CN107542369A - A kind of introversion translation door technical study - Google Patents

A kind of introversion translation door technical study Download PDF

Info

Publication number
CN107542369A
CN107542369A CN201710730852.XA CN201710730852A CN107542369A CN 107542369 A CN107542369 A CN 107542369A CN 201710730852 A CN201710730852 A CN 201710730852A CN 107542369 A CN107542369 A CN 107542369A
Authority
CN
China
Prior art keywords
door
basal sliding
sliding groove
door body
track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710730852.XA
Other languages
Chinese (zh)
Inventor
李永洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Ruiming Energy Saving Door And Window Co Ltd
Original Assignee
Chongqing Ruiming Energy Saving Door And Window Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Ruiming Energy Saving Door And Window Co Ltd filed Critical Chongqing Ruiming Energy Saving Door And Window Co Ltd
Priority to CN201710730852.XA priority Critical patent/CN107542369A/en
Publication of CN107542369A publication Critical patent/CN107542369A/en
Pending legal-status Critical Current

Links

Landscapes

  • Wing Frames And Configurations (AREA)

Abstract

The invention discloses a kind of introversion translation door technical study, including laterally long door body, the side of the long door body of transverse direction is provided with horizontal hatch body, the bottom of the horizontal hatch body is provided with basal sliding groove, top slide groove is provided with the top of the horizontal hatch body, the long door body of transverse direction and the junction of basal sliding groove are provided with basal sliding wheel and side movable pulley, the basal sliding wheel is arranged on laterally long door body and the bottom junctions of basal sliding groove, and the side movable pulley is arranged on laterally long door body and the side junction of basal sliding groove;The long door body of specification transverse direction in different size and horizontal hatch body are designed as in the present invention, and laterally long door body and the lateral separation sum of horizontal hatch body are greater than the horizontal distance that doorframe is stayed, after introversion translation door installs, door is closed, there will be no the appearance of very big crack between a door and its frame, the effect of the sealing of translation door is significantly increased, while also increases the effect of its sound insulation.

