CN107527134A - A kind of distribution transformer state evaluating method and device based on big data - Google Patents

A kind of distribution transformer state evaluating method and device based on big data Download PDF

Info

Publication number
CN107527134A
CN107527134A CN201710562145.4A CN201710562145A CN107527134A CN 107527134 A CN107527134 A CN 107527134A CN 201710562145 A CN201710562145 A CN 201710562145A CN 107527134 A CN107527134 A CN 107527134A
Authority
CN
China
Prior art keywords
data
distribution transformer
module
state
assessed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710562145.4A
Other languages
Chinese (zh)
Inventor
井天军
闫浩然
史彤晖
王江波
牛焕娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Agricultural University
Original Assignee
China Agricultural University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Agricultural University filed Critical China Agricultural University
Priority to CN201710562145.4A priority Critical patent/CN107527134A/en
Publication of CN107527134A publication Critical patent/CN107527134A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The embodiment of the present invention provides a kind of distribution transformer state evaluating method and device based on big data.Methods described includes the historical data for obtaining distribution transformer;If the historical data has missing, the historical data is handled, to obtain history processing data;According to the history processing data, the setting data weighting corresponding with the distribution transformer.Distribution transformer state evaluating method provided in an embodiment of the present invention obtains the data weighting with the distribution transformer according to the historical data of distribution transformer, so as to obtain the real-time status of the distribution transformer according to the Real-time Monitoring Data, it can realize and distribution transformer failure is given warning in advance, so as to improve the safety and reliability of distribution transformer.

