 The bottom plate of wind frame 200.The clamping element is blocked in shell described in being arranged on, and the clamping element is used to make the first clamping split 110 clamp the clamping engagement of split 120 with described second.
Above-mentioned screen folder 100, the first clamping split 110 and second clamp split 120 and are respectively assembled in the two of screen 160 Behind side, the first clamping split 110 is clamped split 120 with second by clamping element and mutually clamp, in the first clamping split 110 First conflict head 113 and second clamp split 120 on second conflict head 123 screen 160 can be clamped consolidate It is fixed.Clamping element can be blocked positioned at blocking in shell by blocking shell.In this way, in the first clamping clamping point of split 110, second After body 120 is assembled to the two sides of screen 160, clamping element can be sheltered from by blocking shell, so as to be not easy to observe directly clamping element etc. Connector.
In one embodiment, the clamping element includes the bolt 132 of seat board 131 and first.The middle part of seat board 131 is provided with It is inserted into the first through hole 1311 of first bolt 132.The seat board 131 is towards on the side of the first substrate 112 It is interval with the first projection 133 and the second projection 134.First side of first projection 133 towards second projection 134 1331 be the inclined-plane that is obliquely installed relative to the plate face of seat board 131, and second projection 134 is towards first projection 133 Second side 1341 be the inclined-plane that is obliquely installed relative to the plate face of seat board 131.The first side 1331 and described the Spacing between two side faces 1341 becomes larger on the direction away from the plate face of seat board 131.
The first substrate 112 is provided with the first screwed hole 1121 coordinated with first bolt 132.The first substrate 112 are provided with first cell body 1122 corresponding with first projection 133, first cell body towards the plate face of the seat board 131 1122 have the inclined-plane being engaged with the first side 1331.Plate face of the second substrate 122 towards the seat board 131 Provided with second cell body 1221 corresponding with second projection 134, second cell body 1221 has and the second side 1341 inclined-planes being engaged.
In this way, the first bolt 132 is loaded to the first spiral shell of first substrate 112 by the first through hole 1311 of seat board 131 In pit 1121, the first projection 133 of seat board 131, the second projection 134 is corresponded to respectively and be inserted into the first cell body 1122, second In cell body 1221, seat board 131 just by first substrate 112, the assembly and connection of second substrate 122 together.The first bolt 132 is tightened, Seat board 131 is set closely to conform on bottom plate, seat board 131 causes the first projection 133, the second projection 134 to continue corresponding insert Enter into the first cell body 1122, the second cell body 1221, due to the spacing between first side 1331 and the second side 1341 Tapered on the direction of the plate face of seat board 131, first side 1331 will cause first substrate 112 with second side 1341 Closely fit together with second substrate 122.First substrate 112 be brought into close contact with second substrate 122 together with when, just Enable to the first conflict head 113, second to contradict head 123 and more securely clamp screen 160.Alternatively, clamping element Spring secures rail to sleeper can be used, spring secures rail to sleeper is also that first substrate 112, second substrate 122 can be assembled and be closely adhered to Together.
Further, first projection 133, second projection 134 are two, first cell body 1122, institute It is two to state the second cell body 1221.Two first projections 133 and two first cell bodies 1122 relative set one by one, Two second projections 134 and two second cell bodies 1221 relative set one by one.In this way, two group of first projection 133 with Second projection 134 preferably can closely fit together first substrate 112 and second substrate 122.
In one embodiment, the seat board 131 blocks the sidepiece of point shell 111 towards described first and is provided with the first chute 1312, described first, which blocks point shell 111, is provided with the first sliding shoe 114 being slidably matched with first chute 1312.Described One sliding shoe 114 is slideably installed up in first chute 1312.The seat board 131 blocks a point shell towards described second 121 sidepiece is provided with the second chute 1313, and described second, which blocks point shell 121, is provided with what is be slidably matched with second chute 1313 The second sliding shoe 124.The second sliding shoe 124 is slideably installed up in the second chute 1313.In this way, the first clamping split 110 and second clamping split 120 splicing fit together after, the first sliding shoe 114 is fitted into the first chute 1312, second Sliding shoe 124 is fitted into the second chute 1313, and such first sliding shoe 114, the second sliding shoe 124 can rise to seat board 131 To guide effect, during tightening bolt, in the moving process of seat board 131, will not rock, can be more effectively by first substrate 112 It is tightly bonded together with second substrate 122.
