CN107542976A - A kind of natural gas line construction and installation support meanss - Google Patents

A kind of natural gas line construction and installation support meanss Download PDF

Info

Publication number
CN107542976A
CN107542976A CN201710778816.0A CN201710778816A CN107542976A CN 107542976 A CN107542976 A CN 107542976A CN 201710778816 A CN201710778816 A CN 201710778816A CN 107542976 A CN107542976 A CN 107542976A
Authority
CN
China
Prior art keywords
support plate
slide rail
bolted connection
natural gas
sliding block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710778816.0A
Other languages
Chinese (zh)
Other versions
CN107542976B (en
Inventor
刘玉馨
桑秀中
胡家桢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guilin Xinao Gas Development Co., Ltd.
Original Assignee
刘玉馨
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 刘玉馨 filed Critical 刘玉馨
Priority to CN201710778816.0A priority Critical patent/CN107542976B/en
Publication of CN107542976A publication Critical patent/CN107542976A/en
Application granted granted Critical
Publication of CN107542976B publication Critical patent/CN107542976B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Drawing Aids And Blackboards (AREA)
  • Tents Or Canopies (AREA)

Abstract

The present invention relates to a kind of support meanss, more particularly to a kind of natural gas line construction and installation support meanss.The technical problem to be solved in the present invention is to provide a kind of saving goods and materials, efficiency high, time saving and energy saving natural gas line construction and installation support meanss.In order to solve the above-mentioned technical problem, the invention provides such a natural gas line construction and installation support meanss, bottom plate etc. is included;The front and rear sides of bottom plate top left are connected with the first support plate by bolted connection, and the first top plate is connected with the top of front and rear first support plate, and lowering or hoisting gear is provided with the inside of front and rear first support plate, clamping device is provided with lowering or hoisting gear.The present invention is clamped natural gas line by clamping device, and lowering or hoisting gear drives and moved up and down, and carriage is moved easily natural gas line, and support meanss and fixing device prevent natural gas line from sliding, and has been reached and has been saved goods and materials, efficiency high, time saving and energy saving effect.