Description

A kind of distribution transformer state evaluating method and device based on big data
Technical field
The present embodiments relate to technical field of power systems, more particularly to a kind of distribution transformer shape based on big data State appraisal procedure and device.
Background technology
Transformer is one of equipment the most key in power system, improves the fortune of transformer, particularly high-power transformer Row reliability, no matter for whole power network safe and reliable operation, or reduce operation of power networks cost all have it is highly important Meaning.Distribution transformer is the important component of power distribution network, and the fast-developing operation to distribution transformer of social economy can There is higher requirement by property and security.
The continuous popularization and application of system such as the continuous development of intelligent distribution network in recent years, power distribution automation, power information collection, But relatively low data analysis and process ability make it that scientific research personnel is difficult to excavate more valuable information therefrom.Traditional matches somebody with somebody There is much the evaluation method of application, in terms of the assessment of piezoelectric transformer running status such as Field Using Fuzzy Comprehensive Assessment, analytic hierarchy process (AHP), nerve Network technique etc..
These methods have higher practicality, but wherein the influence of human factor is than more serious, and different comment The keynote message that valency method protrudes is different, and these factors are there is a possibility that error occurs in evaluation result, and prior art mainly uses Be two methods of periodic detection and fault detect, the issuable failure of distribution transformer can not be accomplished to give warning in advance.
The content of the invention
The embodiment of the present invention provides a kind of distribution transformer state evaluating method and device based on big data, to solve It is unreliable to power transformer detecting method in the prior art and the problem of can not give warning in advance.
In a first aspect, the embodiments of the invention provide a kind of distribution transformer state evaluating method based on big data, bag Include:
Obtain the historical data of distribution transformer;
If the historical data has missing, the historical data is handled, to obtain history processing data;
According to the history processing data, the setting data weighting corresponding with the distribution transformer.
Second aspect, the embodiments of the invention provide a kind of distribution transformer state evaluation device based on big data, bag Include:
Receiving module, for obtaining the historical data of distribution transformer;
Data processing module is connected with the receiving module and state estimation module, if having for the historical data scarce Lose, then the historical data is handled, to obtain history processing data;
The state estimation module, for corresponding with the distribution transformer according to the history processing data, setting Data weighting.
The third aspect, the embodiments of the invention provide a kind of electronic equipment, including memory and processor, the processor Mutual communication is completed by bus with the memory;The memory storage has can be by the program of the computing device Instruction, the processor call described program instruction to be able to carry out above-mentioned method.
Fourth aspect, the embodiments of the invention provide a kind of computer-readable recording medium, is stored thereon with computer journey Sequence, it is characterised in that the computer program realizes above-mentioned method when being executed by processor.
Distribution transformer state evaluating method and device provided in an embodiment of the present invention based on big data, by described Distribution transformer historical data sets data weighting corresponding with the distribution transformer, to assess the shape of the distribution transformer State, it can realize and distribution transformer failure is given warning in advance, important evidence is provided for the maintenance decision of transformer, can avoid counting Blindness existing for drawing maintenance, is reduced to the human and material resources demand required for Repair of Transformer, so as to produce significant society Benefit and economic benefit, and improve the safety and reliability of distribution transformer.
Brief description of the drawings
Fig. 1 is the distribution transformer state evaluating method schematic flow sheet based on big data of the embodiment of the present invention;
Fig. 2 is another distribution transformer state evaluating method schematic flow sheet based on big data of the embodiment of the present invention;
Fig. 3 is the distribution transformer state evaluation device structural representation based on big data according to the embodiment of the present invention;
Fig. 4 is another distribution transformer state evaluation device structural representation based on big data according to the embodiment of the present invention Figure;
Fig. 5 is the electronic devices structure schematic diagram of the embodiment of the present invention.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is Part of the embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art The every other embodiment obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
Fig. 1 be the embodiment of the present invention the distribution transformer state evaluating method schematic flow sheet based on big data, such as Fig. 1 Shown, methods described includes:
Step S01, the historical data of distribution transformer is obtained;
In existing power system in order to power system in all devices be monitored, the letter in grid service device The data that breath acquisition server can be run to all devices carry out taken at regular intervals and are saved in the memory cell of grid service device, with It is standby to transfer corresponding data when needing.The memory cell that methods described of the embodiment of the present invention just needs to first pass through grid service device obtains The historical data for taking the distribution transformer to preserve, such as the load factor of the distribution transformer, tri-phase unbalance factor, voltage, The historical data such as electric current and operation curve.Certainly the historical data that specifically obtains can according to the problem of being actually needed monitoring and The demand of equipment where the distribution transformer determines.
If step S02, described historical data has missing, the historical data is handled, to obtain history processing Data;
It can be produced in equipment operating data gatherer process during grid service device information acquisition system is to power system a small amount of Empty data or wrong data, and it is also possible in follow-up storing process phenomena such as loss of data or copy errors occur, Now just need to reject such historical data according to operation curve and actual conditions the data and completion sky number of apparent error According to, such as the shortage of data at moment today, can be directly using the data at a few days ago this moment, or today can also be used Data before and after this moment or a few days ago this time data are weighted average mode and obtained.The method of specific completion data Have a lot, repeat no more here.
