CN107543233A - Bright dress heating construction technology - Google Patents
Bright dress heating construction technology Download PDFInfo
- Publication number
- CN107543233A CN107543233A CN201710778189.0A CN201710778189A CN107543233A CN 107543233 A CN107543233 A CN 107543233A CN 201710778189 A CN201710778189 A CN 201710778189A CN 107543233 A CN107543233 A CN 107543233A
- Authority
- CN
- China
- Prior art keywords
- radiator
- boiler
- pipeline
- installation
- bright dress
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Heat-Pump Type And Storage Water Heaters (AREA)
Abstract
The present invention relates to house ornamentation field, discloses a kind of bright dress heating construction technology, comprises the following steps:Verification step, according to the situation of consumer premise, confirm the installation site of bright dress heater unit to be installed;Step is protected, the ground and furniture of client are protected;Punch out step, the installation site confirmed according to installation confirmation step, carry out the drilling operation of relevant position;Installation steps, bright dress heater unit is installed;Testing procedure, test bright dress heater unit;Recovering step, recover the state of consumer premise.According to method provided by the invention can safely, simplify bright dress heating.
Description
Technical field
The present invention relates to house ornamentation field, disclose a kind of bright dress heating construction technology, can safely, simplify bright dress and warm up
Gas.
Background technology
Heating refers to a kind of heating equipment, and steam or delivery are in room or car body as caused by pipeline by boiler
Radiator, shed heat, increases room temperature, then flows back to boiler and reheats, circulates.Not yet covered for some central heatings
Area or outdated building, planning installation central heating difficulty is larger again, therefore bright fill can be used to solve by the way of heating
Certainly heating problem.
Due to being bright dress heating, so pipeline is exposed outside wall, if lacking the circuit design of specialty, can cause a large amount of
Pipeline does not have shielded, can not only influence attractive in appearance, and can hinder to pass through.If pipeline is long simultaneously, causes heat to scatter and disappear, then drop
Low heated by central heat system efficiency.
And in installation process, due to needing to fix radiator and heating, therefore it is then inevitable to burrow on the wall.Together
When easily cause volume of smoke when burrowing, easily cause the infection of respiratory tract.Easily cause mud in work progress simultaneously
On splashing road wall or furniture, be not only difficult to clear up, influence it is attractive in appearance, also pollution live or working environment.
The content of the invention
, can be with reasonable installation radiator the invention provides a kind of bright dress heating construction technology.
To solve the above problems, the invention provides a kind of bright dress heating construction technology, for installing bright dress heater unit,
Comprise the following steps:
Verification step, according to the situation of consumer premise, confirm the installation site of bright dress heater unit to be installed;
Step is protected, the ground and furniture of client are protected;
Punch out step, the installation site confirmed according to installation confirmation step, carry out the drilling operation of relevant position;
Installation steps, bright dress heater unit is installed;
Testing procedure, test bright dress heater unit;
Recovering step, recover the state of consumer premise.
The pipeline of bright dress heating of rationally arranging of the invention by pipeline, after installation results do not influence user as far as possible
Continuous work or life.In terms of existing technologies, the present invention is made by strict construction requirement and distinctive arrangement and method for construction
Obtain installation process to simplify as far as possible, and do not interfere with the surrounding environment of user in installation process as far as possible.
Preferably, in verification step, in addition to following sub-step:
Radiator location confirmation step, the installation site of radiator is determined according to radiator size;
Pipeline rout verification step, according to the installation site of radiator, determine the trend of pipeline;
Hole location verification step, according to the installation site and pipeline rout of the radiator having confirmed that, determine hole size
And position;
The installation site verification step of boiler, select boiler erection position;
Smoke pipe exhaust position verification step, confirm boiler exhaust position with reference to heating boiler installation requirement and client.