Description

A kind of introversion translation door technical study
Technical field
The invention belongs to translation door technical field, and in particular to a kind of introversion translation door technical study.
Background technology
It is all device of electric sliding door that translation door is most of, has multi-functional feature, and its door body requires tighter to wind load resistance, fitted Conjunction is installed in various factory building structures.This kind of door leaf can be changed manually, electrically.Controllable gate door leaf quantity be not it is too many, General monorail.It is divided into lower load-bearing and upper two kinds of load-bearing.Lower load-bearing:Door body is by base track load-bearing, top guide.Durability By force, very little maintenance, safety is simple with control, adapts to a variety of heat-insulated and outer layer system;Upper load-bearing:The load-bearing of door body weight in top, Bottom is oriented to.The bearing track intensity requirement on door body top is high, and load-carrying properties are excellent, and door body operational reliability is high.Door body is run When frictional force it is small, open it is light, steady, door starting up's torque demand is small, small power consumption.
But existing translation door still has some irrational factors during use, existing translation door exists In use, if power used when sliding is excessive, the situation that leaning forward can occur because of inertia in translation door occurs, and translation door exists When leaning forward, Men Bian is in contact with bottom shifting chute, door occurs and is occurred using shakiness, and the flimsy situation of door body part;It is existing Some translation doors when in use, if the lateral length of two door body and the lateral separation stayed with doorframe relatively, Translation door when in use, is difficult to play the effect of very perfect sealing and sound insulation, inconvenience is caused to use.
The content of the invention
It is an object of the invention to provide a kind of introversion translation door technical study, to solve what is proposed in above-mentioned background technology When in use, if it is that power used is excessive to slide, translation door the feelings to lean forward because of inertia to existing translation door can occur Condition occurs, and translation door is that Men Bian is in contact with bottom shifting chute leaning forward, and door occurs and uses shakiness, and door body part rapid wear Bad situation occurs;Existing translation door when in use, if the lateral length of two door body and with doorframe stayed laterally away from From relatively, translation door when in use, is difficult to play the effect of very perfect sealing and sound insulation, caused to use The problem of inconvenience.
To achieve the above object, the present invention provides following technical scheme:A kind of introversion translation door technical study, including transverse direction Long door body, the side of the long door body of transverse direction are provided with horizontal hatch body, and the bottom of the horizontal hatch body is provided with bottom cunning Groove is moved, top slide groove, the long door body of transverse direction and the junction of basal sliding groove are provided with the top of the horizontal hatch body Basal sliding wheel and side movable pulley are provided with, the basal sliding wheel is arranged on laterally long door body and the bottom of basal sliding groove Junction, the side movable pulley are arranged on laterally long door body and the side junction of basal sliding groove.
Preferably, the external dimensions size of the long door body of the transverse direction is more than the external dimensions size of horizontal hatch body.
Preferably, the long door body of the transverse direction is connected with basal sliding groove by basal sliding slipping, and laterally long door body Aid in sliding by side movable pulley with basal sliding groove.
Preferably, the basal sliding groove is bolted to connection with bottom mounting plate, and basal sliding groove is set altogether There are two.
Preferably, the long door body of the transverse direction and horizontal hatch body are rectangular parallelepiped structure, and the long door body of transverse direction and transverse direction are short Door bulk frame is stainless steel aluminum alloy material members.
A kind of introversion translation door technical study, including following installation steps:
First, the preparation before installing:Get out the works such as the screw of various models, nut, power drill, inner hexagon spanner, bottle opener Tool.
The 2nd, basal sliding groove is installed:Aluminum alloy outer frame automatically-controlled door and safety glass need that guidance quality track is housed, still Different in nature steel pipe does not have a track, is embedded in underground during the installation of basal sliding groove, to be planned below door early stage, track length is mostly to be Twice of gate-width.Pay attention to being consistent with the absolute altitude of terrace surface material when burying track, bury the bottom of dress lateral length half first Portion's sliding groove.
The 3rd, top slide groove is installed:The top slide groove being previously welded is put into coil to bury at the door pillar of iron, with level Chi is smoothed, vertical hanging, and is ensured the position relationship with following track, is then welded again with electric welding.
The 4th, laterally long door body and horizontal hatch body are installed:The aluminium section bar processed is rectified the blooming of glass M8 Screw tightening, notice that wanting parallel between aluminium alloy can not stagger, the door leaf sealing joint strip of small adhesive tape triangle is filled in the front of door, instead The door leaf sealing joint strip that big adhesive tape is similar to square is filled in face, and adhesive tape will be slightly longer than corresponding doorframe, be entirely sealed in adhesive tape Between framework and glass, then laterally long door body and horizontal hatch body are slided by basal sliding wheel and side movable pulley with bottom The contact of dynamic groove, laterally long door body and horizontal hatch body card and in the inside of basal sliding groove and top slide groove.
The 5th, basal sliding groove is installed:Aluminum alloy outer frame automatically-controlled door and safety glass need that guidance quality track is housed, still Different in nature steel pipe does not have a track, is embedded in underground during the installation of basal sliding groove, to be planned below door early stage, track length is mostly to be Twice of gate-width.Pay attention to being consistent with the absolute altitude of terrace surface material when burying track, then remaining half basal sliding Groove is arranged on bottom fixed board by bolt.
6th, the inspection and correction to performance:The width of doorframe and height will be in 1400mm or so, it is allowed to deviation exist In the range of 1.5mm, examined using slide measure;Doorframe diagonal difference will be in 1900mm or so, it is allowed to deviation in 2.5mm models In enclosing, examined with slide measure;The deviation that the front perpendicularity of sash allows is 1mm, 1m vertical checkout rulers can be used to examine Survey;To be detected in the range of 0.3mm using clearance gauge door component fit-up gap;The error that door beam guide rail levelness allows is 1mm, 1m vertical checkout rulers can be used to detect;Lower guideway and door beam guide rail parallelism, it is allowed to error be 1.5mm, water can be used Leveling ruler is examined;Clearance is generally between 1.1mm~1.7mm between door leaf and side frame, can be detected with clearance gauge.