Step S03, according to the history processing data, the setting data weighting corresponding with the distribution transformer.
By the processing to the historical data, the accurate historical data of the distribution transformer can be reduced substantially.Institute So that the history run state change process of the distribution transformer can be reduced according to the history processing data, can analyze Go out to cause the main reason for being broken down in the distribution transformer historical data, and failure occur before and after each ginseng in data Several situations of change.Each parameter can be obtained by the analysis to each parameter to run well to the distribution transformer To the proportion of effect, and design the data weighting corresponding with the distribution transformer.
Wherein because the physical significance representated by each parameter and unit are different, so in order to allow follow-up comment It is more convenient, it is necessary to be standardized to each parameter to estimate operation, handles as normalizing parameter, so as to obtain normalized number According to.For example, the standardized data of distribution transformer is A={ a1, a2... ..., ai, wherein a1, a2... ..., aiGeneration respectively I different normalizing parameters of table, a1For the normalizing parameter of load factor, a2The normalizing parameter ... ... of tri-phase unbalance factor, aiFor the normalizing parameter of voltage, can obtain matching somebody with somebody with described by the comparative analysis to place normalizing parameter in historical data The corresponding data weighting B={ b of piezoelectric transformer1, b2... ..., bi, wherein the b1, b2... ..., biRepresent respectively with i not I corresponding parameters weighting of same normalizing parameter, b1For the parameters weighting of load factor, b2The parameter power of tri-phase unbalance factor Weight ... ..., biFor the parameters weighting of voltage.
For different distribution transformers, because its effect played in power system is different or use demand Difference, so also having corresponding difference for the data weighting obtained by different distribution transformers.
The embodiment of the present invention can be obtained and the distribution transformer phase by the analysis to distribution transformer historical data Corresponding data weighting, different distribution transformers can be made to possess the data weighting to match with itself historical data, so as to More accurate accurate evaluation can must be carried out to the state of the distribution transformer, to improve the security of the power system and can By property.
Fig. 2 is another distribution transformer state evaluating method schematic flow sheet based on big data of the embodiment of the present invention, As shown in Fig. 2 methods described also includes after step S03:
Step S04, the Real-time Monitoring Data of the distribution transformer is received;
After data weighting corresponding with the distribution transformer in obtaining above-described embodiment, it is possible to start to institute The real-time running state for stating distribution transformer is assessed.Now, it is possible to which reception is adopted by the information in the grid service device The Real-time Monitoring Data for the distribution transformer that collecting system collects.
Step S05, if it is determined that the Real-time Monitoring Data has missing, then Real-time Monitoring Data is repaired, so as to obtain Take data to be assessed;
Because grid service device information acquisition system is in distribution transformer service data gatherer process described in power system The missing or mistake of a small amount of parameter can be produced, now just needs to reject bright such parameter according to operation curve and actual conditions Show the parameter and completion sky parameter of mistake, such as the tri-phase unbalance factor missing in the Real-time Monitoring Data, can directly adopt It is weighted with the tri-phase unbalance factor at a few days ago this moment, or the tri-phase unbalance factor collected several times before can also using Average mode obtains.The method of specific completion parameter has a lot, repeats no more here.Parameter after completion constitutes The data to be assessed of the distribution transformer.
Step S06, weighed according to the data to be assessed and the data corresponding with the distribution transformer to prestore Weight, obtain the comprehensive score of the distribution transformer;
According to the data weighting corresponding with the distribution transformer obtained before, and after treatment to be assessed Data, the comprehensive score of the distribution transformer can be obtained by calculating., equally will be to described of course for the convenience of calculating Data to be assessed are standardized to remove influence caused by physical significance and unit between all parameters, so as to obtain Standardization data to be assessed.Described computational methods have many kinds, for example, the data weighting is B={ b1, b2... ..., bi, the standardization data to be assessed are A '={ a1', a2' ... ..., ai', then the comprehensive score is:
A ' B=a1’*b1+a2’*b2+……+ai’*bi
Above-mentioned computational methods are that a citing is not unique method, can be designed completely according to the needs of itself The computational methods being more suitable for.
Step S07, according to the comprehensive score and the state threshold scope to prestore, the state of the distribution transformer is provided Signal.
The obtained comprehensive score can provide specific Condition evaluation according to the state threshold scope to prestore, wherein institute Stating state threshold scope can be divided according to the needs of itself.A kind of wherein the simplest dividing mode, is exactly only A threshold value of warning is set, the status signal of early warning is issued by after the comprehensive score is up to or over threshold value of warning, with Alert the distribution transformer and failure risk be present.
Of course for the running status that can must more comprehensively understand the distribution transformer, a status signal is only divided It is far from being enough, it is possible to multiple state threshold scopes, such as following table are set according to specific detection demand:
It is as shown in the table, and further, the status signal includes status indicator and the control corresponding with the status indicator System instruction.
When the comprehensive score meets some state threshold scope therein, corresponding status signal will be produced, its Described in status signal include the status indicator and control instruction corresponding with the state threshold scope.For example, the synthesis Score [s3, s4) in the range of, then the status indicator that caused status signal includes is III, and control instruction for action 3. Wherein specific state threshold scope and corresponding status indicator and control instruction can be entered according to the actual needs Row adjustment.
Further, the control operation corresponding with the control instruction is performed according to the control instruction.
Each control instruction can have corresponding control operation, can send to adjust to the distribution transformer The instruction of some parameter or the instruction that some parameter of adjustment is sent to the equipment related to the distribution transformer.Example Such as, when the control instruction included in the status signal obtained according to the comprehensive score for action 3, specially reduce the distribution The magnitude of voltage of transformer.Specific operating process can be set according to the demand of reality, be repeated no more here.