In this step, it is necessary to consider every factor, to determine optimal installation site.For example, radiator after installation
Complexity that boldness, pipeline degree of exposure after mounting, hole are given a farfetched interpretation etc., it is ensured that after mounting for user
Normal life cause minimum influence.
In addition, preferably, in step is protected, in addition to following sub-step:
Land protection step, ground is covered with protection materials;
The moving step of furniture, the furniture for influenceing construction is moved, reserves enough working spaces;
Furred ceiling dismantling step, dismounting furred ceiling is moved towards according to pipeline, for hiding pipeline.
Ground is covered with protection materials, can prevent from bringing damage to ground in installation process.Furniture is removed, both may be used
To avoid furniture from being damaged, enough working spaces are may insure again to carry out the step such as installing.Furred ceiling is removed as needed,
It is the protection to furred ceiling, and can also be covered after Pipe installing is completed with furred ceiling for a part of pipeline, reduces pipe
The exposure in road.
In addition, preferably, in punch out step, the diameter in the hole beaten is less than or equal to 50mm.
In punch out step, strict control is given a farfetched interpretation the aperture in cavity, can centralized purchasing pipeline, make pipe laying can
It is smoothed out.Meanwhile the diameter for limiting the hole beaten can reduce the destruction to wall as far as possible.
In addition, preferably, in installation steps, in addition to following sub-step:
Radiator step is installed, the installation of radiator is carried out according to fixed radiator installation site, is pacified in radiator
It is corrected after dress, makes radiator keep level;
Pipe laying step, the pipe protection material being ready for is fixed on metope, carries out stringing;
The Connection Step of radiator and boiler, the pipeline arranged is connected on radiator, and according to the installation of boiler
It is required that pipeline is connected on boiler.
It is corrected for the radiator after installation, makes radiator horizontal, it is ensured that radiator is attractive in appearance, it is often more important that favourable
In radiator.In installation process, first pipe laying protection materials, compared to first pipe laying pipe laying protected material again
Material, installation difficulty is relatively low, and technique is simpler.After pipe laying, each several part is linked together by pipeline.
Further, preferably, in pipe laying step,
The evenly distributed pipeline in a manner of down-feed and up-return.
The mode of down-feed and up-return, which arranges, can avoid pipeline around door and window or wait facility, hence it is evident that reduce the consuming of tubing;
Simultaneously, it is not necessary to by a large amount of exposed tubes outside, more attractive in appearance.Evenly distributed pipeline in this way, it is beneficial to subsequent installation and warms up
Gas piece radiates, and strengthens heating effect.
In addition, preferably, in the Connection Step of radiator and boiler,
Pipeline is connected on radiator in a manner of down-feed and up-return.
The mode of down-feed and up-return is:It is suitable for reading to connect feed pipe, lower mouth connection return pipe, hot water is smoothly flowed through, hydraulic pressure ratio
It is relatively stable, and can fully be contacted with radiator, make temperature than more uniform, it is ensured that the effect of heating.
In addition, preferably, in testing procedure, in addition to following sub-step:
Water filling steps of exhausting, by the water return pipeline of boiler, radiator is noted in the way of being drawn near apart from boiler
Water, water supply valve is opened until water reserves;
Pipe-line system pressure holding step, connection is suppressed equipment progress system and suppressed, and continues pressurize, checks pressure release after no leak source
To as defined in boiler operatiopn in pressure limit;
Debugging step, it is powered after ventilation, checks whether power supply meets boiler electricity consumption requirement, check whether combustion gas is revealed, so
After start shooting, debugged.
Water filling steps of exhausting may insure the unimpeded of pipeline, pipeline obstruction be found when avoiding subsequently using, while can examine
The sealing in test tube road.Pipe-line system pressurize may insure pipeline under a certain pressure, still there is good sealing.Such as check
Leak source, can in time be repaired, prevent situations such as leak, gas leakage occur during follow-up use., can in debugging step
To detect the performance of heating, prevent from going wrong in construction before, and cause heating effect bad or leave potential safety hazard.