In one embodiment, described first block point shell 111 be used for and described second block point shell 121 splicing end The 3rd cell body 1111 is provided with, described second, which blocks point shell 121, is used for being set on the described first end for blocking the splicing of point shell 111 There is the 3rd projection 1211.3rd projection 1211 and the relative set of the 3rd cell body 1111.In this way, first blocks a point shell 111 and second block after the splicing of point shell 121 fits together, and the 3rd projection 1211 is fitted into the 3rd cell body 1111, can be so that the One, which blocks point shell 111 and second, blocks the seamless spliced formation of point shell 121 and blocks shell, and first, which blocks point shell 111 and second, blocks point Connection effect between shell 121 is more firm.
In one embodiment, the first substrate 112 is used to be provided with the with the end face of the second substrate 122 splicing One projection 1123.The second substrate 122 is used to be provided with and first projection with the end face of the first substrate 112 splicing 1123 the first adaptable recesses 1222.The first substrate 112 is used to be provided with the end face of the second substrate 122 splicing Second recess 1124.The second substrate 122 be used for the end face of the first substrate 112 splicing be provided with it is described second recessed The second adaptable projection 1223 of portion 1124.In this way, after the splicing of first substrate 112, second substrate 122 fits together, first Projection 1123 is inserted into the first recess 1222, and the second projection 1223 is inserted into the second recess 1124, such first substrate 112 Connective stability between second substrate 122 is preferable.
In one embodiment, described second block the madial wall of point shell 121 and be connected with installing plate 140.The installing plate 140 Blocked positioned at described inside shell, the installing plate 140 is used to be installed up to desktop.It is fixed on because installing plate 140 is mounted directly On desktop, it just can not so be easy to observe the connectors such as bolt.
Specifically, the installing plate 140 is provided with the second screwed hole 141, in the second screwed hole 141 of the installing plate 140 Provided with screw 142.Described first, which blocks the madial wall of point shell 111, is connected with guide pad.The guide pad, which has, is located at described second The contact inclined-plane 1151 of the top of screwed hole 141.The contact inclined-plane 1151, which is used to contradict with the screw 142, to be coordinated.In this way, turn During dynamic screw 142, screw 142 contradicts contact inclined-plane 1151, enables to guide pad to block point shell 121 towards described second and moves It is dynamic, it so can block point shell 111 by first and block point shell 121 with second and assemble even closer, first can be avoided to block point Shell 111 is blocked with second and separated between point shell 121.Alternatively, guide pad is integrated with the first sliding shoe 114.
Specifically, referring to Fig. 6, the installing plate 140 is provided with the 3rd screwed hole 143, it is correspondingly provided with desktop 150 Through hole, installing plate 140 can be fixed and are installed up to by through hole, the 3rd screwed hole 143 of the second bolt 144 through desktop 150 On desktop 150.
In one embodiment, referring to Fig. 5, described first contradicts the side on head 113 and the plate of first substrate 112 Face is used to surround the first receiving portion 116 being adapted with a wherein sidepiece for screen frame 200.Described second contradicts head 123 Side is used to surround the second receiving portion being adapted with the other side of the screen frame 200 with the plate face of second substrate 122 125.In this way, after screen folder 100 is installed up on screen 160, a wherein sidepiece for screen frame 200 loads to the first receiving portion 116 In, the other side of screen frame 200 is fitted into the second receiving portion 125, so can be preferably by the firm peace of screen frame 200 Dress, screen frame 200 will not rock.
Alternatively, the first conflict plate 117 is removably equiped with the first conflict head 113, second contradicts on head 123 Removably it is equiped with the second conflict plate 126.Shielding in this way, contradicting plate 126 by the first conflict plate 117, second and contradicting respectively On two sides of wind 160, screen 160 preferably can be subjected to installation fixation.
As shown in Fig. 5 to Fig. 8 and Figure 10, a kind of fixed equipment of screen 160, including described screen folder 100, in addition to The screen frame 200 of 100 clamping engagements is pressed from both sides with the screen.The screen frame 200 includes the first framework 210 and second framework 220. First framework 210 is used to cover the peripheral sidewall for being filled to screen 160, and first framework 210 is resilient bezel.Described second Framework 220 includes the first frame section 221 and the second frame section 222.The first frame section 221 is spliced to form with the second frame section 222 The second framework 220.The second frame section 222 is located on one of side of the second framework 220.First frame Section 221 is installed on the peripheral sidewall of the first framework 210 with the second frame section 222, and the second framework 220 is hardness Frame.