Description

A kind of natural gas line construction and installation support meanss
Technical field
The present invention relates to a kind of support meanss, more particularly to a kind of natural gas line construction and installation support meanss.
Background technology
Natural gas line refers to natural gas (associated gas for including oil field production) being transported to city from exploitation ground or treatment plant The pipeline of city's air distribution center or Industry enterprise customer, also known as gas pipeline.Natural gas is conveyed using natural gas line, is land The sole mode of a large amount of conveying natural gases.In world's pipeline overall length, natural gas line accounts for half.
, it is necessary to be lifted by crane using crane during natural gas line construction and installation, consume huge amounts of material, and manually lift or Mobile efficiency is low, wastes time and energy, therefore needs a kind of saving goods and materials of research and development, efficiency high, the construction of time saving and energy saving natural gas line badly Installation support meanss.
The content of the invention
(1) technical problems to be solved
The present invention is lifted by crane to overcome using crane, consumes huge amounts of material, and manually lift or mobile efficiency it is low, The shortcomings that wasting time and energy, the technical problem to be solved in the present invention is to provide a kind of goods and materials, efficiency high, time saving and energy saving natural saved Feed channel construction and installation support meanss.
(2) technical scheme
In order to solve the above-mentioned technical problem, filled the invention provides such a natural gas line construction and installation with support Put, include bottom plate, the first support plate, the first top plate, lowering or hoisting gear and clamping device, the front and rear sides of bottom plate top left are logical Cross bolted mode and be connected with the first support plate, the first top plate, front and rear first support plate are connected with the top of front and rear first support plate Inner side is provided with lowering or hoisting gear, and clamping device is provided with lowering or hoisting gear.
Preferably, lowering or hoisting gear include the first slide rail, the first sliding block, the first transverse slat, steel wire, first pulley and it is electronic around Line wheel, the inner side of front and rear first support plate are connected with the first slide rail by bolted connection, and the first slide rail is vertical setting, Slidingtype is provided with the first sliding block on first slide rail, and the first slide rail and the first sliding block slidingtype coordinate, between front and rear first sliding block The first transverse slat is connected with by bolted connection, and for the first transverse slat in being horizontally disposed with, the top of front and rear first sliding block is fixed Steel wire is connected with, the crown center of the first top plate is provided with electronic reel and two first by bolted connection respectively Pulley, two first pulleys are located at the front and rear sides of electronic reel respectively, and steel wire, which slides, runs through the first top plate, front and rear steel wire point It is not wound in front and rear first pulley and is fixedly connected with electronic reel.
Preferably, clamping device includes the second slide rail, the second sliding block, block, fixing bolt, the first pole, the first bullet Spring and fixture block, the front and rear sides at the top of the first transverse slat are connected with the second slide rail by bolted connection, on the second slide rail Slidingtype is provided with the second sliding block, and the second slide rail and the second sliding block slidingtype coordinate, the inner opposite end connection of front and rear second slide rail There is block, the left side central portion rotary type of the second sliding block is connected with fixing bolt, first is respectively connected with the top of front and rear second sliding block Pole, the first spring is connected with the inside of the first pole, the end of the first spring is connected with fixture block.
Preferably, support meanss are also included, support meanss include cushion block, arc support plate and rubber blanket, the first transverse slat Crown center be connected with cushion block by bolted connection, arc support plate, the top of arc support plate are connected with the top of cushion block Portion is connected with rubber blanket by bolted connection.
Preferably, the second support plate and carriage are also included, the front and rear sides of bottom plate top right-hand member are connected by bolt The mode connect is connected with the second support plate, and the inner side of front and rear second support plate is provided with carriage, carriage include the 3rd slide rail, 3rd sliding block, the second transverse slat, cylinder and traction wheel, the inner side of front and rear second support plate are connected with the 3rd by bolted connection Slide rail, the 3rd slide rail are vertical setting, and slidingtype is provided with the 3rd sliding block on the 3rd slide rail, and the 3rd sliding block and the 3rd slide rail slide Formula coordinates, and is connected with the second transverse slat between front and rear 3rd sliding block by bolted connection, the second transverse slat is in horizontally disposed, bottom The middle part of right-hand member is provided with cylinder, the expansion link end of cylinder and the bottom of the second transverse slat by bolted connection at the top of plate Centre connection, the crown center of the second transverse slat are connected with traction wheel by bolted connection.
Preferably, fixing device is also included, fixing device includes the second pole, guide pin bushing, guide rod, second pulley and Two springs, the rear and front end at the top of the second transverse slat are connected with the second support plate, front and rear second support plate by bolted connection Inside top be connected with guide pin bushing by bolted connection, slidingtype is provided with guide rod in front and rear guide pin bushing, and guide rod is with leading Set coordinates, and the end of guide rod is connected with second pulley by bolted connection, leading between guide pin bushing and second pulley Second spring is cased with the outside of bar, one end of second spring is connected with second pulley, and the other end is connected with guide pin bushing.
Preferably, the second top plate and connecting plate are also included, the top of front and rear second support plate connects by bolted connection The second top plate is connected to, connecting plate is connected with by bolted connection between front and rear first support plate and front and rear second support plate.
Preferably, also include wheel, wheel is connected with by bolted connection at the bottom four corners of bottom plate.