The embodiment of the present invention, can be to the distribution transformer by the data weighting of the obtained distribution transformer Real-time Monitoring Data is calculated to obtain comprehensive score, and the real-time status of the distribution transformer is provided further according to comprehensive score Signal simultaneously can carry out specific control operation, and the state of the distribution transformer must be monitored so as to more accurate, and carries Before send fault pre-alarming, to improve the safety and reliability of power system.
Fig. 3 is the distribution transformer state evaluation device structural representation based on big data according to the embodiment of the present invention, As shown in figure 3, described device includes:Receiving module 10, data processing module 11 and state estimation module 12, wherein,
The receiving module 10 is used for the historical data for obtaining distribution transformer;The data processing module 11 connects with described Receive module 10 with the state estimation module 12 to be connected, if having missing for the historical data, the historical data is entered Row processing, to obtain history processing data;The state estimation module 12, for according to the history processing data, setting with The corresponding data weighting of the distribution transformer.
Specifically, all devices are monitored in existing power system in order to power system, grid service The data that information collection server in device can be run to all devices carry out taken at regular intervals and are saved in depositing for grid service device Storage unit, in case transferring corresponding data when needing.Methods described of the embodiment of the present invention is just needed first by the receiving module 10 The historical data preserved by the memory cell acquisition distribution transformer of grid service device, such as the distribution transformer The historical datas such as load factor, tri-phase unbalance factor, voltage, electric current and operation curve.Certainly the historical data that specifically obtains can be with Determined according to the demand of equipment the problem of being actually needed monitoring and where the distribution transformer.Then by the history number According to being sent to the data processing module 11.
It can be produced in equipment operating data gatherer process during grid service device information acquisition system is to power system a small amount of Empty data or wrong data, and it is also possible in follow-up storing process phenomena such as loss of data or copy errors occur, The data processing module 11 is now just needed, according to operation curve and actual conditions, to reject apparent error to such historical data Data and completion sky data.The method of specific completion data has a lot, repeats no more here.Then the data processing mould The history processing data can be sent to the state estimation module 12 by block 11.
By the processing to the historical data, the accurate historical data of the distribution transformer can be reduced substantially.Institute The history run shape of the distribution transformer can be reduced according to the history processing data with the state estimation module 12 State change procedure, it can analyze and cause the main reason for being broken down in the distribution transformer historical data, and failure Before and after generation in data parameters situation of change.Each parameter can be obtained by the analysis to each parameter to described to match somebody with somebody The played a role proportion of piezoelectric transformer normal operation, and design the data weighting corresponding with the distribution transformer.
Wherein because the physical significance representated by each parameter and unit are different, so in order to allow follow-up comment It is more convenient, it is necessary to be standardized to each parameter to estimate operation, handles as normalizing parameter, so as to obtain normalized number According to.And corresponding data weighting is obtained according to the normal data.
For different distribution transformers, because its effect played in power system is different or use demand Difference, so also having corresponding difference for the data weighting obtained by different distribution transformers.
Device provided in an embodiment of the present invention is used to perform the above method, its function with specific reference to above method embodiment, Its specific method flow repeats no more here.
The embodiment of the present invention can be obtained and the distribution transformer phase by the analysis to distribution transformer historical data Corresponding data weighting, different distribution transformers can be made to possess the data weighting to match with itself historical data, so as to More accurate accurate evaluation can must be carried out to the state of the distribution transformer, to improve the security of the power system and can By property.
Fig. 4 is another distribution transformer state evaluation device structural representation based on big data according to the embodiment of the present invention Figure, as shown in figure 4, described device includes:Receiving module 10, data processing module 11, state estimation module 12 and warning module 13, wherein,
The receiving module 10 is additionally operable to receive the Real-time Monitoring Data of the distribution transformer;The data processing module 11 are additionally operable to if it is determined that the Real-time Monitoring Data has missing, then repair Real-time Monitoring Data, to be assessed so as to obtain Data;The state estimation module 12, it is additionally operable to according to the data to be assessed and prestores relative with the distribution transformer The data weighting answered, obtain the comprehensive score of the distribution transformer;The warning module 13, for according to the synthesis Score and the state threshold scope to prestore, provide the status signal of the distribution transformer.
Specifically, after data weighting corresponding with the distribution transformer in obtaining above-described embodiment, it is possible to Start to assess the real-time running state of the distribution transformer.Now, the information gathering system in the grid service device The Real-time Monitoring Data of the distribution transformer collected can be sent to the receiving module 10 by system.And the reception mould The Real-time Monitoring Data is then forwarded to the data processing module 11 by block 10.
Because grid service device information acquisition system is in distribution transformer service data gatherer process described in power system The missing or mistake of a small amount of parameter can be produced, now just needs the data processing module 11 to such parameter according to operation curve With actual conditions, reject apparent error parameter and completion sky parameter.The method of specific completion parameter has a lot, here no longer Repeat.Parameter after completion constitutes the data to be assessed of the distribution transformer.The data processing module 11 is by institute State data to be assessed and be sent to the state estimation module 12.