The fixed equipment of above-mentioned screen 160, there is technique effect caused by screen folder 100, in addition, screen frame 200 When being attached on screen 160, first 210 sets of the first framework of energy elastic telescopic can be filled on screen 160, such first framework 210 can be played a protective role to screen 160, and the first frame section 221, the second frame section 222 then are passed through into the modes such as clamping, bonding again It is installed on the peripheral sidewall of the first framework 210, the second framework 220 of hard material can play a protective role to the first framework 210. Secondly as second framework 220 is spliced to form by the first frame section 221 and the second frame section 222, the second frame section 222 is positioned at the On one of side of two frameworks 220 so that the splicing line in second framework 220 is located on the side of second framework 220, this Sample can press from both sides 100 by screen and shelter from the splicing line in second framework 220 completely.In this way, it is installed up to the screen on screen 160 Wind frame 200 can play preferable protective effect to screen 160, and the installation operation efficiency of screen frame 200 is higher, screen frame 200 On splicing line can shelter from completely.
In one embodiment, Fig. 8 and Fig. 9 are referred to, flexible card article on the madial wall of the first framework 210 211.The card article 211 is used to insert into the first groove 161 on the peripheral sidewall of the screen 160.In this way, the first framework After 210 are installed up on screen 160, card article 211 is inserted into the first groove 161 on the peripheral sidewall of screen 160, can cause the One framework 210 is more firmly sleeved on screen 160.
Further, the card article 211 is interference fitted with first groove 161.The side wall of card article 211 is arranged to saw Dentation.In this way, the first framework 210 can coordinate more firm between the first groove 161.
In one embodiment, have on the madial wall of the first framework 210 recessed for installing the second of the screen 160 Groove 212.In this way, after the first framework 210 is installed up on screen 160, screen 160 is installed in the second groove 212, the second groove 212 can cause the first framework 210 to be more firmly sleeved on screen 160.
In one embodiment, the lateral wall of the first framework 210 is provided with the 3rd groove 213.3rd groove 213 The first shackle member 214 is inside provided with, is connected with the madial wall of second framework 220 and is engaged by clamping with first shackle member 214 The second shackle member 223.In this way, the first frame section 221, the second frame section 222 pass through the first shackle member of clamping of the second shackle member 223 214, can relatively rapid it be installed on the lateral wall of the first framework 210.
Further, the 3rd groove 213 is circumferentially disposed around the lateral wall of the first framework 210.First clamping Part 214 is several, and first shackle member 214 is adhesively fixed on the bottom wall of the 3rd groove 213.In this way, the first shackle member 214 can relatively rapid be installed up on the lateral wall of the first framework 210.Specifically, the first shackle member 214 passes through double faced adhesive tape 225 It is adhesively fixed on the bottom wall of the 3rd groove 213.It is adhesively fixed with the 3rd groove 213 on each side of first framework 210 First shackle member 214.
In one embodiment, the madial wall of second framework 220, which is provided with, is used to install the of first framework 210 Four grooves 224.4th groove 224 is circumferentially disposed around first framework 210, and second shackle member 223 is positioned at described In 4th groove 224.In this way, second framework 220 can wrap the first framework 210, between second framework 220, the first framework 210 Stability is preferable.Specifically, second shackle member 223 is integrated with the second framework 220;The second framework 220 be aluminium frame, stainless steel framework, chase or copper frame.
In one embodiment, also it is connected referring again to Figure 10, described screen frame 200 including the first connector with second Part.One end of the first frame section 221 is connected by first connector with one end of the second frame section 222, and described second The other end of the first frame section 221 is connected by connector with the other end of the second frame section 222.Specifically, the first connection Part, the second connector include connecting plate 231 and screw 232.One end of connecting plate 231, the other end of connecting plate 231, first One end of frame section 221, one end of the second frame section 222, the other end of the first frame section 221 and the second frame section 222 the other end on phase Screwed hole should be provided with.
Specifically, the first frame section 221, the second frame section 222 are integrated.In this way, the bending in the first frame section 221 Place is without splicing line, also without splicing line in the second frame section 222.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, the scope that this specification is recorded all is considered to be.
Embodiment described above only expresses the several embodiments of the present invention, and its description is more specific and detailed, but simultaneously Can not therefore it be construed as limiting the scope of the patent.It should be pointed out that come for one of ordinary skill in the art Say, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present invention Scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (10)