Operation principle:In use, natural gas line is passed through between front and rear first support plate, lowering or hoisting gear and folder are placed in In tight device, natural gas line is clamped, it is necessary to when adjusting natural gas line height by clamping device, adjusted by lowering or hoisting gear Section, after natural gas line has been fixedly mounted, adjustment clamping device unclamps natural gas line, starts under lowering or hoisting gear Drop, when natural gas line and present apparatus separate type, the present apparatus is removed.
Because lowering or hoisting gear includes the first slide rail, the first sliding block, the first transverse slat, steel wire, first pulley and electronic coiling Wheel, the inner side of front and rear first support plate are connected with the first slide rail by bolted connection, and the first slide rail is vertical setting, the Slidingtype is provided with the first sliding block on one slide rail, and the first slide rail and the first sliding block slidingtype coordinate, led between front and rear first sliding block Cross bolted mode and be connected with the first transverse slat, the first transverse slat is in horizontally disposed, the fixed company in top of front and rear first sliding block Steel wire is connected to, the crown center of the first top plate is provided with electronic reel and two first cunnings by bolted connection respectively Wheel, two first pulleys are located at the front and rear sides of electronic reel respectively, and steel wire, which slides, runs through the first top plate, front and rear steel wire difference It is wound in front and rear first pulley and is fixedly connected with electronic reel.In use, natural gas line is placed on above the first transverse slat, Start electronic reel coiling, so that by steel wire winding, steel wire drives the first transverse slat to move up, so as to drive natural gas line Move up, when natural gas line is moved to suitable height, close electronic reel.
Because clamping device include the second slide rail, the second sliding block, block, fixing bolt, the first pole, the first spring and Fixture block, the front and rear sides at the top of the first transverse slat are connected with the second slide rail, slided on the second slide rail by bolted connection Formula is provided with the second sliding block, and the second slide rail and the second sliding block slidingtype coordinate, and the inner opposite end of front and rear second slide rail is connected with gear Block, the left side central portion rotary type of the second sliding block are connected with fixing bolt, the first pole are respectively connected with the top of front and rear second sliding block, The first spring is connected with the inside of first pole, the end of the first spring is connected with fixture block.When natural gas line is placed on first After on transverse slat, and between front and rear fixture block, unscrew fixing bolt, stir front and rear first pole respectively inwards, front and rear fixture block and Natural gas line is contacted, and the first spring is compressed, now tightens fixing bolt, in the presence of the first spring, front and rear fixture block Natural gas line is clamped.After natural gas line has been fixedly mounted, unscrew fixing bolt, by front and rear fixture block and natural gas tube Road separates.
Because also including support meanss, support meanss include cushion block, arc support plate and rubber blanket, the top of the first transverse slat Cushion block is connected among portion by bolted connection, arc support plate is connected with the top of cushion block, the top of arc support plate leads to Cross bolted mode and be connected with rubber blanket.In use, natural gas line is placed on above arc support plate, rubber is lined with anti-skidding Effect, slide during so as to prevent that natural gas line is fixedly mounted, further improve installation effectiveness.
Because also including the second support plate and carriage, the front and rear sides of right-hand member are bolted at the top of bottom plate Mode is connected with the second support plate, and the inner side of front and rear second support plate is provided with carriage, and carriage includes the 3rd slide rail, the 3rd Sliding block, the second transverse slat, cylinder and traction wheel, the inner side of front and rear second support plate are connected with the 3rd cunning by bolted connection Rail, the 3rd slide rail are vertical setting, and slidingtype is provided with the 3rd sliding block, the 3rd sliding block and the 3rd slide rail slidingtype on the 3rd slide rail Coordinate, be connected with the second transverse slat between front and rear 3rd sliding block by bolted connection, the second transverse slat is in horizontally disposed, bottom plate The middle part of top right-hand member is provided with cylinder by bolted connection, the expansion link end of cylinder with the bottom of the second transverse slat Between connect, the crown center of the second transverse slat is connected with traction wheel by bolted connection.In use, natural gas line is put Above the second transverse slat, when needing to move natural gas line in installation process, clamping device is separated with natural gas line, opened Dynamic lowering or hoisting gear declines, and natural gas line is rested on traction wheel, starts Telescopic-cylinder bar and stretches, so as to drive natural gas tube Road moves up or down, and promotes natural gas line to the left or to the right, and natural gas line horizontally slips on traction wheel, you can side Just natural gas line is moved, so as to further improve installation effectiveness.
Because also including fixing device, fixing device includes the second pole, guide pin bushing, guide rod, second pulley and second Spring, the rear and front end at the top of the second transverse slat are connected with the second support plate by bolted connection, front and rear second support plate Inside top is connected with guide pin bushing by bolted connection, and slidingtype is provided with guide rod, guide rod and guide pin bushing in front and rear guide pin bushing Coordinate, the end of guide rod is connected with second pulley by bolted connection, the guide rod between guide pin bushing and second pulley Outside is cased with second spring, and one end of second spring is connected with second pulley, and the other end is connected with guide pin bushing.In use, will be natural Feed channel is placed on traction wheel and between front and rear second pulley, and in the presence of second spring, front and rear second pulley is by day Right feed channel is fixed, and prevents from sliding from traction wheel when natural gas line from moving, so as to further improve installation effectiveness.
Because also including the second top plate and connecting plate, the top of front and rear second support plate is connected with by bolted connection Second top plate, connecting plate is connected with by bolted connection between front and rear first support plate and front and rear second support plate.Second top The steadiness of the present apparatus is improved with connecting plate, so as to increase the service life of the present apparatus.
