CN107542270B - Construction method of anti-loosening and anti-displacement pre-buried tie bar - Google Patents
Construction method of anti-loosening and anti-displacement pre-buried tie bar Download PDFInfo
- Publication number
- CN107542270B CN107542270B CN201610483398.8A CN201610483398A CN107542270B CN 107542270 B CN107542270 B CN 107542270B CN 201610483398 A CN201610483398 A CN 201610483398A CN 107542270 B CN107542270 B CN 107542270B
- Authority
- CN
- China
- Prior art keywords
- steel bar
- reserved
- coil spring
- construction method
- bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The invention relates to the field of building structure construction, in particular to a construction method of an anti-loosening and anti-displacement embedded tie bar; the method is characterized in that: drilling a preformed hole in a position, corresponding to a preformed steel bar, on a template by using a drilling machine, and nailing an iron nail at a position 30-80 mm above the preformed hole; inserting the reserved steel bar into the reserved hole, sleeving the coil spring into the steel bar, and tensioning the free end of the outer side of the coil spring to tightly wrap the reserved steel bar and fix the reserved steel bar; and fixing the free end of the coil spring on an iron nail above the reserved steel bar. The construction method is additionally provided with the coil spring for fixation on the basis of the original embedded part, so that the phenomena of drop, displacement and the like of the tie bar caused by vibration are solved, and the phenomenon of slurry leakage caused by the gap of the template hole is avoided.
Description
Technical Field
The invention relates to the field of building structure construction, in particular to a construction method of anti-loosening and anti-displacement embedded tie bars.
Background
At present, the construction of the tie bars of structures such as civil high-rise and multi-story houses, commercial office buildings, hotels and the like mainly adopts a pre-buried process and a bar planting process. The traditional tie bar pre-embedding process has the common quality problems of pre-embedding falling, tie bar displacement, slurry leakage and the like, and the appearance and the secondary structure quality of a building structure are seriously influenced; the traditional bar planting process is complex in procedure and difficult in control of drawing force, bar planting construction needs to be carried out again if a drawing test does not pass, the effect of one-step forming cannot be achieved, and meanwhile, quality defects are prone to remaining.
Disclosure of Invention
The invention aims to provide a construction method capable of preventing quality problems such as displacement, falling off, slurry leakage and the like of tie bars.
In order to achieve the above object, the present invention is realized by:
a construction method of an anti-loose and anti-displacement pre-buried tie bar comprises
and 4, fixing the free end of the coil spring on an iron nail above the reserved steel bar.
The construction method is characterized in that a coil spring is additionally arranged on the basis of the original embedded part for fixing, so that the phenomena of drop, displacement and the like of tie bars caused by vibration are avoided, and the phenomenon of slurry leakage caused by the gaps of the template holes is also avoided; compared with the existing bar planting process, the construction method can fix the reserved inserted bars on the template only by spending a little time in the template installation process, thereby ensuring the pre-buried length of the steel bars, achieving the pre-buried effect and avoiding the drawing experiment. By adopting the method, the construction quality of the reserved joint bar can be effectively controlled, meanwhile, the compensation measures such as repair, rework, verification and the like caused by slurry leakage and insufficient drawing force can be saved, meanwhile, the required material coil spring can be repeatedly utilized, the standard layer template can be continuously used, the construction period is shortened, the cost is saved, and cost reduction and efficiency improvement are facilitated.
Drawings
FIG. 1 is a first schematic view of the construction method.
FIG. 2 is a second schematic view of the construction method.
Detailed Description
The invention is further illustrated by the following specific examples.
As shown in figures 1 and 2, the construction method of the pre-buried tie bar for preventing loosening and displacement comprises
and 4, fixing the free end of the coil spring 5 on the iron nail 4 above the reserved steel bar.
The construction method is characterized in that a coil spring is additionally arranged on the basis of the original embedded part for fixing, so that the phenomena of drop, displacement and the like of tie bars caused by vibration are avoided, and the phenomenon of slurry leakage caused by the gaps of the template holes is also avoided; compared with the existing bar planting process, the construction method can fix the reserved inserted bars on the template only by spending a little time in the template installation process, thereby ensuring the pre-buried length of the steel bars, achieving the pre-buried effect and avoiding the drawing experiment. By adopting the method, the construction quality of the reserved joint bar can be effectively controlled, meanwhile, the compensation measures such as repair, rework, verification and the like caused by slurry leakage and insufficient drawing force can be saved, meanwhile, the required material coil spring can be repeatedly utilized, the standard layer template can be continuously used, the construction period is shortened, the cost is saved, and cost reduction and efficiency improvement are facilitated.