  1. A kind of 1. screen folder, it is characterised in that including:
    First clamping split, the first clamping split blocks a point shell, first substrate and the first conflict head including first, described First substrate is installed in described first and blocked on one end of point shell, and the first conflict head is installed on the first substrate, Described first, which contradicts head, is used to contradict cooperation with the wherein one side of screen;
    Second clamping split, the second clamping split blocks a point shell, second substrate and the second conflict head including second, described Second substrate is installed in described second and blocked on one end of point shell, and the second conflict head is installed on the second substrate, Described second, which contradicts head, is used to contradict cooperation with the another side of the screen, and described first blocks point shell hides with described second Gear divides shell to be spliced to form to block shell, and the first substrate is spliced to form the bottom plate for supporting screen frame with the second substrate; And
    Clamping element, the clamping element be arranged on it is described block in shell, the clamping element is used to make the first clamping split and institute State the second clamping split clamping engagement.
  2. 2. screen folder according to claim 1, it is characterised in that the clamping element includes seat board and the first bolt, described It is provided with the first through hole for being inserted into first bolt in the middle part of seat board, the seat board is towards between on the side of the first substrate Every provided with the first projection and the second projection, the first side of first projection towards second projection is relative to the seat The inclined-plane that plate plate face is obliquely installed, the second side of second projection towards first projection is relative to the seat board plate The inclined-plane that face is obliquely installed, the spacing between the first side and the second side is in the direction away from the seat board plate face On become larger;
    The first substrate is provided with the first screwed hole coordinated with first bolt, and the first substrate is towards the seat board Plate face is provided with the first cell body corresponding with first projection, and first cell body has what is be engaged with the first side Inclined-plane, the plate face of the second substrate towards the seat board are provided with the second cell body corresponding with second projection, and described second Cell body has the inclined-plane being engaged with the second side.
  3. 3. screen folder according to claim 2, it is characterised in that first projection, second projection are two, First cell body, second cell body are two, and two first projections and two first cell bodies are corresponding one by one Set, two second projections and two second cell bodies relative set one by one.
  4. 4. screen according to claim 2 folder, it is characterised in that the seat board is towards the described first sidepiece for blocking point shell Provided with the first chute, described first block point shell be provided with first slide coordinate the first sliding shoe, described first Sliding shoe is slideably installed up in first chute;The sidepiece that the seat board blocks point shell towards described second is provided with second Chute, described second, which blocks point shell, is provided with the second sliding shoe coordinated with second slide, and the second sliding shoe can Slidably it is installed up in the second chute.
  5. 5. screen folder according to claim 1, it is characterised in that described first, which blocks point shell, is used to block with described second The end of shell splicing is divided to be provided with the 3rd cell body, described second, which blocks point shell, is used to block a point end for shell splicing with described first It is provided with the 3rd projection, the 3rd projection and the 3rd cell body relative set.
  6. 6. screen folder according to claim 1, it is characterised in that the first substrate is used to splice with the second substrate End face be provided with the first projection, the second substrate is used to be provided with the end face of first substrate splicing and described first The first adaptable recess of projection;The first substrate is used to be provided with the second recess with the end face of second substrate splicing, The second substrate is used to be provided with the second projection being adapted with second recess with the end face of first substrate splicing.
  7. 7. screen folder according to claim 1, it is characterised in that described second, which blocks a point shell madial wall, is connected with installation Plate, the installing plate are blocked inside shell positioned at described, and the installing plate is used to be installed up to desktop.
  8. 8. screen folder according to claim 7, it is characterised in that the installing plate is provided with the second screwed hole, the installation Screw is provided with second screwed hole of plate, described first, which blocks a point shell madial wall, is connected with guide pad, and the guide pad has position Contact inclined-plane above second screwed hole, the contact inclined-plane, which is used to contradict with the screw, to be coordinated.
  9. 9. the screen folder according to claim 1 to 8 any one, it is characterised in that described first contradicts the side on head It is used to surround the first receiving portion being adapted with a wherein sidepiece for screen frame with the first substrate plate face;Described second contradicts The side on head is used to surround the second receiving portion being adapted with the other side of the screen frame with the second substrate plate face.
  10. A kind of 10. fixed equipment of screen, it is characterised in that pressed from both sides including the screen as described in claim 1 to 9 any one, Also include the screen frame with screen folder clamping engagement, the screen frame includes the first framework and second framework;Described first Framework is used to cover the peripheral sidewall for being filled to screen, and first framework is resilient bezel;The second framework includes the first frame section With the second frame section, the first frame section is spliced to form the second framework with the second frame section, and the second frame section is located at institute State on one of side of second framework, the first frame section is installed in the first framework periphery with the second frame Duan Jun In side wall, the second framework is rigid frame.
CN201710912017.8A 2017-09-29 2017-09-29 Screen clip and screen fixing device Active CN107550073B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710912017.8A CN107550073B (en) 2017-09-29 2017-09-29 Screen clip and screen fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710912017.8A CN107550073B (en) 2017-09-29 2017-09-29 Screen clip and screen fixing device