The state estimation module 12 according to the data weighting corresponding with the distribution transformer obtained before, and Data to be assessed after treatment, the comprehensive score of the distribution transformer can be obtained by calculating.Of course for calculating Convenience, equally the data to be assessed are standardized with the physical significance removing all parameters and unit institute The influence brought, so as to obtain standardization data to be assessed.Described computational methods have many kinds, can be according to the need of itself To design.The comprehensive score can be sent to the warning module 13 by the state estimation module 12.
The obtained comprehensive score can provide specifically according to the state threshold scope that the warning module 13 prestores Condition evaluation, wherein the state threshold scope can be divided according to the needs of itself.It is wherein the simplest a kind of Dividing mode, it is exactly only to set a threshold value of warning, is issued by after the comprehensive score is up to or over threshold value of warning pre- Alert status signal, failure risk be present to alert the distribution transformer.
Of course for the running status that can must more comprehensively understand the distribution transformer, a status signal is only divided It is far from being enough, it is possible to multiple state threshold scopes are set according to specific detection demand.
Further, the status signal includes status indicator and the control instruction corresponding with the status indicator.
When the comprehensive score meets some state threshold scope therein, the warning module 13 will produce accordingly Status signal, wherein the status signal includes the status indicator and control instruction corresponding with the state threshold scope. Wherein specific state threshold scope and corresponding status indicator and control instruction can be entered according to the actual needs Row adjustment.
Further, described device is also connected including control module with the warning module 13, for according to the control Instruction performs the control operation corresponding with the control instruction.
The status signal of acquisition can be sent to control module by the warning module 13, and the control module can be according to docking The analysis of the control instruction included in the status signal being subject to performs corresponding control operation.Can be to the distribution transformer Device, which sends the instruction for adjusting some parameter or sent to the equipment related to the distribution transformer, adjusts some parameter Instruction.Specific operating process can be set according to the demand of reality, be repeated no more here.
Device provided in an embodiment of the present invention is used to perform the above method, its function with specific reference to above method embodiment, Its specific method flow repeats no more here.
The embodiment of the present invention, can be to the distribution transformer by the data weighting of the obtained distribution transformer Real-time Monitoring Data is calculated to obtain comprehensive score, and the real-time status of the distribution transformer is provided further according to comprehensive score Signal simultaneously can carry out specific control operation, and the state of the distribution transformer must be monitored so as to more accurate, and carries Before send fault pre-alarming, to improve the safety and reliability of power system.
Fig. 5 is the electronic devices structure schematic diagram of the embodiment of the present invention.
Send out shown in Fig. 5, the test equipment of the display device, including:Processor (processor) 601, memory (memory) 602 and bus 603;
Wherein, the processor 601 and the memory 602 complete mutual communication by the bus 603;
The processor 601 is used to call the programmed instruction in the memory 602, to perform above-mentioned each method embodiment The method provided, such as including:The setting power corresponding with the distribution transformer wants data;Obtain the distribution transformer Status signal.
The present embodiment discloses a kind of computer program product, and the computer program product includes being stored in non-transient calculating Computer program on machine readable storage medium storing program for executing, the computer program include programmed instruction, when described program instruction is calculated When machine performs, computer is able to carry out the method that above-mentioned each method embodiment is provided, such as including:Setting becomes with the distribution The corresponding power of depressor wants data;Obtain the status signal of the distribution transformer.
The present embodiment provides a kind of non-transient computer readable storage medium storing program for executing, the non-transient computer readable storage medium storing program for executing Computer instruction is stored, the computer instruction makes the computer perform the method that above-mentioned each method embodiment is provided, example Such as include:The setting power corresponding with the distribution transformer wants data;Obtain the status signal of the distribution transformer.
One of ordinary skill in the art will appreciate that:Realizing all or part of step of above method embodiment can pass through Programmed instruction related hardware is completed, and foregoing program can be stored in a computer read/write memory medium, the program Upon execution, the step of execution includes above method embodiment;And foregoing storage medium includes:ROM, RAM, magnetic disc or light Disk etc. is various can be with the medium of store program codes.
The embodiments such as the test equipment of display device described above are only schematical, wherein described as separation The unit of part description can be or may not be it is physically separate, can be as the part that unit is shown or It can not be physical location, you can with positioned at a place, or can also be distributed on multiple NEs.Can be according to reality Border needs to select some or all of module therein to realize the purpose of this embodiment scheme.Those of ordinary skill in the art In the case where not paying performing creative labour, you can to understand and implement.
Through the above description of the embodiments, those skilled in the art can be understood that each embodiment can Realized by the mode of software plus required general hardware platform, naturally it is also possible to pass through hardware.Based on such understanding, on The part that technical scheme substantially in other words contributes to prior art is stated to embody in the form of software product, should Computer software product can store in a computer-readable storage medium, such as ROM/RAM, magnetic disc, CD, including some fingers Make to cause a computer equipment (can be personal computer, server, or network equipment etc.) to perform each implementation Method described in some parts of example or embodiment.
Finally it should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although The present invention is described in detail with reference to the foregoing embodiments, it will be understood by those within the art that:It still may be used To be modified to the technical scheme described in foregoing embodiments, or equivalent substitution is carried out to which part technical characteristic; And these modification or replace, do not make appropriate technical solution essence depart from various embodiments of the present invention technical scheme spirit and Scope.