Because also including wheel, wheel, wheel are connected with the bottom four corners of bottom plate by bolted connection It can be more convenient, the smooth mobile present apparatus.
(3) beneficial effect
The present invention is clamped natural gas line by clamping device, and lowering or hoisting gear drives and moved up and down, and carriage is convenient Mobile natural gas line, support meanss and fixing device prevent natural gas line from sliding, have reached saving goods and materials, efficiency high, province When labour-saving effect.
Brief description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is the schematic cross-sectional view of the first left view of the present invention.
Fig. 3 is the schematic cross-sectional view of second of left view of the present invention.
Fig. 4 is second of main structure diagram of the present invention.
Fig. 5 is the schematic cross-sectional view of the third left view of the present invention.
Fig. 6 is the schematic cross-sectional view of the 4th kind of left view of the present invention.
Fig. 7 is the third main structure diagram of the present invention.
Mark in accompanying drawing for:1- bottom plates, the support plates of 2- first, the top plates of 3- first, 4- lowering or hoisting gears, the slide rails of 41- first, The sliding blocks of 42- first, the transverse slats of 43- first, 44- steel wires, 45- first pulleys, the electronic reels of 46-, 5- clamping devices, 51- second Slide rail, the sliding blocks of 52- second, 53- blocks, 54- fixing bolts, the poles of 55- first, the springs of 56- first, 57- fixture blocks, 6- support dresses Put, 61- cushion blocks, 62- arc support plates, 63- rubber blankets, the support plates of 7- second, 8- carriages, the slide rails of 81- the 3rd, 82- the 3rd is slided Block, the transverse slats of 83- second, 84- cylinders, 85- traction wheels, 9- fixing devices, the poles of 91- second, 92- guide pin bushings, 93- guide rods, 94- Two pulleys, 95- second springs, the top plates of 10- second, 11- connecting plates, 12- wheels.
Embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of natural gas line construction and installation support meanss, as shown in figs. 1-7, include bottom plate 1, the first support plate 2, One top plate 3, lowering or hoisting gear 4 and clamping device 5, the front and rear sides of the top left of bottom plate 1 connect by bolted connection There is the first support plate 2, the top of front and rear first support plate 2 is connected with the first top plate 3, and the front and rear inner side of first support plate 2 is provided with lowering or hoisting gear 4, lowering or hoisting gear 4 is interior to be provided with clamping device 5.
Embodiment 2
A kind of natural gas line construction and installation support meanss, as shown in figs. 1-7, include bottom plate 1, the first support plate 2, One top plate 3, lowering or hoisting gear 4 and clamping device 5, the front and rear sides of the top left of bottom plate 1 connect by bolted connection There is the first support plate 2, the top of front and rear first support plate 2 is connected with the first top plate 3, and the front and rear inner side of first support plate 2 is provided with lowering or hoisting gear 4, lowering or hoisting gear 4 is interior to be provided with clamping device 5.
Lowering or hoisting gear 4 includes the first slide rail 41, the first sliding block 42, the first transverse slat 43, steel wire 44, first pulley 45 and electricity Dynamic reel 46, the inner side of front and rear first support plate 2 is connected with the first slide rail 41, the first slide rail 41 by bolted connection It is vertical setting, slidingtype is provided with the first sliding block 42 on the first slide rail 41, and the first slide rail 41 and the slidingtype of the first sliding block 42 are matched somebody with somebody Closing, be connected with the first transverse slat 43 between front and rear first sliding block 42 by bolted connection, the first transverse slat 43 is in be horizontally disposed with, The top of front and rear first sliding block 42 has been fixedly connected with steel wire 44, what the crown center of the first top plate 3 was bolted respectively Mode is provided with electronic reel 46 and two first pulleys 45, before two first pulleys 45 are located at electronic reel 46 respectively Both sides afterwards, steel wire 44, which slides, runs through the first top plate 3, front and rear steel wire 44 rotating around in front and rear first pulley 45 and with electronic coiling Wheel 46 is fixedly connected.
Embodiment 3
A kind of natural gas line construction and installation support meanss, as shown in figs. 1-7, include bottom plate 1, the first support plate 2, One top plate 3, lowering or hoisting gear 4 and clamping device 5, the front and rear sides of the top left of bottom plate 1 connect by bolted connection There is the first support plate 2, the top of front and rear first support plate 2 is connected with the first top plate 3, and the front and rear inner side of first support plate 2 is provided with lowering or hoisting gear 4, lowering or hoisting gear 4 is interior to be provided with clamping device 5.
Lowering or hoisting gear 4 includes the first slide rail 41, the first sliding block 42, the first transverse slat 43, steel wire 44, first pulley 45 and electricity Dynamic reel 46, the inner side of front and rear first support plate 2 is connected with the first slide rail 41, the first slide rail 41 by bolted connection It is vertical setting, slidingtype is provided with the first sliding block 42 on the first slide rail 41, and the first slide rail 41 and the slidingtype of the first sliding block 42 are matched somebody with somebody Closing, be connected with the first transverse slat 43 between front and rear first sliding block 42 by bolted connection, the first transverse slat 43 is in be horizontally disposed with, The top of front and rear first sliding block 42 has been fixedly connected with steel wire 44, what the crown center of the first top plate 3 was bolted respectively Mode is provided with electronic reel 46 and two first pulleys 45, before two first pulleys 45 are located at electronic reel 46 respectively Both sides afterwards, steel wire 44, which slides, runs through the first top plate 3, front and rear steel wire 44 rotating around in front and rear first pulley 45 and with electronic coiling Wheel 46 is fixedly connected.
Clamping device 5 includes the second slide rail 51, the second sliding block 52, block 53, fixing bolt 54, the first pole 55, One spring 56 and fixture block 57, the front and rear sides at the top of the first transverse slat 43 are connected with the second slide rail by bolted connection 51, slidingtype is provided with the second sliding block 52 on the second slide rail 51, and the second slide rail 51 and the slidingtype of the second sliding block 52 coordinate, and front and rear the The inner opposite end of two slide rails 51 is connected with block 53, and the left side central portion rotary type of the second sliding block 52 is connected with fixing bolt 54, preceding The top of the second sliding block 52 is respectively connected with the first pole 55 afterwards, and the inner side of the first pole 55 is connected with the first spring 56, the first bullet The end of spring 56 is connected with fixture block 57.