Further, preferably, in pipe-line system pressure holding step, it is 1.5 times of operating pressure to suppress pressure, not
Less than 6 kilograms, the pressurize duration is more than or equal to 15 minutes.
The manner described above simulation pressure that pipeline can carry under closer limiting case, for bearing capacity deficiency
Part further adjust, with reduce using process potential safety hazard.
In addition, preferably, in debugging step,
Start runs and at least debugged three times, wherein,
Debugging temperature is 40 degree for the first time, keeps debugging temperature to run at least 15 minutes;
Second of debugging temperature is 55 degree, keeps debugging temperature to run at least 30 minutes;
Third time debugging temperature is 70 degree;
In debugging process, by detecting the surface temperature per a piece of radiator, it is confirmed whether to reach requirement.
Repeatedly debugging temperature, it is ensured that the heating effect and heating speed of heating.Wherein third time is debugged, and is higher survey
Examination, it is ensured that can bear such temperature in each part certain time., can during such as water temperature over-high as broken down in use
To provide safety guarantee for user of service.
Brief description of the drawings
Fig. 1 is the bright dress construction technology process schematic diagram of first embodiment of the invention heating;
Fig. 2 is the sub-step schematic diagram of first embodiment of the invention verification step;
Fig. 3 is the sub-step schematic diagram of first embodiment of the invention protection step;
Fig. 4 is the sub-step schematic diagram of first embodiment of the invention installation steps;
Fig. 5 is the sub-step schematic diagram of first embodiment of the invention testing procedure.
Embodiment
First embodiment
The first embodiment of the present invention provides a kind of bright dress heating construction technology, for installing bright dress heater unit,
From the point of view of Fig. 1, Fig. 2, Fig. 3 and Fig. 4, comprise the following steps:
Verification step, according to the situation of consumer premise, confirm the installation site of bright dress heater unit to be installed;
Step is protected, the ground and furniture of client are protected;
Punch out step, the installation site confirmed according to installation confirmation step, carry out the drilling operation of relevant position;
Installation steps, bright dress heater unit is installed;
Testing procedure, test bright dress heater unit;
Recovering step, recover the state of consumer premise.
Wherein, from the point of view of with reference to Fig. 2, in verification step, in addition to following sub-step:
Radiator location confirmation step, the installation site of radiator is determined according to radiator size;
Pipeline rout verification step, according to the installation site of radiator, determine the trend of pipeline;
Hole location verification step, according to the installation site and pipeline rout of the radiator having confirmed that, determine hole size
And position;
The installation site verification step of boiler, select boiler erection position;
Smoke pipe exhaust position verification step, confirm boiler exhaust position with reference to heating boiler installation requirement and client.
In specific operation, can so it carry out:
The surrounding facility for needing bright dress heating is observed and measured, generally total length of tubing needed for estimation etc.
Deng;
According to the position of peripheral facilities, many factors such as attractive in appearance, safe are considered, it is determined that needing to install the position of radiator;
By the position of radiator, the trend of pipeline is determined, is measured, the total length of tubing needed for calculating;
Checked for wall, select easily punching, the region of installation, at the same consider to the destructiveness of wall and
Influence to peripheral facilities, it is determined that the position of punching
Determine to consider security first during boiler sites, there must be certain safeguard procedures around boiler, such as set originally
When having boiler, original boiler can be utilized, new boiler, such as heating boiler can also be reinstalled;
According to the boiler sites determined, the position of boiler exhaust is determined, and then smoke pipe exhaust position is confirmed.
From the point of view of Fig. 3, in step is protected, in addition to following sub-step:
Land protection step, ground is covered with protection materials;
The moving step of furniture, the furniture for influenceing construction is moved, reserves enough working spaces;
Furred ceiling dismantling step, dismounting furred ceiling is moved towards according to pipeline, for hiding pipeline.