Claims (10)

1. a kind of distribution transformer state evaluating method based on big data, it is characterised in that methods described includes:
Obtain the historical data of distribution transformer;
If the historical data has missing, the historical data is handled, to obtain history processing data;
According to the history processing data, the setting data weighting corresponding with the distribution transformer.
2. according to the method for claim 1, it is characterised in that methods described also includes:
Receive the Real-time Monitoring Data of the distribution transformer;
If it is determined that the Real-time Monitoring Data has missing, then data to be assessed are repaired, so as to obtain data to be assessed;
According to the data to be assessed and the data weighting corresponding with the distribution transformer to prestore, match somebody with somebody described in acquisition The comprehensive score of piezoelectric transformer;
According to the comprehensive score and the state threshold scope that prestores, the status signal of the distribution transformer is provided.
3. according to the method for claim 2, it is characterised in that the status signal include status indicator and with the state Identify corresponding control instruction.
4. according to the method for claim 3, it is characterised in that methods described also includes:
The control operation corresponding with the control instruction is performed according to the control instruction.
5. a kind of distribution transformer state evaluation device based on big data, it is characterised in that described device includes:
Receiving module, for obtaining the historical data of distribution transformer;
Data processing module is connected with the receiving module and state estimation module, if having missing for the historical data, The historical data is handled, to obtain history processing data;
The state estimation module, for according to the history processing data, the setting number corresponding with the distribution transformer According to weight.
6. device according to claim 5, it is characterised in that described device also includes fault pre-alarming module and the state Evaluation module is connected, wherein,
The receiving module, it is additionally operable to receive the Real-time Monitoring Data of the distribution transformer;
The data processing module, it is additionally operable to if it is determined that the Real-time Monitoring Data has missing, then repair data to be assessed Mend, so as to obtain data to be assessed;
The state estimation module, it is additionally operable to according to the data to be assessed and prestores corresponding with the distribution transformer The data weighting, obtain the comprehensive score of the distribution transformer;
The warning module, for according to the comprehensive score and the state threshold scope to prestore, providing the distribution transformer Status signal.
7. device according to claim 6, it is characterised in that the status signal include status indicator and with the state Identify corresponding control instruction.
8. device according to claim 7, it is characterised in that described device also includes control module and the warning module It is connected, for performing the control operation corresponding with the control instruction according to the control instruction.
9. a kind of electronic equipment, it is characterised in that including memory and processor, the processor and the memory pass through total Line completes mutual communication;The memory storage has and can adjusted by the programmed instruction of the computing device, the processor The method as described in Claims 1-4 is any is able to carry out with described program instruction.
10. a kind of computer-readable recording medium, is stored thereon with computer program, it is characterised in that the computer program quilt The method as described in Claims 1-4 is any is realized during computing device.
CN201710562145.4A 2017-07-11 2017-07-11 A kind of distribution transformer state evaluating method and device based on big data Pending CN107527134A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710562145.4A CN107527134A (en) 2017-07-11 2017-07-11 A kind of distribution transformer state evaluating method and device based on big data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710562145.4A CN107527134A (en) 2017-07-11 2017-07-11 A kind of distribution transformer state evaluating method and device based on big data