Publications (2)

Publication Number Publication Date
CN107550073A true CN107550073A (en) 2018-01-09
CN107550073B CN107550073B (en) 2023-07-21

Family

ID=60983849

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710912017.8A Active CN107550073B (en) 2017-09-29 2017-09-29 Screen clip and screen fixing device

Country Status (1)

Country Link
CN (1) CN107550073B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102022125476A1 (en) 2022-10-04 2024-04-04 Johannes Nikolaus Göckel Fastening device for a workpiece

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000136676A (en) * 1999-11-01 2000-05-16 Nippon Sheet Glass Co Ltd Plate-glass body holding member and plate glass body
TWM297705U (en) * 2006-04-04 2006-09-21 Shuen-Mau Yang Improved structure of desktop screen
TWM368666U (en) * 2009-07-24 2009-11-11 Power 7 Co Ltd Clothes pegs
JP2010011953A (en) * 2008-07-02 2010-01-21 Panasonic Electric Works Co Ltd Kitchen screen
CN201542198U (en) * 2009-11-05 2010-08-11 浙江圣奥家具制造有限公司 Overhead shielding screen of screen
US20130308999A1 (en) * 2012-05-18 2013-11-21 Micah Black Panel clamp apparatus and system
US20140096347A1 (en) * 2012-10-07 2014-04-10 Ilija Rokvic Glass Clip
CN204060374U (en) * 2014-07-02 2014-12-31 加枫卫浴(中山)有限公司 A kind of glass clamp assembly of exempting to punch
CN204071440U (en) * 2014-10-11 2015-01-07 陈祗源 Floor screen
CN204071438U (en) * 2014-10-11 2015-01-07 陈祗源 Floor screen
CN205606137U (en) * 2016-05-13 2016-09-28 乐歌人体工学科技股份有限公司 Screen holding frame
CN205689021U (en) * 2016-06-22 2016-11-16 佛山市嘉铧五金有限公司 A kind of hidden type hydraulic floor spring
CN106637852A (en) * 2016-12-30 2017-05-10 卓力电器集团有限公司 Novel self-tightening clamp
CN206261403U (en) * 2016-06-30 2017-06-20 黄振辉 Foldable many folder clothes hangers
JP6197210B1 (en) * 2017-02-21 2017-09-20 株式会社エムス・テック Towel clip
US20170312427A1 (en) * 2015-10-14 2017-11-02 B. Braun Melsungen Ag Medical pump comprising a hose clamp seating, hose clamp and a system consisting thereof
CN208243239U (en) * 2017-09-29 2018-12-18 广东优米勒智能家居有限公司 The fixed equipment of screen folder and screen