Specifically protect, safeguard measure can have following several:
Protection for ground can be to being probably that affected ground is protected using privacy protection material;
Moved for transportable furniture, avoid that furniture is caused to damage in installation steps;
For irremovable furniture, can be equally protected by using special protection materials;
When being provided with dismountable furred ceiling, it can need according to pipeline rout, cost etc., rationally it is dismantled.
In punch out step, the diameter in the hole beaten is less than or equal to 50mm.
Punch operation is as follows:
Perforator is fixed according to the installation site of pipeline rout and radiator;
Carry out burrow dust-proof processing and the protection of metope scratch;
Cleared up in time after punching, it is ensured that subsequent operation can be smoothed out.
From the point of view of Fig. 4, in installation steps, in addition to following sub-step:
Radiator step is installed, the installation of radiator is carried out according to fixed radiator installation site, is pacified in radiator
It is corrected after dress, makes radiator keep level;
Pipe laying step, the pipe protection material being ready for is fixed on metope, carries out stringing;
The Connection Step of radiator and boiler, the pipeline arranged is connected on radiator, and according to the installation of boiler
It is required that pipeline is connected on boiler.
Dustless drilling technique can be used when radiator is installed, reduces the pollution brought in boring procedure.Installing
Radiator is corrected in time after radiator, it is ensured that radiator is horizontally mounted.
Before pipe laying, can first pipe laying protection materials, specific installation process is:First the pipeline of preparation is protected
Protective material with dustless nailing gun is fixed on metope and closes the installation number of radiator again carries out stringing from suitable pipeline.
The pipeline arranged is in some way connected on radiator using special part and instrument;Boiler tubing connects
Connect, be connected to according to the installation requirement of boiler on boiler.
Reference picture 5, in testing procedure, in addition to following sub-step:
Water filling steps of exhausting, by the water return pipeline of boiler, radiator is noted in the way of being drawn near apart from boiler
Water, water supply valve is opened until water reserves;
Pipe-line system pressure holding step, connection is suppressed equipment progress system and suppressed, and continues pressurize, checks pressure release after no leak source
To as defined in boiler operatiopn in pressure limit;
Debugging step, it is powered after ventilation, checks whether power supply meets boiler electricity consumption requirement, check whether combustion gas is revealed, so
After start shooting, debugged.
Testing procedure is repaired mainly for detection of going out produced problem in installation process in time.Arranged by water filling
Jia bombardier detects the watertightness and air-tightness of pipe laying suddenly, and main method is exactly to open valve water filling into pipeline;Pipeline system
System pressure holding step, test the pressure bearing capacity of whole heating system;Debugging step, inspection make whole heating system high
Effect, heat as requested.
For prior art, dustless mounting technique is used in installation process, and surrounding is set in a pre-installation
Apply and protected, reduce the pollution to surrounding environment in installation process, built more good construction environment.
Second embodiment
Second embodiment of the present invention provides a kind of bright dress heating construction technology, and second embodiment is real to first
The further improvement of mode is applied, is mainly theed improvement is that,
In pipe laying step, the evenly distributed pipeline in a manner of down-feed and up-return.
In the Connection Step of radiator and boiler, pipeline is connected on radiator in a manner of down-feed and up-return.
Upper in three kinds of last time, Lower Pleistocene series and down-feed and up-return mounting means, down-feed and up-return heating effect is best.
The water inlet system that should be noted in operation and return water system position.Specifically, feed pipe should return with connection suitable for reading
Water pipe is connected with lower mouth.During arrangement pipeline, it is considered however that the quantity of radiator, be mutually matched both, reach best confession
Warm effect.
It is noted that the obvious present embodiment of the mounting means of down-feed and up-return is more preferable a kind of, work as mounting bar
When part is special, also mounting means should be selected according to actual conditions.