Embodiment 4
A kind of natural gas line construction and installation support meanss, as shown in figs. 1-7, include bottom plate 1, the first support plate 2, One top plate 3, lowering or hoisting gear 4 and clamping device 5, the front and rear sides of the top left of bottom plate 1 connect by bolted connection There is the first support plate 2, the top of front and rear first support plate 2 is connected with the first top plate 3, and the front and rear inner side of first support plate 2 is provided with lowering or hoisting gear 4, lowering or hoisting gear 4 is interior to be provided with clamping device 5.
Lowering or hoisting gear 4 includes the first slide rail 41, the first sliding block 42, the first transverse slat 43, steel wire 44, first pulley 45 and electricity Dynamic reel 46, the inner side of front and rear first support plate 2 is connected with the first slide rail 41, the first slide rail 41 by bolted connection It is vertical setting, slidingtype is provided with the first sliding block 42 on the first slide rail 41, and the first slide rail 41 and the slidingtype of the first sliding block 42 are matched somebody with somebody Closing, be connected with the first transverse slat 43 between front and rear first sliding block 42 by bolted connection, the first transverse slat 43 is in be horizontally disposed with, The top of front and rear first sliding block 42 has been fixedly connected with steel wire 44, what the crown center of the first top plate 3 was bolted respectively Mode is provided with electronic reel 46 and two first pulleys 45, before two first pulleys 45 are located at electronic reel 46 respectively Both sides afterwards, steel wire 44, which slides, runs through the first top plate 3, front and rear steel wire 44 rotating around in front and rear first pulley 45 and with electronic coiling Wheel 46 is fixedly connected.
Clamping device 5 includes the second slide rail 51, the second sliding block 52, block 53, fixing bolt 54, the first pole 55, One spring 56 and fixture block 57, the front and rear sides at the top of the first transverse slat 43 are connected with the second slide rail by bolted connection 51, slidingtype is provided with the second sliding block 52 on the second slide rail 51, and the second slide rail 51 and the slidingtype of the second sliding block 52 coordinate, and front and rear the The inner opposite end of two slide rails 51 is connected with block 53, and the left side central portion rotary type of the second sliding block 52 is connected with fixing bolt 54, preceding The top of the second sliding block 52 is respectively connected with the first pole 55 afterwards, and the inner side of the first pole 55 is connected with the first spring 56, the first bullet The end of spring 56 is connected with fixture block 57.
Also include support meanss 6, support meanss 6 include cushion block 61, arc support plate 62 and rubber blanket 63, the first transverse slat 43 crown center is connected with cushion block 61 by bolted connection, and the top of cushion block 61 is connected with arc support plate 62, arc The top of support plate 62 is connected with rubber blanket 63 by bolted connection.
Also include the second support plate 7 and carriage 8, what the front and rear sides of the top right-hand member of bottom plate 1 were bolted Mode is connected with the second support plate 7, and the inner side of front and rear second support plate 7 is provided with carriage 8, and carriage 8 includes the 3rd slide rail 81st, the 3rd sliding block 82, the second transverse slat 83, cylinder 84 and traction wheel 85, the side that the inner side of front and rear second support plate 7 is bolted Formula is connected with the 3rd slide rail 81, and the 3rd slide rail 81 is vertical setting, and slidingtype is provided with the 3rd sliding block 82 on the 3rd slide rail 81, the Three sliding blocks 82 and the slidingtype of the 3rd slide rail 81 coordinate, and second is connected with by bolted connection between front and rear 3rd sliding block 82 Transverse slat 83, for the second transverse slat 83 in being horizontally disposed with, the middle part of the top right-hand member of bottom plate 1 is provided with cylinder by bolted connection 84, with being connected among the bottom of the second transverse slat 83, the crown center of the second transverse slat 83 passes through bolt for the expansion link end of cylinder 84 The mode of connection is connected with traction wheel 85.
Also include fixing device 9, fixing device 9 includes the second pole 91, guide pin bushing 92, guide rod 93, second pulley 94 With second spring 95, the rear and front end at the top of the second transverse slat 83 is connected with the second support plate 7 by bolted connection, front and rear The inside top of second support plate 7 is connected with guide pin bushing 92 by bolted connection, and slidingtype is provided with front and rear guide pin bushing 92 Guide rod 93, guide rod 93 coordinate with guide pin bushing 92, and the end of guide rod 93 is connected with second pulley 94 by bolted connection, is located at The outside of guide rod 93 between guide pin bushing 92 and second pulley 94 is cased with second spring 95, one end and the second pulley 94 of second spring 95 Connection, the other end are connected with guide pin bushing 92.
Also include the second top plate 10 and connecting plate 11, the top of front and rear second support plate 7 connects by bolted connection There is the second top plate 10, connecting plate 11 is connected with by bolted connection between front and rear first support plate 2 and front and rear second support plate 7.
Also include wheel 12, wheel 12 is connected with by bolted connection at the bottom four corners of bottom plate 1.
Operation principle:In use, natural gas line is passed through between front and rear first support plate 2, the He of lowering or hoisting gear 4 is placed in In clamping device 5, natural gas line is clamped, it is necessary to when adjusting natural gas line height by clamping device 5, filled by lifting 4 regulations are put, after natural gas line has been fixedly mounted, adjustment clamping device 5 unclamps natural gas line, starts lifting Device 4 declines, and when natural gas line and present apparatus separate type, the present apparatus is removed.