Compared with prior art, the beneficial effects of the invention are as follows:The present invention is scientific and reasonable for structure, safe and convenient to use, this The long door body of specification transverse direction in different size and horizontal hatch body, and laterally long door body and horizontal hatch body are designed as in invention Lateral separation sum be greater than the horizontal distance that doorframe is stayed, after introversion translation door installs, door is closed, just not Have very big crack between a door and its frame to occur, it will be apparent that add the effect of the sealing of translation door, while also increase the effect of its sound insulation;This It is provided with invention after the movable pulley of side, when translation door slides in basal sliding groove, side movable pulley can play very The effect that good auxiliary is slided, uses enhanced convenience, and power used is excessive when being not in slip, then translation door can be because The situation for occurring leaning forward for inertia occurs, and when leaning forward, Men Bian's translation door is in contact with bottom shifting chute, door occurs using not Surely, and the flimsy situation of door body part occurs, and uses enhanced convenience, safety.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the structural representation of basal sliding groove of the present invention;
Fig. 3 is the door body mounting structure schematic diagram of the present invention;
Fig. 4 is the translation door integral installation structural representation of the present invention;
In figure:1- laterally long door body, 2- basal slidings groove, 3- transverse direction hatch body, 4- top slides groove, 5- basal slidings Wheel, 6- sides movable pulley.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under the premise of creative work is not made Embodiment, belong to the scope of protection of the invention.
Fig. 1, Fig. 2, Fig. 3 and Fig. 4 are referred to, the present invention provides a kind of technical scheme:A kind of introversion translation door technical study, Including laterally long door body 1, the side of horizontal long door body 1 is provided with horizontal hatch body 3, and the bottom of horizontal hatch body 3 is provided with bottom Portion's sliding groove 2, the top of horizontal hatch body 3 are provided with top slide groove 4, laterally long door body 1 and the junction of basal sliding groove 2 Basal sliding wheel 5 and side movable pulley 6 are provided with, basal sliding wheel 5 is arranged on laterally long door body 1 and the bottom of basal sliding groove 2 Portion junction, side movable pulley 6 are arranged on laterally long door body 1 and the side junction of basal sliding groove 2.
In the present embodiment, it is preferred that laterally the external dimensions size of long door body 1 is more than the external dimensions of horizontal hatch body 3 Size.
In the present embodiment, it is preferred that laterally long door body 1 is slidably connected with basal sliding groove 2 by basal sliding wheel 5, and Laterally long door body 1 aids in sliding with basal sliding groove 2 by side movable pulley 6.
In the present embodiment, it is preferred that basal sliding groove 2 is bolted to connection with bottom mounting plate, and basal sliding Groove 2 is provided with two altogether.
In the present embodiment, it is preferred that laterally long door body 1 and horizontal hatch body 3 are rectangular parallelepiped structure, and laterally long door body 1 and the horizontal frame of hatch body 3 be stainless steel aluminum alloy material members.
A kind of introversion translation door technical study, including following installation steps:
First, the preparation before installing:Get out the works such as the screw of various models, nut, power drill, inner hexagon spanner, bottle opener Tool.
The 2nd, basal sliding groove 2 is installed:Aluminum alloy outer frame automatically-controlled door and safety glass need that guidance quality track is housed, but It is that different in nature steel pipe does not have a track, is embedded in underground during the installation of basal sliding groove 2, to be planned below door early stage, track length It is twice of gate-width mostly.Pay attention to being consistent with the absolute altitude of terrace surface material when burying track, bury dress lateral length half first Basal sliding groove 2.
The 3rd, top slide groove 4 is installed:The top slide groove 4 being previously welded is put into coil to bury at the door pillar of iron, uses water Leveling ruler is smoothed, vertical hanging, and is ensured the position relationship with following track, is then welded again with electric welding.
The 4th, laterally long door body 1 and horizontal hatch body 3 are installed:The aluminium section bar processed is rectified the opening of glass M8 Flower screw tightening, pays attention to that wanting parallel between aluminium alloy can not stagger, the door leaf sealing joint strip of the small adhesive tape triangle of front plug of door, The big adhesive tape of reverse side plug is similar to the door leaf sealing joint strip of square, and adhesive tape will be slightly longer than corresponding doorframe, adhesive tape is fully sealed Between framework and glass, then laterally long door body 1 and horizontal hatch body 3 by basal sliding wheel 5 and side movable pulley 6 with The contact of basal sliding groove 2, laterally long door body 1 and horizontal hatch body 3 are blocked and in basal sliding groove 2 and top slide groove 4 It is internal.
The 5th, basal sliding groove 2 is installed:Aluminum alloy outer frame automatically-controlled door and safety glass need that guidance quality track is housed, but It is that different in nature steel pipe does not have a track, is embedded in underground during the installation of basal sliding groove 2, to be planned below door early stage, track length It is twice of gate-width mostly.Pay attention to being consistent with the absolute altitude of terrace surface material when burying track, then remaining half bottom Sliding groove 2 is arranged on bottom fixed board by bolt.
6th, the inspection and correction to performance:The width of doorframe and height will be in 1400mm or so, it is allowed to deviation exist In the range of 1.5mm, examined using slide measure;Doorframe diagonal difference will be in 1900mm or so, it is allowed to deviation in 2.5mm models In enclosing, examined with slide measure;The deviation that the front perpendicularity of sash allows is 1mm, 1m vertical checkout rulers can be used to examine Survey;To be detected in the range of 0.3mm using clearance gauge door component fit-up gap;The error that door beam guide rail levelness allows is 1mm, 1m vertical checkout rulers can be used to detect;Lower guideway and door beam guide rail parallelism, it is allowed to error be 1.5mm, water can be used Leveling ruler is examined;Clearance is generally between 1.1mm~1.7mm between door leaf and side frame, can be detected with clearance gauge.
The operation principle and process for using of the present invention:After the present invention installs, the installation for first checking for the present invention is fixed And security protection, then can use, in use,.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of changes, modification can be carried out to these embodiments, replace without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (6)