3rd embodiment
Third embodiment of the present invention provides a kind of bright dress heating construction technology, and the 3rd embodiment is real to first
The further improvement of mode and second embodiment is applied, is mainly theed improvement is that,
In pipe-line system pressure holding step, pressure is suppressed as 1.5 times of operating pressure, not less than 6 kilograms, pressurize is lasting
Time is more than or equal to 15 minutes.
In debugging step,
Start runs and at least debugged three times, wherein,
Debugging temperature is 40 degree for the first time, keeps debugging temperature to run at least 15 minutes;
Second of debugging temperature is 55 degree, keeps debugging temperature to run at least 30 minutes;
Third time debugging temperature is 70 degree;
In debugging process, by detecting the surface temperature per a piece of radiator, it is confirmed whether to reach requirement.
During detection, before carrying out above-mentioned detection, basic inspection is first had to, as whether caliduct installation is safe
Firmly, tubing must not bend, corrosion, no flash, pipe and uneven phenomenon;Pipe fitting unbiased button, disorderly button, fracture of wire and angle are not
Accurate phenomenon.
After above-mentioned detection is completed, start carries out above-mentioned inspection.It is as follows in the process for carrying out pipe-line system pressurize,
30% Strengh testing pressure is first risen to, voltage stabilizing 15min, pipeline is observed;
60% Strengh testing pressure is risen to again, voltage stabilizing 15min, pipeline is observed;
Pipe is checked during voltage stabilizing, phenomenon without exception, rise to Strengh testing pressure, test pressure is 1.5 times of designs
Pressure, observed again.
Specific observational technique can carry out son with the connecting portion such as suds welding all to system, valve, flange
It is thin to smear, pressurize when having seen whether bubble, and then judged.
Or pressure-detecting device can be used, the pressure in pipeline is measured after suppressing, in the form of data
Intuitively reflect.
In debugging step, directly start shooting, visual panel adjusts the water temperature of boiler, and regulation selection is different three times
Temperature, low temperature long-time heating, normal use heating and the fast hot ability of high temperature of boiler is tested respectively, it is right in time to be advantageous to
Heating system is adjusted.Meanwhile the temperature of radiator is measured, it is ensured that the effect of heating.Also, by debugging three times
Temperature, can the more reasonably orientation of control valve and fixation, user-friendly, avoiding user's misoperation can
The problem of bringing.
4th embodiment
The 4th embodiment of the present invention provides a kind of bright dress heating construction technology, and the 4th embodiment is real to first
The further improvement of mode and the 3rd embodiment is applied, main thes improvement is that, in testing procedure, for measuring pipeline
Pressure, boiler pressure, the device of boiler water temperature and radiator temperature, continue to be arranged in heating system, and real-time measuring data,
Feed back to terminal.
For example, user can easily view the working condition of whole heating system in the application of mobile phone;For
The staff of maintenance can also more clearly know the convenient maintenance in position that heating system goes wrong.
Compared with prior art, the present invention can install and carry out using process multi-faceted monitoring to heating equipment,
Substantially increase security.
It will be understood by those skilled in the art that in above-mentioned each embodiment, in order that reader is more preferably geographical
Solve the application and propose many ins and outs.But even if without these ins and outs and based on the respective embodiments described above
Many variations and modification, each claim of the application technical scheme claimed can also be realized substantially.Therefore, in reality
In, can to above-mentioned embodiment, various changes can be made in the form and details, without departing from the present invention spirit and model
Enclose.
Claims (10)
- A kind of 1. bright dress heating construction technology, for installing bright dress heater unit, it is characterised in that comprise the following steps:Verification step, according to the situation of consumer premise, confirm the installation site of bright dress heater unit to be installed;Step is protected, the ground and furniture of client are protected;Punch out step, the installation site confirmed according to the installation confirmation step, carry out the drilling operation of relevant position;Dress heater unit is stated in installation steps, installation clearly;Dress heater unit is stated in testing procedure, test clearly;Recovering step, recover the state of consumer premise.