Because lowering or hoisting gear 4 includes the first slide rail 41, the first sliding block 42, the first transverse slat 43, steel wire 44, first pulley 45 With electronic reel 46, the inner side of front and rear first support plate 2 is connected with the first slide rail 41 by bolted connection, and first slides Rail 41 is vertical setting, and slidingtype is provided with the first sliding block 42 on the first slide rail 41, and the first slide rail 41 and the first sliding block 42 slide Formula coordinates, and is connected with the first transverse slat 43 between front and rear first sliding block 42 by bolted connection, the first transverse slat 43 is in level Set, the top of front and rear first sliding block 42 has been fixedly connected with steel wire 44, and the crown center of the first top plate 3 is connected by bolt respectively The mode connect is provided with electronic reel 46 and two first pulleys 45, and two first pulleys 45 are located at electronic reel 46 respectively Front and rear sides, steel wire 44, which slides, runs through the first top plate 3, front and rear steel wire 44 rotating around in front and rear first pulley 45 and with it is electronic Reel 46 is fixedly connected.In use, natural gas line is placed on into the top of the first transverse slat 43, start the electronic coiling of reel 46, So as to which steel wire 44 be wound, steel wire 44 drives the first transverse slat 43 to move up, so as to drive natural gas line to move up, the same day When right feed channel is moved to suitable height, electronic reel 46 is closed.
Because clamping device 5 includes the second slide rail 51, the second sliding block 52, block 53, fixing bolt 54, the first pole 55th, the first spring 56 and fixture block 57, the front and rear sides at the top of the first transverse slat 43 are connected with second by bolted connection Slide rail 51, slidingtype is provided with the second sliding block 52 on the second slide rail 51, and the second slide rail 51 and the slidingtype of the second sliding block 52 coordinate, preceding The inner opposite end of the second slide rail 51 is connected with block 53 afterwards, and the left side central portion rotary type of the second sliding block 52 is connected with fixing bolt 54, the top of front and rear second sliding block 52 is respectively connected with the first pole 55, and the inner side of the first pole 55 is connected with the first spring 56, the The end of one spring 56 is connected with fixture block 57.After natural gas line is placed on the first transverse slat 43, and located at front and rear fixture block 57 Between, to unscrew fixing bolt 54, stir front and rear first pole 55 respectively inwards, front and rear fixture block 57 contacts with natural gas line, the One spring 56 is compressed, and now tightens fixing bolt 54, and in the presence of the first spring 56, front and rear fixture block 57 is by natural gas tube Road clamps.After natural gas line has been fixedly mounted, unscrew fixing bolt 54, by front and rear fixture block 57 and natural gas line point From.
Because also including support meanss 6, support meanss 6 include cushion block 61, arc support plate 62 and rubber blanket 63, first The crown center of transverse slat 43 is connected with cushion block 61 by bolted connection, and the top of cushion block 61 is connected with arc support plate 62, The top of arc support plate 62 is connected with rubber blanket 63 by bolted connection.In use, natural gas line is placed on arc The top of support plate 62, rubber blanket 63 have anti-skidding effect, slide during so as to prevent that natural gas line is fixedly mounted, further improve installation Efficiency.
Because also including the second support plate 7 and carriage 8, the front and rear sides of the top right-hand member of bottom plate 1 are connected by bolt The mode connect is connected with the second support plate 7, and the inner side of front and rear second support plate 7 is provided with carriage 8, and carriage 8 includes the 3rd Slide rail 81, the 3rd sliding block 82, the second transverse slat 83, cylinder 84 and traction wheel 85, the inner side of front and rear second support plate 7 are bolted Mode be connected with the 3rd slide rail 81, the 3rd slide rail 81 is vertical setting, and slidingtype is provided with the 3rd sliding block on the 3rd slide rail 81 82, the 3rd sliding block 82 and the slidingtype of the 3rd slide rail 81 coordinate, and are connected by bolted connection between front and rear 3rd sliding block 82 There is the second transverse slat 83, in being horizontally disposed with, the middle part of the top right-hand member of bottom plate 1 is provided with the second transverse slat 83 by bolted connection Cylinder 84, with being connected among the bottom of the second transverse slat 83, the crown center of the second transverse slat 83 passes through for the expansion link end of cylinder 84 Bolted mode is connected with traction wheel 85.In use, natural gas line is placed in into the top of the second transverse slat 83, work as installation process In when needing to move natural gas line, clamping device 5 is separated with natural gas line, starts lowering or hoisting gear 4 and declines, make natural gas Pipeline is rested on traction wheel 85, is started the expansion link of cylinder 84 and is stretched, so as to drive natural gas line to move up or down, to A left side promotes to the right natural gas line, and natural gas line horizontally slips on traction wheel 85, you can natural gas line is moved easily, So as to further improve installation effectiveness.
Because also including fixing device 9, fixing device 9 includes the second pole 91, guide pin bushing 92, the cunning of guide rod 93, second Wheel 94 and second spring 95, the rear and front end at the top of the second transverse slat 83 are connected with the second support plate 7 by bolted connection, The inside top of front and rear second support plate 7 is connected with guide pin bushing 92 by bolted connection, equal slidingtype in front and rear guide pin bushing 92 Provided with guide rod 93, guide rod 93 coordinates with guide pin bushing 92, and the end of guide rod 93 is connected with second pulley 94 by bolted connection, The outside of guide rod 93 between guide pin bushing 92 and second pulley 94 is cased with second spring 95, and one end of second spring 95 is slided with second The connection of wheel 94, the other end are connected with guide pin bushing 92.In use, natural gas line is placed on traction wheel 85 and slided located at front and rear second Between wheel 94, in the presence of second spring 95, front and rear second pulley 94 fixes natural gas line, prevents natural gas line from moving Slid when dynamic from traction wheel 85, so as to further improve installation effectiveness.
Because also including the second top plate 10 and connecting plate 11, the top of front and rear second support plate 7 is by bolted connection The second top plate 10 is connected with, connecting plate is connected with by bolted connection between front and rear first support plate 2 and front and rear second support plate 7 11.Second top and connecting plate 11 improve the steadiness of the present apparatus, so as to increase the service life of the present apparatus.
Because also including wheel 12, wheel 12 is connected with the bottom four corners of bottom plate 1 by bolted connection, Wheel 12 can be more convenient, the smooth mobile present apparatus.
Embodiment described above only expresses the preferred embodiment of the present invention, and its description is more specific and detailed, but simultaneously Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art For, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these belong to this hair Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (8)