Publications (1)

Publication Number Publication Date
CN107527134A true CN107527134A (en) 2017-12-29

Family

ID=60748927

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710562145.4A Pending CN107527134A (en) 2017-07-11 2017-07-11 A kind of distribution transformer state evaluating method and device based on big data

Country Status (1)

Country Link
CN (1) CN107527134A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108537415A (en) * 2018-03-20 2018-09-14 深圳市泰和安科技有限公司 A kind of distribution method, the apparatus and system of online safety utilization of electric power
CN109723610A (en) * 2018-12-05 2019-05-07 新奥数能科技有限公司 Generating set rate of load condensate lacks value complement and recruits method and device
CN109726197A (en) * 2018-12-05 2019-05-07 新奥数能科技有限公司 A kind of generating set rate of load condensate missing value complement trick method and device
CN110197762A (en) * 2019-07-15 2019-09-03 武汉供电变压器修造有限公司 A kind of transformer heat dissipation temperature control method and system
CN110929972A (en) * 2018-09-20 2020-03-27 西门子股份公司 Method, apparatus, device, medium, and program for evaluating state of distribution transformer
CN111310946A (en) * 2020-02-26 2020-06-19 清华大学 Transformer operation situation sensing method and system based on intelligent operation and maintenance
CN113420957A (en) * 2021-05-27 2021-09-21 北京国电通网络技术有限公司 Power alarm method, device, electronic equipment and computer medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105095621A (en) * 2014-05-09 2015-11-25 国家电网公司 Transformer online running state evaluation method
CN105205590A (en) * 2015-09-01 2015-12-30 深圳供电局有限公司 Transformer health state analysis method and system
MX2015006996A (en) * 2015-05-26 2016-11-25 Inst De Investig Electricas * Diagnostic system and method of the condition of power transformers.
CN106483947A (en) * 2016-09-21 2017-03-08 国网江苏省电力公司南通供电公司 Distribution Running State assessment based on big data and method for early warning
CN106841846A (en) * 2016-12-19 2017-06-13 广东电网有限责任公司电力调度控制中心 A kind of transformer state analysis and fault diagnosis method and system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105095621A (en) * 2014-05-09 2015-11-25 国家电网公司 Transformer online running state evaluation method
MX2015006996A (en) * 2015-05-26 2016-11-25 Inst De Investig Electricas * Diagnostic system and method of the condition of power transformers.
CN105205590A (en) * 2015-09-01 2015-12-30 深圳供电局有限公司 Transformer health state analysis method and system
CN106483947A (en) * 2016-09-21 2017-03-08 国网江苏省电力公司南通供电公司 Distribution Running State assessment based on big data and method for early warning
CN106841846A (en) * 2016-12-19 2017-06-13 广东电网有限责任公司电力调度控制中心 A kind of transformer state analysis and fault diagnosis method and system