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000136676A (en) * 1999-11-01 2000-05-16 Nippon Sheet Glass Co Ltd Plate-glass body holding member and plate glass body
TWM297705U (en) * 2006-04-04 2006-09-21 Shuen-Mau Yang Improved structure of desktop screen
JP2010011953A (en) * 2008-07-02 2010-01-21 Panasonic Electric Works Co Ltd Kitchen screen
TWM368666U (en) * 2009-07-24 2009-11-11 Power 7 Co Ltd Clothes pegs
CN201542198U (en) * 2009-11-05 2010-08-11 浙江圣奥家具制造有限公司 Overhead shielding screen of screen
US20130308999A1 (en) * 2012-05-18 2013-11-21 Micah Black Panel clamp apparatus and system
US20140096347A1 (en) * 2012-10-07 2014-04-10 Ilija Rokvic Glass Clip
CN204060374U (en) * 2014-07-02 2014-12-31 加枫卫浴(中山)有限公司 A kind of glass clamp assembly of exempting to punch
CN204071440U (en) * 2014-10-11 2015-01-07 陈祗源 Floor screen
CN204071438U (en) * 2014-10-11 2015-01-07 陈祗源 Floor screen
US20170312427A1 (en) * 2015-10-14 2017-11-02 B. Braun Melsungen Ag Medical pump comprising a hose clamp seating, hose clamp and a system consisting thereof
CN205606137U (en) * 2016-05-13 2016-09-28 乐歌人体工学科技股份有限公司 Screen holding frame
CN205689021U (en) * 2016-06-22 2016-11-16 佛山市嘉铧五金有限公司 A kind of hidden type hydraulic floor spring
CN206261403U (en) * 2016-06-30 2017-06-20 黄振辉 Foldable many folder clothes hangers
CN106637852A (en) * 2016-12-30 2017-05-10 卓力电器集团有限公司 Novel self-tightening clamp
JP6197210B1 (en) * 2017-02-21 2017-09-20 株式会社エムス・テック Towel clip
CN208243239U (en) * 2017-09-29 2018-12-18 广东优米勒智能家居有限公司 The fixed equipment of screen folder and screen

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102022125476A1 (en) 2022-10-04 2024-04-04 Johannes Nikolaus Göckel Fastening device for a workpiece

Also Published As

Publication number Publication date
CN107550073B (en) 2023-07-21

Similar Documents

Publication Publication Date Title
CN201504058U (en) Laminated cable clamp
CN101725594B (en) Locking device
CN107550073A (en) Screen presss from both sides and the fixed equipment of screen
KR101318316B1 (en) Multifunction fiber holder for cleaving
CN208243239U (en) The fixed equipment of screen folder and screen
CN210842236U (en) Novel aluminum alloy cabinet connecting structure
CN207500254U (en) Connection structure and display screen
CN108599700A (en) A kind of briquetting using Yan Bianshi proximate matters hides photovoltaic system installation method
CN106760078B (en) Glass curtain wall clamp
CN204633277U (en) Four-core centralized strain clamp
CN105472934A (en) Universal shockproof device for circuit board
CN214958634U (en) Waterproof gram head for ship engineering
CN204910770U (en) Track mosaic structure and track toy
CN211046846U (en) Fast-assembling connecting piece is used in installation of solar photovoltaic board
CN210391123U (en) Protective chassis wire arranging groove for railway vehicle
CN209624846U (en) Clamp device
CN207296395U (en) A kind of fixture of cylindrical concrete formwork
CN207939123U (en) One kind being used for underground cable laying clamping device
CN207339200U (en) Cable clamp is leaked in on-line operation
CN206387938U (en) A kind of fiber optic adapters
CN218070911U (en) Pencil antiskid mount
CN217290555U (en) A mounting fixture for circuit board drilling
CN205986059U (en) 8 word cable suspension clamp
CN109914404B (en) Recoverable pressure-bearing anchor rod
CN103869427A (en) Optical fiber connector

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20211019

Address after: 526100 1st, 2nd, 3rd and 4th floors, building D8, No. 6, Jinxin Avenue, Jintao Industrial Park, Jinli Town, Gaoyao District, Zhaoqing City, Guangdong Province

Applicant after: Guangdong Yizhuo Intelligent Furniture Co.,Ltd.

Address before: 510663 No. 1701, block A1, Greenland Central Plaza, Science City, Guangzhou Economic and Technological Development Zone, Guangzhou, Guangdong

Applicant before: GUANGDONG YOUMILE INTELLIGENT HOUSEHOLD Co.,Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Screen clips and fixed equipment for screens

Granted publication date: 20230721

Pledgee: Bank of China Limited Zhaoqing branch

Pledgor: Guangdong Yizhuo Intelligent Furniture Co.,Ltd.

Registration number: Y2024980015280