  1. A kind of 1. natural gas line construction and installation support meanss, it is characterised in that include bottom plate (1), the first support plate (2), First top plate (3), lowering or hoisting gear (4) and clamping device (5), the front and rear sides of bottom plate (1) top left are bolted Mode be connected with the first support plate (2), the first top plate (3), front and rear first support plate are connected with the top of front and rear first support plate (2) (2) inner side is provided with lowering or hoisting gear (4), and clamping device (5) is provided with lowering or hoisting gear (4).
  2. A kind of 2. natural gas line construction and installation support meanss according to claim 1, it is characterised in that lowering or hoisting gear (4) include the first slide rail (41), the first sliding block (42), the first transverse slat (43), steel wire (44), first pulley (45) and it is electronic around Line wheel (46), the inner side of front and rear first support plate (2) are connected with the first slide rail (41), the first slide rail by bolted connection (41) it is vertical setting, slidingtype is provided with the first sliding block (42), the first slide rail (41) and the first sliding block on the first slide rail (41) (42) slidingtype coordinates, and is connected with the first transverse slat (43) between front and rear first sliding block (42) by bolted connection, and first Transverse slat (43) has been fixedly connected with steel wire (44), the top of the first top plate (3) in being horizontally disposed with the top of front and rear first sliding block (42) Electronic reel (46) and two first pulleys (45), two first cunnings are installed by bolted connection respectively among portion The front and rear sides that (45) are located at electronic reel (46) respectively are taken turns, steel wire (44), which slides, runs through the first top plate (3), front and rear steel wire (44) it is fixedly connected rotating around in front and rear first pulley (45) and with electronic reel (46).
  3. A kind of 3. natural gas line construction and installation support meanss according to claim 2, it is characterised in that clamping device (5) the second slide rail (51), the second sliding block (52), block (53), fixing bolt (54), the first pole (55), the first bullet are included Spring (56) and fixture block (57), the front and rear sides at the top of the first transverse slat (43) are connected with the second slide rail by bolted connection (51), slidingtype is provided with the second sliding block (52), the second slide rail (51) and the second sliding block (52) slidingtype on the second slide rail (51) Coordinate, the inner opposite end of front and rear second slide rail (51) is connected with block (53), and the left side central portion rotary type of the second sliding block (52) connects Be connected to fixing bolt (54), be respectively connected with the first pole (55) at the top of front and rear second sliding block (52), the first pole (55) it is interior Side is connected with the first spring (56), and the end of the first spring (56) is connected with fixture block (57).
  4. 4. a kind of natural gas line construction and installation support meanss according to claim 3, it is characterised in that also include Support meanss (6), support meanss (6) include cushion block (61), arc support plate (62) and rubber blanket (63), the first transverse slat (43) Crown center is connected with cushion block (61) by bolted connection, and arc support plate (62), arc are connected with the top of cushion block (61) The top of shape support plate (62) is connected with rubber blanket (63) by bolted connection.
  5. 5. a kind of natural gas line construction and installation support meanss according to claim 4, it is characterised in that also include Second support plate (7) and carriage (8), the front and rear sides of bottom plate (1) top right-hand member are connected with by bolted connection Second support plate (7), the inner side of front and rear second support plate (7) are provided with carriage (8), and carriage (8) includes the 3rd slide rail (81), the 3rd sliding block (82), the second transverse slat (83), cylinder (84) and traction wheel (85), pass through on the inside of front and rear second support plate (7) Bolted mode is connected with the 3rd slide rail (81), and the 3rd slide rail (81) is vertical setting, slidingtype on the 3rd slide rail (81) 3rd sliding block (82) is installed, the 3rd sliding block (82) coordinates with the 3rd slide rail (81) slidingtype, between front and rear 3rd sliding block (82) The second transverse slat (83) is connected with by bolted connection, and the second transverse slat (83) is in horizontally disposed, right-hand member at the top of bottom plate (1) Middle part is provided with cylinder (84), the expansion link end of cylinder (84) and the bottom of the second transverse slat (83) by bolted connection Centre connection, the crown center of the second transverse slat (83) are connected with traction wheel (85) by bolted connection.
  6. 6. a kind of natural gas line construction and installation support meanss according to claim 5, it is characterised in that also include Fixing device (9), fixing device (9) include the second pole (91), guide pin bushing (92), guide rod (93), second pulley (94) and Two springs (95), the rear and front end at the top of the second transverse slat (83) is connected with the second support plate (7) by bolted connection, preceding The inside top of the second support plate (7) is connected with guide pin bushing (92) by bolted connection afterwards, is slided in front and rear guide pin bushing (92) Dynamic formula is provided with guide rod (93), and guide rod (93) coordinates with guide pin bushing (92), and the end of guide rod (93) connects by bolted connection There is second pulley (94), second spring (95) be cased with the outside of the guide rod (93) between guide pin bushing (92) and second pulley (94), One end of second spring (95) is connected with second pulley (94), and the other end is connected with guide pin bushing (92).
  7. 7. a kind of natural gas line construction and installation support meanss according to claim 6, it is characterised in that also include Second top plate (10) and connecting plate (11), the top of front and rear second support plate (7) are connected with the second top plate by bolted connection (10), connecting plate (11) is connected with by bolted connection between front and rear first support plate (2) and front and rear second support plate (7).
  8. 8. a kind of natural gas line construction and installation support meanss according to claim 7, it is characterised in that also include Wheel (12), wheel (12) is connected with by bolted connection at the bottom four corners of bottom plate (1).
CN201710778816.0A 2017-09-01 2017-09-01 A kind of natural gas line construction and installation support device Active CN107542976B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710778816.0A CN107542976B (en) 2017-09-01 2017-09-01 A kind of natural gas line construction and installation support device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710778816.0A CN107542976B (en) 2017-09-01 2017-09-01 A kind of natural gas line construction and installation support device