1. a kind of introversion translation door technical study, including laterally long door body (1), it is characterised in that:The long door body of transverse direction (1) Side is provided with horizontal hatch body (3), and the bottom of the horizontal hatch body (3) is provided with basal sliding groove (2), and the transverse direction is short Top slide groove (4) is provided with the top of door body (3), the long door body of transverse direction (1) and the junction of basal sliding groove (2) are set There are basal sliding wheel (5) and side movable pulley (6), the basal sliding wheel (5) is arranged on laterally long door body (1) and basal sliding The bottom junctions of groove (2), the side movable pulley (6) is arranged on laterally long door body (1) and the side of basal sliding groove (2) connects Meet place.
A kind of 2. introversion translation door technical study according to claim 1, it is characterised in that:The long door body of transverse direction (1) External dimensions size be more than horizontal hatch body (3) external dimensions size.
A kind of 3. introversion translation door technical study according to claim 1, it is characterised in that:The long door body of transverse direction (1) It is slidably connected with basal sliding groove (2) by basal sliding wheel (5), and laterally long door body (1) passes through side with basal sliding groove (2) Face movable pulley (6) auxiliary is slided.
A kind of 4. introversion translation door technical study according to claim 1, it is characterised in that:The basal sliding groove (2) It is bolted to connection with bottom mounting plate, and basal sliding groove (2) is provided with two altogether.
A kind of 5. introversion translation door technical study according to claim 1, it is characterised in that:The long door body of transverse direction (1) It is rectangular parallelepiped structure with horizontal hatch body (3), and laterally long door body (1) and horizontal hatch body (3) frame are stainless steel aluminium Alloy material component.
6. a kind of introversion translation door technical study, including following installation steps:
First, the preparation before installing:Get out the instruments such as the screw of various models, nut, power drill, inner hexagon spanner, bottle opener.
Basal sliding groove (2) the 2nd, is installed:Aluminum alloy outer frame automatically-controlled door and safety glass need that guidance quality track is housed, still Different in nature steel pipe does not have a track, is embedded in underground during the installation of basal sliding groove (2), to be planned below door early stage, track length It is twice of gate-width mostly.Pay attention to being consistent with the absolute altitude of terrace surface material when burying track, bury dress lateral length half first Basal sliding groove (2).
Top slide groove (4) the 3rd, is installed:The top slide groove (4) being previously welded is put into coil to bury at the door pillar of iron, uses water Leveling ruler is smoothed, vertical hanging, and is ensured the position relationship with following track, is then welded again with electric welding.
4th, the horizontal long door body (1) of installation and horizontal hatch body (3):The aluminium section bar processed is rectified the opening of glass M8 Flower screw tightening, pays attention to that wanting parallel between aluminium alloy can not stagger, the door leaf sealing joint strip of the small adhesive tape triangle of front plug of door, The big adhesive tape of reverse side plug is similar to the door leaf sealing joint strip of square, and adhesive tape will be slightly longer than corresponding doorframe, adhesive tape is fully sealed Between framework and glass, then laterally long door body (1) and horizontal hatch body (3) are slided by basal sliding wheel (5) and side Driving wheel (6) contact with basal sliding groove (2), laterally long door body (1) and horizontal hatch body (3) card and in basal sliding groove (2) and top slide groove (4) inside.
Basal sliding groove (2) the 5th, is installed:Aluminum alloy outer frame automatically-controlled door and safety glass need that guidance quality track is housed, still Different in nature steel pipe does not have a track, is embedded in underground during the installation of basal sliding groove (2), to be planned below door early stage, track length It is twice of gate-width mostly.Pay attention to being consistent with the absolute altitude of terrace surface material when burying track, then remaining half bottom Sliding groove (2) is arranged on bottom fixed board by bolt.
6th, the inspection and correction to performance:The width of doorframe and height will be in 1400mm or so, it is allowed to deviation in 1.5mm models In enclosing, examined using slide measure;Doorframe diagonal difference will be in 1900mm or so, it is allowed to deviation in the range of 2.5mm, use Slide measure is examined;The deviation that the front perpendicularity of sash allows is 1mm, 1m vertical checkout rulers can be used to detect;Door structure To be detected in the range of 0.3mm using clearance gauge part fit-up gap;The error that door beam guide rail levelness allows is 1mm, Ke Yiyong 1m vertical checkout rulers detect;Lower guideway and door beam guide rail parallelism, it is allowed to error be 1.5mm, can be examined with horizon rule;Door Clearance is generally between 1.1mm~1.7mm between fan and side frame, can be detected with clearance gauge.
CN201710730852.XA 2017-08-23 2017-08-23 A kind of introversion translation door technical study Pending CN107542369A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710730852.XA CN107542369A (en) 2017-08-23 2017-08-23 A kind of introversion translation door technical study

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710730852.XA CN107542369A (en) 2017-08-23 2017-08-23 A kind of introversion translation door technical study

Publications (1)

Publication Number Publication Date
CN107542369A true CN107542369A (en) 2018-01-05

Family

ID=60958214

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710730852.XA Pending CN107542369A (en) 2017-08-23 2017-08-23 A kind of introversion translation door technical study

Country Status (1)

Country Link
CN (1) CN107542369A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113216800A (en) * 2021-04-12 2021-08-06 河海大学常州校区 Large-scale run-flat translation door of return pulley drive combination formula

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102733720A (en) * 2012-07-19 2012-10-17 吴江科沃客机械设备有限公司 Sliding door
EP2584131B1 (en) * 2011-10-20 2015-11-25 M.T.H. S.r.l. Sliding door with reversible sliding system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2584131B1 (en) * 2011-10-20 2015-11-25 M.T.H. S.r.l. Sliding door with reversible sliding system
CN102733720A (en) * 2012-07-19 2012-10-17 吴江科沃客机械设备有限公司 Sliding door

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
董凯: "自动平移门的生产工艺过程分析", 《豆丁网》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113216800A (en) * 2021-04-12 2021-08-06 河海大学常州校区 Large-scale run-flat translation door of return pulley drive combination formula

Similar Documents

Publication Publication Date Title
AU2017235906B2 (en) House having aluminum alloy structure
CN105525712B (en) Slotted stone curtain wall system
CN105113646A (en) Outer window structure suitable for passive-type low-energy-consumption buildings and installation method thereof
CN202467522U (en) Slide runner type steel structure protective sealed horizontal plugging plate
CN107542369A (en) A kind of introversion translation door technical study
CN205976915U (en) Platform door threshold structure
CN202227906U (en) Slide rail type steel structure protective sealing vertical blocking board
CA2858710C (en) Watertight hatch
CN211821514U (en) Geological disaster field monitoring platform with height convenient to adjust
CN208455846U (en) A kind of deformation slot set between steel building metope steel column
CN207200176U (en) A kind of aluminum cable tray
CN205802735U (en) A kind of support for installing hoistway door sill
CN214277303U (en) Sealing device for detecting air tightness of door and window
CN106120490B (en) The integrated track and installation method of a kind of vertical loop
CN209230857U (en) A kind of lift noise barrier stand column Bolt Torque detection device
CN103628919A (en) Large slide-rail-type perpendicular plugging device
CN203902541U (en) Insulation structure for rail transit platform screen door
CN206448700U (en) A kind of adjustable T-shaped attachment means
AU2017101335A4 (en) House having aluminum alloy structure
CN208978842U (en) A kind of subway platform door metal threshold surface insulation layer structure
CN208816846U (en) A kind of petroleum pipeline bracket
CN202808127U (en) External construction elevator without platform frame
CN106245835A (en) Curtain wall is folded in one
EP2787143A1 (en) Lower profile for balcony railing
CN206496879U (en) A kind of earthquake-resistant building detection means

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 402772 168 Wenxing street, Bishan Road, Chongqing

Applicant after: Chongqing Rui Zhou Intelligent Technology Co., Ltd.

Address before: 402760 168 Wenxing street, Da Lu street, Bishan County, Chongqing

Applicant before: CHONGQING RUIMING ENERGY SAVING DOOR AND WINDOW CO., LTD.

SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180105