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108537415A (en) * 2018-03-20 2018-09-14 深圳市泰和安科技有限公司 A kind of distribution method, the apparatus and system of online safety utilization of electric power
CN110929972A (en) * 2018-09-20 2020-03-27 西门子股份公司 Method, apparatus, device, medium, and program for evaluating state of distribution transformer
CN110929972B (en) * 2018-09-20 2023-09-08 西门子股份公司 Method, apparatus, device, medium and program for evaluating state of distribution transformer
CN109723610A (en) * 2018-12-05 2019-05-07 新奥数能科技有限公司 Generating set rate of load condensate lacks value complement and recruits method and device
CN109726197A (en) * 2018-12-05 2019-05-07 新奥数能科技有限公司 A kind of generating set rate of load condensate missing value complement trick method and device
CN110197762A (en) * 2019-07-15 2019-09-03 武汉供电变压器修造有限公司 A kind of transformer heat dissipation temperature control method and system
CN110197762B (en) * 2019-07-15 2021-03-16 宁波鄞州竹创信息科技有限公司 Transformer heat dissipation temperature control method and system
CN111310946A (en) * 2020-02-26 2020-06-19 清华大学 Transformer operation situation sensing method and system based on intelligent operation and maintenance
CN113420957A (en) * 2021-05-27 2021-09-21 北京国电通网络技术有限公司 Power alarm method, device, electronic equipment and computer medium
CN113420957B (en) * 2021-05-27 2022-11-01 北京国电通网络技术有限公司 Power alarm method, device, electronic equipment and computer medium

Similar Documents

Publication Publication Date Title
CN107527134A (en) A kind of distribution transformer state evaluating method and device based on big data
CN107612756A (en) A kind of operation management system with intelligent trouble analyzing and processing function
CN107862393A (en) A kind of IT operation management system
CN110503136A (en) Platform area line loss exception analysis method, computer readable storage medium and terminal device
CN112650200B (en) Method and device for diagnosing plant station equipment faults
CN105871634A (en) Method and application for detecting cluster anomalies and cluster managing system
CN115936428A (en) External damage prevention fixed value optimization system for incremental power distribution network
CN109450089B (en) Transformer area low voltage identification method and device and terminal equipment
CN116540941B (en) Data storage safety control system based on cloud computing
CN114487856A (en) Thermal runaway early warning method and system for battery replacement station
CN112002949A (en) Monitoring management method and system for active equalization of power battery
CN109685344A (en) A kind of power equipment O&M strategy determines method, apparatus and storage medium
CN110738415A (en) Electricity stealing user analysis method based on electricity utilization acquisition system and outlier algorithm
CN117193088B (en) Industrial equipment monitoring method and device and server
CN111797530B (en) Method, device, equipment and medium for determining weak links of power system
CN112436542B (en) Steady-state safety emergency control online pre-decision method considering stability control strategy
CN117371788A (en) Electric power marketing risk early warning method and system
CN115983836A (en) Data processing method and related equipment
CN113176962B (en) Computer room IT equipment fault accurate detection method and system for data center
CN115392747A (en) Method, device and system for evaluating health degree of power grid regulation and control system and storage medium
CN114665610A (en) Capacitor monitoring method, system and equipment based on reactive power acquisition
CN115372752A (en) Fault detection method, device, electronic equipment and storage medium
CN107450030B (en) Communication storage battery telemetry data processing method, device and system
CN113327341A (en) Equipment early warning system, method and storage medium based on network technology
CN112001588A (en) Accident event online pre-judging method and device based on N-1 state

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171229