Publications (2)

Publication Number Publication Date
CN107542976A true CN107542976A (en) 2018-01-05
CN107542976B CN107542976B (en) 2019-04-19

Family

ID=60957662

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710778816.0A Active CN107542976B (en) 2017-09-01 2017-09-01 A kind of natural gas line construction and installation support device

Country Status (1)

Country Link
CN (1) CN107542976B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112919361A (en) * 2021-02-08 2021-06-08 河北建设集团股份有限公司 Pipeline vertical hoisting device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1182809A (en) * 1997-09-04 1999-03-26 Hitachi Plant Eng & Constr Co Ltd Piping tractional installation construction method and device
CN203006839U (en) * 2012-11-22 2013-06-19 罗福田 Automatic lifting mechanism of zipper making machine
CN103791167A (en) * 2014-01-20 2014-05-14 江苏海事职业技术学院 Adjustable pipe hanging bracket and adjustable hanging bracket assembly for suppressing ship pipe vibration noise
CN104132187A (en) * 2014-07-18 2014-11-05 张家港迪威高压管件有限公司 Pipe hanger
CN105333225A (en) * 2015-11-30 2016-02-17 中国一冶集团有限公司 Wire twisting type installing and lifting device for air pipes
CN205824372U (en) * 2016-06-20 2016-12-21 成都科盛石油科技有限公司 A kind of adjustable petroleum pipeline bracket
CN205916957U (en) * 2016-06-28 2017-02-01 苏州东宇建设发展有限公司 Light piping erection hoisting frame
CN206010289U (en) * 2016-06-17 2017-03-15 邱晓龙 A kind of portable natural gas line abutting joint auxiliary device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1182809A (en) * 1997-09-04 1999-03-26 Hitachi Plant Eng & Constr Co Ltd Piping tractional installation construction method and device
CN203006839U (en) * 2012-11-22 2013-06-19 罗福田 Automatic lifting mechanism of zipper making machine
CN103791167A (en) * 2014-01-20 2014-05-14 江苏海事职业技术学院 Adjustable pipe hanging bracket and adjustable hanging bracket assembly for suppressing ship pipe vibration noise
CN104132187A (en) * 2014-07-18 2014-11-05 张家港迪威高压管件有限公司 Pipe hanger
CN105333225A (en) * 2015-11-30 2016-02-17 中国一冶集团有限公司 Wire twisting type installing and lifting device for air pipes
CN206010289U (en) * 2016-06-17 2017-03-15 邱晓龙 A kind of portable natural gas line abutting joint auxiliary device
CN205824372U (en) * 2016-06-20 2016-12-21 成都科盛石油科技有限公司 A kind of adjustable petroleum pipeline bracket
CN205916957U (en) * 2016-06-28 2017-02-01 苏州东宇建设发展有限公司 Light piping erection hoisting frame

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112919361A (en) * 2021-02-08 2021-06-08 河北建设集团股份有限公司 Pipeline vertical hoisting device

Also Published As

Publication number Publication date
CN107542976B (en) 2019-04-19

Similar Documents

Publication Publication Date Title
CN204381726U (en) A kind of H profile steel plate forming device
CN206665686U (en) A kind of pipe cutting agency
CN204238880U (en) The drilling rod automatic powder adding of underground drill rig adds retracting device
CN107542976A (en) A kind of natural gas line construction and installation support meanss
CN205650978U (en) Full -automatic solar wafer stringer
CN202897429U (en) Material box automatic feeding and recovering apparatus
CN202824263U (en) Vertical double-position reshaping device for closed barrel
CN103337359B (en) High-power transformer coil manufactures the pneumatic conducting wire tensioning device of walking
CN207645231U (en) Used eyelid retractor when for replacing belt roller
CN208499701U (en) A kind of battery pack feeding system
CN215252030U (en) Device for efficiently replacing railway line sleeper
CN109179284A (en) It is a kind of rely on vehicle move manhole lid device certainly
CN208166430U (en) A kind of fully-mechanized mining working elevating conveyor lifts by crane arm assembly with machine
CN209716597U (en) A kind of metallic plate cutter device
CN204163658U (en) With the rigid guide device of car folding type tourist bus
CN208297258U (en) A kind of tire protection chain resistance to compression detection device
CN208631636U (en) A kind of pickling line automatic charging device
CN208086105U (en) A kind of crawl falling type recrater
CN207142166U (en) The attachment structure of ribbon conveyer backhaul flat carrier roller and frame
CN207844916U (en) A kind of mining simple box discharge mechanism
CN206288680U (en) Profile shapes automatic basket loading equipment
CN206071619U (en) A kind of two-way changer of oil cylinder
CN109592395A (en) Sucker rod conveyer
CN109850635A (en) A kind of tire base expanding unit
CN212447866U (en) Scraped car disassembles turning device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190326

Address after: No. 10, Nanyili, Xishan Road, Xiufeng District, Guilin City, Guangxi Zhuang Autonomous Region

Applicant after: Guilin Xinao Gas Development Co., Ltd.

Address before: 230000 No. 130 Changjiang West Road, Shushan District, Hefei City, Anhui Province

Applicant before: Liu Yuxin

GR01 Patent grant
GR01 Patent grant