- 2. bright dress heating construction technology according to claim 1, it is characterised in that in the verification step, in addition to Following sub-step:Radiator location confirmation step, the installation site of the radiator is determined according to radiator size;Pipeline rout verification step, according to the installation site of the radiator, determine the trend of pipeline;Hole location verification step, according to the installation site and pipeline rout of the radiator having confirmed that, determine hole size and position Put;The installation site verification step of boiler, select boiler erection position;Smoke pipe exhaust position verification step, confirm boiler exhaust position with reference to heating boiler installation requirement and client.
- 3. bright dress heating construction technology according to claim 1, it is characterised in that in the protection step, in addition to Following sub-step:Land protection step, ground is covered with protection materials;The moving step of furniture, the furniture for influenceing construction is moved, reserves enough working spaces;Furred ceiling dismantling step, dismounting furred ceiling is moved towards according to pipeline, for hiding pipeline.
- 4. bright dress heating construction technology according to claim 1, it is characterised in that in the punch out step, beat The diameter in hole is less than or equal to 50mm.
- 5. bright dress heating construction technology according to claim 1, it is characterised in that in the installation steps, in addition to Following sub-step:Radiator step is installed, the installation of radiator is carried out according to fixed radiator installation site, after radiator installation It is corrected, makes radiator keep level;Pipe laying step, the pipe protection material being ready for is fixed on metope, carries out stringing;The Connection Step of radiator and boiler, the pipeline arranged is connected on radiator, and according to the installation requirement of boiler, Pipeline is connected on boiler.
- 6. bright dress heating construction technology according to claim 5, it is characterised in that in the pipe laying step,The evenly distributed pipeline in a manner of down-feed and up-return.
- 7. bright dress heating construction technology according to claim 5, it is characterised in that in the connection of the radiator and boiler In step,Pipeline is connected on radiator in a manner of down-feed and up-return.
- 8. bright dress heating construction technology according to claim 1, it is characterised in that in the testing procedure, in addition to Following sub-step:Water filling steps of exhausting, by the water return pipeline of boiler, to radiator water filling in the way of being drawn near apart from boiler, beat Water supply valve is opened until water reserves;Pipe-line system pressure holding step, connection, which suppresses equipment and carries out system, to be suppressed, and continues pressurize, checks after no leak source pressure release to pot In the pressure limit of stove operating provisions;Debugging step, it is powered after ventilation, checks whether power supply meets boiler electricity consumption requirement, checks whether combustion gas is revealed, Ran Houkai Machine, debugged.
- 9. bright dress heating construction technology according to claim 8, it is characterised in that in the pipe-line system pressure holding step In, pressure is suppressed as 1.5 times of operating pressure, and not less than 6 kilograms, the pressurize duration is more than or equal to 15 minutes.
- 10. bright dress heating construction technology according to claim 8, it is characterised in that in the debugging step,Start runs and at least debugged three times, wherein,Debugging temperature is 40 degree for the first time, keeps debugging temperature to run at least 15 minutes;Second of debugging temperature is 55 degree, keeps debugging temperature to run at least 30 minutes;Third time debugging temperature is 70 degree;In debugging process, by detecting the surface temperature per a piece of radiator, it is confirmed whether to reach requirement.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710778189.0A CN107543233A (en) | 2017-09-01 | 2017-09-01 | Bright dress heating construction technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710778189.0A CN107543233A (en) | 2017-09-01 | 2017-09-01 | Bright dress heating construction technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107543233A true CN107543233A (en) | 2018-01-05 |
Family
ID=60957618
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710778189.0A Pending CN107543233A (en) | 2017-09-01 | 2017-09-01 | Bright dress heating construction technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107543233A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111425931A (en) * | 2020-04-16 | 2020-07-17 | 宁波奥克斯电气股份有限公司 | Exhaust method and device of heat pump system and heat pump system |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1238436A (en) * | 1998-06-10 | 1999-12-15 | 朗海有限公司 | Independently operating and mobile radiator and process for its manufacture |
CN101608806A (en) * | 2008-06-20 | 2009-12-23 | 河南省第五建筑安装工程(集团)有限公司 | The installation method of household metering heating pipeline |
CN105508729A (en) * | 2015-12-29 | 2016-04-20 | 中天建设集团有限公司第五建设公司 | Dry-method floor heating pipeline laying process |
CN106403650A (en) * | 2016-08-31 | 2017-02-15 | 南京胜出环境工程有限公司 | Exposed boiler heating radiator and mounting process thereof |
-
2017
- 2017-09-01 CN CN201710778189.0A patent/CN107543233A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1238436A (en) * | 1998-06-10 | 1999-12-15 | 朗海有限公司 | Independently operating and mobile radiator and process for its manufacture |
CN101608806A (en) * | 2008-06-20 | 2009-12-23 | 河南省第五建筑安装工程(集团)有限公司 | The installation method of household metering heating pipeline |
CN105508729A (en) * | 2015-12-29 | 2016-04-20 | 中天建设集团有限公司第五建设公司 | Dry-method floor heating pipeline laying process |
CN106403650A (en) * | 2016-08-31 | 2017-02-15 | 南京胜出环境工程有限公司 | Exposed boiler heating radiator and mounting process thereof |
Non-Patent Citations (1)
Title |
---|
马金忠: "《建筑设备安装工艺与识图》", 31 March 2016, 重庆大学出版社 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111425931A (en) * | 2020-04-16 | 2020-07-17 | 宁波奥克斯电气股份有限公司 | Exhaust method and device of heat pump system and heat pump system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20200264068A1 (en) | Systems and methods for fluid leak detection | |
CN104296946B (en) | The detection method of a kind of air conditioner coolant leakage and system | |
CN206739417U (en) | A kind of electromagnetic heating device | |
US20160273786A1 (en) | Monitoring and operation of a liquid flow circuit containing a chemical additive | |
RU2690524C1 (en) | Fluid leakage control system from spent nuclear fuel maintenance pool | |
US20210312606A1 (en) | Method for Evaluating the Installation Position of a Measuring Device in a System, Augmented Reality Device and Method for Installing a Measuring Device | |
CN107940762A (en) | A kind of leakage detection method for water heater and water heater | |
JP5019861B2 (en) | Plant leak detection system | |
JP2023538321A (en) | Refrigerant filling system and method | |
CN107543233A (en) | Bright dress heating construction technology | |
CN105043681A (en) | Test method for detecting leakage of vacuum system of condensing steam turbine | |
CN201859041U (en) | Defect detection device for floor radiant heating buried coil pipe | |
CN103499506B (en) | Thermal power generation boiler fluoroplastics economizer simulation test stand | |
CN105092157B (en) | A kind of internal leakage of valve of thermodynamic system in power plant diagnostic method and diagnostic system | |
CN207335132U (en) | Gas heater with antifreeze and pre- hot function | |
KR100837120B1 (en) | Measuring apparatus of thermal conductivity in ground with automatically controlled of flow capacity and electric heat capacity | |
CN106769814A (en) | A kind of low-temperature corrosion detecting system and its detection method | |
CN110410683A (en) | A kind of localization method for building inner conduit leakage point | |
JP6488883B2 (en) | Heat source machine | |
CN105823121B (en) | The water leakage proofing safe control device and method of false alarm prevention | |
CN207394987U (en) | A kind of air conditioner room unit | |
CN206786201U (en) | A kind of wall-hung boiler pipeline positioning device | |
CN105738141A (en) | Indoor fire hydrant pressure loss automatic testing device | |
JP5301000B2 (en) | Leak site determination apparatus and method | |
CN104792003A (en) | Installing method for air source heat pump hot water unit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180105 |
|
RJ01 | Rejection of invention patent application after publication |