Claims (1)
1. A construction method of an anti-loosening and anti-displacement pre-buried tie bar is characterized by comprising the following steps: comprises that
Step 1, after the reinforcing steel bar formwork is installed, drilling a reserved hole in a position, corresponding to a reserved reinforcing steel bar, on the reinforcing steel bar formwork by using a drilling machine, and nailing an iron nail at a position 30-80 mm above the reserved hole;
step 2, inserting the reserved steel bar into the reserved hole, sleeving the coil spring into the steel bar after the reserved steel bar reaches the required length, and ensuring that the coil spring is tightly attached to the steel bar template;
step 3, tensioning the free end of the outer side of the coil spring to enable the coil spring to tightly wrap the reserved steel bars, and fixing the reserved steel bars through the tensioning force of the coil spring;
and 4, fixing the free end of the coil spring on an iron nail above the reserved steel bar.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610483398.8A CN107542270B (en) | 2016-06-28 | 2016-06-28 | Construction method of anti-loosening and anti-displacement pre-buried tie bar |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610483398.8A CN107542270B (en) | 2016-06-28 | 2016-06-28 | Construction method of anti-loosening and anti-displacement pre-buried tie bar |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107542270A CN107542270A (en) | 2018-01-05 |
CN107542270B true CN107542270B (en) | 2020-05-26 |
Family
ID=60962083
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610483398.8A Active CN107542270B (en) | 2016-06-28 | 2016-06-28 | Construction method of anti-loosening and anti-displacement pre-buried tie bar |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107542270B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114482525B (en) * | 2022-02-18 | 2023-10-31 | 中国建筑第七工程局有限公司 | Construction method for embedded butt-spliced templates of masonry tie bars |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3870054B2 (en) * | 2001-10-01 | 2007-01-17 | 株式会社ダイクレ | Reinforcing method for structural members |
CN103669582A (en) * | 2013-11-30 | 2014-03-26 | 重庆诚硕科技有限公司 | Concrete embedded part positioning device |
CN104695713A (en) * | 2015-01-20 | 2015-06-10 | 广州市景龙装饰工程有限公司 | Reinforcing steel bar connecting mechanism and accurate reinforcing steel bar connecting method thereof |
-
2016
- 2016-06-28 CN CN201610483398.8A patent/CN107542270B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3870054B2 (en) * | 2001-10-01 | 2007-01-17 | 株式会社ダイクレ | Reinforcing method for structural members |
CN103669582A (en) * | 2013-11-30 | 2014-03-26 | 重庆诚硕科技有限公司 | Concrete embedded part positioning device |
CN104695713A (en) * | 2015-01-20 | 2015-06-10 | 广州市景龙装饰工程有限公司 | Reinforcing steel bar connecting mechanism and accurate reinforcing steel bar connecting method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN107542270A (en) | 2018-01-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR102108417B1 (en) | magnetic type jig for anchor bolt installation for facility construction of concrete structure and method of construction concrete structure using the jig | |
CN103485537B (en) | Super High horizontal secondary structure embedded bar construction method and structure thereof | |
CN103104040A (en) | Assembled framework beam-column joint adopting vertical connection and construction method thereof | |
KR101564442B1 (en) | Apparatus fixing water proof concrete mold | |
CN104895279A (en) | Dry hanging connecting structure of precast outer wallboard and precast beam and construction method of dry hanging connecting structure | |
CN107542270B (en) | Construction method of anti-loosening and anti-displacement pre-buried tie bar | |
WO2011006674A3 (en) | Method and device for subsequently attaching a protruding outer part to an existing load-bearing building part | |
CN103953121A (en) | Pre-buried sleeve for wall tie bar, and positioning method thereof | |
KR101456954B1 (en) | Non-welding type seismic reinforcing method for column using CFT | |
CN104695558A (en) | Pre-buried sleeve component for lacing wire of secondary structural wall | |
CN109281408B (en) | Comprehensive pipe gallery embedded part and fixing method thereof | |
CN100507174C (en) | Pre-embedded construction method for PVC casing pipe of prestressed hollow slab hanger rod | |
CN105735487A (en) | Wall tied reinforcement component | |
CN216239833U (en) | Pre-embedding device for mounting suspender | |
CN109826441B (en) | Lateral pre-embedding installation method for C-shaped hafen groove of concrete structure | |
KR101611453B1 (en) | Finishing system of construction beam | |
CN107152161B (en) | The drawknot construction method of external scaffolding and wall interconnecting piece | |
KR101424347B1 (en) | Shear anchor for joing new and old concrete and method for joining new and old concrete | |
KR101366503B1 (en) | Concrete composite wall for improving concrete pouring pressure resistance ability and the construction method therefor | |
KR100988270B1 (en) | Level spacer device | |
JP7000067B2 (en) | Steel structure | |
KR20090122670A (en) | Ceiling-frame facility using bracket | |
KR101677858B1 (en) | Column section enlargement method using socket shaped anchor | |
CN204590257U (en) | A kind of embedded sleeve barrel assembly for secondary structure wall lacing wire | |
CN213563307U (en) | Prefabricated wallboard wall screw rod fixed position frock of wearing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |